CN103835221A - Closely arranged frame bridge structure of high speed railway switch area - Google Patents
Closely arranged frame bridge structure of high speed railway switch area Download PDFInfo
- Publication number
- CN103835221A CN103835221A CN201210491120.7A CN201210491120A CN103835221A CN 103835221 A CN103835221 A CN 103835221A CN 201210491120 A CN201210491120 A CN 201210491120A CN 103835221 A CN103835221 A CN 103835221A
- Authority
- CN
- China
- Prior art keywords
- bridge
- speed railway
- frames
- high speed
- switch area
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention belongs to the technical field of bridge structures, and particularly relates to a closely arranged frame bridge structure of a high speed railway switch area. The bridge structure comprises a base plate located on a foundation, a side wall and a train walking roof. A plurality of closely arranged frames are formed by the base plate, the side wall and the train walking roof, the aperture of the frames which are perpendicular to the switch area ranges from 8 m to10-m, and a gap among the frames in the train driving direction is 2cm. The closely arranged frame bridge structure of the high speed railway switch area has the advantages that stress is clear, the structure is reasonable and the economy is good, requirements on a bridge longitudinal stiffness, a transverse stiffness and a displacement of the high speed railway switch are met, construction is convenient and fast, the construction process can move fast, service life of the structure is assured, traffic of a road under the frames can be also assured, the frames without interchange can be developed for business purposes, and that is to say, one bridge has three functions.
Description
Technical field
The invention belongs to bridge construction technical field, be specifically related to a kind of high-speed railway switch district solid matter frame bridge girder construction.
Background technology
At present, to establish the design and construction problem of bridge be the problem receiving much concern always high-speed railway switch district, particularly bottle-neck section.At railway station bottle-neck section, be traditionally arranged to be roadbed, there is no the precedent that bridge is set at bottle-neck section.But switch area (single group track switch), bridge is due to the requirement of high-speed railway seamless track switch to bridge construction, the general beam structure that adopts, whole group of track switch is all placed on a binding beam, structure relative complex, simultaneously because many group track switches can not be located on a binding beam simultaneously, track switch need be pulled open certain distance, cause bridge height, length to increase, in addition because switch area bridge design, constructional difficulties, construction quality are difficult to guarantee completely, and long construction period, often affects construction quality, duration of a project and construction investment.
Thereby for switch area, particularly bottle-neck section bridge, how to choose rational bridge construction form, to overcome the requirement of high-speed railway seamless track switch to bridge pier, beam rigidity, again can convenient construction, maintenance, improve the endurance quality of structure, guarantee the application life of structure, this is one of key technology of urgently studying and solving.
Summary of the invention
The object of the invention is for above-mentioned technical problem, provide a kind of stressed clear and definite, structure rationally, good economy performance, high-speed railway pier, beam strength, rigidity requirement can finely be met, convenient and quick construction, the high-speed railway switch district solid matter frame bridge girder construction that stencil design is simple, construction turnover is fast.
Technical scheme of the present invention is: high-speed railway switch district solid matter frame bridge girder construction comprises the base plate, abutment wall and the driving top board that are positioned on basis, described base plate, abutment wall and driving top board form some solid matter frameworks, described framework is 8-10m perpendicular to the aperture of switch area, between framework, is not more than 2cm along the gap that This train is bound for XXX.
Section with High Speed Switch of the present invention solid matter frame bridge girder construction, adopt the framework in 8-10m aperture to lay perpendicular to switch area main track, bullet train is sailed in frame plate top line, between framework, be 2cm along line direction gap, both met the requirement of high-speed switch to bridge vertical, horizontal rigidity, displacement, can take into account the current of road under framework simultaneously, also can double as business development without the framework of grade separation, be bridge three use simultaneously.Solid matter frame foundation can be selected open cut foundation or pile foundation according to geological conditions, and framework adopts construction with brackets.
The Section with High Speed Switch solid matter frame bridge girder construction that the present invention proposes, stressed clear and definite, structure rationally, good economy performance, can finely meet highway bridge to intensity, rigidity requirement, convenient and quick construction, construction turnover is fast, the application life of guaranteeing structure.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail, be convenient to be well understood to the present invention, but they do not form restriction to the present invention.
High-speed railway switch district solid matter frame bridge girder construction as shown in Figure 1 comprises the base plate, abutment wall and the driving top board that are positioned on basis, base plate, abutment wall and driving top board form some solid matter frameworks, framework is 8-10m perpendicular to the aperture of switch area, between framework, is 2cm along the gap that This train is bound for XXX.
The present invention adopts the framework in 8-10m aperture to lay perpendicular to switch area main track, bullet train is sailed in frame plate top line, between framework, be 2cm along line direction gap, both met the requirement of high-speed switch to bridge vertical, horizontal rigidity, displacement, can take into account the current of road under framework simultaneously, also can double as business development without the framework of grade separation, be bridge three use simultaneously.Solid matter frame foundation can be selected open cut foundation or pile foundation according to geological conditions, and framework adopts construction with brackets.
General railway is before entering the station, because track becomes and makees even 12 lines of 6 lines from two-wire, due to high-speed railway seamless track switch to the beam seam of bridge construction the relativeness with track switch, bridge construction lateral displacement is no more than the harsh technical requirements of 1mm, switch area particularly bottle-neck section establish conventional bridge and cannot realize at all, therefore bottle-neck section is generally located on roadbed.But due to the impact of the fringe conditions such as line condition and grade separation, part station bottleneck must be arranged on bridge.Section with High Speed Switch of the present invention solid matter frame bridge girder construction, has solved this difficult problem well.Because the firm structure construction of conventional span is simple, short construction period, can reduce investment, can save the duration again, has good society and economic benefit.
Claims (1)
1. a high-speed railway switch district solid matter frame bridge girder construction, comprise the base plate, abutment wall and the driving top board that are positioned on basis, it is characterized in that: described base plate, abutment wall and driving top board form some solid matter frameworks, described framework is 8-10m perpendicular to the aperture of switch area, between framework, is not more than 2cm along the gap that This train is bound for XXX.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210491120.7A CN103835221A (en) | 2012-11-27 | 2012-11-27 | Closely arranged frame bridge structure of high speed railway switch area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210491120.7A CN103835221A (en) | 2012-11-27 | 2012-11-27 | Closely arranged frame bridge structure of high speed railway switch area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103835221A true CN103835221A (en) | 2014-06-04 |
Family
ID=50799088
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210491120.7A Pending CN103835221A (en) | 2012-11-27 | 2012-11-27 | Closely arranged frame bridge structure of high speed railway switch area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103835221A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105887587A (en) * | 2016-04-29 | 2016-08-24 | 中铁第四勘察设计院集团有限公司 | Turnout zone and non-turnout zone transition section structure for medium and low-speed magnetic levitation low implantation line |
CN106120853A (en) * | 2016-06-30 | 2016-11-16 | 中铁第四勘察设计院集团有限公司 | A kind of inverted construction method of frame bridge |
CN109930437A (en) * | 2019-03-18 | 2019-06-25 | 中铁第四勘察设计院集团有限公司 | A kind of straddle-type monorail section turnout junction girder picks up the transition system at station |
-
2012
- 2012-11-27 CN CN201210491120.7A patent/CN103835221A/en active Pending
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105887587A (en) * | 2016-04-29 | 2016-08-24 | 中铁第四勘察设计院集团有限公司 | Turnout zone and non-turnout zone transition section structure for medium and low-speed magnetic levitation low implantation line |
CN105887587B (en) * | 2016-04-29 | 2017-06-13 | 中铁第四勘察设计院集团有限公司 | A kind of low circuit switch area of putting of medium-and low-speed maglev is with non-switch area transition section structure |
WO2017185906A1 (en) * | 2016-04-29 | 2017-11-02 | 中铁第四勘察设计院集团有限公司 | Transitional structure for turnout and non-turnout zones in low-set, mid-to-low speed magnetic levitation lines |
CN106120853A (en) * | 2016-06-30 | 2016-11-16 | 中铁第四勘察设计院集团有限公司 | A kind of inverted construction method of frame bridge |
CN109930437A (en) * | 2019-03-18 | 2019-06-25 | 中铁第四勘察设计院集团有限公司 | A kind of straddle-type monorail section turnout junction girder picks up the transition system at station |
CN109930437B (en) * | 2019-03-18 | 2023-12-19 | 中铁第四勘察设计院集团有限公司 | Transition system of straddle type monorail section turnout beam connection station |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103452036B (en) | Split streamline steel-concrete composite box girder | |
CN201144398Y (en) | Straddling type track traffic elevated 'bridge-build' structure | |
CN203639800U (en) | Split streamline steel-concrete composite box girder | |
CN105735101A (en) | High-speed railway rush repair beam capable of being converted into permanent bridge structure, and rush repair method of high-speed railway rush repair beam | |
CN110359355A (en) | Combine beam section in the case of rail-road mixed-arrangement-purlin | |
CN203462399U (en) | Railway continuous steel box girder | |
CN103835221A (en) | Closely arranged frame bridge structure of high speed railway switch area | |
CN205443907U (en) | Double track railway box web letter branching groove ellbeam | |
CN113652948A (en) | High-speed railway cable-stayed bridge with improved rigidity | |
CN201390928Y (en) | Support rail continuous beam in double track railway | |
CN202530370U (en) | Channel steel-concrete composite beam with novel shear connector | |
CN201459610U (en) | D-type construction temporary beam of improved railway | |
CN110130201A (en) | A kind of half floats the cable-stayed bridge of truss-like bridge tower | |
CN206438381U (en) | high-speed railway steel-concrete combination beam | |
CN105714627A (en) | Combined box type track beam with open bottom plates and suspended top plate | |
CN210482019U (en) | High-pier large-span station bridge structure of high-speed railway in hard mountain area | |
CN205501788U (en) | Convertiblely salvage roof beam for permanent bridge structures's high -speed railway | |
CN107642010A (en) | Medium-and low-speed maglev traffic system straightway support rail beam | |
CN203034346U (en) | Closely arranged framework bridge structure of high speed railway turnout zone | |
CN202000221U (en) | Ballastless track structure for steep slope subgrade | |
CN106638261A (en) | Railway bridge separated dual-box pre-stressed concrete main girder structure | |
CN102296527A (en) | Portal pier continuous rigid frame beam | |
CN204174481U (en) | Soft clay area modern tram abutment rebound structure | |
CN111636294A (en) | High-pier large-span station bridge structure of high-speed railway in hard mountain area | |
CN202787106U (en) | Sound barrier plate fixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140604 |