CN103812041B - 10kV电缆线路不停电检修环网柜方法 - Google Patents

10kV电缆线路不停电检修环网柜方法 Download PDF

Info

Publication number
CN103812041B
CN103812041B CN201410059316.8A CN201410059316A CN103812041B CN 103812041 B CN103812041 B CN 103812041B CN 201410059316 A CN201410059316 A CN 201410059316A CN 103812041 B CN103812041 B CN 103812041B
Authority
CN
China
Prior art keywords
ring main
load switch
main unit
repaired
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410059316.8A
Other languages
English (en)
Other versions
CN103812041A (zh
Inventor
刘夏清
邹德华
牛捷
章建军
刘拓晟
欧乃成
郭昊
蒋礼
唐力
郑克全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Live Working Center of State Grid Hunan Electric Power Co
Original Assignee
Live Working Center of State Grid Hunan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Live Working Center of State Grid Hunan Electric Power Co filed Critical Live Working Center of State Grid Hunan Electric Power Co
Priority to CN201410059316.8A priority Critical patent/CN103812041B/zh
Publication of CN103812041A publication Critical patent/CN103812041A/zh
Application granted granted Critical
Publication of CN103812041B publication Critical patent/CN103812041B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种10kV电缆线路不停电检修环网柜方法,当两环网柜之间的环网柜需要维修时,利用原有电缆对旁路***进行搭建,利用所搭建的旁路***依次将供电侧线路以及送电侧线路连通,从而使得带检修环网柜退出运行后不影响正常供电与送电,实现不停电检修的目的。本发明能利用原有电缆搭建旁路***,减少了敷设旁路电缆长度,减少了人力和物力的投入,降低了检修成本;对旁路电缆两侧环网柜有备用和无备用间隔情况都能实现不停电作业;对环网柜无备用间隔情况,可以有效减少停电检修次数,提高供电可靠性;提升了作业水平,提高了供电的可靠性,减少长时间停电带来的电量损失,经济效益显著。

Description

10kV电缆线路不停电检修环网柜方法
技术领域
本发明涉及一种10kV电缆线路不停电检修环网柜方法。
背景技术
当环网***中某个环网柜发生故障或严重缺陷时,往往通过电缆旁路***实现不停电或短时停电连接两来电侧环网柜,临时取代故障环网柜对分支箱和用户供电。旁路作业检修两环网柜之间环网柜(分支箱)的关键步骤是利用旁路电缆作业设备进行作业,对于无备用间隔的情况采用短时停电方式进行。这种作业方式的原理示意如图2所示。
短时停电检修环网柜的方法包括以下步骤:
步骤1,确认负荷电流小于旁路***额定电流;
步骤2,断开待检修环网柜两侧的间隔开关,拆除与此开关连接的电缆终端;
步骤3,确认两侧开关已断开;
步骤4,将旁路***两端的终端连接至待检修环网柜两侧的开关;
步骤5,确认旁路***与原***相序一致;
步骤6,合上送电侧开关;
步骤7,合上受电侧开关,使旁路***投入运行;
步骤8,监视旁路电缆电流;
步骤9,实施并完成电缆线路检修;
步骤10,参照2-7的操作顺序,退出旁路***,恢复已检修电缆线路运行。
现行的检修方法对旁路电缆两侧环网柜无备用间隔情况能完成检修任务。但有如下的几点不足:
(1)建立旁路***,连接两侧环网柜,需要铺设较长电缆线路,敷设旁路电缆时,需要投入较多人力物力,增加了检修成本,对电缆线路的保护和管理工作量也相应增加。
(2)由于旁路***中所用电缆较长,路过公路或人员密集区域时,需要投入较多的人力进行管理。稍有不慎,将造成严重事故,检修作业的安全水平不高。
(3)对没有备用间隔开关的线路需要停电检修,降低了供电的可靠性,对用户造成不必要的影响;
(4)停电带来了电量的损失,降低了用户对企业的满意度。
发明内容
本发明的目的是提供一种能不停电检修环网柜的10kV电缆线路不停电检修环网柜方法。
本发明提供的这种10kV电缆线路不停电检修环网柜方法,一号环网柜、二号待修环网柜和三号环网柜依次连接,该方法包括如下步骤:
步骤1,确认负荷电流小于旁路***额定电流;
所述旁路***主要包括肘型接头一、肘型接头二、负荷开关一、负荷开关二、负荷开关三、T型接头;肘型接头一的一端与所述一号环网柜连接,其另一端与负荷开关一的一端连接,负荷开关一的另一端与T型接头的一输入端连接;肘型接头二的一端与所述三号环网柜连接,其另一端与负荷开关三的一端连接,负荷开关三的另一端与T型接头的另一输入端连接;T型接头的输出端与负荷开关二的一端连接,该负荷开关二的另一端与所述二号分支箱连接;
步骤2,断开一号环网柜送电侧间隔开关和二号待修环网柜受电侧间隔开关;
步骤3,断开二号待修环网柜中与一号环网柜连接的电缆终端,并将其连接至肘型接头一;
步骤4,肘型接头一通过柔性电缆与负荷开关一连接;负荷开关一与T型接头连接;T型接头与负荷开关二连接;
步骤5,确定负荷开关二至由所述二号待修环网柜供电的二号分支箱的距离在50米以内;
步骤6,断开负荷开关一和负荷开关二,将与负荷开关二连接的电缆终端空载***所述二号分支箱中,并对柔性电缆进行核相;
步骤7,闭合负荷开关一和负荷开关二;
步骤8,断开二号待修环网柜中与二号分支箱连接的间隔开关,拆除与该间隔开关连接的电缆终端,使得二号待修环网柜停止对二号分支箱供电;
步骤9,断开三号环网柜送电侧间隔开关和二号待修环网柜受电侧间隔开关;
步骤10,断开二号待修环网柜中与三号环网柜连接的电缆终端,并将其连接至肘型接头二;
步骤11,将肘型接头二通过柔性电缆与负荷开关三连接;负荷开关三通过所述T型接头与负荷开关二连接;
步骤12,断开负荷开关三,并对柔性电缆进行核相;
步骤13,闭合负荷开关三和三号环网柜的间隔开关,二号待修环网柜退出运行;
步骤14,实施并完成二号待修环网柜检修;
步骤15,参照步骤2至步骤13的操作顺序,拆除旁路***,并恢复二号待修环网柜投入运行。
本发明对旁路作业检修两环网柜之间环网柜或分支箱,解决了现行方法中的不足:1、能利用原有电缆搭建旁路***,减少了敷设旁路电缆长度,减少了人力和物力的投入,降低了检修成本;2、对旁路电缆两侧环网柜有备用和无备用间隔情况都能实现不停电作业;对环网柜无备用间隔情况,可以有效减少停电检修次数,提高供电可靠性;提升了作业水平,提高了供电的可靠性,减少长时间停电带来的电量损失,经济效益显著。
附图说明
图1是本发明的实施方式结构示意图。
图2是现有的无备用间隔情况下短时停电作业原理图。
具体实施方式
本发明围绕环网柜检修这一核心问题,根据《10kV电缆线路不停电作业技术导则》,在现有的检修技术的基础上,对检修技术进行优化和改进,实现不停电检修环网柜的目的。
针对现有方法的几点不足,本发明对现有检修方法进行优化和改进;特别是对于那些环网柜中无备用间隔的情况,进行优化和改进,实现无备用间隔也能实现不停电检修作业。
考虑到建立旁路***时需要敷设较长的电缆,本发明对旁路***进行优化设计,利用部分原有电缆来搭建旁路***。
如图1所示,2号待修环网柜为带检修环网柜。旁路***电缆线路连接1号环网柜,在距2号待修环网柜附近布置电缆线路,再连接3号环网柜。旁路线路靠近2号待修环网柜,减少了敷设电缆长度。此外,这样也方便对旁路***线路进行管理,减少了人力和物力的投入,降低了检修成本。
图1中虚线位置为2号待修环网柜在搭建旁路***前与1号环网柜、3号环网柜以及2号分支箱的原有接线。
根据《10kV电缆线路不停电作业技术导则》的要求,与可带电拔插旁路电缆终端连接的柔性电缆长度不应超过50m。因此为了对检修无备用间隔开关的环网柜也实现不停电作业,可以通过增加负荷开关2,并使得负荷开关2和分支箱2之间的距离保持50m以内,这样使得与负荷开关2连接的电缆终端能够实现空载***分支箱中。当负荷开关1和负荷开关2闭合时,能够实现1号环网柜对分支箱2进行供电,之后再断开与2号待修环网柜连接的电缆终端,实现不停电对2号待修环网柜的检修,从而提高了供电的可靠性,减少经济损失。
基于上述原理,本发明的具体步骤如下。
步骤1,确认负荷电流小于旁路***额定电流;
步骤2,断开1号环网柜送电侧间隔开关和2号待修环网柜受电侧间隔开关;
步骤3,断开2号待修环网柜中与1号环网柜连接的电缆终端;
步骤4,将由1号环网柜引出且原来与2号待修环网柜连接的电缆终端连接至肘型接头1;
步骤5,肘型接头1通过柔性电缆与负荷开关1连接;负荷开关1与T型接头连接;T型接头与负荷开关2连接;
步骤6,确定负荷开关2至由所述2号待修环网柜供电的2号分支箱的距离在50米以内;
步骤7,断开负荷开关1和负荷开关2,将与负荷开关2连接的电缆终端空载***所述2号分支箱中,并对电缆进行核相;
步骤8,闭合负荷开关1和负荷开关2;
步骤9,断开2号待修环网柜中与2号分支箱连接的间隔开关,拆除与该间隔开关连接的电缆终端,使得2号待修环网柜停止对2号分支箱供电;
步骤10,断开3号环网柜送电侧间隔开关和2号待修环网柜受电侧间隔开关;
步骤11,断开2号待修环网柜中与3号环网柜连接的电缆终端;
步骤12, 将由3号环网柜引出的原来与2号待修环网柜连接的电缆终端连接至肘型接头2,
步骤13,将肘型接头2通过柔性电缆与负荷开关3连接;负荷开关3通过所述T型接头与负荷开关2连接;
步骤14,断开负荷开关3,并对电缆进行核相;
步骤15,闭合负荷开关3和3号环网柜的间隔开关,2号待修环网柜退出运行;
步骤16,实施并完成2号待修环网柜检修;
步骤17,参照步骤2至步骤15的操作顺序,拆除旁路***,并恢复2号待修环网柜投入运行。
最终本发明利用原有电缆搭建的旁路***包括肘型接头1、肘型接头2、负荷开关1、负荷开关2、负荷开关3、T型接头。所采用的原有电缆包括:2号待修环网柜中与1号环网柜连接的电缆;2号待修环网柜中与3号环网柜连接的电缆。
由本发明带来的直接经济效益是:按每次作业避免停电1小时计算,线路负荷为1.6万千瓦,本发明开展一次作业可减少停电损失电量1.6万千瓦时。以电价为0.633元/kw.h计算,直接经济效益预估每次约1.01万元;其经济效益分析具体如表1所示。
表1:经济效益分析一览表
注:电价按0.633元/ kw.h计算。

Claims (1)

1.一种10kV电缆线路不停电检修环网柜方法,一号环网柜、二号待修环网柜和三号环网柜依次连接,该方法包括如下步骤:
步骤1,确认负荷电流小于旁路***额定电流;
所述旁路***主要包括肘型接头一、肘型接头二、负荷开关一、负荷开关二、负荷开关三、T型接头;肘型接头一的一端与所述一号环网柜连接,其另一端与负荷开关一的一端连接,负荷开关一的另一端与T型接头的一输入端连接;肘型接头二的一端与所述三号环网柜连接,其另一端与负荷开关三的一端连接,负荷开关三的另一端与T型接头的另一输入端连接;T型接头的输出端与负荷开关二的一端连接,该负荷开关二的另一端与所述二号分支箱连接;
步骤2,断开一号环网柜送电侧间隔开关和二号待修环网柜受电侧间隔开关;
步骤3,断开二号待修环网柜中与一号环网柜连接的电缆终端,并将其连接至肘型接头一;
步骤4,肘型接头一通过柔性电缆与负荷开关一连接;负荷开关一与T型接头连接;T型接头与负荷开关二连接;
步骤5,确定负荷开关二至由所述二号待修环网柜供电的二号分支箱的距离在50米以内;
步骤6,断开负荷开关一和负荷开关二,将与负荷开关二连接的电缆终端空载***所述二号分支箱中,并对柔性电缆进行核相;
步骤7,闭合负荷开关一和负荷开关二;
步骤8,断开二号待修环网柜中与二号分支箱连接的间隔开关,拆除与该间隔开关连接的电缆终端,使得二号待修环网柜停止对二号分支箱供电;
步骤9,断开三号环网柜送电侧间隔开关和二号待修环网柜受电侧间隔开关;
步骤10,断开二号待修环网柜中与三号环网柜连接的电缆终端,并将其连接至肘型接头二;
步骤11,将肘型接头二通过柔性电缆与负荷开关三连接;负荷开关三通过所述T型接头与负荷开关二连接;
步骤12,断开负荷开关三,并对柔性电缆进行核相;
步骤13,闭合负荷开关三和三号环网柜的间隔开关,二号待修环网柜退出运行;
步骤14,实施并完成二号待修环网柜检修;
步骤15,参照步骤2至步骤13的操作顺序,拆除旁路***,并恢复二号待修环网柜投入运行。
CN201410059316.8A 2014-02-21 2014-02-21 10kV电缆线路不停电检修环网柜方法 Active CN103812041B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410059316.8A CN103812041B (zh) 2014-02-21 2014-02-21 10kV电缆线路不停电检修环网柜方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410059316.8A CN103812041B (zh) 2014-02-21 2014-02-21 10kV电缆线路不停电检修环网柜方法

Publications (2)

Publication Number Publication Date
CN103812041A CN103812041A (zh) 2014-05-21
CN103812041B true CN103812041B (zh) 2015-03-25

Family

ID=50708434

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410059316.8A Active CN103812041B (zh) 2014-02-21 2014-02-21 10kV电缆线路不停电检修环网柜方法

Country Status (1)

Country Link
CN (1) CN103812041B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105098648A (zh) * 2015-08-24 2015-11-25 国网天津市电力公司 一种两环网柜间电缆线路短时停电作业方法
CN105374582B (zh) * 2015-12-24 2017-08-25 国家电网公司 用于电网下一次设备的入网连接方法
CN109462276A (zh) * 2018-08-07 2019-03-12 国网浙江省电力有限公司衢州供电公司 无缝接电方法
CN109546578A (zh) * 2019-01-23 2019-03-29 浙江华仪电器科技有限公司 一种不停电作业检修辅助开关设备及电网不停电检修方法
CN109546577A (zh) * 2019-01-23 2019-03-29 浙江华仪电器科技有限公司 一种不停电作业检修辅助开关设备及电网不停电检修方法
CN111342447A (zh) * 2020-03-02 2020-06-26 国网湖北省电力有限公司宜昌供电公司 新型旁路电缆作业在配网线路环网柜中的应用
CN111181063B (zh) * 2020-03-02 2021-09-10 国网湖北省电力有限公司宜昌供电公司 一种应用于配网线路环网柜的新型旁路电缆作业方法
CN113541294A (zh) * 2021-05-31 2021-10-22 浙江大有实业有限公司带电作业分公司 一种基于临时电源应用的环网单元短时停电检修方法
CN113346409A (zh) * 2021-07-14 2021-09-03 国网河南省电力公司平顶山供电公司 变电站10kV出线间隔带负荷转移检修不停电作业方法

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5041911B2 (ja) * 2007-08-10 2012-10-03 中国電力株式会社 プラグ引き抜き工具
CN103078268A (zh) * 2012-12-28 2013-05-01 上海市电力公司 一种两环网柜间10kV电缆线路的不停电检修方法
CN103050892A (zh) * 2012-12-28 2013-04-17 上海市电力公司 一种用于欧式和美式环网柜间不停电作业的旁路连接装置
CN103036160A (zh) * 2012-12-28 2013-04-10 广州供电局有限公司 两侧不中断供电可扩展型环网柜

Also Published As

Publication number Publication date
CN103812041A (zh) 2014-05-21

Similar Documents

Publication Publication Date Title
CN103812041B (zh) 10kV电缆线路不停电检修环网柜方法
CN103840439B (zh) 主站与分布式终端配合实现的配电自动化保护方法
CN204068405U (zh) 一种带漏电保护的直流供电***
CN104158103B (zh) 一种城市配电房快速抢修方法
CN202309201U (zh) 一种通信电源***
CN204928156U (zh) 一种配电网架接线结构
CN203367955U (zh) 低压电力电缆隔离装置
CN204732777U (zh) 一种电缆线路不停电作业***
CN105226642A (zh) 一种变电站全停事故下的配电网供电恢复方法
CN112310874B (zh) 一种220v两充四馈直流***不停电安全更换方法
CN102480109A (zh) 一种带负荷更换10kV配电线路导线的方法
CN104218457A (zh) 一种配电装置及其电气主***
CN203225578U (zh) 一种具有高冗余特性的输电线路感应取能电源装置
CN101841136A (zh) 低压配电绝缘导线断线带负荷处理装置及其处理方法
CN201018221Y (zh) 一种用于电网带电作业的装置
CN211089136U (zh) 一种6kV厂用电源互联装置
CN104917287A (zh) 一种pdu电源控制***
CN204230918U (zh) 群井动态补偿软启分时控制装置
CN201717670U (zh) 一种带过压保护的双电源切换装置
CN209329780U (zh) 一种电源接入装置
CN211377605U (zh) 一种中压电源车的不停电并机并网***
Yinger Self-healing circuits at southern California Edison
CN106549484A (zh) 低压台区低压供电备用电源投入装置
CN112049728A (zh) 基于车载燃气轮机发电机组不停电作业的***和方法
CN105610137A (zh) 一种集中型配电***单相接地故障排除方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: LIVE WORKING CENTER OF STATE GRID HUNAN ELECTRIC P

Effective date: 20150421

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: LIVE WORKING CENTER OF STATE GRID HUNAN ELECTRIC POWER COMPANY

Effective date: 20150421

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zou Dehua

Inventor after: Tang Li

Inventor after: Zheng Kequan

Inventor after: Liu Xiaqing

Inventor after: Ren Chengxian

Inventor after: Niu Jie

Inventor after: Zhang Jianjun

Inventor after: Liu Tuocheng

Inventor after: Ou Naicheng

Inventor after: Guo Hao

Inventor after: Jiang Li

Inventor before: Liu Xiaqing

Inventor before: Zheng Kequan

Inventor before: Zou Dehua

Inventor before: Niu Jie

Inventor before: Zhang Jianjun

Inventor before: Liu Tuocheng

Inventor before: Ou Naicheng

Inventor before: Guo Hao

Inventor before: Jiang Li

Inventor before: Tang Li

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 410100 CHANGSHA, HUNAN PROVINCE TO: 100031 XICHENG, BEIJING

Free format text: CORRECT: INVENTOR; FROM: LIU XIAQING ZOU DEHUA NIU JIE ZHANG JIANJUN LIU TUOSHENG OU NAICHENG GUO HAO JIANG LI TANG LI ZHENG KEQUAN TO: ZOU DEHUA LIU XIAQING REN CHENGXIAN NIU JIE ZHANG JIANJUN LIU TUOSHENG OU NAICHENG GUO HAO JIANG LI TANG LI ZHENG KEQUAN

TR01 Transfer of patent right

Effective date of registration: 20150421

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Guo Wang Hunan Province Utilities Electric Co. live line working center

Patentee after: State Grid Hunan Electric Power Company

Address before: 410100 Hunan province Changsha City Economic Development Zone Li Xiang Road No. 8

Patentee before: Guo Wang Hunan Province Utilities Electric Co. live line working center