CN103779851A - Distant back-up protection checking method for ultra-high-voltage line - Google Patents

Distant back-up protection checking method for ultra-high-voltage line Download PDF

Info

Publication number
CN103779851A
CN103779851A CN201410072485.5A CN201410072485A CN103779851A CN 103779851 A CN103779851 A CN 103779851A CN 201410072485 A CN201410072485 A CN 201410072485A CN 103779851 A CN103779851 A CN 103779851A
Authority
CN
China
Prior art keywords
backup protection
section
apart
calculated value
jsiii
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410072485.5A
Other languages
Chinese (zh)
Other versions
CN103779851B (en
Inventor
杨韵
李银红
李一泉
于芮技
邱建
陈志光
曾耿晖
张弛
朱晓华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huazhong University of Science and Technology
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
Huazhong University of Science and Technology
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huazhong University of Science and Technology, Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd filed Critical Huazhong University of Science and Technology
Priority to CN201410072485.5A priority Critical patent/CN103779851B/en
Publication of CN103779851A publication Critical patent/CN103779851A/en
Application granted granted Critical
Publication of CN103779851B publication Critical patent/CN103779851B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)
  • Measurement Of Resistance Or Impedance (AREA)

Abstract

The invention provides a distant back-up protection checking method for an ultra-high-voltage line. The method includes the steps: selectively checking a distant back-up protection section I according to a distant back-up protection section I checking method; checking a distant back-up protection section II according to a distant back-up protection section II checking method, judging whether an adjacent line is provided with a transformer or not, and judging whether the transformer extends out of an adjacent main transformer if the adjacent line is provided with the transformer; selectively checking the adjacent line if the adjacent line is not provided with the transformer; checking a distant back-up protection section III according to a distant back-up protection section III checking method, judging action time to perform selective checking, and finally performing hidden load checking. Without reducing grid security risks, checking calculation is more convenient, rapider and more accurate, the workload of checking calculation is relieved, the method and a protection system setting calculation principle are kept consistent in style and form, a computer is conveniently implemented, and the method has fine universality and transportability.

Description

Supertension line is apart from backup protection check method
Technical field
The present invention relates to Relay Protection Technology in Power System field, particularly relate to a kind of supertension line apart from backup protection check method.
Background technology
Relaying protection is one of most important secondary device in electric power system, and the safety to system, stable operation have very crucial effect.At present, relay protection constant value is all that the maximum operational mode of taking into account system under off-line state and minimum operational mode obtain, and remains unchanged system is in service.But; in actual motion, system operation mode is constantly to change; when system is because overhaul of the equipments, newly built construction put into operation and power grid accident and during in some special running status; part relay protection constant value possibly cannot meet the requirement of selectivity and sensitivity, has the possibility of protection mistake action and rejecting action.Therefore; be necessary the relay protection constant value under current operational mode to carry out Security Checking and assessment; there is the operation definite value of hidden danger and may cause the dangerous operational mode that performance of relay setting is abnormal in identification, thereby improves the managerial skills to electric grid relay protection constant value.
At present, there is many defects in the distance backup protection check method of supertension line (220~500kV), for example, because electric network composition changes and the variation of operational mode, makes check result unreliable.
Summary of the invention
Based on this, being necessary, for the insecure problem of above-mentioned check result, provides a kind of supertension line apart from backup protection check method.
For achieving the above object, the present invention adopts following technical scheme:
A distance backup protection check method for supertension line, comprises the following steps:
Obtain the operational mode of current electrical network, and carry out selectivity check according to the backup protection I section of adjusting the distance of the system data under this operational mode;
According to sensitivity K lmwith the maximum experience impedance Z of this line end short circuit gsmaxcalculate apart from backup protection II section calculated value Z jsII, and according to this apart from backup protection II section calculated value Z jsIIcarry out sensitivity and check judgement, if Z jsIIbe less than (1+ δ) * Z setII, sensitivity meets; Otherwise sensitivity does not meet, and carries out alarm prompt; In formula, Z setIIfor apart from standby II section setting value, δ gets 0.1;
If adjacent lines has transformer, according to this circuit positive sequence impedance Z 1with adjacent transformers resistance value Z' tcalculate apart from backup protection II section calculated value Z jsII, and the distance backup protection II section calculated value Z calculating according to this jsIIcarry out selectivity and check judgement, if Z jsIIbe greater than (1-δ) * Z setII, do not stretch out adjacent main transformer, selectivity meets; Otherwise stretch out adjacent main transformer, selectivity does not meet, and carries out alarm prompt; In formula, δ gets 0.07;
If protection adjacent elements is circuit, II section does not coordinate with neighbor distance backup protection I section, not to coordinating and check with neighbor distance backup protection I section; If apart from backup protection II section time T setIIbe less than min (T' dzII+ Δ T, T maxII), II section coordinates with adjacent pilot protection, according to this circuit positive sequence impedance Z 1with adjacent lines positive sequence impedance value Z 1' calculate apart from backup protection II section calculated value Z jsII, and the distance backup protection II section calculated value Z calculating according to this jsIIcarry out selectivity and check judgement, if Z jsIIbe greater than (1-δ) * Z setII, selectivity meets; Otherwise selectivity does not meet, and carries out alarm prompt; In formula, T' dzIIfor the adjacent lines protection II section time; Δ T is that the time is differential, gets 0.2S; T maxIIfor apart from backup protection II section time definite value, be above limited to 2S; δ gets 0.07;
If min is (T' dzII+ Δ T, T maxII) be less than or equal to T setII, the distance backup protection II section of adjacent lines coordinates, according to this circuit positive sequence impedance Z 1with neighbor distance backup protection II section definite value Z' dzIIcalculate apart from backup protection II calculated value Z jsII, and the distance protection II section calculated value Z calculating according to this jsIIcarry out selectivity and check judgement, if Z jsIIbe greater than (1-δ) * Z setII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt, in formula, δ gets 0.07.
Can be found out by above scheme, a kind of supertension line of the present invention is apart from backup protection check method, first corresponding apart from backup protection calculated value when calculating under previous mode, and then carry out sensitivity check, selectivity is checked judgement, this method is than the check method based on protection range, do not reducing under the prerequisite of power grid security risk, the huge amount of calculation of protection range and the problem of inaccuracy are not only avoided asking for, make to check calculating convenient, quick and accurate, alleviate and checked the workload of calculating, and be consistent in style with protection system calculation principle in form, be convenient to the realization of computer, possesses good versatility with portable.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of a kind of supertension line of the present invention apart from backup protection check method;
Fig. 2 is ground distance backup protection II section check method schematic flow sheet in the embodiment of the present invention;
Fig. 3 is ground distance backup protection III section check method schematic flow sheet in the embodiment of the present invention.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
Shown in Figure 1, a kind of distance backup protection check method of supertension line, comprises the following steps:
Step S101, carries out checking apart from backup protection I section, is specially the operational mode of obtaining current electrical network, and carries out selectivity check according to the backup protection I section of adjusting the distance of the system data under this operational mode.As follows apart from backup protection I section check method:
According to the minimum experience impedance Z of protection place line end short circuit gsminwith safety factor K kcalculate apart from backup protection I section calculated value Z jsI, and according to this apart from backup protection I section calculated value Z jsIcarry out selectivity and check judgement, if Z jsIbe greater than (1-δ) * Z setI, selectivity meets, otherwise selectivity is dissatisfied, carries out alarm prompt (δ gets 0.07).
Wherein, Z setIfor ground distance I section setting value; When line length is less than 20km, safety factor K k=0.7 (1-5L), wherein L is line length, the km of unit; When line length is more than or equal to 20km, generally, safety factor gets 0.7, and in particular cases (as many times mutual inductance circuits) safety factor gets 0.5; In the time that total track length is less than 5km, K kget 0.
Step S102, carries out checking apart from backup protection II section.
Concrete, above-mentioned process of carrying out checking apart from backup protection II section can comprise as follows:
Step S1021, carries out sensitivity check, according to sensitivity K lmwith the maximum experience impedance Z of this line end short circuit gsmaxcalculate apart from backup protection II section calculated value Z jsII, and according to this apart from backup protection II section calculated value Z jsIIcarry out sensitivity and check judgement, if Z jsIIbe less than (1+ δ) * Z setII, sensitivity meets; Otherwise sensitivity does not meet, and carries out alarm prompt; In formula, Z setIIfor apart from standby II section setting value, δ gets 0.1;
Step S1022, if adjacent lines has transformer, according to this circuit positive sequence impedance Z 1with adjacent transformers resistance value Z' tcalculate apart from backup protection II section calculated value Z jsII, and the distance backup protection II section calculated value Z calculating according to this jsIIcarry out selectivity and check judgement, if Z jsIIbe greater than (1-δ) * Z setII, do not stretch out adjacent main transformer, selectivity meets; Otherwise stretch out adjacent main transformer, selectivity does not meet, and carries out alarm prompt; In formula, δ gets 0.07; If adjacent lines transless, goes to step S1023;
Step S1023, if protection adjacent elements is circuit, II section does not coordinate with neighbor distance backup protection I section, does not need coordinating and check with neighbor distance backup protection I section; If apart from backup protection II section time T setIIbe less than min (T' dzII+ Δ T, T maxII), illustrate that II section coordinates with adjacent pilot protection, can be according to this circuit positive sequence impedance Z 1with adjacent lines positive sequence impedance value Z 1' calculate apart from backup protection II section calculated value Z jsII, and the distance backup protection II section calculated value Z calculating according to this jsIIcarry out selectivity and check judgement, if Z jsIIbe greater than (1-δ) * Z setII, selectivity meets; Otherwise selectivity does not meet, and carries out alarm prompt; In formula, T' dzIIfor the adjacent lines protection II section time; Δ T is that the time is differential, generally gets 0.2S; T maxIIfor apart from backup protection II section time definite value, be above limited to 2S; δ gets 0.07;
Step S1024, if min is (T' dzII+ Δ T, T maxII) be less than or equal to T setII, illustrate that the distance backup protection II section of adjacent lines coordinates, can be according to this circuit positive sequence impedance Z 1with neighbor distance backup protection II section definite value Z' dzIIcalculate apart from backup protection II calculated value Z jsII, and the distance protection II section calculated value Z calculating according to this jsIIcarry out selectivity and check judgement, if Z jsIIbe greater than (1-δ) * Z setII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt, in formula, δ gets 0.07.
As a good embodiment, described according to this circuit positive sequence impedance Z 1with adjacent transformers resistance value Z' tcalculate apart from backup protection II section calculated value Z jsIIprocess specifically can comprise as follows:
Adopt following formula to calculate apart from backup protection II section calculated value Z jsII: Z jsII=K k* Z 1+ K kTk zz' t; In formula, K kfor safety factor, get 0.8; K kTfor cooperation coefficient, get 0.8; K zfor helping increasing coefficient under current operational mode.
As a good embodiment, described according to this circuit positive sequence impedance Z 1with adjacent lines positive sequence impedance value Z 1' calculate apart from backup protection II section calculated value Z jsIIprocess specifically can comprise as follows:
Adopt following formula to calculate apart from backup protection II section calculated value Z jsII: Z jsII=K k* Z 1+ K kk zz 1'; In formula, K kfor safety factor, get 0.7; K zfor helping increasing coefficient under front operational mode.
As a good embodiment, described according to this circuit positive sequence impedance Z 1with neighbor distance backup protection II section definite value Z' dzIIcalculate apart from backup protection II calculated value Z jsIIprocess specifically can comprise as follows:
Adopt following formula to calculate apart from backup protection II section calculated value Z jsII: Z jsII=K k* Z 1+ K kk zz' dzII, in formula, K kfor safety factor, get 0.8; K zfor helping increasing coefficient under front operational mode.
It should be noted that the distance backup protection check method of a kind of supertension line of the present invention comprises ground distance backup protection check method and phase spacing backup protection check method.Because ground distance backup protection check method is consistent with phase spacing backup protection check method, therefore only describe the solution of the present invention in detail as an example of ground distance backup protection check example below:
As shown in Figure 2, line-to-ground apart from backup protection II section sensitivity check method is:
Z jsII=K lm*Z gsmax
Wherein: K lmfor sensitivity; Z gsmaxfor the maximum experience impedance of this line end short circuit.
Criterion: if Z jsII< (1+ δ) * Z setII, sensitivity meets, otherwise sensitivity does not meet (δ gets 0.1), carries out alarm prompt.In formula, Z jsIIfor ground distance II section calculated value, Z setIIfor ground distance II section setting value.
Apart from backup protection II section sensitivity K lmrequire as follows:
A) when line length is less than 50km, K lm=1.5;
B) when line length is between 50km and 100km, K lm=1.45;
C) when line length is between 100km and 150km, K lm=1.4;
D) when line length is between 150km and 200km, K lm=1.35;
E) when line length is greater than 200km, K lm=1.3.
(1) whether stretch out adjacent main transformer, selectivity is checked:
Z jsII=K k*Z 1+K kTK zZ' T
Wherein: K kfor safety factor, get 0.8; K kTfor cooperation coefficient, get 0.8; Z 1for this circuit positive sequence impedance; Z' tfor adjacent transformers resistance value; K zfor helping increasing coefficient under current operational mode.
Criterion: if Z jsII> (1-δ) * Z setII, do not stretch out adjacent main transformer, selectivity meets, otherwise stretches out adjacent main transformer, and selectivity does not meet, and carries out alarm prompt.(δ gets 0.07).
(2) protection adjacent elements is circuit, and II section does not coordinate with neighbor distance backup protection I section, therefore do not need coordinating and check with neighbor distance backup protection I section.
I) min (T' dzII+ Δ T, T maxII) >T setII, coordinate with adjacent pilot protection:
Z jsII=K k*Z 1+K kK zZ 1';
Wherein: K kfor safety factor, get 0.7; K zfor helping increasing coefficient under current operational mode; Z 1for this circuit positive sequence impedance; Z 1' be adjacent lines positive sequence impedance value; T' dzIIfor the mating protection II section time; Δ T is that the time is differential, generally gets 0.2S, T maxIIfor apart from backup protection II section time definite value, be above limited to 2S.
Criterion: if Z jsII> (1-δ) * Z setII, selectivity meets, otherwise selectivity is dissatisfied, carries out alarm prompt.Wherein, Z setIIfor ground distance II section setting value, δ gets 0.07.
Ii) min (T' dzII+ Δ T, T maxII) £ T setII, coordinate with the distance backup protection II section of adjacent lines:
Z jsII=K k*Z 1+K kK zZ' dzII
Wherein: K kfor safety factor, get 0.8; K zfor helping increasing coefficient under current operational mode; Z 1for this circuit positive sequence impedance; Z' dzIIfor neighbor distance backup protection II section definite value; T' dzIIfor the mating protection II section time; Δ T is that the time is differential, generally gets 0.2S, T maxIIfor apart from backup protection II section time definite value, be above limited to 2S.
Criterion: if Z jsII> (1-δ) * Z setII, selectivity meets, otherwise does not meet selectivity, carries out alarm prompt.(δ gets 0.07)
As shown in Figure 1, as a good embodiment, the present invention, after the backup protection II section of adjusting the distance has been checked, can also comprise step S103: carry out checking apart from backup protection III section.This process specifically can comprise as follows:
Step S1031, according to the sensitivity K of twice lmwith the maximum experience impedance Z of this line end short circuit gsmaxcalculate distance and protect III section calculated value Z below jsIII, and according to this apart from backup protection III section calculated value Z jsIIIcarry out sensitivity and check judgement, if Z jsIIIbe less than (1+ δ) * Z setIII, sensitivity meets; Otherwise sensitivity does not meet, and carries out alarm prompt; In formula, Z setIIIfor apart from III section setting value; δ gets 0.1;
Step S1032, if apart from backup protection III section time T setIIIbe less than min (T' dzII+ Δ T, T maxIII), III segment protect coordinates with adjacent lines pilot protection, according to this circuit positive sequence impedance Z 1with adjacent lines positive sequence impedance definite value Z 1' calculate apart from backup protection III section calculated value Z jsIII, and the distance backup protection III section calculated value Z calculating according to this jsIIIcarry out selectivity and check judgement, if Z jsIIIbe greater than (1-δ) * Z setIII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt; In formula, T' dzIIfor adjacent lines is apart from backup protection II section operate time; Δ T is that the time is differential, generally gets 0.2S; T maxIIIfor the maximum actuation time of protection III section, be 4.2S; δ gets 0.07;
Step S1033, if apart from backup protection III section time T setIIIbe less than min (T' dzIII+ Δ T, T maxIII) and be more than or equal to min (T' dzII+ Δ T, T maxIII), III segment protect coordinates with the distance backup protection II section of adjacent lines, according to this circuit positive sequence impedance Z 1with adjacent lines apart from backup protection II section action definite value Z' iIcalculate apart from backup protection III section calculated value Z jsIII, and the distance backup protection III section calculated value Z calculating according to this jsIIIcarry out selectivity and check judgement, if Z jsIIIbe greater than (1-δ) * Z setIII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt, in formula, δ gets 0.07;
Step S1034, if ground distance backup protection III section time T setIIIbe more than or equal to min (T' dzIII+ Δ T, T maxIII), III segment protect coordinates with adjacent lines distance protection III section, according to this circuit positive sequence impedance Z 1with adjacent lines apart from backup protection III section action definite value Z' iIIcalculate apart from backup protection III calculated value Z jsIII, and the distance backup protection III section calculated value Z calculating according to this jsIIIcarry out selectivity and check judgement, if Z jsIIIbe greater than (1-δ) * Z setIII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt; In formula, δ gets 0.07;
Step S1035, according to minimum accident overload impedance Z corresponding to the maximum accident overload electric current of this circuit fhminwith safety factor K kcalculate apart from backup protection III section calculated value Z jsIII, and the distance backup protection III section calculated value Z calculating according to this jsIIIthe load of hiding is checked judgement, if Z jsIIIbe greater than (1-δ) * Z setIII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt; In formula, δ gets 0.07.
As a good embodiment, described according to this circuit positive sequence impedance Z 1with adjacent lines positive sequence impedance definite value Z 1' calculate apart from backup protection III section calculated value Z jsIIIprocess comprise:
Adopt following formula to calculate apart from backup protection III section calculated value Z jsIII: Z jsIII=K k* Z 1+ K kk zz 1'; In formula, K kfor safety factor, get 0.84; K zfor helping increasing coefficient under current operational mode.
As a good embodiment, described according to this circuit positive sequence impedance Z 1with adjacent lines apart from backup protection II section action definite value Z' iIcalculate apart from backup protection III section calculated value Z jsIIIprocess comprise:
Adopt following formula to calculate apart from backup protection III section calculated value Z jsIII: Z jsIII=K k* Z 1+ K kk zz' iI; In formula, K kfor safety factor, get 0.8, K zfor helping increasing coefficient under current operational mode.
As a good embodiment, described according to this circuit positive sequence impedance Z 1with adjacent lines apart from backup protection III section action definite value Z' iIIcalculate apart from backup protection III calculated value Z jsIII
Adopt following formula to calculate apart from backup protection III section calculated value Z jsIII: Z jsIII=K k* Z 1+ K kk zz' iII; In formula, K kfor safety factor, get 0.8, K zfor helping increasing coefficient under current operational mode.
Still be elaborated as an example of ground distance backup protection example below:
As shown in Figure 3, line-to-ground apart from backup protection III section sensitivity check method is:
Z jsIII=2K lm*Z gsmax
Wherein: K lmfor sensitivity; Z gsmaxfor the maximum experience impedance of this line end short circuit;
Criterion: if Z jsIII< (1+ δ) * Z setIII, sensitivity meets, otherwise sensitivity is dissatisfied, carries out alarm prompt.In formula, Z jsIIIfor ground distance III section calculated value, Z setIIIfor ground distance III section setting value, δ gets 0.1.
The sensitivity K of ground distance backup protection III section lmrequire as follows:
A) when line length is less than 25km, K lm=2.2;
B) when line length is between 25km and 50km, K lm=2.0;
C) when line length is between 50km and 100km, K lm=1.8;
D) when line length is between 100km and 150km, K lm=1.6;
E) when line length is between 150km and 200km, K lm=1.5;
F) when line length is greater than 200km, K lm=1.4.
(1) min (T' dzII+ Δ T, T maxIII) >T setIIIfirst coordinate with adjacent lines pilot protection:
Z jsIII=K k*Z 1+K kK zZ 1';
Wherein: K kfor safety factor, get 0.84; K zfor helping increasing coefficient under current operational mode; Z 1for this circuit positive sequence impedance; Z 1' be adjacent lines positive sequence impedance definite value; T' dzIIfor adjacent lines ground distance backup protection II section operate time; Δ T is that the time is differential, generally gets 0.2S; T maxIIIfor the maximum actuation time of ground protection III section, be 4.2S, T setIIIfor ground distance backup protection III section setting time.
Criterion: if Z jsIII> (1-δ) * Z setIII, selectivity meets, otherwise does not meet selectivity, carries out alarm prompt (δ gets 0.07).
(2) min (T' dzIII+ Δ T, T maxIII) >T setIII3min (T' dzII+ Δ T, T maxIII) coordinate with the distance backup protection II section of adjacent lines:
Z jsIII=K k*Z 1+K kK zZ' II
Wherein: K kfor safety factor, get 0.8; K zfor helping increasing coefficient under current operational mode; Z 1for this circuit positive sequence impedance; Z' iIfor adjacent lines is apart from backup protection II section action definite value; T' dzIIfor adjacent lines ground distance backup protection II section operate time; T' dzIIIfor adjacent lines ground distance backup protection III section operate time; Δ T is that the time is differential, generally gets 0.2S; T maxIIIfor the maximum actuation time of ground protection III section, be 4.2S.
Criterion: if Z jsIII> (1-δ) * Z setIII, selectivity meets, otherwise does not meet selectivity, carries out alarm prompt (δ gets 0.07).
(3) T setII>=min (T' dzIII+ Δ T, T maxIII) coordinate with adjacent lines distance protection III section:
Z jsIII=K k*Z 1+K kK zZ' III
Wherein: K kfor safety factor, get 0.8; K zfor helping increasing coefficient under current operational mode; Z 1for this circuit positive sequence impedance; Z' iIIfor adjacent lines is apart from backup protection III section action definite value; T' dzIIIfor adjacent lines is apart from backup protection III section operate time; Δ T is that the time is differential, generally gets 0.2S; T maxIIIfor the maximum actuation time apart from backup protection III section, be 4.2S.
Criterion: if Z jsIII> (1-δ) * Z setIII, selectivity meets, otherwise does not meet selectivity, carries out alarm prompt (δ gets 0.07).
(4) escape the minimum load impedance of this circuit:
Z jsIII=K k*Z fhmin
Wherein: K kfor safety factor, get 0.7; Z fhminfor minimum accident overload impedance corresponding to the maximum accident overload electric current of this circuit;
Criterion: if Z jsIII> (1-δ) * Z setIII, selectivity meets, otherwise does not meet selectivity, carries out alarm prompt (δ gets 0.07).
Can find out by above scheme, a kind of supertension line of the present invention is apart from backup protection check method, first corresponding apart from backup protection calculated value when calculating under previous mode, and then carry out sensitivity check, selectivity is checked judgement, this method is than the check method based on protection range, do not reducing under the prerequisite of power grid security risk, the huge amount of calculation of protection range and the problem of inaccuracy are not only avoided asking for, make to check calculating convenient, quick and accurate, alleviate and checked the workload of calculating, and be consistent in style with protection system calculation principle in form, be convenient to the realization of computer, possesses good versatility with portable.
It should be noted that, although the step in the present invention is arranged with label, but and be not used in and limit the precedence of step, unless expressly stated the order of step or the execution of certain step need other steps as basis, otherwise the relative order of step is adjustable.
The above embodiment has only expressed several execution mode of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that for the person of ordinary skill of the art, without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection range of patent of the present invention should be as the criterion with claims.

Claims (10)

1. a distance backup protection check method for supertension line, is characterized in that, comprises the following steps:
Obtain the operational mode of current electrical network, and carry out selectivity check according to the backup protection I section of adjusting the distance of the system data under this operational mode;
According to sensitivity K lmwith the maximum experience impedance Z of this line end short circuit gsmaxcalculate apart from backup protection II section calculated value Z jsII, and according to this apart from backup protection II section calculated value Z jsIIcarry out sensitivity and check judgement, if Z jsIIbe less than (1+ δ) * Z setII, sensitivity meets; Otherwise sensitivity does not meet, and carries out alarm prompt; In formula, Z setIIfor apart from standby II section setting value, δ gets 0.1;
If adjacent lines has transformer, according to this circuit positive sequence impedance Z 1with adjacent transformers resistance value Z' tcalculate apart from backup protection II section calculated value Z jsII, and the distance backup protection II section calculated value Z calculating according to this jsIIcarry out selectivity and check judgement, if Z jsIIbe greater than (1-δ) * Z setII, do not stretch out adjacent main transformer, selectivity meets; Otherwise stretch out adjacent main transformer, selectivity does not meet, and carries out alarm prompt; In formula, δ gets 0.07;
If protection adjacent elements is circuit, II section does not coordinate with neighbor distance backup protection I section, not to coordinating and check with neighbor distance backup protection I section; If apart from backup protection II section time T setIIbe less than min (T' dzII+ Δ T, T maxII), II section coordinates with adjacent pilot protection, according to this circuit positive sequence impedance Z 1calculate apart from backup protection II section calculated value Z with adjacent lines positive sequence impedance value Z1' jsII, and the distance backup protection II section calculated value Z calculating according to this jsIIcarry out selectivity and check judgement, if Z jsIIbe greater than (1-δ) * Z setII, selectivity meets; Otherwise selectivity does not meet, and carries out alarm prompt; In formula, T' dzIIfor the adjacent lines protection II section time; Δ T is that the time is differential, gets 0.2S; T maxIIfor apart from backup protection II section time definite value, be above limited to 2S; δ gets 0.07;
If min is (T' dzII+ Δ T, T maxII) be less than or equal to T setII, the distance backup protection II section of adjacent lines coordinates, according to this circuit positive sequence impedance Z 1with neighbor distance backup protection II section definite value Z' dzIIcalculate apart from backup protection II calculated value Z jsII, and the distance protection II section calculated value Z calculating according to this jsIIcarry out selectivity and check judgement, if Z jsIIbe greater than (1-δ) * Z setII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt, in formula, δ gets 0.07.
2. the distance backup protection check method of supertension line according to claim 1, is characterized in that, the described sensitivity K apart from backup protection II section lmrequire as follows:
When line length is less than 50km, K lm=1.5;
Line length is between 50km and 100km time, K lm=1.45;
Line length is between 100km and 150km time, K lm=1.4;
Line length is between 150km and 200km time, K lm=1.35;
When line length is greater than 200km, K lm=1.3.
3. the distance backup protection check method of supertension line according to claim 1, is characterized in that, described according to this circuit positive sequence impedance Z 1with adjacent transformers resistance value Z' tcalculate apart from backup protection II section calculated value Z jsIIprocess comprise:
Adopt following formula to calculate apart from backup protection II section calculated value Z jsII: Z jsII=K k* Z 1+ K kTk zz' t; In formula, K kfor safety factor, get 0.8; K kTfor cooperation coefficient, get 0.8; K zfor helping increasing coefficient under current operational mode.
4. the distance backup protection check method of supertension line according to claim 3, is characterized in that, described according to this circuit positive sequence impedance Z 1with adjacent lines positive sequence impedance value Z 1' calculate apart from backup protection II section calculated value Z jsIIprocess comprise:
Adopt following formula to calculate apart from backup protection II section calculated value Z jsII: Z jsII=K k* Z 1+ K kk zz 1'; In formula, K kfor safety factor, get 0.7; K zfor helping increasing coefficient under front operational mode.
5. according to the distance backup protection check method of the supertension line described in claim 3 or 4, it is characterized in that, described according to this circuit positive sequence impedance Z 1with neighbor distance backup protection II section definite value Z' dzIIcalculate apart from backup protection II calculated value Z jsIIprocess comprise:
Adopt following formula to calculate apart from backup protection II section calculated value Z jsII: Z jsII=K k* Z 1+ K kk zz' dzII, in formula, K kfor safety factor, get 0.8; K zfor helping increasing coefficient under front operational mode.
6. the distance backup protection check method of supertension line according to claim 1, is characterized in that, after the backup protection II section of adjusting the distance has been checked, also comprises step:
According to the sensitivity K of twice lmwith the maximum experience impedance Z of this line end short circuit gsmaxcalculate distance and protect III section calculated value Z below jsIII, and according to this apart from backup protection III section calculated value Z jsIIIcarry out sensitivity and check judgement, if Z jsIIIbe less than (1+ δ) * Z setIII, sensitivity meets; Otherwise sensitivity does not meet, and carries out alarm prompt; In formula, Z setIIIfor apart from III section setting value; δ gets 0.1;
If apart from backup protection III section time T setIIIbe less than min (T' dzII+ Δ T, T maxIII), III segment protect coordinates with adjacent lines pilot protection, according to this circuit positive sequence impedance Z 1with adjacent lines positive sequence impedance definite value Z 1' calculate apart from backup protection III section calculated value Z jsIII, and the distance backup protection III section calculated value Z calculating according to this jsIIIcarry out selectivity and check judgement, if Z jsIIIbe greater than (1-δ) * Z setIII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt; In formula, T' dzIIfor adjacent lines is apart from backup protection II section operate time; Δ T is that the time is differential, gets 0.2S; T maxIIIfor the maximum actuation time of protection III section, be 4.2S; δ gets 0.07;
If apart from backup protection III section time T setIIIbe less than min (T' dzIII+ Δ T, T maxIII) and be more than or equal to min (T' dzII+ Δ T, T maxIII), III segment protect coordinates with the distance backup protection II section of adjacent lines, according to this circuit positive sequence impedance Z 1with adjacent lines apart from backup protection II section action definite value Z' iIcalculate apart from backup protection III section calculated value Z jsIII, and the distance backup protection III section calculated value Z calculating according to this jsIIIcarry out selectivity and check judgement, if Z jsIIIbe greater than (1-δ) * Z setIII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt, in formula, δ gets 0.07;
If apart from backup protection III section time T setIIIbe more than or equal to min (T' dzIII+ Δ T, T maxIII), III segment protect coordinates with adjacent lines distance protection III section, according to this circuit positive sequence impedance Z1 and adjacent lines apart from backup protection III section action definite value Z' iIIcalculate apart from backup protection III calculated value Z jsIII, and the distance backup protection III section calculated value Z calculating according to this jsIIIcarry out selectivity and check judgement, if Z jsIIIbe greater than (1-δ) * Z setIII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt; In formula, δ gets 0.07;
According to minimum accident overload impedance Z corresponding to the maximum accident overload electric current of this circuit fhminwith safety factor K kcalculate apart from backup protection III section calculated value Z jsIII, and the distance backup protection III section calculated value Z calculating according to this jsIIIthe load of hiding is checked judgement, if Z jsIIIbe greater than (1-δ) * Z setIII, selectivity meets; Otherwise do not meet selectivity, carry out alarm prompt; In formula, δ gets 0.07.
7. the distance backup protection check method of supertension line according to claim 6, is characterized in that, the described sensitivity K apart from backup protection III section lmrequire as follows:
When line length is less than 25km, K lm=2.2;
Line length is between 25km and 50km time, K lm=2.0;
Line length is between 50km and 100km time, K lm=1.8;
Line length is between 100km and 150km time, K lm=1.6;
Line length is between 150km and 200km time, K lm=1.5;
When line length is greater than 200km, K lm=1.4.
8. the distance backup protection check method of supertension line according to claim 6, is characterized in that, described according to this circuit positive sequence impedance Z 1with adjacent lines positive sequence impedance definite value Z 1' calculate apart from backup protection III section calculated value Z jsIIIprocess comprise:
Adopt following formula to calculate apart from backup protection III section calculated value Z jsIII: Z jsIII=K k* Z 1+ K kk zz 1'; In formula, K kfor safety factor, get 0.84; K zfor helping increasing coefficient under current operational mode.
9. the distance backup protection check method of supertension line according to claim 8, is characterized in that, described according to this circuit positive sequence impedance Z 1with adjacent lines apart from backup protection II section action definite value Z' iIcalculate apart from backup protection III section calculated value Z jsIIIprocess comprise:
Adopt following formula to calculate apart from backup protection III section calculated value Z jsIII: Z jsIII=K k* Z 1+ K kk zz' iI; In formula, K kfor safety factor, get 0.8, K zfor helping increasing coefficient under current operational mode.
10. the distance backup protection check method of supertension line according to claim 8 or claim 9, is characterized in that, described according to this circuit positive sequence impedance Z 1with adjacent lines apart from backup protection III section action definite value Z' iIIcalculate apart from backup protection III calculated value Z jsIII
Adopt following formula to calculate apart from backup protection III section calculated value Z jsIII: Z jsIII=K k* Z 1+ K kk zz' iII; In formula, K kfor safety factor, get 0.8, K zfor helping increasing coefficient under current operational mode.
CN201410072485.5A 2014-02-28 2014-02-28 Supertension line distance backup protection check method Active CN103779851B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410072485.5A CN103779851B (en) 2014-02-28 2014-02-28 Supertension line distance backup protection check method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410072485.5A CN103779851B (en) 2014-02-28 2014-02-28 Supertension line distance backup protection check method

Publications (2)

Publication Number Publication Date
CN103779851A true CN103779851A (en) 2014-05-07
CN103779851B CN103779851B (en) 2015-11-18

Family

ID=50571821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410072485.5A Active CN103779851B (en) 2014-02-28 2014-02-28 Supertension line distance backup protection check method

Country Status (1)

Country Link
CN (1) CN103779851B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104319748A (en) * 2014-10-13 2015-01-28 清华大学 Quick adjustment method for parallel line branching factor in substation area distance protection section III
CN105305390A (en) * 2015-11-17 2016-02-03 北京中恒博瑞数字电力科技有限公司 Setting calculation optimization method for direct feeding traction network distance protection
CN106124896A (en) * 2016-06-28 2016-11-16 广东电网有限责任公司佛山供电局 Manually simulation supervoltage line protective device phase spacing back-up protection method of testing
CN106655095A (en) * 2016-11-01 2017-05-10 国家电网公司 Transformer backup protection setting method
CN109787186A (en) * 2017-11-15 2019-05-21 中国电力科学研究院有限公司 A kind of multistage power grid wide area definite value check method and system based on cloud platform

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105552862B (en) * 2015-12-31 2017-11-17 国家电网公司 The region-type back-up protection method simplified for III of Distance section protection seting

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102437557A (en) * 2011-12-15 2012-05-02 河南省电力公司洛阳供电公司 Quick-acting and selective parallel double-circuit running lines (110kV) and quick-action and selection method thereof
CN102545174A (en) * 2012-01-10 2012-07-04 广东省电力调度中心 Distance back-up protection setting method of ultrahigh voltage circuit
CN103280779A (en) * 2013-04-19 2013-09-04 广东电网公司电力调度控制中心 Auditing processing method for relay protection setting value

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102437557A (en) * 2011-12-15 2012-05-02 河南省电力公司洛阳供电公司 Quick-acting and selective parallel double-circuit running lines (110kV) and quick-action and selection method thereof
CN102545174A (en) * 2012-01-10 2012-07-04 广东省电力调度中心 Distance back-up protection setting method of ultrahigh voltage circuit
CN103280779A (en) * 2013-04-19 2013-09-04 广东电网公司电力调度控制中心 Auditing processing method for relay protection setting value

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王敬军等: "基于分相法的牵引供电***等值阻抗分析及对距离保护的校核", 《电力***保护与控制》 *
黄超等: "基于整定逆过程的保护定值在线校核原则", 《电力***自动化》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104319748A (en) * 2014-10-13 2015-01-28 清华大学 Quick adjustment method for parallel line branching factor in substation area distance protection section III
CN104319748B (en) * 2014-10-13 2017-04-12 清华大学 Quick adjustment method for parallel line branching factor in substation area distance protection section III
CN105305390A (en) * 2015-11-17 2016-02-03 北京中恒博瑞数字电力科技有限公司 Setting calculation optimization method for direct feeding traction network distance protection
CN106124896A (en) * 2016-06-28 2016-11-16 广东电网有限责任公司佛山供电局 Manually simulation supervoltage line protective device phase spacing back-up protection method of testing
CN106124896B (en) * 2016-06-28 2018-12-28 广东电网有限责任公司佛山供电局 Simulation supervoltage line protective device phase spacing back-up protection test method manually
CN106655095A (en) * 2016-11-01 2017-05-10 国家电网公司 Transformer backup protection setting method
CN109787186A (en) * 2017-11-15 2019-05-21 中国电力科学研究院有限公司 A kind of multistage power grid wide area definite value check method and system based on cloud platform

Also Published As

Publication number Publication date
CN103779851B (en) 2015-11-18

Similar Documents

Publication Publication Date Title
CN103779851B (en) Supertension line distance backup protection check method
CN102290800B (en) Method for checking relay protection setting
US10910826B2 (en) Voltage derivative and zero-sequence broken conductor detection
CN102882193B (en) Method and system for traveling wave protection setting of high-voltage direct-current transmission line
CN104269809B (en) Method for on-line verification of relay protection setting value of regional power grid
CN102931727A (en) Topological anti-error check method of power dispatching master station type integrated intelligent anti-error system
CN109510227B (en) Method and device for determining steady-state voltage of converter station bus after direct-current blocking
CN105223293A (en) Based on the transformer state method for early warning of oil chromatography on-line monitoring
CN110764020A (en) Method and device for detecting residual current of long cable of transformer substation, computer equipment and storage medium
CN104242260B (en) Fixed time limit protection fixed value optimization method based on risk index
CN203350349U (en) Transformer substation bus phase voltage off-limit alarm system
CN104393580B (en) A kind of T of utilization voltage x current Sudden Changing Rate wavelet coefficient correlation analysis gets access to grid transient cell protection method
CN103236682B (en) A kind of relay protection action simulation method for power system of simple and fast
CN104462767B (en) A kind of distribution network reliability fast evaluation method based on element transmission characteristic
CN103887775B (en) Distribution network microcomputer protection system integrating distribution automation master station dynamic setting
CN108736455B (en) Relay protection simulation method and system
CN105262086A (en) Security domain-based method for determining N-1 overload component set
CN109193594B (en) Method, device, server and storage medium for determining power safety protection level
CN106062575B (en) Method for locating a short circuit in an electrical network comprising at least one conductor section
CN104079066A (en) Method for judging disappearance of secondary direct-current power supply of far-end transformer substation
CN105182185A (en) Line fault identification method based on directional current construction
CN104600839B (en) Risk based grid safe stable control system key communication link identification method
CN107276048A (en) The recognition methods of fault direction containing distributed power distribution network
CN107968387B (en) Means of relay controlling based on impedance plane analysis positive sequence polarization voltage
CN106786336B (en) The sampling of intelligent substation protective device single-point is abnormal to count greatly anti-error processing method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 510699 No. 75 Meihua Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: ELECTRICAL POWER DISPATCHING & CONTROL CENTER OF GUANGDONG POWER GRID Co.,Ltd.

Patentee after: HUAZHONG University OF SCIENCE AND TECHNOLOGY

Address before: 510699 No. 75 Meihua Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee before: ELECTRIC POWER DISPATCH CONTROL CENTER OF GUANGDONG GRID Co.

Patentee before: HUAZHONG University OF SCIENCE AND TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210723

Address after: 510699 No. 75 Meihua Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee after: ELECTRICAL POWER DISPATCHING & CONTROL CENTER OF GUANGDONG POWER GRID Co.,Ltd.

Address before: 510699 No. 75 Meihua Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee before: ELECTRICAL POWER DISPATCHING & CONTROL CENTER OF GUANGDONG POWER GRID Co.,Ltd.

Patentee before: HUAZHONG University OF SCIENCE AND TECHNOLOGY