CN103882977B - The frame structure and its method of construction assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard - Google Patents

The frame structure and its method of construction assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard Download PDF

Info

Publication number
CN103882977B
CN103882977B CN201310688094.1A CN201310688094A CN103882977B CN 103882977 B CN103882977 B CN 103882977B CN 201310688094 A CN201310688094 A CN 201310688094A CN 103882977 B CN103882977 B CN 103882977B
Authority
CN
China
Prior art keywords
wall
precast concrete
wallboard
building
strip precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310688094.1A
Other languages
Chinese (zh)
Other versions
CN103882977A (en
Inventor
侯建群
吴亚志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANTUO (SHANGHAI) NEW ENERGY INVESTMENT Co Ltd
Architectural Design and Research Institute of Tsinghua University
Original Assignee
JIANTUO (SHANGHAI) NEW ENERGY INVESTMENT Co Ltd
Architectural Design and Research Institute of Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANTUO (SHANGHAI) NEW ENERGY INVESTMENT Co Ltd, Architectural Design and Research Institute of Tsinghua University filed Critical JIANTUO (SHANGHAI) NEW ENERGY INVESTMENT Co Ltd
Priority to CN201310688094.1A priority Critical patent/CN103882977B/en
Publication of CN103882977A publication Critical patent/CN103882977A/en
Priority to PCT/CN2014/093996 priority patent/WO2015090190A1/en
Priority to US14/392,385 priority patent/US9816262B2/en
Priority to AU2014366090A priority patent/AU2014366090B2/en
Priority to CA2933296A priority patent/CA2933296C/en
Priority to EA201690654A priority patent/EA031217B1/en
Application granted granted Critical
Publication of CN103882977B publication Critical patent/CN103882977B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention provides a kind of frame structure assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard and its methods of construction.The frame structure building includes the cast-in-place space template system being interconnected to constitute by strip precast concrete wall, wall column formwork and building/roof system template;The strip precast concrete wall, using Prefabricated reinforced concrete, the structure with end slot and two side channels, and insulating layer and decorative layer can be also had as needed;By wallboard and wallboard or between wall column include side channel cavity, in the space being connected to by end slot, and place reinforcing bar in the building/roof system template and pour concrete, form the frame structure building with one layer of building unit;It may make up tier building unit by overlap joint on the basis of one layer of building unit.Frame structure building and its method of construction of the invention has many advantages, such as that the processing is simple, small investment of production equipment, and reduces operational procedure, accelerates speed of application and save artificial.

Description

The frame structure and its construction assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard Method
Technical field
The invention belongs to building and its building technology field, it is related to frame structure building, more particularly to is based on three side bands The frame structure and its method of construction of groove bar shaped Prefabricated Concrete wallboard assembling.
Background technique
Frame structure form is widely used in structural engineering.Traditional cast-in-situ reinforced concrete frame structure needs at the scene Assembling reinforcement, formwork supporting plate are poured after concrete form removal again, and live recruitment is more, and the construction period is long.
In order to overcome the disadvantages mentioned above and shortcoming of conventional frame structural system, need in structure process and construction method On seek more reasonable scheme, to be formed, investment reduction, the processing is simple, the monolithic architecture of frame structure easy for construction.
Summary of the invention
The present invention provides a kind of frame structure assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard and its construction sides Method.
The present invention improves the structure of beam forms on the basis of available frame formwork supporting plate, and takes in prefabricated panel The structure of end slot and side channel is set, so that the frame structure that three sides for forming free removal are assembled with groove bar shaped Prefabricated Concrete wallboard is built It builds.
Invention also improves traditional reinforced concrete cast-in-place framework and construction method, the present invention is with the processing is simple, raw It is few to produce equipment investment, and reduces operational procedure, accelerate speed of application and saves the advantages that artificial.
On the one hand, the present invention provides a kind of frame structures assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard to build It builds comprising the multiple of the free removal of the girder construction of adjacent wall board or wall column are connected using the end slot construction of strip precast concrete wall Strip precast concrete wall, wall column formwork.
Wherein, used three side strip precast concrete wall with groove use Prefabricated reinforced concrete, have first surface and Second surface on the other side, first end and the second end on the other side and two opposite sides, first table Face and second surface are parallel to each other, and the first end is to the top for being applied to wallboard when usual wall constructs, the second end Portion is to the bottom end for being applied to wallboard when usual wall constructs;Wherein, it is equipped in the first end and is parallel to the first surface With second surface and along the end slot of end face extension, it is respectively equipped with two sides and is parallel to the first surface and second Surface and the side channel extended along the side.
The three sides strip precast concrete wall with groove can also further comprise insulating layer and decorative layer, i.e., in above-mentioned wall Insulating layer and decorative layer in addition are successively arranged on the second surface on the basis of plate.On two sides edge of the insulating layer Wallboard it is longitudinally disposed fluted.
When constructing the joining relation of wallboard and wall and other components, the two sides of the strip precast concrete wall are utilized The side channel structure, can form the cavity including the side channel between wallboard and wallboard and other components, wherein to intert steel Muscle.
When constructing the joining relation of wallboard and wall, using the groove structure of the two sides of the insulating layer, in two pieces of walls The lacuna including the groove can be formed between the insulating layer side of plate, wherein closing insulation or sealing cutting or injection is arranged Suitable insulation or sealing material.
When constructing the space package assembly of wallboard and wall column and flooring, the end of the strip precast concrete wall is utilized End slot structure, settable reinforced concrete beam, to form the multiple strip precast concrete walls of connection, wall column formwork and floor template Space template system be fixedly connected.The space template system can form single-storeyed frame structure building by Cast-in-place concrete.
Based on one layer of building unit, by overlap joint can constitute tier building unit to combine to be formed it is more Layer building.
On the other hand, the present invention provides a kind of frame structures assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard Method of construction.
The features of the present invention and effect include:
1) it can be prepared on a large scale strip precast concrete wall in factory using the prior art and forms industrialization;Due to template It is in plant produced, construction quality and space of a whole page flatness easily guarantee.
2) strip precast concrete wall has been placed in when factory process makes template due to the most reinforcing bar of primary structure member It is interior, greatly reduce tie up at the construction field (site) bundle reinforcing bar workload, and reduce construction site shuttering supporting workload and Difficulty of construction reduces the labor intensity of worker.Every layer of house beam forms may be implemented and building/roof system template has once supported Finish, accelerates speed of application.Free removal prefabricated reinforced concrete groove template is a part of primary structure member, is torn open so as to save template Except process, artificial and time cost is reduced.
3) due to prepare strip precast concrete wall itself have sufficient intensity, this layer of Cast-in-place concrete be filled into assembling cavity it Afterwards, the construction of one layer of building unit can be carried out at once to form multilayer monolithic architecture unit, without waiting existing pour concrete solidifying Consolidation is hard, improves construction efficiency.
Detailed description of the invention
Above-mentioned brief introduction for the present invention and following detailed descriptions, can be better understood in conjunction with attached drawing.
Figure 1A -1F is three sides strip precast concrete wall with groove used by a kind of specific embodiment according to the present invention The schematic diagram of board concrete component.Wherein, Figure 1A, 1B, 1C, 1D, 1E and 1F are respectively to describe the Prefabricated Concrete R.C. wall board Main view, top view, cross-sectional view, right view, bottom view and the perspective view of component.
Fig. 2A -2F is that another specific embodiment according to the present invention includes concrete component and insulating layer and decoration The schematic diagram of the three sides strip precast concrete wall with groove of layer.Wherein, Fig. 2A, 2B, 2C, 2D, 2E and 2F are respectively to describe institute State main view, top view, cross-sectional view, right view, bottom view and the perspective view of strip precast concrete wall concrete component.
Fig. 3 is a kind of signal of the door and window upper end lintel Prefabricated Concrete groove template of specific embodiment according to the present invention Figure.
Fig. 4 A is three sides strip precast concrete wall with groove described in Figure 1A -1F in side and the wall column mould for having side channel The connection relationship diagram of plate.
Fig. 4 B is the connection that three sides strip precast concrete wall with groove described in Figure 1A -1F passes through end slot and floor template Structural schematic diagram.
Fig. 5 is the middle frame space template system schematic diagram of one embodiment of the present invention.
Fig. 6 A is the frame assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard according to one embodiment of the present invention The schematic diagram of frame structural construction.
Fig. 6 B is the sectional view of the frame structure building assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard in Fig. 6 A, Middle display wall form, column template, building/roof system template horizontal layout relationship.
Specific embodiment
In order to make technical solution of the present invention, character of innovation, reach purpose and effect is easy to understand, below with reference to tool Body illustrates and passes through following specific embodiments the invention will be further elaborated.
Figure 1A -1E is schematically illustrated employed in a kind of frame structure building of specific embodiment according to the present invention Three sides strip precast concrete wall 100 with groove.The strip precast concrete wall 100 has first surface 110a and therewith phase Pair second surface 110b, first end 120a and the second end 120b on the other side and two opposite sides, In, the first surface 110a and the second surface 110b are parallel to each other, and the first end 120a is to applied to usual wall The top of wallboard when body constructs is equipped in the first end 120a and is parallel to the first surface and the second surface simultaneously The end slot 130 extended along end face, is respectively equipped in the two sides and is parallel to the first surface and the second surface and suitable The side channel 140 that extends of the side.
The strip precast concrete wall 100 and other wallboards that are vertically fixed on the basal plane or the wall column mould Plate is mutually linked in side by the reinforcement component in the cavity, to form wall body structure.
The building/roof system template is horizontally placed in the wall column formwork and the strip precast with the basal plane in parallel The top of concrete wall 100, and the reinforced concrete member by being arranged in the end slot 130 is mutually linked, to be formed by described Frame space template system made of wall column formwork, the strip precast concrete wall 100 and the building/roof system form assembly.
The space template system is by forming single layer frame in the cavity, the end slot 130 and the basal plane Cast-in-place concrete Frame structural construction.
In addition, Fig. 2A -2E schematically illustrates the frame structure building of another specific embodiment according to the present invention Employed in the three sides strip precast concrete wall 200 with groove with insulating layer and decorative layer.Herein, this specific embodiment party Formula be in addition in turn increased including insulating layer in second surface 110b on the basis of wallboard 100 as shown in Figure 1A -1E and The level of decorative layer.In figures 2 a-2e, for simplicity, part identical with shown 100 is used and phase in Figure 1A -1E With or similar (the rear two digits of label are identical) label, and corresponding construction relationship due to being described above also just no longer It repeats.Here, only for insulating layer increased in present embodiment and decorative layer description as after.
The insulating layer 260 is set to the second surface 110b, and the decorative layer 270 is set to the insulating layer 260. In the two sides of the insulating layer 260 along longitudinally disposed fluted 265.The groove 265 and another strip precast concrete wall The groove of insulating layer is composed lacuna, and insulation, sealing or other suitable materials are inserted into or injected in the gap, to Improve the sealing performance and heat insulation effect between adjacent insulation board.
According to structure needs, the end slot 130 can have different cross sectional shapes, such as the ladder of flaring from inside to outside Shape, rectangle, arc-shaped, the trapezoidal or triangle that tapers from inside to outside, preferably flaring from inside to outside is trapezoidal.
The side channel 140 also can have different cross sectional shapes, such as the trapezoidal of flaring, rectangle, circular arc from inside to outside Shape, the trapezoidal or triangle tapered from inside to outside, preferably trapezoidal (as shown in fig. 1F) of flaring from inside to outside.
The end slot 130 can need to be set as the width and depth for having different according to structure from the side channel 140, excellent Selection of land, the end slot 130 have biggish depth compared with the side channel 140.
In a specific embodiment, the end slot 130 runs through the first end 120a, the institute positioned at the two sides The two sides that side channel 140 extends through wallboard are stated, therefore, the end slot 130 is interconnected to form three sides with the side channel 140 Wallboard with groove.
The cross sectional shape of 260 further groove 265 of insulating layer can be semicircle (as shown in Figure 2 F) or other shapes Shape, such as rectangle, trapezoidal or triangle etc..
Heat-insulated or fire-retardant material preparation can be used in the insulating layer 260, and polystyrene, phenol formaldehyde foam preferably can be used Equal materials.The decorative layer 270 can use with decorative performance or have both decoration and heat insulation function or other suitable performances Material preparation.
Door and window upper end mistake can be used at the door and window position of wall body structure in a kind of specific embodiment according to the present invention Beam prefabricated concrete groove template 330(is as shown in Figure 3), have upward flute configuration.According to the design needs, described excessively beam prefabricated Concrete groove template 330 can be designed with different length.
Fig. 4 A schematically illustrates three sides strip precast concrete wall 410 with groove in side and the wall column mould for having side channel The connection relationship of plate 450.In the illustrated embodiment, can intert in the cavity formed between side channel and wall column formwork 450 Reinforcing bar is simultaneously poured concrete and forms firm connection.
Fig. 4 B schematically illustrates three sides strip precast concrete wall 410 with groove and passes through end slot and floor template 470 Connection relationship.In the illustrated embodiment, reinforcing bar can be set in the end slot and link together with floor template reinforcing bar It is poured concrete and forms firm connection.
In addition, may also be further provided with sandwich in the concrete component of above-mentioned three side strip precast concrete wall with groove Layer (not shown).The laminboard layer be clipped in being arranged to entire level or local level the R.C. wall board component it In.The situation being clipped among the R.C. wall board component in local level can be for example on the top for corresponding to wallboard It is embedded among the R.C. wall board component with three sides at the position of two sides, the laminboard layer, it is also that is, only described Laminboard layer exposes concrete structure relative to the side of R.C. wall board component bottom end.The above-mentioned level cloth of the laminboard layer Office, which can according to need, takes different structural forms.
In above-mentioned diagram, some specific sizes of component have been marked respectively as citing.For example, each in Figure 1A and Fig. 2A Width from the embodiment deadlight of statement is 600mm.However, other different sizes can be used according to actual needs, For example, above-mentioned width can be to be other suitably sized, such as 1200mm.It should be appreciated, however, that these sizes are just for tool For body example, in practice, corresponding size, which can according to need, to be adjusted or changes.
Fig. 5 schematically illustrates a kind of specific embodiment of space template system, is by strip precast concrete wall structure Part 510, the space template system 500 that wall column formwork 550, excessively beam forms 530 and building/roof system template 560 connect and compose.
Fig. 6 A and 6B schematically illustrate a kind of embodiment according to the present invention based on strip precast concrete wall 410 In frame structure building 600 by strip panel 610, cross beam forms 630, wall column formwork 650 and building/roof system template 670 basis/ Frame space template system is connected and composed on basal plane 680.
In some embodiments, the frame space template system passes through the strip precast concrete wall in assembling The end slot of component interts reinforcing bar and fills concrete, and places steel in conjunction with the construction of wall column formwork and in the building/roof system template Muscle and pour concrete form single-storeyed frame structure building.
The single-storeyed frame structure building can be one layer of building unit or single story building.According to building structure needs, energy It is enough to be constituted tier building unit by overlap joint based on one layer of building unit to which combination forms tier building (as schemed Shown in 6A and 6B).
In one embodiment, the method for construction of the frame structure building based on prefabricated reinforced concrete hollow template include with Lower step:
(1) the multiple wall column formworks of pre-production, multiple strip precast concrete walls and multiple buildings/roof system template, wherein making Strip precast concrete wall is included in factory and prepares strip precast concrete wall 100 using armored concrete, including utilizing mold The end slot 130 and the side channel 140 are formed, to form three side strip precast concrete wall 100 with groove;
(2) the strip precast concrete wall is assembled, including according to design requirement that the bar shaped is pre- at the construction field (site) Concrete wall 100 processed, which is set, to be placed in basal plane and is assembled, and erects the strip precast concrete wall 100 downward with the second end 120b The basal plane (such as flooring) is stood on, and makes the side of the strip precast concrete wall 100 and other wallboard or wall column Template linking;
(3) building/roof system template is placed, is horizontally placed in the wall column formwork and institute including by building/roof system template The top of strip precast concrete wall 100 is stated, is formed by the wall column formwork, the strip precast concrete wall 100 and the building/room Frame space template system made of lid form assembly;
(4) connection relationship between wallboard and wallboard and wall column is formed, including in the strip precast concrete wall 100 Intert reinforcing bar in the cavity between wallboard and wall column, and setting insulation or sealing cutting or injection in the lacuna Suitable insulation or sealing material, to form the assembled wall structure including wallboard and wall column;
(5) the slot girder construction in assembled wall structure is set, including in the assembled wall and floor structure, It is combined in the top channel formed by the end slot 130 of the strip precast concrete wall 200 and reinforcing bar is set, so that being formed has beam body The frame space template system of bar construction;And
(6) casting concrete, including respectively for the cavity between wallboard and wallboard and wall column, the beam body Reinforcing bar position pours concrete, while concrete is poured in the building/roof system template, forms single-storeyed frame structure building.
In other embodiment, according to building structure needs, above-mentioned construction process further comprises:
(8) based on single-storeyed frame structure building, repeating said steps (2) to (6), to form multilayer frame Frame structural construction.
According to building structure needs, the method for construction of the above-mentioned frame structure building based on prefabricated reinforced concrete hollow template can Further comprise:
The step of (1) prepares strip precast concrete wall further include: prepare the heat preservation in itself side band fluted 265 Layer 260, material can be heat-insulated or fire proofing;Prepare decorative layer 270;By the strip precast concrete wall 100, the guarantor Warm layer 260 and the decorative layer 270 successively assembling combination, apply binding material appropriate as needed between each level, from And form the three sides strip precast concrete wall 200 with groove for having insulating layer and decorative layer;
Described (2) assemble the step of strip precast concrete wall further include: are formed between wallboard and wallboard and other components Cavity including the side channel 140, and being formed between 260 side of the insulating layer of two blocks of wallboards includes the groove 265 Lacuna;
Described (4) form the step of connection relationship between wallboard and wallboard and wall column further include: set in the lacuna Set insulation or sealing cutting or the suitable insulation of injection or sealing material.
In above-mentioned fabrication and installation method, the sequence of specific steps can carry out adjustment appropriate according to actual needs, In addition related component connection and being laid with for reinforcing bar may also take different schemes according to design and the needs of construction.
In description herein, special shape, material or process sequence are described as to product and method of the invention, and And some detailed parameters are provided for illustrative purposes for some specific embodiments.It is understood, however, that these have Body description does not generate restriction effect to technical solution of the present invention;That is more in relation to shape, material or process sequence Change and is still included within the spirit and scope of the present invention with accommodation.

Claims (10)

1. a kind of frame structure building assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard, which is characterized in that including mutual Connect and compose multiple three sides band groove bar shaped Prefabricated Concrete wallboard, wall column formwork and the building/roof system of the free removal of space template system Template, in which:
The strip precast concrete wall uses Prefabricated reinforced concrete, has first surface and second surface on the other side, first end Portion and the second end on the other side and two opposite sides, the first surface and second surface are parallel to each other, described First end is to the wallboard top for being applied to wall body structure;It is equipped in the first end and is parallel to the first surface and described Second surface and the end slot extended along end face, the side channel extended along the side is respectively equipped in described two sides, Described in end slot run through the first end, the side channel extends through the two sides of wallboard, thus the end slot and the side channel It is interconnected, and the end slot has biggish depth compared with the side channel;The strip precast concrete wall be set as with The second end is erected in basal plane downward, and the end slot of the first end in wallboard top is used to that reinforcing bar is arranged Concrete beam is to form slot girder construction;It is described when being assembled the strip precast concrete wall and another strip precast concrete wall Setting forms the reinforced concrete beam for running through assembled wall plate member end in end slot, and combines with adjacent wall plate member or and wall column In conjunction with;
Side of the strip precast concrete wall with the side channel is connected with other wallboards or wall column, meanwhile, in wallboard and The cavity including the side channel is formed between other wallboards or wall column, and armored concrete, this company are set in the cavity The mode of connecing simplifies conventional construction process and can enhance the bearing capacity and firmness of wall;
The strip precast concrete wall and other wallboards that are vertically fixed on the basal plane or the wall column formwork are in side Face is mutually linked by the reinforcement component in the cavity, to form framed wall structure;
The building/roof system template is horizontally placed in the wall column formwork and the strip precast concrete wall with the basal plane in parallel The top of plate, and the reinforced concrete member by being arranged in the end slot is mutually linked, to be formed by the wall column formwork, institute State frame space template system made of strip precast concrete wall and the building/roof system form assembly;
The space template system is built by forming single-storeyed frame structure in the cavity, the end slot and the basal plane Cast-in-place concrete It builds.
2. frame structure building according to claim 1, wherein three side strip precast concrete wall with groove is into one Step includes insulating layer and decorative layer, wherein the insulating layer is set to the second surface, the decorative layer is set to the guarantor Fluted, the groove and another strip precast concrete wall is respectively set along longitudinal in the two sides of the insulating layer in warm layer The groove of insulating layer is composed lacuna, is inserted into the lacuna or injects insulation, sealing material, to improve adjacent heat preservation Sealing performance and heat insulation effect between plate.
3. frame structure building according to claim 1 or 2, wherein the cross sectional shape of the end slot and the side channel is respectively It is individually for the trapezoidal of flaring from inside to outside, rectangle, arc-shaped, the trapezoidal or triangle that tapers from inside to outside.
4. frame structure building according to claim 1 or 2, wherein the cross sectional shape of the groove be semicircle, rectangle, Trapezoidal or triangle.
5. frame structure building according to claim 1, wherein three side strip precast concrete wall with groove is used for The interior wall of the frame structure building.
6. frame structure building according to claim 2, wherein three side strip precast concrete wall with groove is used for The exterior wall of the frame structure building.
7. the frame structure building assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard described in claim any one of 1-6 is built Make method comprising following steps:
(1) the multiple wall column formworks of pre-production, multiple strip precast concrete walls, multiple door and window upper ends cross beam forms and multiple buildings/ Roof system template, wherein production strip precast concrete wall, which is included in factory, prepares strip precast concrete wall using armored concrete, In including the use of mold form the end slot and the side channel, to form three side strip precast concrete wall with groove;
(2) strip precast concrete wall is assembled, including at the construction field (site) according to design requirement by the strip precast concrete wall If being placed in basal plane to be assembled, the strip precast concrete wall is made to be erected in the basal plane downward with the second end, and So that the side of the strip precast concrete wall is connected with other wallboard or wall column component;
(3) building/roof system template is placed, is horizontally placed in the wall column formwork and the item including by building/roof system template The top of the prefabricated concrete wall of shape is formed by the wall column formwork, the strip precast concrete wall and the building/roof system form assembly Made of frame space template system;
(4) connection relationship between wallboard and wallboard and wall column is formed, including in the strip precast concrete wall and wallboard And intert reinforcing bar in the cavity between wall column, to form the assembled wall structure including wallboard and wall column;
(5) the slot girder construction in assembled wall structure is set, including in the assembled wall and floor structure, by institute The end slot for stating strip precast concrete wall, which combines, is arranged reinforcing bar in the top channel to be formed, so that being formed has beam body reinforcing bar knot The frame space template system of structure;And
(6) casting concrete, including respectively for the cavity, the beam body reinforcing bar between wallboard and wallboard and wall column Position pours concrete, while concrete is poured in the building/roof system template, forms single-storeyed frame structure building.
8. method of construction according to claim 7, wherein further comprising:
(8) based on single-storeyed frame structure building, repeating said steps (2) to (6), to form multistory frame knot Building is built.
9. method of construction according to claim 7, wherein further comprising:
The step of (1) prepares strip precast concrete wall further include: preparation is in itself reeded insulating layer of side band, material Material can be heat-insulated or fire proofing;Prepare decorative layer;By the strip precast concrete wall, the insulating layer and the decorative layer Successively assembling combination applies binding material appropriate as needed between each level, to form the bar shaped with groove of three sides Prefabricated concrete wall;
Described (2) assemble strip precast concrete wall the step of further include: between wallboard and wallboard and other components formed include The cavity of the side channel, and the lacuna including the groove is formed between the insulating layer side of two blocks of wallboards;
Described (4) form the step of connection relationship between wallboard and wallboard and wall column further include: are arranged in the lacuna exhausted Edge or the suitable insulation of sealing cutting or injection or sealing material.
10. the method for construction according to any one of claim 7-9, wherein the cross sectional shape of the end slot and the side channel Respectively it is individually for the trapezoidal of flaring from inside to outside, rectangle, arc-shaped, the trapezoidal or triangle that tapers from inside to outside.
CN201310688094.1A 2013-12-16 2013-12-16 The frame structure and its method of construction assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard Active CN103882977B (en)

Priority Applications (6)

Application Number Priority Date Filing Date Title
CN201310688094.1A CN103882977B (en) 2013-12-16 2013-12-16 The frame structure and its method of construction assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard
PCT/CN2014/093996 WO2015090190A1 (en) 2013-12-16 2014-12-16 Precast modular concrete wall panel, system thereof, and method of construction
US14/392,385 US9816262B2 (en) 2013-12-16 2014-12-16 Precast modular concrete wall panel, system thereof, and method of construction
AU2014366090A AU2014366090B2 (en) 2013-12-16 2014-12-16 Precast modular concrete wall panel, system thereof, and method of construction
CA2933296A CA2933296C (en) 2013-12-16 2014-12-16 Precast modular concrete wall panel, system thereof, and method of construction
EA201690654A EA031217B1 (en) 2013-12-16 2014-12-16 Precast modular concrete wall panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310688094.1A CN103882977B (en) 2013-12-16 2013-12-16 The frame structure and its method of construction assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard

Publications (2)

Publication Number Publication Date
CN103882977A CN103882977A (en) 2014-06-25
CN103882977B true CN103882977B (en) 2019-10-18

Family

ID=50952076

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310688094.1A Active CN103882977B (en) 2013-12-16 2013-12-16 The frame structure and its method of construction assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard

Country Status (1)

Country Link
CN (1) CN103882977B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2014366090B2 (en) * 2013-12-16 2017-05-04 Architectural Design And Research Institute Of Tsinghua University Precast modular concrete wall panel, system thereof, and method of construction
CN104947935B (en) * 2015-04-30 2017-05-03 袁建华 Construction method of combined kitchen and bathroom
CN104947792B (en) * 2015-06-18 2017-11-14 北京大工简筑科技有限公司 Green light steel assembling house and installation method are built in a kind of letter
CN106401009A (en) * 2016-07-21 2017-02-15 中清大科技股份有限公司 Frame shear wall structure based on assembling of strip-shaped thermal-insulation wallboards with mounting grooves and construction method of frame shear wall structure
CN106401008A (en) * 2016-07-21 2017-02-15 中清大科技股份有限公司 Shear wall structure based on assembling of strip-shaped thermal-insulation wallboards with mounting grooves and construction method of shear wall structure
CN106401060A (en) * 2016-07-21 2017-02-15 中清大科技股份有限公司 A slab-column structure based on a strip-type thermal-insulating wallboard assembly provided with mounting slots and a constructing method thereof
CN108951844A (en) * 2018-10-10 2018-12-07 三筑工科技有限公司 Residential housing method of construction and the indoor residential building system without Liang Wuzhu
CN110593449B (en) * 2019-06-28 2024-05-28 中清大科技股份有限公司 Assembled light vertical slat type load-bearing wall structure and construction method thereof
CN111962761A (en) * 2020-08-19 2020-11-20 苏州建鑫建设集团有限公司 Prefabricated wallboard, wall body and connecting piece

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201047132Y (en) * 2007-02-13 2008-04-16 冯葆纯 Prefabricated wallboard of load bearing heat preserving hollow
CN101603336A (en) * 2008-06-12 2009-12-16 黑龙江宇辉新型建筑材料有限公司 Band filling type wallboard precast concrete short-limb shear wall provided and attaching method thereof
CN202925668U (en) * 2012-11-26 2013-05-08 上海市城市建设设计研究总院 Prefabricated framework structure general member combination for small family house
CN203755442U (en) * 2013-12-16 2014-08-06 清华大学建筑设计研究院有限公司 Framework structure assembled based on strip-shaped prefabricated concrete large wall plate with grooves at three sides

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2208401C (en) * 1994-12-20 2008-03-11 Mary Rowena Ginn Building panels

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201047132Y (en) * 2007-02-13 2008-04-16 冯葆纯 Prefabricated wallboard of load bearing heat preserving hollow
CN101603336A (en) * 2008-06-12 2009-12-16 黑龙江宇辉新型建筑材料有限公司 Band filling type wallboard precast concrete short-limb shear wall provided and attaching method thereof
CN202925668U (en) * 2012-11-26 2013-05-08 上海市城市建设设计研究总院 Prefabricated framework structure general member combination for small family house
CN203755442U (en) * 2013-12-16 2014-08-06 清华大学建筑设计研究院有限公司 Framework structure assembled based on strip-shaped prefabricated concrete large wall plate with grooves at three sides

Also Published As

Publication number Publication date
CN103882977A (en) 2014-06-25

Similar Documents

Publication Publication Date Title
CN103882977B (en) The frame structure and its method of construction assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard
CN103882976B (en) The Frame _ Shear Wall Structure and its method of construction assembled based on three sides with groove bar shaped Prefabricated Concrete wallboard
US4942707A (en) Load-bearing roof or ceiling assembly made up of insulated concrete panels
US9816262B2 (en) Precast modular concrete wall panel, system thereof, and method of construction
JP2001515156A (en) Improved mold for building walls
CN101260693A (en) Cast-in-situ light weight composite wall and its architecture construction method
US20080216445A1 (en) Monolithic Buildings and Construction Technology
DE1658991A1 (en) Building construction and methods and means for their manufacture
CN204876198U (en) Frame construction building based on take prefabricated lightweight aggregate concrete filling big -wall board assembly of recess
CN103790284B (en) A kind of three sides strip precast concrete wall with groove and preparation method thereof
CN203755529U (en) Strip-shaped prefabricated concrete wallboard with grooves in three sides
CN203755493U (en) Short-limb shear wall structure assembled based on hidden beam prefabricated concrete large wall plate with grooves at two sides
CN108086553A (en) A kind of Lightweight core mould combined reinforced bar truss fabrication plate
CN209429309U (en) A kind of sandwich heat preservation overlapped shear wall L shape connecting node construction
CN103883024B (en) The short-shear wall structure and its method of construction for thering is concealed beam Prefabricated Concrete big-wall board group to fill with groove based on two sides
RU2421580C1 (en) Method to erect site-cast skeleton building with decorative outer finish
CN103758279A (en) Prefabricated concrete large wallboard with grooves at two sides and with hidden beam and manufacturing method thereof
RU150460U1 (en) FAST-PRODUCED ENERGY-EFFICIENT SMALL BUILDING
CN203755442U (en) Framework structure assembled based on strip-shaped prefabricated concrete large wall plate with grooves at three sides
RU54060U1 (en) A SET OF WALL UNITS FOR THE CONSTRUCTION OF SMALL BUILDINGS
CN105155858A (en) Construction method for assembled composite wall building by concrete composite modules
CN206752744U (en) A kind of two-chamber heat-preserving wall component
CN209369109U (en) A kind of double-deck load-bearing concrete shear wall structure of built-in sandwiched heat insulation board
CN209369110U (en) The multi-storey steel structure of the double-deck weight loading concrete shear wall including sandwiched heat insulation board is built
CN203755440U (en) Framework-shear wall structure assembled based on strip-shaped prefabricated concrete large wall plate with grooves at three sides

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant