CN103879880B CN201410060610.0A CN201410060610A CN103879880B CN 103879880 B CN103879880 B CN 103879880B CN 201410060610 A CN201410060610 A CN 201410060610A CN 103879880 B CN103879880 B CN 103879880B
Authority
CN
China
Prior art keywords
horizontal
fork
longitudinal
hanging
arms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410060610.0A
Other languages
Chinese (zh)
Other versions
CN103879880A (en
Inventor
玉枭彤
陆彪
王桂芳
熊尚冰
李然龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group Holding Co., Ltd
Original Assignee
GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION Co Ltd filed Critical GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION Co Ltd
Priority to CN201410060610.0A priority Critical patent/CN103879880B/en
Publication of CN103879880A publication Critical patent/CN103879880A/en
Application granted granted Critical
Publication of CN103879880B publication Critical patent/CN103879880B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a building material loading and unloading hanging fork. The building material loading and unloading hanging fork is characterized by comprising two longitudinal hanging arms, wherein the upper ends of the two longitudinal hanging arms are connected with two horizontal hanging arms, respectively; the two horizontal hanging arms are connected through a horizontal hanging rod, the middle of the horizontal hanging rod is provided with a hook, and the lower parts of the two longitudinal hanging arms are connected with two inserting forks in a detachable manner, respectively; the horizontal hanging arms are provided with multiple dip angle regulating holes connected with one another, and the two ends of the horizontal hanging rods are inserted into the dip angle regulating holes of the two horizontal hanging arms to be connected with the two horizontal hanging arms, respectively; the longitudinal hanging arms are connected with the inserting forks through lock catches, each lock catch comprises an elbow spring bolt and a reverse buckle, the elbow spring bolts are arranged on the lower parts of the longitudinal hanging arms, and the reverse buckles are arranged on the side parts of the inserting forks; reinforcing ribs are connected with the two longitudinal hanging arms, and the two inserting forks are connected through a horizontal connecting rod. The hanging fork provided by the invention has the advantages that time and labor are saved in loading and unloading, the labor intensity is small, and the carrying efficiency is high.

Description

Fork is hung in a kind of building materials handling
Technical field
The present invention relates to a kind of hanging device, fork is hung in specifically a kind of building materials handling for solid kind.
Background technology
At present, the loading and unloading of the good brick of solid building material such as code is typically manually completed, first by manually fragment of brick is placed into hanging basket, by crane handling to destination, then by manually by fragment of brick, code fetch is good from hanging basket.This mode fragment of brick is at random when hanging basket is placed and taken out, it is impossible to shift the good fragment of brick of code by the gross, and workman is wasted time and energy in handling, and labour intensity is big, handling efficiency is low.
The content of the invention
The purpose of the present invention is directed to the deficiencies in the prior art, and provide it is a kind of use manpower and material resources sparingly, fork is hung in the building materials handling that handling efficiency is higher.
The purpose of the present invention is realized by following technical schemes:
Fork is hung in a kind of building materials handling, including two longitudinal booms, two upper ends of longitudinal boom are connected with two horizontal arms respectively, and two horizontal arms are connected by horizontal hanger rod, suspension hook is provided with the middle part of horizontal hanger rod, two bottoms of longitudinal boom are removably connected with two inserting forks respectively.
The horizontal arm is provided with multiple connected tilt adjustment holes, and the two ends of horizontal hanger rod are connected in inserting two tilt adjustment holes of horizontal arm respectively with horizontal arm.
The longitudinal boom is connected with inserting fork by lock, and lock includes elbow dead bolt and back-off, and elbow dead bolt is arranged on the bottom of longitudinal boom, and back-off is arranged on the sidepiece of inserting fork.
Reinforcement is provided with to be connected with two longitudinal booms.
Two inserting forks are connected by transverse link.
When using, inserting fork was separated before this with longitudinal boom, first by the fragment of brick bottom that inserting fork insertion code is good, inserting fork was fixed with longitudinal boom, then position of the weight and position adjustment horizontal hanger rod according to fragment of brick in tilt adjustment hole, the equalization point for hanging fork is adjusted, by after crane handling to destination, taking out inserting fork, the good fragment of brick of code completes to shift by the gross, without piling up again again, workman is time saving and energy saving when loading and unloading, and labour intensity is small, handling efficiency is higher.
In addition to the handling of the good fragment of brick of code is applicable to, originally hanging fork can support the use the present invention with various lifting handling apparatus, apply also for the handling handling of the building materials of the solid kinds such as timber, stone material, metal material, and adaptive surface is wide.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention;
Fig. 2 is the side structure schematic diagram of Fig. 1;
Fig. 3 is another structural representation of embodiment.
In figure, 1. the horizontal 6. tilt adjustment hole of arm 3. horizontal hanger rod, 4. suspension hook, 5. inserting fork 7. of longitudinal boom 2. latches the transverse link of 8. elbow dead bolt, 9. back-off, 10. reinforcement 11..
Specific embodiment
Present invention is further elaborated with reference to the accompanying drawings and examples, but is not limitation of the invention.
Embodiment:
The Fig. 2 of reference picture 1, fork is hung in a kind of building materials handling, including two longitudinal booms 1, two the upper end of longitudinal boom 1 is connected with two horizontal arms 2 respectively, two horizontal arm 2 is connected by horizontal hanger rod 3, the middle part of horizontal hanger rod 3 is provided with suspension hook 4, and two bottoms of longitudinal boom 1 are removably connected with two inserting forks 5 respectively.Setting two longitudinal booms 1 makes the stationarity for hanging fork more preferable.
The horizontal arm 2 is provided with multiple connected tilt adjustment holes 6, and the two ends of horizontal hanger rod 3 are connected in inserting two tilt adjustment holes 6 of horizontal arm 2 respectively with horizontal arm 2.
The longitudinal boom 1 is connected with inserting fork 5 by lock 7.
Fig. 3 show the lock of another structure, including elbow dead bolt 8 and back-off 9, and elbow dead bolt 8 is arranged on the bottom of longitudinal boom 1, and back-off 9 is arranged on the sidepiece of inserting fork 5.
It is provided with reinforcement 10 to be connected with two longitudinal booms 1, to keep the global shape for hanging fork indeformable.
Two inserting forks 5 are connected by transverse link 11, are made the bottom of inserting fork 5 and are had supporting mass, and handling goods is more steady, while being also convenient for be bound by handling thing and inserting fork with rope, it is to avoid handling process is fallen by handling thing.
When using, inserting fork 5 was separated before this with longitudinal boom 1, inserting fork 5 is inserted into the good fragment of brick bottom of code first, inserting fork 5 is fixed with longitudinal boom 1, then the position of the weight according to fragment of brick and position adjustment horizontal hanger rod 3 in tilt adjustment hole 6, adjust the equalization point for hanging fork, by after crane handling to destination, inserting fork 5 is taken out, the good fragment of brick of code completes to shift by the gross, without piling up again again.

Claims (1)

1. fork is hung in a kind of building materials handling, it is characterised in that:Including two longitudinal booms, two upper ends of longitudinal boom are connected with two horizontal arms respectively, and two horizontal arms are connected by horizontal hanger rod, and suspension hook is provided with the middle part of horizontal hanger rod, and two bottoms of longitudinal boom are removably connected with two inserting forks respectively;
The horizontal arm is provided with multiple connected tilt adjustment holes, and the two ends of horizontal hanger rod are connected in inserting two tilt adjustment holes of horizontal arm respectively with horizontal arm;
The longitudinal boom is connected with inserting fork by lock, and lock includes elbow dead bolt and back-off, and elbow dead bolt is arranged on the bottom of longitudinal boom, and back-off is arranged on the sidepiece of inserting fork;
Reinforcement is provided with to be connected with two longitudinal booms;
Two inserting forks are connected by transverse link;
Inserting fork was separated before this with longitudinal boom, inserting fork is inserted into the good fragment of brick bottom of code first, inserting fork is fixed with longitudinal boom, then position of the weight and position adjustment horizontal hanger rod according to fragment of brick in tilt adjustment hole, adjust the equalization point for hanging fork, by after crane handling to destination, taking out inserting fork.
CN201410060610.0A 2014-02-24 2014-02-24 Building material loading and unloading hanging fork Active CN103879880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410060610.0A CN103879880B (en) 2014-02-24 2014-02-24 Building material loading and unloading hanging fork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410060610.0A CN103879880B (en) 2014-02-24 2014-02-24 Building material loading and unloading hanging fork

Publications (2)

Publication Number Publication Date
CN103879880A CN103879880A (en) 2014-06-25
CN103879880B true CN103879880B (en) 2017-05-24

Family

ID=50949060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410060610.0A Active CN103879880B (en) 2014-02-24 2014-02-24 Building material loading and unloading hanging fork

Country Status (1)

Country Link
CN (1) CN103879880B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110002335A (en) * 2019-03-20 2019-07-12 广州飞机维修工程有限公司 A kind of adjustable vertical lifting device of aircraft nose landing gear
CN116902749A (en) * 2023-09-12 2023-10-20 江苏春兰机械制造有限公司 Lifting equipment for split charging tray of engine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1745839A (en) * 1927-06-07 1930-02-04 New York Brick Handling Corp Dumping fork
US2690926A (en) * 1952-06-18 1954-10-05 Gen Motors Corp Load hook
US4256337A (en) * 1979-08-17 1981-03-17 Wappler Joachim H R Universal fork assembly
CN201395469Y (en) * 2009-05-11 2010-02-03 陈朝 Sling for palletized goods
CN203345923U (en) * 2013-05-07 2013-12-18 中国北车集团大同电力机车有限责任公司 Hoisting device for large built-in component
CN203740865U (en) * 2014-02-24 2014-07-30 陆玉权 Lifting fork for loading and unloading of building materials

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51126666A (en) * 1975-04-28 1976-11-04 Tokuyama Kairiku Unsou Kk Loading and unloading equipment
FI20021588A (en) * 2002-09-06 2004-03-07 Hannu Mantsinen Jack
DE20308664U1 (en) * 2003-06-03 2004-10-07 Kinshofer Greiftechnik Gmbh & Co. Kg lifting fork
KR20110011633U (en) * 2010-06-10 2011-12-16 장대진 Pallet transferring device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1745839A (en) * 1927-06-07 1930-02-04 New York Brick Handling Corp Dumping fork
US2690926A (en) * 1952-06-18 1954-10-05 Gen Motors Corp Load hook
US4256337A (en) * 1979-08-17 1981-03-17 Wappler Joachim H R Universal fork assembly
CN201395469Y (en) * 2009-05-11 2010-02-03 陈朝 Sling for palletized goods
CN203345923U (en) * 2013-05-07 2013-12-18 中国北车集团大同电力机车有限责任公司 Hoisting device for large built-in component
CN203740865U (en) * 2014-02-24 2014-07-30 陆玉权 Lifting fork for loading and unloading of building materials

Also Published As

Publication number Publication date
CN103879880A (en) 2014-06-25

Similar Documents

Publication Publication Date Title
CN202186826U (en) Block transportation device
CN103879880B (en) Building material loading and unloading hanging fork
CN205011284U (en) A simple and easy hoisting apparatus for rack high altitude is in bulk
CN102071812B (en) Method for vertically transporting building materials
CN103395689A (en) Horizontal hoisting clamp for wallboard
CN203740865U (en) Lifting fork for loading and unloading of building materials
CN207078938U (en) A kind of terrace project multifunctional crane
CN203528519U (en) Steel bar conveying pushing frame
CN103145048A (en) Cement brick loader
CN203682893U (en) Steel reinforcement cage hooking and lifting device
CN205776169U (en) Filling pile cage of reinforcement hangs muscle device
CN211368839U (en) Auxiliary device for transporting steel reinforcement cage of excavator
CN209306818U (en) Cargo hoisting frame
CN203511699U (en) Customized trolley for delivering rectangular weight
CN208120547U (en) A kind of engine cylinder body lifting device
CN203247849U (en) Chute for conduction of concrete and mortar
CN207792499U (en) A kind of motor stator handling suspender
CN202099415U (en) Crystal bar containing basket
CN205634646U (en) Building cableway bucket
CN205472231U (en) Gallows is transported to aluminium bar
CN102020197A (en) Vertical transportation hanger
CN210236383U (en) Civil construction reinforcing bar clamping device
CN212387560U (en) Hoisting device for assembly type building
CN211110626U (en) Unit body loading and unloading hoisting appliance
CN208378198U (en) A kind of filler support special hanger

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Yu Xiaotong

Inventor after: Lu Biao

Inventor after: Wang Guifang

Inventor after: Xiong Shangbing

Inventor after: Li Ranlong

Inventor before: Lu Yuquan

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20170410

Address after: 530000 the Guangxi Zhuang Autonomous Region XiXiangTang Nanning fraternity Road No. 45

Applicant after: GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION CO., LTD.

Address before: 541215 the Guangxi Zhuang Autonomous Region Lingchuan County of Guilin Qingshitan town rock village sheep Tamura No. 32

Applicant before: Lu Yuquan

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 530000 Jiangong building, No.19 Pingle Avenue, Liangqing District, Nanning City, Guangxi Zhuang Autonomous Region

Patentee after: Guangxi Construction Engineering Group Holding Co., Ltd

Address before: 530000 the Guangxi Zhuang Autonomous Region XiXiangTang Nanning fraternity Road No. 45

Patentee before: GUANGXI CONSTRUCTION ENGINEERING GROUP UNITED CONSTRUCTION Co.,Ltd.