CN103837737B - The method and apparatus measuring the energy expenditure of electronic equipment - Google Patents

The method and apparatus measuring the energy expenditure of electronic equipment Download PDF

Info

Publication number
CN103837737B
CN103837737B CN201210491708.2A CN201210491708A CN103837737B CN 103837737 B CN103837737 B CN 103837737B CN 201210491708 A CN201210491708 A CN 201210491708A CN 103837737 B CN103837737 B CN 103837737B
Authority
CN
China
Prior art keywords
current value
adapter
electronic equipment
intelligent electric
electric meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210491708.2A
Other languages
Chinese (zh)
Other versions
CN103837737A (en
Inventor
王晓峰
焦洁心
桑和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qindarui Co.
Original Assignee
International Business Machines Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by International Business Machines Corp filed Critical International Business Machines Corp
Priority to CN201210491708.2A priority Critical patent/CN103837737B/en
Publication of CN103837737A publication Critical patent/CN103837737A/en
Application granted granted Critical
Publication of CN103837737B publication Critical patent/CN103837737B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The embodiments of the present invention provide the method and apparatus of the energy expenditure measuring electronic equipment.In one embodiment, a kind of method providing energy expenditure measuring electronic equipment, including: receiving the current value signals from an adapter k at least one adapter, wherein current value signals describes the current value provided via adapter k to electronic equipment;And obtain electronic equipment energy expenditure in a time interval based on current value signals;Wherein adapter k is connected with intelligent electric meter by transmission line of electricity, and electronic device to adapter k is to receive the electric current via transmission line of electricity transmission.In another embodiment, it is provided that a kind of method of energy expenditure measuring electronic equipment, including: the current value that provides to electronic equipment via adapter k is provided at an adapter k at least one adapter;And the current value signals of description current value is sent to intelligent electric meter.Present invention also offers corresponding device.

Description

The method and apparatus measuring the energy expenditure of electronic equipment
Technical field
The embodiments of the present invention relate to DATA REASONING, disappear more particularly, to the energy being used for measuring electronic equipment The method and apparatus of consumption.
Background technology
At present, one of most important energy source during electric energy has become as people's daily life and work.People are in family And/or office often uses various electronic equipment, such as, computer, refrigerator and television set etc..Mesh Before, although have been able to measure total energy of the electronic equipment of (such as, one family) in certain limit by installing ammeter Consume, but ammeter can not the energy expenditure of each electronic equipment of independent measurement.Along with remotely controlling and intelligent residence Development, how to measure for single electronic equipment and control become a study hotspot.
Have been developed over measuring the multiple technologies scheme of the energy expenditure of independent electronic equipment at present, but these technical sides Case is it is generally required to transform existing transmission line of electricity, or needs to dispose extra network for transmitting data, so that in a large number Man power and material put into.On the other hand, the production firm of some electronic equipment also have been developed the independent electronic equipment of measurement The technical scheme of energy expenditure, but each production firm generally uses between self-defining standard, and these standards Compatible poor.Thus, when expectation is measured and adds up the energy expenditure of each electronic equipment (such as, in one family), as What carries out data acquisition and carries out being uniformly processed and there is also bigger difficulty.
Along with popularizing of intelligent residence concept, people increasingly pay close attention to and manage in family in more intelligentized mode Each electronic equipment, thus the energy expenditure how measuring and managing single electronic equipment becomes urgently to be resolved hurrily asking Topic.
Summary of the invention
Accordingly, it is desirable to develop the technical scheme of a kind of energy expenditure that can measure electronic equipment, it is desirable to this technical scheme The energy expenditure of single electronic equipment can be accurately measured in the case of not changing existing transmission line structure. Further, also it is desirable to utilize the existing communication resource, in the case of need not building extra communication network, realize this skill as far as possible Art scheme.
In one aspect of the invention, it is provided that a kind of method of energy expenditure measuring electronic equipment, including: receive From the current value signals of an adapter k at least one adapter, wherein current value signals describe via adapter k to The current value that electronic equipment provides;And obtain electronic equipment energy expenditure in a time interval based on current value signals; Wherein adapter k is connected with intelligent electric meter by transmission line of electricity, and electronic device to adapter k is to receive via transmission line of electricity The electric current of transmission.
In one aspect of the invention, current value signals passes through Transmission Lines.
In one aspect of the invention, the method for the energy expenditure of a kind of subsidiary electronic equipment, including: at least The current value provided to electronic equipment via adapter k is provided at an adapter k in one adapter;And to Intelligent electric Table sends the current value signals describing current value;Wherein adapter k is connected with intelligent electric meter by transmission line of electricity, electronic equipment coupling It is bonded to adapter k to receive the electric current via transmission line of electricity transmission.
In one aspect of the invention, current value signals passes through Transmission Lines.
In other aspects of the present invention, additionally provide the device of energy expenditure for measuring electronic equipment.
Use method and apparatus of the present invention, it may not be necessary to revise the structure of existing transmission line of electricity, but only need Revise the setting of existing ammeter and at existing power supply socket, increase adapter;Methods and apparatus of the present invention can use Existing transmission line of electricity is as transmission medium, in order to transmit data between ammeter and adapter;It addition, by revising simply Ammeter and supply socket, method and apparatus of the present invention can also be readily integrated in the architecture of transmission line of electricity.
Accompanying drawing explanation
By combining accompanying drawing, disclosure illustrative embodiments is described in more detail, the disclosure above-mentioned and its His purpose, feature and advantage will be apparent from, wherein, in disclosure illustrative embodiments, and identical reference number Typically represent same parts.
Fig. 1 diagrammatically illustrates the block diagram being suitable to the exemplary context of use for realizing embodiment of the present invention;
Fig. 2 A diagrammatically illustrate according to a solution, for measuring the technical side of the energy expenditure of electronic equipment The Organization Chart of case;And Fig. 2 B diagrammatically illustrate according to another solution, for measuring the energy expenditure of electronic equipment The Organization Chart of technical scheme;
Fig. 3 diagrammatically illustrates the skill of the energy expenditure for measuring electronic equipment according to one embodiment of the present invention The Organization Chart of art scheme;
Fig. 4 A diagrammatically illustrates the energy expenditure for measuring electronic equipment according to one embodiment of the present invention The flow chart of method, and Fig. 4 B diagrammatically illustrates the energy for measuring electronic equipment according to another embodiment of the present invention The flow chart of the method that amount consumes;
Fig. 5 diagrammatically illustrates the skill of the energy expenditure for measuring electronic equipment according to one embodiment of the present invention The flow chart of art scheme;And
Fig. 6 A and Fig. 6 B diagrammatically illustrate respectively according to one embodiment of the present invention for measuring electronic equipment The block diagram of the device of energy expenditure.
Detailed description of the invention
It is more fully described the preferred implementation of the disclosure below with reference to accompanying drawings.Although accompanying drawing shows the disclosure Preferred implementation, however, it is to be appreciated that may be realized in various forms the disclosure and the embodiment party that should not illustrated here Formula is limited.On the contrary, it is provided that these embodiments are to make the disclosure more thorough and complete, and can be by the disclosure Scope intactly conveys to those skilled in the art.
Person of ordinary skill in the field knows, the present invention can be implemented as system, method or computer program. Therefore, the disclosure can be to be implemented as following form, it may be assumed that can be completely hardware, can also be that software (includes completely Firmware, resident software, microcode etc.), it is also possible to it is the form of hardware and software combination, referred to generally herein as " circuit ", " mould Block " or " system ".Additionally, in certain embodiments, the present invention is also implemented as at one or more computer-readable mediums In the form of computer program, this computer-readable medium comprises computer-readable program code.
The combination in any of one or more computer-readable medium can be used.Computer-readable medium can be to calculate Machine readable signal medium or computer-readable recording medium.Computer-readable recording medium can be such as but not limit In system, device or the device of electricity, magnetic, optical, electromagnetic, infrared ray or quasiconductor, or above combination.Calculate The more specifically example (non exhaustive list) of machine readable storage medium storing program for executing includes: have the electrical connection, just of one or more wire Take formula computer disk, hard disk, random access memory (RAM), read only memory (ROM), erasable type read-only storage able to programme Device (EPROM or flash memory), optical fiber, portable compact disc read only memory (CD-ROM), light storage device, magnetic memory device, Or the combination of above-mentioned any appropriate.In this document, computer-readable recording medium can be any to comprise or store journey The tangible medium of sequence, this program can be commanded execution system, device or device and use or in connection.
The data signal that computer-readable signal media can include in a base band or propagate as a carrier wave part, Wherein carry computer-readable program code.The data signal of this propagation can take various forms, including but It is not limited to electromagnetic signal, optical signal or the combination of above-mentioned any appropriate.Computer-readable signal media can also is that Any computer-readable medium beyond computer-readable recording medium, this computer-readable medium can send, propagate or Transmission is for by instruction execution system, device or device use or program in connection.
The program code comprised on computer-readable medium can with any suitable medium transmission, including but do not limit In wireless, electric wire, optical cable, RF etc., or the combination of above-mentioned any appropriate.
The computer for performing present invention operation can be write with one or more programming languages or a combination thereof Program code, described programming language includes object oriented program language-such as Java, Smalltalk, C++, also Including conventional process type programming language-such as " C " language or similar programming language.Program code can be complete Ground performs on the user computer, performs the most on the user computer, performs as an independent software kit, partly exists Subscriber computer upper part performs on the remote computer or performs on remote computer or server completely.Relating to In the situation of remote computer, remote computer can include LAN (LAN) or wide area by the network of any kind Net (WAN)-be connected to subscriber computer, or, it may be connected to outer computer (such as utilizes ISP to come Pass through Internet connection).
Below with reference to the embodiment of the present invention method, device (system) and the flow chart of computer program and/or Block diagram describes the present invention.Should be appreciated that each square frame in flow chart and/or each square frame of block diagram and flow chart and/or block diagram Combination, can be realized by computer program instructions.These computer program instructions can be supplied to general purpose computer, special Computer or the processor of other programmable data processing meanss, thus produce a kind of machine, these computer program instructions Performed by computer or other programmable data processing meanss, create in the square frame in flowchart and/or block diagram and advise The device of fixed function/operation.
These computer program instructions can also be stored in and can make computer or other programmable data processing meanss In the computer-readable medium worked in a specific way, so, the instruction being stored in computer-readable medium just produces one Command device (the instruction of the function/operation of regulation in the individual square frame included in flowchart and/or block diagram Means) manufacture (manufacture).
Computer program instructions can also be loaded into computer, other programmable data processing meanss or other equipment On so that on computer, other programmable data processing meanss or other equipment, perform sequence of operations step, in terms of producing The process that calculation machine realizes, so that the instruction performed on the computer or other programmable apparatus can provide flowchart And/or the process of the function/operation of regulation in the square frame in block diagram.
Fig. 1 diagrammatically illustrates the block diagram 100 being suitable to the exemplary context of use for realizing embodiment of the present invention.As Shown in Fig. 1, ammeter 110 is connected to transmission line of electricity, and in measuring such as one family, the total energy of each electronic equipment disappears Consumption.Electronic equipment 1 120, electronic equipment 2 122 ..., electronic equipment N 124 are connected to ammeter via transmission line of electricity respectively 110, and from transmission line of electricity to these power electronic equipment.In the environment, ammeter 110 can only measure each electronic equipment The sum of energy expenditure, and the energy expenditure of independent each electronic equipment can not be measured.
Fig. 2 A and Fig. 2 B diagrammatically illustrate respectively according to different solutions, disappear for measuring the energy of electronic equipment Organization Chart 200A and 200B of the technical scheme of consumption.
In the technical scheme shown in Fig. 2 A, for independent measurement each electronic equipment 1220A, electronic equipment 2 222A ..., the energy expenditure of electronic equipment N 224A, can connect ammeter 1 230A, ammeter at each electronic equipment respectively 2 232A ..., ammeter 3234A.It should be noted that, ammeter 1 230A in this embodiment, ammeter 2 232A ..., ammeter 3 234A is analogous to measure the ammeter of energy expenditure currently for each family, and this ammeter structure is complicated and also can take certain Space.In this way, although the energy expenditure of each electronic equipment can be measured respectively, but dispose at each electronic equipment Ammeter is worthless technical scheme.On the one hand being, ammeter belongs to precision instrument and relatively costly;Further aspect is that, User the supply socket on wall may be attached the supply socket of " one-to-many " and connect multiple electronic equipment, so electricity The quantity of subset is uncertain thus is difficult to.
It is used for measuring energy expenditure it addition, the production firm of some electronic equipment is integrated with " ammeter " in the electronic device. But, the standard that different production firms follow is different, how to read each from these from the electronic equipment of different production firms Energy expenditure be the work wasted time and energy.
In the technical scheme shown in Fig. 2 B, set up WLAN (such as, by the technology such as zigbee or bluetooth), And measure the energy of each electronic equipment (such as, electronic equipment 1 220B, electronic equipment 2 222B ..., electronic equipment N 224B) Amount consumes, and then utilizes corresponding wireless module (such as, wireless module 1 230B, wireless module 2 232B ..., wireless module N 234B) to transmit the data about energy expenditure to ammeter 210B by this WLAN.Owing to WLAN needs Special equipment support also needs professional to safeguard, thus this technical scheme is difficult to be generalized in average family use.
Based on the deficiency in above-mentioned solution, it is desired to be able in the situation not changing existing transmission line structure Under, accurately measure the energy expenditure of single electronic equipment.Fig. 3 diagrammatically illustrates according to one embodiment of the present invention For measuring the Organization Chart 300 of the technical scheme of the energy expenditure of electronic equipment.
In the embodiment shown in Fig. 3, at each electronic equipment (such as, electronic equipment 1320, electronic equipment 2 322 ..., electronic equipment N 324) and transmission line of electricity between respectively connection adaptor 1 330, adapter 2 332 ..., adaptive Device N 334.These adapters can measure the current value provided to each electronic equipment respectively, and in real time to intelligent electric meter Current value measured by 310 transmission.
It should be noted that, need not in this embodiment additionally dispose wireless network, but can be via at each electronics Power transmission line between equipment (electronic equipment 1 320, electronic equipment 2 322 ..., electronic equipment N 324) and intelligent electric meter 310 Road is transmitted.Adapter can be to be made as the form of power supply changeover device as shown in Figure 3, in order to user can install easily With dismounting adapter.In other words, when user expects the energy expenditure measuring certain electronic equipment, it is only necessary at supply socket and electricity It is attached between subset according to the adapter described in each embodiment of the present invention.
It addition, can also be integrated in supply socket according to the adapter described in each embodiment of the present invention;According to The concrete function of the intelligent electric meter described in each embodiment of the present invention can also be integrated in ordinary electric meter, in order at power transmission line Roadbed Infrastructure provides the measuring method according to each embodiment of the present invention and device.
It should be noted that, due to the different (current value that such as, air-conditioning is required under different wind speed of the duty of electronic equipment Different), can be the current instantaneous current value provided to electronic equipment at this current value.Furthermore it is also possible to think electronics The current value that equipment provides it when "Off" state is zero.
Fig. 4 A diagrammatically illustrates the energy expenditure for measuring electronic equipment according to one embodiment of the present invention The flow chart 400 of method.This diagrammaticalIy shows a kind of method of energy expenditure measuring electronic equipment, including: receive The current value signals of an adapter k at least one adapter, wherein current value signals describes via adapter k to electricity The current value that subset provides;And obtain electronic equipment energy expenditure in a time interval based on current value signals;Its Middle adapter k is connected with intelligent electric meter by transmission line of electricity, and electronic device to adapter k passes via transmission line of electricity to receive The electric current passed.
It should be noted that, according to the difference of concrete applied environment, intelligent electric meter can be associated with multiple adapters, and respectively Individual adapter can send, to intelligent electric meter, the current value being input in each electronic equipment, in real time then at intelligent electric meter Place, can calculate each electronic equipment the working time based on the magnitude of voltage at this current value, transmission line of electricity and electronic equipment Energy expenditure.
First, at step S402A, receive the current value signals from an adapter k at least one adapter, Wherein current value signals describes the current value provided via adapter k to electronic equipment.It should be noted that, current value signals can be Function f as current valuekThe signal through scaling of (function being associated with adapter k).Those skilled in the art are permissible According to real needs defined function fkFormula, detailed below.
At step S404A, obtain electronic equipment energy expenditure in a time interval based on current value signals, wherein Adapter k is connected with intelligent electric meter by transmission line of electricity, and electronic device to adapter k transmits via transmission line of electricity to receive Electric current.In this step, certain electronic equipment energy from the moment being " unpacked " to current time can such as be calculated in real time Amount consumes, in order to follow the tracks of the energy expenditure of each electronic equipment in real time;Or certain electronic equipment can also be calculated when specific Energy expenditure in section or whole period of being " unpacked ".
It should be noted that, can be performed or in being positioned at ammeter or be positioned in the module beyond ammeter execution by ammeter See the method described in Fig. 4 A.
In an embodiment of the invention, current value signals passes through Transmission Lines.In this embodiment, nothing Need to additionally dispose any Wireless Communication Equipment, various signal can be transmitted via transmission line of electricity.Cost is realized being substantially reduced While, it is thus also avoided that the complexity of additional maintenance cordless communication network.
In an embodiment of the invention, filtered noise signal at intelligent electric meter.It should be noted that, at intelligent electric meter Various noise factor may be there is, thus input noise wave filter can be set at intelligent electric meter, in order to filter in transmission of electricity Various noise signals in circuit.It addition, when receiving the current value signals from adapter via transmission line of electricity, it is also possible to Disturbed by various noises, thus carrier filter can also be utilized to filter out uncorrelated noise signal, in order to current value The extraction of signal.
In an embodiment of the invention, electronic equipment energy in time interval is obtained based on current value signals Consumption includes: extract current value from current value signals;And based on the magnitude of voltage at current value, transmission line of electricity and time zone Between, obtain electronic equipment energy expenditure in time interval.
Owing to current value signals can be as current value function fkThe signal through scaling, thus extract electricity herein The process of flow valuve can include carrying out inverse operation to obtain current value for current value signals.Furthermore it is possible to based on energy expenditure Computing formula (such as, E=U*I*t, wherein E represents that energy expenditure, U represent that voltage, I represent electric current, and t express time) count Calculate the energy expenditure of Single Electron equipment.
In an embodiment of the invention, the adapter k at least one adapter sends initializing signal, just Beginningization signal is for the parameter of specified current flow value signal;And wherein receive from an adapter at least one adapter The current value signals of k farther includes: based on the parameter specified in initializing signal, receives at least one adapter The current value signals of adapter k.When the purpose of transmission initializing signal is that link up execution communicates further with each adapter The messaging parameter taked.In an embodiment of the invention, to transmit to intelligent electric meter with carrier wave via transmission line of electricity Data, parameter herein may refer to the parameter of the fixed every terms of information relevant to carrier wave.
In an embodiment of the invention, parameter at least includes angular frequency.Such as, when at intelligent electric meter and adapter Between use carrier format when transmission line of electricity uploads delivery data, can first define carrier frequency.Angular frequency can be used at this The mode of rate describes carrier frequency.Thus, intelligent electric meter can be divided by the specific angle frequency included at initializing signal Not from different adapter communications.
In an embodiment of the invention, the initializing signal sent to adapter k is expressed as Wherein ωkAndIt is illustrated respectively between adapter k and intelligent electric meter angular frequency when transmitting data and phase place, AkAt the beginning of expression The amplitude of beginningization signal.
Those skilled in the art can arrange the angular frequency for each adapter k and phase place according to real needs.For For the sake of Jian Dan, can be by phase placeIt is set to 0.In this embodiment, each adapter can be associated with specific carrier frequency Rate.Such as, intelligent electric meter can select the frequency being suitable in a series of frequency ranges (e.g., 100Hz, 101Hz ..., 999Hz) Rate, its medium frequency f=ωk/2π.In this embodiment, the amplitude A of initializing signalkCan be predefined numerical value.Due to The transmission of transmissionization signal may be disturbed by noise, thus amplitude can be set to bigger value, in order to make an uproar The interference signal that sound produces makes a distinction.
Owing to frequency and the phase place of the current value signals from different adapters can be different, thus fit from difference Will not interfere between the current value signals of orchestration, intelligent electric meter can by the angular frequency being associated with special adapter and Phase place distinguishes which adapter a certain current value signals is from.
In an embodiment of the invention, current value signalsWherein fkRepresent Amplitude function, i represents current value.When using initializing signal mentioned above, based on the ω carried in initializing signalkWith AndDuring transmission current value signals, angular frequency and the phase place of carrier wave are respectively ωkWith
It will be appreciated by those skilled in the art that and can select different amplitude function f based on real needsk.Specifically, Can be simply by fkIt is set to constant (such as so that the numerical value of current value signals is 10 times of current value numerical value), or goes back Can select to be easy to detect from current value signals other functions of current value.
When amplitude function is fkTime, can be in the following way from current value signals SCurrentMiddle extraction current value i: solve Function fkInverse functionAnd to received current value signals SCurrentApply functionFor example, function is worked as fkWhen representing numerical value is actual current value 10 times of current value signals, the inverse operation appliedMay is that current value Numerical value is set to 1/10th of received current value signals.
In an embodiment of the invention, energy expenditureWherein U represents defeated Magnitude of voltage at electric line, t1-t2 express time is interval.Electric current i owing to providing to electronic equipment is probably real-time change, The mode of integration is asked for, it is possible to obtain electronic equipment is in the t1-t2 time thereby through the power being associated for instantaneous current value Energy expenditure in interval.
In an embodiment of the invention, the method realizes in analog circuit.Relative in prior art by Communicate in zigbee and/or bluetooth approach, embodiments of the present invention based on transmission line foundation facility at analog circuit Middle realization, this can be substantially reduced becoming of measuring circuit, transmission circuit and counting circuit involved in calculating energy expenditure This.It addition, use analog circuit to realize each embodiment of the present invention, for the energy expenditure by measuring independent electronic equipment Technical scheme be integrated in the infrastructure of transmission line of electricity and provide probability.
The energy for subsidiary electronic equipment that Fig. 4 B diagrammatically illustrates according to another embodiment of the present invention disappears The flow chart 400 of the method for consumption.A kind of method that the figure shows energy expenditure measuring electronic equipment, including: at least one The current value provided to electronic equipment via adapter k is provided at an adapter k in individual adapter;And to intelligent electric meter Send the current value signals describing current value;Wherein adapter k is connected with intelligent electric meter by transmission line of electricity, electronic device To adapter k to receive the electric current via transmission line of electricity transmission.
Specifically, at step S402B, measure via adapter k at an adapter k at least one adapter The current value provided to electronic equipment.In this embodiment, each adapter can be measured and carry to electronic equipment via self The current value of confession.
Then, at step S404B, the current value signals describing current value is sent to intelligent electric meter;Wherein adapter k leads to Crossing transmission line of electricity to be connected with intelligent electric meter, electronic device to adapter k is to receive the electric current via transmission line of electricity transmission.Should Working as attention, consistent with the content of the mentioned above method performed at intelligent electric meter, current value signals can be as electricity The function f of flow valuvekThrough scaling signal.Those skilled in the art can be according to real needs defined function fkFormula, example As, for ease of carrying out detecting at intelligent electric meter, the amplitude of current value signals is set to 10 times of actual current value.
In an embodiment of the invention, current value signals passes through Transmission Lines.In this embodiment, nothing Need to additionally dispose any Wireless Communication Equipment, various signal can be transmitted via transmission line of electricity.Cost is realized being substantially reduced While, it is thus also avoided that the complexity of additional maintenance cordless communication network.
In an embodiment of the invention, farther include: filtered noise signal at least one adapter.? In this embodiment, the interference of many noise factor may be there is at adapter, such as, may on transmission line of electricity There is noise factor, electronic equipment and operationally may produce noise.Therefore, it is possible to various noises are carried out at adapter Filter, in order to the current value provided to electronic equipment is be provided.
In an embodiment of the invention, farther include: receive the initializing signal from intelligent electric meter;And Based on the parameter specified in initializing signal, transmit current value signals to intelligent electric meter.Believe in the initialization from intelligent electric meter Specifying in number and transmit the parameter of carrier wave that data are based between intelligent electric meter and adapter, when adapter, to receive this first After beginningization signal, the current value signals of current value can be described to intelligent electric meter transmission in real time according to corresponding parameter.At this In one embodiment of invention, parameter at least includes angular frequency.
In an embodiment of the invention, the initializing signal received at adapter k is expressed asWherein ωkAndIt is illustrated respectively between adapter k and intelligent electric meter angle during transmission data Frequency and phase place, AkRepresent the amplitude of initializing signal.It is described above determining of every content in initializing signal Justice, thus repeat no more.
In an embodiment of the invention, current value signalsWherein fkRepresent Amplitude function, i represents current value.It is described above the definition of every content in current value signals, thus the most superfluous State.
In an embodiment of the invention, the method realizes in analog circuit.Those skilled in the art can root Carry out implementing of design simulation circuit according to concrete applied environment, such as, can select suitable amplifying circuit, wave filter, signal The devices such as maker realize.
Fig. 5 diagrammatically illustrates the skill of the energy expenditure for measuring electronic equipment according to one embodiment of the present invention The flow chart 500 of art scheme.As it is shown in figure 5, first intelligent electric meter 510 sends initializing signal (such as step A to adapter 520 Shown in), initializing signal in this carries the carrier wave communicated between intelligent electric meter 510 and adapter 520 and is correlated with Parameter (such as, including angular frequency, or phase place can also be included).
Then, the current value (as shown in stepb) provided to electronic equipment measured by adapter 520.It should be noted that, now survey The current value of examination is the instantaneous value that the running status with electronic equipment is associated, such as, and the then electric current when electronic equipment is "Off" Value is zero, when electronic equipment in a dormant state time current value less, and current value is relatively when electronic equipment is in running status Greatly.
In step C, send the current value signals being associated with current value to intelligent electric meter 510 based on initializing signal. Then, at intelligent electric meter 510, current value (as shown in Step D) is extracted from current value signals, and at step E, based on electricity Magnitude of voltage at flow valuve, transmission line of electricity and time interval, obtain electronic equipment energy expenditure in time interval.
See Fig. 4 A and Fig. 4 B above and describe the step performed at intelligent electric meter and adapter respectively, at this Repeat no more.It addition, Fig. 5 only generally shows the committed step of the method for the energy expenditure for measuring electronic equipment, Those skilled in the art can be combined with the technical characteristic in other embodiments above.For example, it is also possible at intelligent electric meter 510 With execution at adapter 520, such as noise is carried out the steps such as filtration.
Fig. 6 A and Fig. 6 B diagrammatically illustrate respectively according to one embodiment of the present invention for measuring electronic equipment The block diagram of the device of energy expenditure.In fig. 6, it is shown that the intelligent electric meter of a kind of energy expenditure measuring electronic equipment, bag Include: receiver module 610A, be configured to receive the current value signals from an adapter k at least one adapter, its Middle current value signals describes the current value provided via adapter k to electronic equipment;And acquisition module 620A, it is configured to base Electronic equipment energy expenditure in a time interval is obtained in current value signals;Wherein adapter k passes through transmission line of electricity and intelligence Can connect by ammeter, electronic device to adapter k is to receive the electric current via transmission line of electricity transmission.
In an embodiment of the invention, current value signals passes through Transmission Lines.
In an embodiment of the invention, farther include: filtering module, be configured to filter at intelligent electric meter Noise signal.
In an embodiment of the invention, acquisition module 620B includes: extraction module, is configured to believe from current value Number extract current value;And energy expenditure acquisition module, it is configured to the magnitude of voltage at based on current value, transmission line of electricity with in time Between interval, obtain electronic equipment energy expenditure in time interval.
In an embodiment of the invention, farther include: initialization module, be configured to at least one adaptive Adapter k in device sends initializing signal, and initializing signal is for the parameter of specified current flow value signal;And signal receives mould Block, is configured to, based on the parameter specified in initializing signal, receive the electric current from the adapter k at least one adapter Value signal.
In an embodiment of the invention, parameter at least includes angular frequency.
In an embodiment of the invention, the initializing signal sent to adapter k is expressed asWherein ωkAndIt is illustrated respectively between adapter k and intelligent electric meter angle during transmission data Frequency and phase place, AkRepresent the amplitude of initializing signal.
In an embodiment of the invention, current value signalsWherein fkRepresent Amplitude function, i represents current value.
In an embodiment of the invention, energy expenditureU represents transmission line of electricity The magnitude of voltage at place, t1-t2 express time is interval.
Fig. 6 B shows the adapter of the energy expenditure of a kind of subsidiary electronic equipment, including: test module 610B, join The current value provided to electronic equipment via adapter for measurement is provided;And sending module 620B, it is configured to Intelligent electric Table sends the current value signals describing current value;Wherein adapter is connected with intelligent electric meter by transmission line of electricity, electronic equipment coupling It is bonded to adapter to receive the electric current via transmission line of electricity transmission.
In an embodiment of the invention, current value signals passes through Transmission Lines.
In an embodiment of the invention, farther include: filtering module 630B, be configured to filter at adapter Noise signal.
In an embodiment of the invention, farther include: initialization module, be configured to receive from Intelligent electric The initializing signal of table;And signal transmitting module, it is configured to based on the parameter specified in initializing signal, to intelligent electric meter Transmission current value signals.
In an embodiment of the invention, parameter at least includes angular frequency.
In an embodiment of the invention, initializing signal is expressed asWherein ω and Being illustrated respectively between adapter and intelligent electric meter angular frequency when transmitting data and phase place, A represents the amplitude of initializing signal.
In an embodiment of the invention, current value signalsWherein f represents amplitude Function, i represents current value.
In an embodiment of the invention, it is provided that a kind of method of energy expenditure measuring electronic equipment, including: At intelligent electric meter: receive the current value signals from an adapter k at least one adapter, wherein current value signals The current value provided to electronic equipment via adapter k is described;And obtain electronic equipment in the time based on current value signals Energy expenditure in interval;At an adapter k at least one adapter: measure via adapter k to electronic equipment The current value provided;And the current value signals of description current value is sent to intelligent electric meter;Wherein adapter k passes through transmission line of electricity Being connected with intelligent electric meter, electronic device to adapter k is to receive the electric current via transmission line of electricity transmission.
In an embodiment of the invention, it is provided that the system of a kind of energy expenditure measuring electronic equipment, including: According to intelligent electric meter above and adapter.
It should be noted that, those skilled in the art can according to the requirement of applied environment designed, designed according to the intelligence of the present invention Can ammeter and the physical circuit realization of adapter.Furthermore it is possible to realize according to the present invention's based on to the upgrading of existing ammeter Intelligent electric meter, for example, it is possible to be designed to and the measurement module of the adapter co-ordination according to the present invention, and by this measurement mould Block is integrated in existing ammeter to realize the intelligent electric meter according to the present invention, or this measurement module can also be via transmission line of electricity Or other transmission mediums coupled to existing ammeter, to realize the function according to intelligent electric meter of the present invention.
Those skilled in the art can use various ways to realize functional module as shown in Figure 6 A and 6 B.In Fig. 6 A institute In the schematic diagram shown, filtering module 630A is coupled to transmission line of electricity and carried out for the signal carried on transmission line of electricity Filter, filtering module 630A such as can use the electronic devices such as wave filter to realize.Receiver module 610A can be coupled respectively to Filter module 630A and acquisition module 620A, the current value signals that receiver module 610A is received can be as acquisition module 620A's Input, and acquisition module 620A such as can use amplifying circuit, integrating circuit etc. to realize.Similarly, art technology Personnel principle based on current measurement circuit can realize the measurement module 610B in adapter 600B, based on carrier generator Principle realizes sending module 620B, and realizes filtering module 630B based on wave filter.
Additionally, method as described above and process can also use other hardware modules to realize, include but not limited to: special Other of integrated circuit (ASIC) chip, field programmable gate array (FPGA), and currently known or in the future exploitation are able to programme Logical device.When hardware module activates, this hardware module performs to be included in the method in this hardware module and process.
Flow chart and block diagram in accompanying drawing show the system of multiple embodiments according to the present invention, method and computer journey Architectural framework in the cards, function and the operation of sequence product.In this, each square frame in flow chart or block diagram can generation One module of table, program segment or a part for code, a part for described module, program segment or code comprises one or more use Executable instruction in the logic function realizing regulation.It should also be noted that at some as in the realization replaced, square frame is marked The function of note can also occur to be different from the order marked in accompanying drawing.Such as, two continuous print square frames can essentially base Originally being performed in parallel, they can also perform sometimes in the opposite order, and this is depending on involved function.It is also noted that It is, the combination of the square frame in each square frame in block diagram and/or flow chart and block diagram and/or flow chart, can be with performing rule The special hardware based system of fixed function or operation realizes, or can be by the group of specialized hardware with computer instruction Incompatible realization.
Being described above various embodiments of the present invention, described above is exemplary, and non-exclusive, and also It is not limited to disclosed each embodiment.In the case of the scope and spirit without departing from illustrated each embodiment, for this skill For the those of ordinary skill in art field, many modifications and changes will be apparent from.The selection of term used herein, purport Explaining the principle of each embodiment, actual application or the technological improvement to the technology in market best, or making this technology lead Other those of ordinary skill in territory are understood that each embodiment disclosed herein.

Claims (24)

1. the method measuring the energy expenditure of electronic equipment, including:
Receive the current value signals by Transmission Lines from an adapter k at least one adapter, wherein Described current value signals describes the current value provided via described adapter k to described electronic equipment, and described current value signals is The signal through scaling as current value function;And
Described electronic equipment energy expenditure in a time interval is obtained based on described current value signals;
Wherein said adapter k is connected with intelligent electric meter by transmission line of electricity, described electronic device extremely described adapter k with Receive the electric current transmitted via described transmission line of electricity.
Method the most according to claim 1, farther includes:
Filtered noise signal at described intelligent electric meter.
3., according to the method according to any one of claim 1-2, wherein obtain described electronics based on described current value signals and set Standby energy expenditure in described time interval includes:
Described current value is extracted from described current value signals;And
Based on the magnitude of voltage at described current value, described transmission line of electricity and described time interval, obtain described electronic equipment and exist Energy expenditure in described time interval.
4., according to the method according to any one of claim 1-2, farther include:
Described adapter k at least one adapter described sends initializing signal, and described initializing signal is used for specifying The parameter of described current value signals;And
Wherein receive the current value signals from an adapter k at least one adapter to farther include: based on described The parameter specified in initializing signal, receives the current value signals from the described adapter k at least one adapter described.
Method the most according to claim 4, described parameter at least includes angular frequency.
Method the most according to claim 5, wherein: the described initializing signal sent to described adapter k is expressed as
Wherein ωkAndIt is illustrated respectively between described adapter k and described intelligent electric meter angular frequency when transmitting data and phase Position, AkRepresent the amplitude of described initializing signal.
7. a method for the energy expenditure of subsidiary electronic equipment, including:
At an adapter k at least one adapter, measurement provides to described electronic equipment via described adapter k Current value;And
Send the current value signals describing described current value to intelligent electric meter, described current value signals passes through Transmission Lines, And described current value signals is the signal through scaling as current value function;
Wherein said adapter k is connected with described intelligent electric meter by transmission line of electricity, described electronic device to described adaptation The electric current that device k transmits via described transmission line of electricity with reception.
Method the most according to claim 7, farther includes:
Filtered noise signal at least one adapter described.
9., according to the method according to any one of claim 7-8, farther include:
Receive the initializing signal from described intelligent electric meter;And
Based on the parameter specified in described initializing signal, transmit described current value signals to described intelligent electric meter.
Method the most according to claim 9, described parameter at least includes angular frequency.
11. methods according to claim 10, wherein said initializing signal is expressed as
Wherein ωkAndIt is illustrated respectively between described adapter k and described intelligent electric meter angular frequency when transmitting data and phase Position, AkRepresent the amplitude of described initializing signal.
The intelligent electric meter of 12. 1 kinds of energy expenditures measuring electronic equipment, including:
Receiver module, is configured to receive and passes through Transmission Lines from an adapter k at least one adapter Current value signals, wherein said current value signals describes the current value that provides via described adapter k to described electronic equipment, And described current value signals is the signal through scaling as current value function;And
Acquisition module, is configured to obtain described electronic equipment energy in a time interval based on described current value signals and disappears Consumption;
Wherein said intelligent electric meter and described adapter k are connected by transmission line of electricity, described electronic device to described adaptation The electric current that device k transmits via described transmission line of electricity with reception.
13. intelligent electric meters according to claim 12, farther include:
Filtering module, is configured to filter the noise signal at described intelligent electric meter.
14. include according to the intelligent electric meter according to any one of claim 12-13, wherein said acquisition module:
Extraction module, is configured to extract described current value from described current value signals;And
Energy expenditure acquisition module, be configured to the magnitude of voltage at based on described current value, described transmission line of electricity and described time Between interval, obtain described electronic equipment energy expenditure in described time interval.
15., according to the intelligent electric meter according to any one of claim 12-13, farther include:
Initialization module, the described adapter k being configured at least one adapter described sends initializing signal, described Initializing signal is for specifying the parameter of described current value signals;And
Signal receiving module, is configured to based on the parameter specified in described initializing signal, receive from described at least one The current value signals of the described adapter k in adapter.
16. intelligent electric meters according to claim 15, described parameter at least includes angular frequency.
17. intelligent electric meters according to claim 16, wherein: the described initializing signal table sent to described adapter k It is shown as
Wherein ωkAndIt is illustrated respectively between described adapter k and described intelligent electric meter angular frequency when transmitting data and phase Position, AkRepresent the amplitude of described initializing signal.
The adapter of the energy expenditure of 18. 1 kinds of subsidiary electronic equipments, including:
Test module, is configured to measure the current value provided via described adapter to described electronic equipment;And
Sending module, is configured to send the current value signals describing described current value, described current value signals to intelligent electric meter By Transmission Lines, and described current value signals is the signal through scaling as current value function;
Wherein said intelligent electric meter and described adapter are connected by transmission line of electricity, described electronic device to described adapter The electric current transmitted via described transmission line of electricity with reception.
19. adapters according to claim 18, farther include:
Filtering module, is configured to filter the noise signal at described adapter.
20., according to the adapter according to any one of claim 18-19, farther include:
Initialization module, is configured to receive the initializing signal from described intelligent electric meter;And
Signal transmitting module, is configured to, based on the parameter specified in described initializing signal, transmit institute to described intelligent electric meter State current value signals.
21. adapters according to claim 20, described parameter at least includes angular frequency.
22. adapters according to claim 21, wherein said initializing signal is expressed as
Wherein ω andIt is illustrated respectively between described adapter with described intelligent electric meter angular frequency when transmitting data and phase Position, A represents the amplitude of described initializing signal.
The method of 23. 1 kinds of energy expenditures measuring electronic equipment, including:
At intelligent electric meter:
Receive the current value signals by Transmission Lines from an adapter k at least one adapter, wherein Described current value signals describes the current value provided via described adapter k, and described current value letter to described electronic equipment It number it is the signal through scaling as current value function;And
Described electronic equipment energy expenditure in a time interval is obtained based on described current value signals;
At an adapter k at least one adapter:
The current value provided to described electronic equipment via described adapter k is provided;And
The current value signals describing described current value is sent to intelligent electric meter;
Wherein said intelligent electric meter and described adapter k are connected by transmission line of electricity, described electronic device to described adaptation The electric current that device k transmits via described transmission line of electricity with reception.
The system of 24. 1 kinds of energy expenditures measuring electronic equipment, including: intelligent electric meter according to claim 12 and Adapter according to claim 18.
CN201210491708.2A 2012-11-27 2012-11-27 The method and apparatus measuring the energy expenditure of electronic equipment Active CN103837737B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210491708.2A CN103837737B (en) 2012-11-27 2012-11-27 The method and apparatus measuring the energy expenditure of electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210491708.2A CN103837737B (en) 2012-11-27 2012-11-27 The method and apparatus measuring the energy expenditure of electronic equipment

Publications (2)

Publication Number Publication Date
CN103837737A CN103837737A (en) 2014-06-04
CN103837737B true CN103837737B (en) 2016-12-21

Family

ID=50801442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210491708.2A Active CN103837737B (en) 2012-11-27 2012-11-27 The method and apparatus measuring the energy expenditure of electronic equipment

Country Status (1)

Country Link
CN (1) CN103837737B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2525526Y (en) * 2002-02-07 2002-12-11 程世良 Carrier wave electric meter
CN2557922Y (en) * 2002-07-08 2003-06-25 深圳市兴源供水设备开发公司 Electronic long distance transmitting meter
CN101364096A (en) * 2007-08-10 2009-02-11 天津港股份有限公司煤码头分公司 Automatic monitoring and intelligent analysis system for electric consumption for continuous conveying equipment
DE202009007023U1 (en) * 2009-05-15 2009-08-20 Frieters Steuerungstechnik Gmbh Signal transmission via intermediate plugs
CN201788225U (en) * 2009-11-18 2011-04-06 上海金陵智能电表有限公司 Single-phase intelligent electric energy meter with wireless meter reading module
CN102062813A (en) * 2009-11-18 2011-05-18 上海金陵智能电表有限公司 Single-phase intelligent watt-hour meter with carrier meter reading module
CN102109840A (en) * 2010-12-10 2011-06-29 深圳市科陆电子科技股份有限公司 Intelligent control system and control method thereof for home appliances
CN102215150A (en) * 2011-05-31 2011-10-12 北京许继电气有限公司 Smart home system for integrating power supply with communication on basis of Internet of Things
CN102263593A (en) * 2011-04-06 2011-11-30 深圳市开锐光通信技术有限公司 FTTH (fiber to the home)-based energy efficiency intelligent management and broadband access system and method
CN102292895A (en) * 2008-12-24 2011-12-21 电子部品研究院 System and methods for reducing standby power and monitoring electric energy consumed by home appliances and home network devices
CN102591276A (en) * 2012-01-18 2012-07-18 山东工商学院 Intelligent electric meter system for residents for intelligent smart grid

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2525526Y (en) * 2002-02-07 2002-12-11 程世良 Carrier wave electric meter
CN2557922Y (en) * 2002-07-08 2003-06-25 深圳市兴源供水设备开发公司 Electronic long distance transmitting meter
CN101364096A (en) * 2007-08-10 2009-02-11 天津港股份有限公司煤码头分公司 Automatic monitoring and intelligent analysis system for electric consumption for continuous conveying equipment
CN102292895A (en) * 2008-12-24 2011-12-21 电子部品研究院 System and methods for reducing standby power and monitoring electric energy consumed by home appliances and home network devices
DE202009007023U1 (en) * 2009-05-15 2009-08-20 Frieters Steuerungstechnik Gmbh Signal transmission via intermediate plugs
CN201788225U (en) * 2009-11-18 2011-04-06 上海金陵智能电表有限公司 Single-phase intelligent electric energy meter with wireless meter reading module
CN102062813A (en) * 2009-11-18 2011-05-18 上海金陵智能电表有限公司 Single-phase intelligent watt-hour meter with carrier meter reading module
CN102109840A (en) * 2010-12-10 2011-06-29 深圳市科陆电子科技股份有限公司 Intelligent control system and control method thereof for home appliances
CN102263593A (en) * 2011-04-06 2011-11-30 深圳市开锐光通信技术有限公司 FTTH (fiber to the home)-based energy efficiency intelligent management and broadband access system and method
CN102215150A (en) * 2011-05-31 2011-10-12 北京许继电气有限公司 Smart home system for integrating power supply with communication on basis of Internet of Things
CN102591276A (en) * 2012-01-18 2012-07-18 山东工商学院 Intelligent electric meter system for residents for intelligent smart grid

Also Published As

Publication number Publication date
CN103837737A (en) 2014-06-04

Similar Documents

Publication Publication Date Title
US10386211B2 (en) Smart water management system
Pavan et al. Multicriteria decision making methods
CN107246959B (en) A kind of diagnostic system and method for the equipment fault based on wireless sensor
US20180292983A1 (en) Methods and systems for assigning asset sensor tags to analytic input ports
CN104240008A (en) Hospital quality improving system for patient satisfaction investigation and analysis on basis of cloud platform
US20190372798A1 (en) Scalable facility data monitoring with self-installation
CN109472496A (en) Workflow construction method and device based on visualization guidance and automatic Verification
EP3091487A1 (en) Network deployment for cellular, backhaul, fiber optic and other network infrastructure
CN112292703A (en) Equipment management method, device, system and storage medium
CN108848337A (en) Long-range auditing method, device, terminal and the computer storage medium of line project
CN109815448A (en) Lantern slide generation method and device
Hauser et al. Interoperability: the key for smart water management
Dorji et al. An extensive critique on smart grid technologies: Recent advancements, key challenges, and future directions
CN103837737B (en) The method and apparatus measuring the energy expenditure of electronic equipment
Franco et al. A cyber-physical approach for residential energy management: Current state and future directions
CN103973796A (en) Water quality real-time monitoring and early warning system based on android platform
CN109711053A (en) Based on industrial big data Research on Fan Fault Forecasting method and system
CN110445847A (en) A kind of meter register method and device based on wechat small routine
CN105631606A (en) Energy data management system and energy data management method based on energy metering network diagram
CN113112127B (en) Metering management method and system based on artificial intelligence
Meloni et al. Bandwidth and accuracy-aware state estimation for smart grids using software defined networks
JP2022077028A (en) Method for generating power, computer program, system, and computer readable recording medium
CN204790512U (en) System of wisdom family
US20170059633A1 (en) Power monitoring system and method for monitoring power thereof
CN106130420A (en) Vertical coil winding machine method for controlling number of revolution based on motor and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211104

Address after: USA New York

Patentee after: Qindarui Co.

Address before: Armank, New York, USA

Patentee before: International Business Machines Corp.

TR01 Transfer of patent right