CN103821339B - Operation platform modular unit and operation platform thereof - Google Patents

Operation platform modular unit and operation platform thereof Download PDF

Info

Publication number
CN103821339B
CN103821339B CN201410085596.XA CN201410085596A CN103821339B CN 103821339 B CN103821339 B CN 103821339B CN 201410085596 A CN201410085596 A CN 201410085596A CN 103821339 B CN103821339 B CN 103821339B
Authority
CN
China
Prior art keywords
column
modular unit
operation platform
guide rail
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410085596.XA
Other languages
Chinese (zh)
Other versions
CN103821339A (en
Inventor
张帅
陈德学
盛鹰
齐宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JUSTREACH SCIENCE & TECHNOLOGY Co LTD(CHENGDU)
Original Assignee
JUSTREACH SCIENCE & TECHNOLOGY Co LTD(CHENGDU)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JUSTREACH SCIENCE & TECHNOLOGY Co LTD(CHENGDU) filed Critical JUSTREACH SCIENCE & TECHNOLOGY Co LTD(CHENGDU)
Priority to CN201410085596.XA priority Critical patent/CN103821339B/en
Publication of CN103821339A publication Critical patent/CN103821339A/en
Application granted granted Critical
Publication of CN103821339B publication Critical patent/CN103821339B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The invention discloses a kind of operation platform modular unit and operation platform thereof, comprise modular unit A, described modular unit A comprises interior row's column, outer row's column, guide rail, and described outer row's column is three and spacing side by side is vertically arranged; Described interior row's column is two, guide rail is one, and this guide rail is arranged between column in described two, and described interior row's column, guide rail also spacing side by side are vertically arranged; Arrange column in described two, three are arranged column outward, a guide rail forms square rack, and this square rack is provided with platform floor.A kind of operation platform modular unit of the present invention and operation platform thereof, the degree of modularity is high, between module assembling flexibly, convenient disassembly, interchangeability is strong, and component specifications and models are few, handling ease; Can increase as required temporarily, reduce or adjust and change component, interfere between component less, independence is strong.

Description

Operation platform modular unit and operation platform thereof
Technical field
The present invention relates to a kind of building scaffold, in particular, the present invention relates generally to the modular unit of a kind of attaching lifting multilayer operation platform.
Background technology
Scaffold (scaffold) at the construction field (site) for operative and the various supports solving high-rise working and set up, is the generic term of building field, is mainly used in the higher place that cannot directly construct of exterior wall, interior decoration or floor height on building sites.Scaffold makes material bamboo and wood, steel pipe or synthetic materials etc. usually, and also used as template by scaffold in part engineering at present, it is also widely used in the fields such as advertising, municipal administration, traffic road and bridge, mine in addition.And get back in building field, and in current high-building construction, exterior wall scaffold many employings raise scaffold.Traditional lifting false work mainly adopts steel pipe, connection fastener and other parts to set up, its shortcoming existed be mainly following some: one is have that steel pipe specification is many, assembly program is complicated, assembling speed is slow, efficiency is low, affect the shortcomings such as building structure main body construction progress when assembling; Two is under the condition ensureing identical construction speed, the human resources that needs of having to are a large amount of, and with regard to single constructor, labour intensity is also larger simultaneously; Three is when support body is assembled, and the uncertainty that human factor produces increases, and occurs that frame structure does not meet safety requirements and there is many potential safety hazards sometimes, causes the safety problem in scaffold use procedure; Four is manual operations that same needs are a large amount of in unloading process; Five is that because the syndeton of conventional steel scaffold affects, the scaffold of structure corner both sides can not be in same level at the rotation angle position of building; Six is be not suitable for the building structure construction that building exterior wall face is curved surface or abnormity.
Now also have at present adopt steel pipe, lifting false work that parts are set up, and this kind of lifting false work still existing defects in actual use, such as installation and removal need a large amount of manual operations, connection between steel pipe is generally the detachable connection of steel tube fastener, there is certain potential safety hazard; And for the on-right angle rotation angle position of building, the scaffold of structure corner both sides can not adapt to structure corner angle easily and be linked to be an entirety.Therefore based on aforesaid problem, be necessary to make further research for the structure of existing lifting false work and improve.Existing climbing frame, once be implicative of each other, there is the technical problem cannot changed, adjust after installing.
Summary of the invention
Instant invention overcomes the deficiencies in the prior art, provide a kind of and assemble flexibly, the operation platform modular unit of convenient disassembly and operation platform thereof.
Consider the problems referred to above of prior art, according to an aspect disclosed by the invention, the present invention by the following technical solutions:
A kind of operation platform modular unit, comprise modular unit A, described modular unit A comprises interior row's column, outer row's column, guide rail, and described outer row's column is three and spacing side by side is vertically arranged; Described interior row's column is two, guide rail is one, and this guide rail is arranged between column in described two, and described interior row's column, guide rail also spacing side by side are vertically arranged; Arrange column in described two, three are arranged column outward, a guide rail forms square rack, and this square rack is provided with platform floor.
In order to realize the present invention better, further technical scheme is:
According to one embodiment of the invention, also comprise modular unit B, center is set hangs jacking system by increasing on described modular unit A and form described modular unit B.
According to one embodiment of the invention, jacking system is hung at least by electric block in described center, fixing suspender member and mobile suspender member form, described fixing suspender member is arranged between guide rail and outer row's column, described mobile suspender member is for being arranged on the hard point of building, described electric block is arranged on fixing suspender member, described electric block is also connected with mobile suspender member by main rope, described main rope one end is fixed on the lower suspension hook of electric block, the other end is fixed on mobile suspender member after main rope being turned to through twin columns inclined head transfer, for by electric block by main rope for guide rail and outer row's column provide the power driving operation platform to rise or decline.
According to one embodiment of the invention, many inside and outside row of horizontal support bars are installed between described interior row's column and outer row's column, inside and outside row's inclined support bar is also installed between described two adjacent inside and outside row of horizontal support bars.
According to one embodiment of the invention, be provided with between described guide rail and outer row's column multiple inside and outside emptying between horizontal support frame, inside and outside described adjacent two emptying horizontal support frame end between inside and outside row's inclined support bar is also installed, form the space making main rope process for making in inside and outside emptying horizontal support frame.
According to one embodiment of the invention, described twin columns inclined head transfer is arranged between guide rail and outer row's column, and is placed in the below of electric block;
Secondary rope diverting pulley pack is also provided with above described electric block, described pair rope diverting pulley pack is arranged on fixing suspender member by fixed installation bar, the lower suspension hook of described electric block is also connected with lower suspension hook connector, described lower suspension hook connector is connected with mobile suspender member by secondary rope, described pair rope one end is fixed on lower suspension hook connector, the other end is fixed on mobile suspender member, for forming by the chain of pair rope and main rope and electric block chain link of restricting after secondary rope being turned to through secondary rope diverting pulley pack.
According to one embodiment of the invention, described modular unit A is provided with cat ladder.
According to one embodiment of the invention, described two are provided with protective screen plate between row's column outward.
According to one embodiment of the invention, described protective screen plate is provided with confining bed.
The present invention can also be:
A kind of operation platform, described at least one modular unit A and at least one modular unit B is combined to form described operation platform.
Compared with prior art, one of beneficial effect of the present invention is:
A kind of operation platform modular unit of the present invention and operation platform thereof, the degree of modularity is high, between module assembling flexibly, convenient disassembly, interchangeability is strong, and component specifications and models are few, handling ease; Can increase as required temporarily, reduce or adjust and change component, interfere between component less, independence is strong.
Accompanying drawing explanation
In order to clearer explanation present specification embodiment or technical scheme of the prior art, below the accompanying drawing used required in the description to embodiment or prior art is briefly described, apparently, the accompanying drawing that the following describes is only the reference to some embodiments in present specification, for those skilled in the art, when not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 shows the structural representation of modular unit A according to an embodiment of the invention.
Fig. 2 shows the structural representation of modular unit B according to an embodiment of the invention.
Fig. 3 shows the structural representation that jacking system is hung at center according to an embodiment of the invention.
Fig. 4 shows the structural representation according to an embodiment of the invention between guide rail and outer row's column.
Fig. 5 shows the structural representation of operation platform according to an embodiment of the invention.
Detailed description of the invention
Below in conjunction with embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited thereto.
Fig. 1 shows the structural representation of modular unit A according to an embodiment of the invention.A kind of operation platform modular unit as shown in Figure 1, comprises modular unit A, and described modular unit A comprises interior row's column 1, outer row's column 2, guide rail 5, and described outer row's column 2 is three and spacing side by side is vertically arranged; Described interior row's column 1 is two, guide rail 5 is one, and this guide rail 5 is arranged between column 1 in described two, and described interior row's column 1, guide rail 5 also spacing side by side are vertically arranged; Arrange 1, three, column outer row column, 2, guide rail 5 in described two and form square rack, this square rack is provided with platform floor 4, platform floor 4 can be any number of plies.
Described two are provided with protective screen plate 3 between row's column 2 outward.
Described protective screen plate 3 is provided with confining bed, and wherein confining bed can be cloth, tarpaulin or advertising cloth etc., and can adopt and have other transparent, fire-retardant material, is reached the object of insulation, dust-proof, environmental protection by confining bed; And by totally enclosed form, rainproof effect can be played.
Fig. 2 shows the structural representation of modular unit B according to an embodiment of the invention.A kind of operation platform modular unit as shown in Figure 2, comprises modular unit B, arranges center and hangs jacking system by increasing on described modular unit A and form described modular unit B.
Fig. 3 shows the structural representation that jacking system is hung at center according to an embodiment of the invention.Jacking system is hung at least by electric block 7 in a kind of center as shown in Figure 3, fixing suspender member 8 forms with mobile suspender member 9, described fixing suspender member 8 is arranged between guide rail 5 and outer row's column 2, described mobile suspender member 9 is for being arranged on the hard point of building, described electric block 7 is arranged on fixing suspender member 8, described electric block 7 is also connected with mobile suspender member 9 by main rope 13, described main rope 13 one end is fixed on the lower suspension hook 74 of electric block, the other end is fixed on mobile suspender member 9 after main rope 13 being turned to through twin columns inclined head transfer 14, for by electric block 7 by main rope 13 for guide rail 5 and outer row's column 2 provide the power driving operation platform to rise or decline.In one preferred embodiment, also can set up gravity sensor 22 on above-mentioned fixing suspender member 8, this gravity sensor 22 is connected with the main suspension hook 75 of electric block 7, by this gravity sensor 22, can match with the electric-control system of elevating construction platform, the synchronization action completing each power seat in the plane on platform controls.
Guide rail 5 passes for being arranged on architectural guide type shoe 6, and guide rail 5 slippage in guide type shoe 6, and then drive operation platform to move up and down.
Inventor is also for ease of the installation of " rope chain link " structure; Also by the lower suspension hook 74 of above-mentioned electric block 7 by lower suspension hook connector 21 and main rope 13, secondary restrict 20 end be connected.Simultaneously after having set up time suspension hook connector 21, electric block 7 does not contact completely with above-mentioned " rope chain link ", only as the power source that " rope chain link " operates.
Secondary rope diverting pulley pack 18 is set up above electric block 7, and this pair rope diverting pulley pack 18 is arranged on fixing suspender member 8 by fixed installation bar 19, electric block 7 is also connected with mobile suspender member 9 by secondary rope 20 simultaneously, this pair rope 20 one end are fixed on the lower suspension hook connector 21 that is connected with electric block 7, the other end is fixed on mobile suspender member 9 after secondary rope 20 being turned to through secondary rope diverting pulley pack 18, and then make secondary rope 20 form with the chain of main rope 13 and electric block 7 chain link of restricting, suitable rate of tension is kept in use for making secondary rope 20, also can restrict on 20 in pair and set up tensioning apparatus 23, and this tensioning apparatus 23 is preferably arranged on lower suspension hook connector 21 and secondary pair rope 20 of restricting between diverting pulley pack 18.
Jacking system is hung in actual use in the center of said structure, when electric block 7 drives operation platform to rise, electric block 7 chain of handling up makes lower suspension hook 74 move up, and then the main rope 13 between lower suspension hook 74 and twin columns inclined head transfer 14 is increased, main rope 13 between twin columns inclined head transfer 14 and mobile suspender member 9 shortens, pair rope 20 between secondary rope diverting pulley pack 18 and mobile suspender member 9 increases, and the pair rope 20 between secondary rope diverting pulley pack 18 and lower suspension hook 74 shortens; When electric block 7 drives operation platform to decline, electric block 7 chain of handling up makes lower suspension hook 74 move down, and then the main rope 13 between lower suspension hook 74 and twin columns inclined head transfer 14 is shortened, main rope 13 between twin columns inclined head transfer 14 and mobile suspender member 9 increases, pair rope 20 between secondary rope diverting pulley pack 18 and mobile suspender member 9 shortens, and the pair rope 20 between secondary rope diverting pulley pack 18 and lower suspension hook 74 increases; Namely no matter rise or decline, lower suspension hook 74 and all relative movements ringwise on " rope chain link " of mobile suspender member 9 of electric block 74.
Many inside and outside row of horizontal support bars 10 are installed between described interior row's column 1 and outer row's column 2, inside and outside row's inclined support bar 11 is also installed between described two adjacent inside and outside row of horizontal support bars 10.
Fig. 4 shows the structural representation according to an embodiment of the invention between guide rail and outer row's column.A kind of operation platform modular unit as shown in Figure 4, be provided with between described guide rail 5 and outer row's column 2 multiple inside and outside emptying between horizontal support frame 12, inside and outside described adjacent two emptying horizontal support frame 12 end between inside and outside row's inclined support bar 11 is also installed, form the space making main rope 13 process for making in inside and outside emptying horizontal support frame 12.
Described modular unit A also can be provided with cat ladder.
Fig. 5 shows the structural representation of operation platform according to an embodiment of the invention.A kind of operation platform as shown in Figure 5, described at least one modular unit A and at least one modular unit B is combined to form described operation platform, and modular unit A and modular unit B can slitless connection.As modular unit A is arranged on modular unit B, the mode of " building blocks " is adopted to set gradually.
By standardized modular unit A and the modular unit B of the application, the degree of modularity is high, interchangeability is strong, and component specifications and models are few, handling ease; Can increase as required temporarily, reduce or adjust and change component, interfere between component less, independence is strong; Avoid existing climbing frame, once the technical problem being implicative of each other, cannot changing, adjust after installing; Also various functional module elements can be conveniently developed into by the standard module unit of the application; All component all can be arranged in standardized modular unit, and maintenance, inspection can be carried out in modular unit, and implementation and operation all can carry out in modular unit, and safe coefficient is high.
In this manual, each embodiment adopts the mode of going forward one by one to describe, and what each embodiment stressed is the difference with other embodiment, identical similar portion cross-reference between each embodiment.
Spoken of in this manual " embodiment ", " another embodiment ", " embodiment ", etc., refer to the specific features, structure or the feature that describe in conjunction with this embodiment and be included at least one embodiment of the application's generality description.Multiple place occurs that statement of the same race is not necessarily refer to same embodiment in the description.Furthermore, when describing specific features, structure or a feature in conjunction with any embodiment, what advocate is also fall within the scope of the invention to realize this feature, structure or feature in conjunction with other embodiments.
Although with reference to multiple explanatory embodiment of the present invention, invention has been described here, but, should be appreciated that, those skilled in the art can design a lot of other amendment and embodiment, these amendments and embodiment will drop within spirit disclosed in the present application and spirit.More particularly, in the scope of, accompanying drawing open in the application and claim, multiple modification and improvement can be carried out to the building block of subject combination layout and/or layout.Except the modification of carrying out building block and/or layout is with except improvement, to those skilled in the art, other purposes also will be obvious.

Claims (8)

1. an operation platform modular unit, it is characterized in that, comprise modular unit A, described modular unit A comprises interior row's column (1), outer row's column (2), guide rail (5), and described outer row's column (2) is three and spacing side by side is vertically arranged, described interior row's column (1) is two, guide rail (5) is one, this guide rail (5) is positioned at described two and arranges between column (1), and described interior row's column (1), guide rail (5) also spacing side by side are vertically arranged, arrange column (1) in described two, three are arranged column (2) outward, a guide rail (5) forms square rack, this square rack are provided with platform floor (4), also comprise modular unit B, center is set hangs jacking system by increasing on described modular unit A and form described modular unit B, jacking system is hung at least by electric block (7) in described center, fixing suspender member (8) forms with mobile suspender member (9), described fixing suspender member (8) is arranged between guide rail (5) and outer row's column (2), described mobile suspender member (9) is for being arranged on the hard point of building, described electric block (7) is arranged on fixing suspender member (8), described electric block (7) is also connected with mobile suspender member (9) by main rope (13), described main rope (13) one end is fixed on the lower suspension hook (74) of electric block, the other end is fixed on mobile suspender member (9) after main rope (13) being turned to through twin columns inclined head transfer (14), for the power being provided the rising of drive operation platform or decline by main rope (13) for guide rail (5) and outer row's column (2) by electric block (7).
2. operation platform modular unit according to claim 1, it is characterized in that, many inside and outside row of horizontal support bars (10) are installed between described interior row's column (1) and outer row's column (2), inside and outside row's inclined support bar (11) is also installed between described two adjacent inside and outside row of horizontal support bars (10).
3. operation platform modular unit according to claim 2, it is characterized in that, be provided with between described guide rail (5) and outer row's column (2) multiple inside and outside emptying between horizontal support frame (12), inside and outside described adjacent two emptying horizontal support frame (12) end between inside and outside row's inclined support bar (11) is also installed, form the space making main rope (13) process for making in inside and outside emptying horizontal support frame (12).
4. operation platform modular unit according to claim 2, it is characterized in that, described twin columns inclined head transfer (14) is arranged between guide rail (5) and outer row's column (2), and is placed in the below of electric block (7);
Described electric block (7) top is also provided with secondary rope diverting pulley pack (18), described pair rope diverting pulley pack (18) is arranged on fixing suspender member (8) by fixed installation bar (19), the lower suspension hook (74) of described electric block (7) is also connected with lower suspension hook connector (21), described lower suspension hook connector (21) is connected with mobile suspender member (9) by secondary rope (20), described pair rope (20) one end is fixed on lower suspension hook connector, the other end is fixed on mobile suspender member (9) after secondary rope (20) being turned to through secondary rope diverting pulley pack (18), for forming by pair rope (20) and the chain of main rope (13) and electric block (7) chain link of restricting.
5. operation platform modular unit according to claim 1, is characterized in that, described modular unit A is provided with cat ladder.
6. operation platform modular unit according to claim 1, is characterized in that, arranges outward between column (2) and is provided with protective screen plate (3) for described two.
7. operation platform modular unit according to claim 6, is characterized in that, (3) are provided with confining bed to described protective screen plate.
8. an operation platform, is characterized in that, described in modular unit A described at least one any one of claim 1-7 described and at least one any one of claim 1-7, modular unit B is combined to form described operation platform.
CN201410085596.XA 2014-03-10 2014-03-10 Operation platform modular unit and operation platform thereof Active CN103821339B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410085596.XA CN103821339B (en) 2014-03-10 2014-03-10 Operation platform modular unit and operation platform thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410085596.XA CN103821339B (en) 2014-03-10 2014-03-10 Operation platform modular unit and operation platform thereof

Publications (2)

Publication Number Publication Date
CN103821339A CN103821339A (en) 2014-05-28
CN103821339B true CN103821339B (en) 2016-02-10

Family

ID=50756604

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410085596.XA Active CN103821339B (en) 2014-03-10 2014-03-10 Operation platform modular unit and operation platform thereof

Country Status (1)

Country Link
CN (1) CN103821339B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107268965B (en) * 2017-05-25 2023-10-31 上海建工四建集团有限公司 Attachment conversion method of integral scaffold without lifting working condition
CN112002263A (en) * 2020-06-30 2020-11-27 中国一冶集团有限公司 Construction method for combining external climbing frame with multifunctional advertising board

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3992118A (en) * 1973-10-10 1976-11-16 Sgb Group Limited Scaffolding joint
CN103422663A (en) * 2013-01-25 2013-12-04 成都嘉泽正达科技有限公司 Adhesive lifting scaffold
CN204024015U (en) * 2014-03-10 2014-12-17 成都嘉泽正达科技有限公司 Operation platform modular unit and operation platform thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3992118A (en) * 1973-10-10 1976-11-16 Sgb Group Limited Scaffolding joint
CN103422663A (en) * 2013-01-25 2013-12-04 成都嘉泽正达科技有限公司 Adhesive lifting scaffold
CN204024015U (en) * 2014-03-10 2014-12-17 成都嘉泽正达科技有限公司 Operation platform modular unit and operation platform thereof

Also Published As

Publication number Publication date
CN103821339A (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN103821340B (en) The mounting method of adhering lifting multilayer operation platform
CN104444840B (en) Mining hydraulic boom hoisting
CN103422663B (en) Attached lift scaffold
CN103821341B (en) Attaching automatic lifting multilayer operation platform
CN205133081U (en) Novel hanging flower basket system
CN107268969A (en) A kind of scaffold structure for work high above the ground
CN206722429U (en) A kind of roofing color corrugated sheet steel transportation system
CN204024015U (en) Operation platform modular unit and operation platform thereof
CN104632088A (en) Petroleum drilling machine tower-shaped derrick sleeving mounting method
CN105537898A (en) Tool for assembling reinforcing steel mesh cages
CN204310644U (en) A kind of single suspension centre cage guide installation and maintenance hanging basket
CN103821339B (en) Operation platform modular unit and operation platform thereof
CN202202800U (en) Ropeladder used for lateral tensioning of T-shaped girder
CN203878961U (en) Attached automatic lifting multilayer construction platform
CN214834620U (en) Supporting platform for lighting well
CN206667458U (en) The constructing device of vestibule system steel structure girder
CN105672641A (en) Double-guide-frame multi-stage synchronous lifting working platform and construction method thereof
CN206299107U (en) Without scaffold hanging basket
CN202187780U (en) Trolley device for tunnels
CN104060813A (en) Construction device and method for large-span steel girder frame connection platform
RU120692U1 (en) DEVICE FOR MOUNTING THE TOWER TYPE DRILL RIGS
CN203878957U (en) Protective screen module unit
CN203394008U (en) Suspension type hanging bracket used on plane truss
CN201942466U (en) Hoisting device for indoor prefabricated component
CN205933127U (en) Erection equipment of various steel inner panel in factory building roof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant