CN103852609B - Metering box, ground wire hitching method of the metering box, and replacement method of current transformer of the metering box - Google Patents

Metering box, ground wire hitching method of the metering box, and replacement method of current transformer of the metering box Download PDF

Info

Publication number
CN103852609B
CN103852609B CN201210496601.7A CN201210496601A CN103852609B CN 103852609 B CN103852609 B CN 103852609B CN 201210496601 A CN201210496601 A CN 201210496601A CN 103852609 B CN103852609 B CN 103852609B
Authority
CN
China
Prior art keywords
batch meter
stripping mouth
current transformer
stripping
ground wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210496601.7A
Other languages
Chinese (zh)
Other versions
CN103852609A (en
Inventor
赵惠民
王强
陈双奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Beijing Electric Power Corp
Original Assignee
State Grid Corp of China SGCC
Beijing Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Beijing Electric Power Corp filed Critical State Grid Corp of China SGCC
Priority to CN201210496601.7A priority Critical patent/CN103852609B/en
Publication of CN103852609A publication Critical patent/CN103852609A/en
Application granted granted Critical
Publication of CN103852609B publication Critical patent/CN103852609B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Transformers For Measuring Instruments (AREA)
  • Measurement Of Resistance Or Impedance (AREA)

Abstract

The invention provides a metering box, a ground wire hitching method of the metering box, and a replacement method of a current transformer of the metering box. The metering box comprises a meter, multiple current transformers electrically connected with the meter, multiple input cables in one-to-one correspondence and in electrical connection with the input ends of the multiple current transformers, and multiple protective sleeves, wherein each input cable is provided with a first stripping port formed by peeling an insulation layer, and the first stripping port of each input cable is detachably provided with a protective sleeve. When a ground wire needs to be hitched to the input ends of the current transformers, such as when the current transformers in the metering box are replaced, the ground wire can be directly connected with an exposed metal wire at the first stripping port, such that what is needed is only to turn off the knife switches at the input ends of the transformers rather than breaking a high voltage drop fuse at the input ends of a transformer, thus the operation on the high voltage drop fuse is reduced, and the labor intensity of the work personnel is also reduced.

Description

The replacing options of batch meter and its ground wire hooking method summation current transformer
Technical field
The present invention relates to power domain, more particularly, to a kind of batch meter and its ground wire hooking method and Current Mutual Inductance The replacing options of device.
Background technology
In prior art, when needing to change current transformer in 380V batch meters, it is necessary first in current transformer Input hanging earthing conductor.Current way is the hanging earthing conductor at the knife switch of the input of current transformer, but if The hanging earthing conductor at the knife switch, just must disconnect high pressure fall insurance device first.So it is accomplished by staff frequently to grasp The high pressure fall insurance device of transformer inputs is placed in, the working strength of staff is increased, to high pressure fall insurance device Operation also than relatively hazardous.
The content of the invention
The present invention is intended to provide the replacing options of a kind of batch meter and its ground wire hooking method summation current transformer, to solve Need to operate the problem of high pressure fall insurance device during the current transformer of the replacing batch meter of prior art.
For solving above-mentioned technical problem, according to an aspect of the invention, there is provided a kind of batch meter, including:Gauge table; Multiple current transformers, are electrically connected with gauge table;Multiple input cables, the input of multiple input cables and multiple current transformers End electrically connects correspondingly;The the first stripping mouth formed by stripping insulation layer is provided with each input cable;It is multiple Protective jacket, is removably provided with a protective jacket at the first stripping mouth of each input cable.
Further, batch meter also includes zero line cable, and zero line cable is electrically connected with gauge table;The insulating barrier of zero line cable On be provided with stripping insulation layer and formed second stripping mouth, second stripping mouth at a protective jacket is removably installed.
Further, first shell mouth in a ring.
Further, second shell mouth in a ring.
Further, protective jacket includes body, and body is in a ring;Body has the opening at insertion two ends vertically.
Further, protective jacket also includes afterbody, and afterbody is connected with body.
Further, protective jacket is made up of electro-insulating rubber.
According to the second aspect of the invention, additionally provide a kind of ground wire hooking method of batch meter, there is provided above-mentioned meter Measuring tank;Dismounting is arranged on the protective jacket on the first stripping mouth of multiple input cables of batch meter, to expose the first stripping mouth;First Connect ground wire on stripping mouth.
According to the third aspect of the present invention, a kind of replacing options of the current transformer of batch meter are additionally provided, there is provided Above-mentioned batch meter;Dismounting is arranged on the protective jacket on the first stripping mouth of multiple input cables of batch meter, to expose the first stripping Mouthful;Connect ground wire on the first stripping mouth;Change the current transformer in batch meter;Remove ground wire, and the first of input cable Protective jacket is reinstalled at stripping mouth.
Due to being provided with the formed by stripping insulation layer first stripping mouth on each input cable in batch meter, make It is proper to need in the input hanging earthing conductor of current transformer, such as when changing the current transformer in batch meter, Ke Yizhi Connect and ground wire is connected on the exposed metal wire at the first stripping mouth.So, it is only necessary to the input of turn-off current transformer Knife switch, without disconnecting the high pressure fall insurance device of transformer inputs, reduces the behaviour to high pressure fall insurance device Make, also reduce the working strength of staff.
Description of the drawings
The accompanying drawing for constituting the part of the application is used for providing a further understanding of the present invention, the schematic reality of the present invention Apply example and its illustrate, for explaining the present invention, not constituting inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 diagrammatically illustrates the schematic diagram that the batch meter in the present invention is not provided with protective jacket;
Fig. 2 diagrammatically illustrates the schematic diagram that batch meter has arranged protective jacket;And
Fig. 3 diagrammatically illustrates the structural representation of protective jacket.
Reference in figure:10th, gauge table;20th, current transformer;30th, input cable;31st, the first stripping mouth;40th, protect Set;41st, body;411st, it is open;42nd, afterbody;50th, zero line cable;51st, the second stripping mouth;60th, knife switch.
Specific embodiment
Embodiments of the invention are described in detail below in conjunction with accompanying drawing, but the present invention can be defined by the claims Implement with the multitude of different ways for covering.
According to the first aspect of the invention, there is provided a kind of batch meter, as depicted in figs. 1 and 2, the batch meter includes meter Scale 10;Multiple current transformers 20, are electrically connected with gauge table 10;Multiple input cables 30, multiple input cables 30 with it is multiple The input of current transformer 20 is electrically connected correspondingly;Be provided with each input cable 30 by stripping insulation layer and The the first stripping mouth 31 for being formed;Multiple protective jackets 40, are removably provided with one at the first stripping mouth 31 of each input cable 30 Protective jacket 40.
Due to being provided with the formed by stripping insulation layer first stripping mouth on each input cable 30 in batch meter 31 so that when the input hanging earthing conductor in current transformer 20 is needed, such as when changing the current transformer in batch meter, Directly ground wire can be connected on metal wire exposed at the first stripping mouth 31.So, it is only necessary to turn-off current transformer 20 The knife switch 60 of input, without disconnecting the high pressure fall insurance device of transformer inputs, reduces and high pressure is fallen The operation of safeguard, also reduces the working strength of staff.Again due to removably installing at each first stripping mouth 31 There is protective jacket 40, it is ensured that in batch meter normal work, the first stripping mouth 31 will not occur leaky, it is ensured that batch meter is pacified Row for the national games.
Preferably, batch meter also includes zero line cable 50, and zero line cable 50 is electrically connected with gauge table 10;Zero line cable 50 The the second stripping mouth 51 for stripping insulation layer being provided with insulating barrier and being formed, is removably provided with one at the second stripping mouth 51 Protective jacket 40.The second stripping mouth 51 is provided with the insulating barrier of zero line cable 50, when the hanging earthing conductor on zero line cable 50 is needed, Can also be in hanging earthing conductor at the second stripping mouth 51.
Additionally, not only can be by mounting ground at the second stripping mouth 51 of the first stripping mouth 31 and zero line cable 50 of input cable 30 Line, other equipment(Such as voltage detection device)Can also by the first stripping mouth 31 and the second stripping mouth 51 respectively with input cable 30 Electrically connect with zero line cable 50.
Preferably, first shell mouth 31 in a ring.Preferably, second shell mouth 51 in a ring.The stripping mouth of annular can be used and be connect Wire clamp connects ground wire or other cables.
Preferably, protective jacket 40 includes body 41, and body 41 is in a ring;Body 41 has the opening at insertion two ends vertically 411.Preferably, protective jacket 40 also includes afterbody 42, and afterbody 42 is connected with body 41.As shown in figure 3, the annular of protective jacket 40 Body 41 can wrap the first stripping mouth 31 and the second stripping mouth 51, and protective jacket 40 is dismantled with each cable by opening 411 or is connected Connect.Also with the afterbody 42 being connected with body 41, so, staff can grip afterbody 42 to protective jacket 40, by protective jacket 40 Disassemble from the first stripping mouth 31 and the second stripping mouth 51.Preferably, afterbody 42 is half body being connected with body 41.
Preferably, protective jacket 40 is made up of electro-insulating rubber, using the insulating properties of rubber to the first stripping mouth 31 and the second stripping mouth 51 insulated enclosures.Further, since rubber has elasticity so that protective jacket 40 can be conveniently installed at the first stripping mouth 31 and second Stripping mouth 51, or dismantle from the first stripping mouth 31 and the second stripping mouth 51.Preferably, can be insulated with the winding in the outside of protective jacket 40 Adhesive tape, to improve the insulating properties of batch meter, and then improves safety.
According to the second aspect of the invention, there is provided a kind of ground wire hooking method of batch meter, first, there is provided above-mentioned Batch meter;Secondly, dismounting is arranged on the protective jackets 40 on the first stripping mouth 31 of multiple input cables 30 of batch meter, to expose the One stripping mouth 31;Finally, connect ground wire on the first stripping mouth 31.The ground wire hooking method of this batch meter only needs to disconnect batch meter Current transformer input knife switch, without disconnect transformer inputs high pressure fall insurance device, reduce Operation to high pressure fall insurance device, also reduces the working strength of staff.
According to the third aspect of the present invention, there is provided a kind of replacing options of the current transformer of batch meter, first, carry For above-mentioned batch meter;Secondly, dismounting is arranged on the protective jacket 40 on the first stripping mouth 31 of multiple input cables 30 of batch meter, To expose the first stripping mouth 31;Afterwards, connect ground wire on the first stripping mouth 31;Then, change the current transformer 20 in batch meter; Finally, ground wire is removed, and the protective jacket 40 is reinstalled at the first stripping mouth 31 of input cable 30.
The preferred embodiments of the present invention are these are only, the present invention is not limited to, for those skilled in the art For member, the present invention can have various modifications and variations.All any modifications within the spirit and principles in the present invention, made, Equivalent, improvement etc., should be included within the scope of the present invention.

Claims (14)

1. the ground wire hooking method of a kind of batch meter, it is characterised in that
Batch meter is provided, the batch meter includes:
Gauge table (10);
Multiple current transformer (20), are electrically connected with the gauge table (10);
Multiple input cable (30), the input of the plurality of input cable (30) and the plurality of current transformer (20) is one by one Accordingly electrically connect;The the first stripping mouth formed by stripping insulation layer is provided with each described input cable (30) (31);
Multiple protective jacket (40), first stripping mouth (31) place of each input cable (30) are removably provided with described in one Protective jacket (40)
Dismounting is arranged on the protection in first stripping mouth (31) of the multiple described input cable (30) of the batch meter Set (40), to expose first stripping mouth (31);
Connect ground wire in the described first stripping mouth (31).
2. the ground wire hooking method of batch meter according to claim 1, it is characterised in that the batch meter also includes zero line Cable (50), zero line cable (50) are electrically connected with the gauge table (10);Set on the insulating barrier of zero line cable (50) The second stripping mouth (51) formed by stripping insulation layer is equipped with, the second stripping mouth (51) place is removably provided with an institute State protective jacket (40).
3. the ground wire hooking method of batch meter according to claim 1, it is characterised in that first stripping mouth (31) is in ring Shape.
4. the ground wire hooking method of batch meter according to claim 2, it is characterised in that second stripping mouth (51) is in ring Shape.
5. the ground wire hooking method of batch meter according to claim 1 and 2, it is characterised in that described protective jacket (40) wrap Include body (41), body (41) in a ring;Described body (41) have the opening (411) at insertion two ends vertically.
6. the ground wire hooking method of batch meter according to claim 5, it is characterised in that protective jacket (40) also include Afterbody (42), afterbody (42) are connected with the body (41).
7. the ground wire hooking method of batch meter according to claim 5, it is characterised in that protective jacket (40) are by insulating Rubber is made.
8. a kind of replacing options of the current transformer of batch meter, it is characterised in that
Batch meter is provided, the batch meter includes:
Gauge table (10);
Multiple current transformer (20), are electrically connected with the gauge table (10);
Multiple input cable (30), the input of the plurality of input cable (30) and the plurality of current transformer (20) is one by one Accordingly electrically connect;The the first stripping mouth formed by stripping insulation layer is provided with each described input cable (30) (31);
Multiple protective jacket (40), first stripping mouth (31) place of each input cable (30) are removably provided with described in one Protective jacket (40);
Dismounting is arranged on the protection in first stripping mouth (31) of the plurality of input cable (30) of the batch meter Set (40), to expose first stripping mouth (31);
Connect ground wire in the described first stripping mouth (31);
Change the current transformer (20) in the batch meter;
The ground wire is removed, and the protective jacket is reinstalled at the first stripping mouth (31) place of the input cable (30) (40)。
9. replacing options of the current transformer of batch meter according to claim 8, it is characterised in that the batch meter is also Including zero line cable (50), zero line cable (50) are electrically connected with the gauge table (10);Zero line cable (50) it is exhausted The second stripping mouth (51) for stripping insulation layer being provided with edge layer and being formed, the second stripping mouth (51) place removably installs There are one protective jacket (40).
10. replacing options of the current transformer of batch meter according to claim 8, it is characterised in that first stripping Mouth (31) is in a ring.
The replacing options of the current transformer of 11. batch meters according to claim 9, it is characterised in that second stripping Mouth (51) is in a ring.
The replacing options of the current transformer of 12. batch meters according to claim 8 or claim 9, it is characterised in that the protection Set (40) include body (41), body (41) in a ring;Described body (41) have the opening at insertion two ends vertically (411)。
The replacing options of the current transformer of 13. batch meters according to claim 12, it is characterised in that the protective jacket (40) also include afterbody (42), afterbody (42) are connected with the body (41).
The replacing options of the current transformer of 14. batch meters according to claim 12, it is characterised in that the protective jacket (40) it is made up of electro-insulating rubber.
CN201210496601.7A 2012-11-28 2012-11-28 Metering box, ground wire hitching method of the metering box, and replacement method of current transformer of the metering box Active CN103852609B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210496601.7A CN103852609B (en) 2012-11-28 2012-11-28 Metering box, ground wire hitching method of the metering box, and replacement method of current transformer of the metering box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210496601.7A CN103852609B (en) 2012-11-28 2012-11-28 Metering box, ground wire hitching method of the metering box, and replacement method of current transformer of the metering box

Publications (2)

Publication Number Publication Date
CN103852609A CN103852609A (en) 2014-06-11
CN103852609B true CN103852609B (en) 2017-03-22

Family

ID=50860513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210496601.7A Active CN103852609B (en) 2012-11-28 2012-11-28 Metering box, ground wire hitching method of the metering box, and replacement method of current transformer of the metering box

Country Status (1)

Country Link
CN (1) CN103852609B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105388341A (en) * 2015-11-27 2016-03-09 国网北京市电力公司 Metering box
CN107085195B (en) * 2017-04-14 2020-12-29 中国电力科学研究院 Method and system for matching mutual inductor and electric energy meter of plant station

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2819569Y (en) * 2005-06-14 2006-09-20 杨伟斌 Cable protective cover
CN201311441Y (en) * 2008-11-18 2009-09-16 河南省电力公司南阳供电公司 External anti-electricity-theft device of high pressure metering tank
CN201656252U (en) * 2010-01-30 2010-11-24 许罡 10KV incoming line-protecting and electric energy-metering comprehensive switch cabinet
CN201804029U (en) * 2010-09-24 2011-04-20 陈家斌 220V and 380V charged assembly and disassembly electric energy metering device
CN202360086U (en) * 2011-11-17 2012-08-01 森松(江苏)海油工程装备有限公司 Protection structure for gas-liquid separator instrument

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2819569Y (en) * 2005-06-14 2006-09-20 杨伟斌 Cable protective cover
CN201311441Y (en) * 2008-11-18 2009-09-16 河南省电力公司南阳供电公司 External anti-electricity-theft device of high pressure metering tank
CN201656252U (en) * 2010-01-30 2010-11-24 许罡 10KV incoming line-protecting and electric energy-metering comprehensive switch cabinet
CN201804029U (en) * 2010-09-24 2011-04-20 陈家斌 220V and 380V charged assembly and disassembly electric energy metering device
CN202360086U (en) * 2011-11-17 2012-08-01 森松(江苏)海油工程装备有限公司 Protection structure for gas-liquid separator instrument

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
穿心电流互感器快速接线法;李廷河等;《农村电工》;20120131(第1期);正文第42页 *

Also Published As

Publication number Publication date
CN103852609A (en) 2014-06-11

Similar Documents

Publication Publication Date Title
US20160181771A1 (en) Method of constructing distribution line using extra-high voltage neutral line combined with overhead earth wire having separate installation structure of extra-high voltage neutral line and low-voltage neutral line
CN104991095B (en) A kind of transformer test wiring fexible unit
CN202749745U (en) Special-purpose grounding lead wire for intersecting interconnection box maintenance
CN204989239U (en) Transformer test multipurpose plant of working a telephone switchboard
CN105207116B (en) Electric line foreign matter remover
CN103852609B (en) Metering box, ground wire hitching method of the metering box, and replacement method of current transformer of the metering box
CN204517286U (en) A kind of insulated shielding cover
CN202693622U (en) Power transformer test connecting device
EP2804272B1 (en) Mobile unit for high- and medium-voltage electrical interconnection
CN207165335U (en) Energy-conservation becomes platform pillar arrester
CN105161878A (en) Power distribution fast acousto-optic electricity testing grounding wire
CN105429019A (en) Metering box
RU2640315C1 (en) Adjustable capacitive sensor of high voltage
CN205385160U (en) Portable electrification of ground wire alarm device that connects
CN204834156U (en) High noise immunity control cable
CN103944094A (en) 10-kV handcart switch cabinet bus fixed contact ground method and special grounding device thereof
US20140262436A1 (en) Electrical Equipment Clip
CN114270649A (en) Protection of AC equipment
CN206225183U (en) Transformer grounding resistance device
CN206400166U (en) Cable fitting more than a kind of double cable OPGW of transformer station's single pole
CN102445592B (en) Vacuum switch and cable connection electricity testing device
CN201252348Y (en) Box-type bus-connecting device containing transformer bank
CN217562930U (en) Cable sheath protector, device and equipment
CN111834761B (en) Intermediate connection device and method for insulated tubular busbar and application
CN209071060U (en) A kind of three-phase side outlet arrester

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant