CN103738359B - A kind of route triggers control method and the system of order - Google Patents

A kind of route triggers control method and the system of order Download PDF

Info

Publication number
CN103738359B
CN103738359B CN201310689623.XA CN201310689623A CN103738359B CN 103738359 B CN103738359 B CN 103738359B CN 201310689623 A CN201310689623 A CN 201310689623A CN 103738359 B CN103738359 B CN 103738359B
Authority
CN
China
Prior art keywords
route
dependence
unit
train
relation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310689623.XA
Other languages
Chinese (zh)
Other versions
CN103738359A (en
Inventor
简锐锋
冉冉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Control Technology TCT Co Ltd
Original Assignee
Beijing Traffic Control Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Traffic Control Technology Co Ltd filed Critical Beijing Traffic Control Technology Co Ltd
Priority to CN201310689623.XA priority Critical patent/CN103738359B/en
Publication of CN103738359A publication Critical patent/CN103738359A/en
Application granted granted Critical
Publication of CN103738359B publication Critical patent/CN103738359B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

The invention provides control method and system that a kind of route triggers order, comprising: step S1: unique path of clear and definite train operation; Step S2: judge whether described train exists the combine scenes of multiple route: in the time that described train does not exist the combine scenes of multiple route, enter step S3; In the time that described train exists the combine scenes of multiple route, enter step S4; Step S3: preserve route data and carry out accordingly route and trigger order control, method step finishes; Step S4: extract the definite route combination in described unique path; Step S5: be near-end route and far-end route by described route Combinatorial resolution, described far-end route be defined as to the dependence route of described near-end route, dependence route relation is stored; Step S6: carry out route according to stored dependence route relation and trigger order control. The present invention has improved the control method of route triggering order, has reduced manual intervention, has improved automaticity and efficiency of operation.

Description

A kind of route triggers control method and the system of order
Technical field
The present invention relates to field of track traffic, relate in particular to a kind of controlling party of route triggering orderMethod and system.
Background technology
In recent years, city rail traffic signal system automation and intellectuality develop rapidly, trainAutomatic monitored control system (AutomaticTrainSupervision, ATS) is a kind of intelligent automaticMonitoring system, provides the control device of automation, to alleviate running scheduling personnel homework burden,Promote efficiency and the service level of metro operation.
According to traditional ATS, it is to trigger according to from the close-by examples to those far off carrying out order that route triggers. With Fig. 1Analyze, when train is set out by AB place, arrive to turn back in AC place or directly to passing through AFTime, according to the traditional method of current ATS, first to trigger route HE, and then trigger ECOr EF. But according to interlocking condition, if now trigger route HE, interlocking can be by track switchAutomatic blocking to location or antiposition: as being locked in location, if be about to handle be intoRoad EC, must before semaphore E, come to a complete stop until train (CBTC train can be after coming to a complete stop afterMeet immediately unlocking condition, if be non-CBTC train, need after 45S, meet unlocking condition)After could release track switch and handle EC route; If instead must handle route EF, track switch is lockedAlso be like this in antiposition.
Can find out according to above description, in existing mode, the protection section lock of being interlockedThere is the possibility that significantly reduces efficiency of operation in the difference of closing position. Particularly, for CBTCTrain efficiency of operation does not have too much influence, for non-CBTC train, needs elder generationStop the sufficient 45S additional time of moving switch locking route again, even if now come by manual intervention, also there is the drawback that operating automation degree is not high in walkthrough front route.
Summary of the invention
(1) technical problem that will solve
The invention provides control method and system that a kind of route triggers order, to solve existing skillRoute in art triggers time low technical problem of sequence controlling method efficiency of operation.
(2) technical scheme
For solving the problems of the technologies described above, the invention provides a kind of control method of route triggering order,It is characterized in that, comprising:
Step S1: unique path of clear and definite train operation;
Step S2: judge whether described train exists the combine scenes of multiple route: when described rowWhen car does not exist the combine scenes of multiple route, enter step S3; When described train exists multipleWhen the combine scenes of route, enter step S4;
Step S3: preserve route data and carry out accordingly route and trigger order control, method stepFinish;
Step S4: extract the definite route combination in described unique path;
Step S5: be near-end route and far-end route by described route Combinatorial resolution, by described far awayEnd route is defined as the dependence route of described near-end route, and dependence route relation is stored;
Step S6: carry out route according to stored dependence route relation and trigger order control.
Further, unique path of described clear and definite train operation comprises:
According to the clear and definite train operation plan of route map of train, determine unique path of train operation.
Further, described preservation route data carry out accordingly route and trigger order control and comprise:
Preserve route data according to unique path of train operation, carry out route and trigger order control.
Further, described method also comprises:
The data of reading pre-stored, determine whether Existence dependency route relation, work as Existence dependencyWhen route is related to, preferentially carries out route according to stored dependence route relation and trigger order control.
Further, describedly carry out route according to stored dependence route relation and trigger order controlSystem comprises:
Handle far-end route according to stored dependence route relation preference, handle at far-end routeAfter success, handle again near-end route.
On the other hand, the present invention also provides a kind of route to trigger the control system of order, comprising:Path unit, judging unit, storage unit, extraction unit, dependence unit and triggering controlUnit processed, described path unit, judging unit, extraction unit and dependence sequence of unit connectConnect described storage unit and described judging unit, described dependence unit and described triggering controlUnit processed connects respectively, wherein:
Path unit, for unique path of clear and definite train operation;
Judging unit, for judging whether described train exists the combine scenes of multiple route, whenWhen described train does not exist the combine scenes of multiple route, make storage unit preserve route data;In the time that described train exists the combine scenes of multiple route, be sent to extraction unit;
Storage unit, for preserving route data; Also for store dependence unit transmitRely on route relation;
Extraction unit, for extracting the definite route combination of described unique path, and is sent to and complies withRely and be related to unit;
Dependence unit, for being near-end route and far-end route by described route Combinatorial resolution,Described far-end route is defined as to the dependence route of described near-end route, will relies on route relation and passDelivering to storage unit stores;
Trigger control unit, for according to the route data of described storage unit storage or rely on intoRoad relation is carried out route and is triggered order control.
Further, described path unit comprises:
Operational plan subelement, for according to the clear and definite train operation plan of route map of train, determinesUnique path of train operation.
Further, described storage unit comprises:
Route data subelement, preserves route data for the unique path according to train operation,Carry out route and trigger order control.
Further, described trigger control unit comprises:
Read subelement, for the data of reading pre-stored, determine whether Existence dependency routeRelation, in the time that Existence dependency route is related to, preferentially carries out according to stored dependence route relationRoute triggers order control.
Further, described trigger control unit also comprises:
Preferentially handle subelement, for handling far-end according to stored dependence route relation preferenceRoute is handled near-end route after far-end route is handled successfully again.
(3) beneficial effect
Visible, the route proposing in the present invention triggers in the control method and system of order, passes throughRoute combination, root are determined in unique path of specifying train operation in the comprehensive scene of multiple routeAccording to relying on route relation, the triggering order of route is controlled. The present invention has improved route triggeringThe control method of order, has reduced manual intervention, has improved automaticity and efficiency of operation.
Brief description of the drawings
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, belowTo the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described, aobviousAnd easy insight, the accompanying drawing in the following describes is some embodiments of the present invention, general for this areaLogical technical staff, is not paying under the prerequisite of creative work, can also be attached according to theseFigure obtains other accompanying drawing.
Fig. 1 is the Run-time scenario schematic diagram that embodiment of the present invention route triggers order;
Fig. 2 is the basic procedure schematic diagram that embodiment of the present invention route triggers the control method of order;
Fig. 3 is the control method flow process signal that a preferred embodiment of the invention route triggers orderFigure;
Fig. 4 is the basic structure schematic diagram that embodiment of the present invention route triggers the control system of order.
Detailed description of the invention
For making object, technical scheme and the advantage of the embodiment of the present invention clearer, will tie belowClose the accompanying drawing in the embodiment of the present invention, to the technical scheme in the embodiment of the present invention carry out clear,Intactly describe, obviously, described embodiment is the present invention's part embodiment, instead ofWhole embodiment. Based on the embodiment in the present invention, those of ordinary skill in the art are not havingMake the every other embodiment obtaining under creative work prerequisite, all belong to the present invention's protectionScope.
First the embodiment of the present invention proposes a kind of control method of route triggering order, referring to Fig. 2,Comprise:
Step S1: unique path of clear and definite train operation.
Step S2: judge whether described train exists the combine scenes of multiple route: when described rowWhen car does not exist the combine scenes of multiple route, enter step S3; When described train exists multipleWhen the combine scenes of route, enter step S4.
Step S3: preserve route data and carry out accordingly route and trigger order control, method stepFinish.
Step S4: extract the definite route combination in described unique path.
Step S5: be near-end route and far-end route by described route Combinatorial resolution, by described far awayEnd route is defined as the dependence route of described near-end route, and dependence route relation is stored.
Step S6: carry out route according to stored dependence route relation and trigger order control.
Visible, the route proposing in the embodiment of the present invention triggers in the control method of order, passes throughRoute combination, root are determined in unique path of specifying train operation in the comprehensive scene of multiple routeAccording to relying on route relation, the triggering order of route is controlled. The embodiment of the present invention has been improvedThe control method that order is triggered on road, has reduced manual intervention, has improved automaticity and operationEfficiency.
In one embodiment of the invention, preferably, can come according to route map of train clear and definiteThe operational plan of train, to determine unique path of train operation.
In another embodiment of the present invention, there is not the combine scenes of multiple route when trainTime, preferably, unique path of train operation can be preserved, according to preserved enteringCircuit-switched data is carried out route and is triggered order control.
In one embodiment of the invention, carry out the process of route triggering order control at ATSIn, preferably, can first learn train operation path by the data of reading pre-storedDependence route relation, in the time that Existence dependency route is related to, can be preferentially according to stored complying withRely route relation to carry out route and trigger order control.
In another embodiment of the present invention, preferably, carry out according to relying on route relationRoute triggers order control and can comprise: preferentially handle according to stored dependence route relationFar-end route, after far-end route is handled successfully, then handles near-end route, thereby ensures trainHigh efficiency operation.
Below taking the route triggering order control as the train of HE-EC-BA to operating path in Fig. 1Be made as example, describe the specific implementation of the embodiment of the present invention in detail, referring to Fig. 3:
Step 301: according to the clear and definite train operation plan of route map of train, determine that train operation onlyOne path.
In this step, carry out the operational plan of clear and definite this train according to route map of train. In the present inventionIn embodiment, the operating path of train is route HE, route EC, route BA, and train is wantedIn the operation of turning back of when operation, but not by operation.
Step 302: judge whether train exists the combine scenes of multiple route.
In the embodiment of the present invention, there is route HE, route EF and route in the circuit shown in Fig. 1, so there is the combine scenes of multiple route in HE, two kinds of route combine scenes of route EC.
Step 303: extract the definite route combination in unique path.
In the time that train exists the combine scenes of multiple route, need to extract according to route map of trainThe route combination that unique path is definite. According to the unique path of train definite in step 301, canWith clearly, in this section of route, the corresponding route of train is combined as route HE, route EC.
Step 304: determine and rely on route relation storage.
In this step, be first near-end route by route Combinatorial resolution corresponding unique train pathWith far-end route, and far-end route is defined as to the dependence route of near-end route, determine rely on intoRoad relation. In the embodiment of the present invention, route HE is the near-end route of this train under this scene,Route EC is far-end route. So route EC is the dependence route of route HE, the two foundationRely on route relation, and the above results is stored in the server that ATS uses.
Step 305: carry out route according to stored dependence route relation and trigger order control.
After above-mentioned Data Preparation completes, ATS is carrying out route while triggering order control,First whether learn Existence dependency route relation by reading stored data, when existence is complied withWhile relying route to be related to, can preferentially handle.
In the embodiment of the present invention, route EC and route HE are Existence dependency route relations, instituteWith in the time handling the control of route triggering order, first handle far-end route EC, at far-end routeEC handles near-end route HE again after handling successfully, in the time that train sails into, can directly enter like thisThe row operation of turning back, thus the high efficiency operation of train ensured.
So far, completed the control method overall process of the route triggering order of the embodiment of the present invention.
The control system that the embodiment of the present invention also provides a kind of route to trigger order, referring to Fig. 4,Comprise:
Path unit 401, for unique path of clear and definite train operation;
Judging unit 402, for judging whether described train exists the combine scenes of multiple route,In the time that described train does not exist the combine scenes of multiple route, make storage unit 403 preserve routeData; In the time that described train exists the combine scenes of multiple route, be sent to extraction unit 404;
Storage unit 403, for preserving route data; Also for storing dependence unit 405The dependence route relation transmitting;
Extraction unit 404, for extracting the definite route combination in described unique path, and is sent toDependence unit 405;
Dependence unit 405, for being that near-end route and far-end enter by described route Combinatorial resolutionRoad, is defined as described far-end route the dependence route of described near-end route, will rely on route and closeSystem is sent to storage unit 403 and stores;
Trigger control unit 406, for according to route data or the dependence of described storage unit storageRoute relation is carried out route and is triggered order control.
In one embodiment of the invention, preferably, path unit 401 can comprise: fortuneRow plan subelement, for according to the clear and definite train operation plan of route map of train, determines train fortuneUnique path of row.
In another embodiment of the present invention, preferably, storage unit 403 can comprise:Route data subelement, preserves route data for the unique path according to train operation, carries outRoute triggers order control.
In one embodiment of the invention, preferably, trigger control unit 406 can comprise:Read subelement, for the data of reading pre-stored, determine whether Existence dependency route relation,In the time that Existence dependency route is related to, preferentially carries out route according to stored dependence route relation and touchSend out order control.
In another embodiment of the present invention, preferably, trigger control unit 406 is all rightComprise: preferentially handle subelement, for handling far according to stored dependence route relation preferenceEnd route is handled near-end route after far-end route is handled successfully again.
Visible, the embodiment of the present invention has following beneficial effect:
The route proposing in the embodiment of the present invention triggers in the control method and system of order, passes throughRoute combination, root are determined in unique path of specifying train operation in the comprehensive scene of multiple routeAccording to relying on route relation, the triggering order of route is controlled. The embodiment of the present invention has been improvedThe control method that order is triggered on road, has reduced manual intervention, has improved automaticity and operationEfficiency.
Finally it should be noted that: above embodiment is only in order to technical scheme of the present invention to be described, andNon-to its restriction; Although the present invention is had been described in detail with reference to previous embodiment, abilityThe those of ordinary skill in territory is to be understood that: the skill that it still can be recorded aforementioned each embodimentArt scheme is modified, or part technical characterictic is wherein equal to replacement; And these are repaiiedChange or replace, not making the essence of appropriate technical solution depart from various embodiments of the present invention technical sideThe spirit and scope of case.

Claims (4)

1. route triggers a control method for order, it is characterized in that, comprising:
Step S1: unique path of clear and definite train operation;
Step S2: judge whether described train exists the combine scenes of multiple route: in the time that described train does not exist the combine scenes of multiple route, enter step S3; In the time that described train exists the combine scenes of multiple route, enter step S4;
Step S3: preserve route data and carry out accordingly route and trigger order control, method step finishes;
Described preservation route data are also carried out accordingly the control of route triggering order and are comprised:
Preserve route data according to unique path of train operation, carry out route and trigger order control;
Step S4: extract the definite route combination in described unique path;
Step S5: be near-end route and far-end route by described route Combinatorial resolution, described far-end route be defined as to the dependence route of described near-end route, dependence route relation is stored;
Step S6: carry out route according to stored dependence route relation and trigger order control;
Described method also comprises:
The data of reading pre-stored, determine whether Existence dependency route relation, in the time that Existence dependency route is related to, preferentially carries out route according to stored dependence route relation and trigger order control;
Describedly carry out route according to stored dependence route relation and trigger order control and comprise:
Handle far-end route according to stored dependence route relation preference, after far-end route is handled successfully, handle again near-end route.
2. route according to claim 1 triggers the control method of order, it is characterized in that, unique path of described clear and definite train operation comprises:
According to the clear and definite train operation plan of route map of train, determine unique path of train operation.
3. the control system of a route triggering order, it is characterized in that, comprise: path unit, judging unit, storage unit, extraction unit, dependence unit and trigger control unit, described path unit, judging unit, extraction unit and dependence sequence of unit are connected, described storage unit is connected respectively with described judging unit, described dependence unit and described trigger control unit, wherein:
Path unit, for unique path of clear and definite train operation;
Judging unit, for judging whether described train exists the combine scenes of multiple route, in the time that described train does not exist the combine scenes of multiple route, makes storage unit preserve route data; In the time that described train exists the combine scenes of multiple route, be sent to extraction unit;
Storage unit, for preserving route data; The dependence route relation also transmitting for storing dependence unit;
Described storage unit comprises:
Route data subelement, preserves route data for the unique path according to train operation, carries out route and triggers order control;
Extraction unit, for extracting the definite route combination in described unique path, and is sent to dependence unit;
Dependence unit, for being near-end route and far-end route by described route Combinatorial resolution, is defined as described far-end route the dependence route of described near-end route, dependence route relation is sent to storage unit and stores;
Trigger control unit, for carrying out the control of route triggering order according to the route data of described storage unit storage or dependence route relation;
Described trigger control unit comprises:
Read subelement, for the data of reading pre-stored, determine whether Existence dependency route relation, in the time that Existence dependency route is related to, preferentially carries out route according to stored dependence route relation and trigger order control;
Described trigger control unit also comprises:
Preferentially handle subelement, for handling far-end route according to stored dependence route relation preference, after far-end route is handled successfully, handle again near-end route.
4. route according to claim 3 triggers the control system of order, it is characterized in that, described path unit comprises:
Operational plan subelement, for according to the clear and definite train operation plan of route map of train, determines unique path of train operation.
CN201310689623.XA 2013-12-16 2013-12-16 A kind of route triggers control method and the system of order Active CN103738359B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310689623.XA CN103738359B (en) 2013-12-16 2013-12-16 A kind of route triggers control method and the system of order

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310689623.XA CN103738359B (en) 2013-12-16 2013-12-16 A kind of route triggers control method and the system of order

Publications (2)

Publication Number Publication Date
CN103738359A CN103738359A (en) 2014-04-23
CN103738359B true CN103738359B (en) 2016-05-04

Family

ID=50495459

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310689623.XA Active CN103738359B (en) 2013-12-16 2013-12-16 A kind of route triggers control method and the system of order

Country Status (1)

Country Link
CN (1) CN103738359B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106828544B (en) * 2016-12-09 2018-11-23 交控科技股份有限公司 A kind of movement across lines route triggering method and device
CN108189866B (en) * 2017-12-12 2020-09-25 交控科技股份有限公司 Conflict processing method and device for route handling
CN108583621B (en) * 2018-04-28 2020-10-23 北京全路通信信号研究设计院集团有限公司 Control method and alarm system
CN110329320B (en) * 2019-07-08 2021-09-03 卡斯柯信号有限公司 Tramcar route control method based on LTE vehicle-ground continuous communication
CN110481599B (en) * 2019-07-31 2021-09-10 交控科技股份有限公司 Method and device for processing route change of train
CN111874046B (en) * 2020-07-14 2022-06-24 中国铁道科学研究院集团有限公司通信信号研究所 Train driving-based automatic handling method and system for high-speed railway route
CN112758134B (en) * 2020-12-30 2022-04-15 北京交通大学 Control method and system for rapid vehicle section departure based on digital twinning

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201338637Y (en) * 2008-12-29 2009-11-04 卡斯柯信号有限公司 Access automatic processing device
CN102328673A (en) * 2011-07-11 2012-01-25 北京和利时***工程有限公司 Automatic train supervision system and automatic train route control method
CN102616251A (en) * 2011-01-27 2012-08-01 铁道部运输局 Automatic access management method and control device for high-speed train
CN102874279A (en) * 2012-09-26 2013-01-16 北京交控科技有限公司 Train route handling method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1148974A (en) * 1997-08-05 1999-02-23 Hitachi Ltd Train routing method and total traffic control device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201338637Y (en) * 2008-12-29 2009-11-04 卡斯柯信号有限公司 Access automatic processing device
CN102616251A (en) * 2011-01-27 2012-08-01 铁道部运输局 Automatic access management method and control device for high-speed train
CN102328673A (en) * 2011-07-11 2012-01-25 北京和利时***工程有限公司 Automatic train supervision system and automatic train route control method
CN102874279A (en) * 2012-09-26 2013-01-16 北京交控科技有限公司 Train route handling method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
CTCS-3级列控***仿真测试平台;裴志斌;《中国优秀硕士论文学位论文全文数据库工程科技II辑》;20110715(第07期);24-26 *

Also Published As

Publication number Publication date
CN103738359A (en) 2014-04-23

Similar Documents

Publication Publication Date Title
CN103738359B (en) A kind of route triggers control method and the system of order
EP3381768B1 (en) Railway turnout control method and system
US8967553B2 (en) Train operation control system
US8467920B2 (en) Train control system
CN105383526B (en) A kind of train conflict inspection and solution and train automatic monitoring system
EP3656643B1 (en) Railway cyber security systems
CN103035129B (en) Special vehicle signal priority control method based on global position system (GPS)
US20180001917A1 (en) Train-information management device and train-information management method
CN103991465B (en) Tramcar safety type is wireless switch control system and control method
US10858018B2 (en) Train information management device and door control system
CN109649449B (en) Transponder arrangement method for automatic switching of vehicle-mounted ATP (automatic train protection) and LKJ (LKJ) control power without stopping
CN108583621B (en) Control method and alarm system
CN108333613A (en) A kind of global position system being suitable for heavily loaded movable block
CN104635672A (en) Intersection controller system of tramcar
CN103707905B (en) The fixed automatic route of figure
JP2017019381A (en) Train and signal security system
CN103985007A (en) Railway emergency rescue command system
EP2993106B1 (en) ERTMS / ETCS radio block centre; method for establishing a connection with said radio block centre
EP3713127B1 (en) Method and apparatus for hot backup of master control unit, and computer storage medium
CN106672030B (en) Train is turned back conflict processing method between station
US11891097B2 (en) Vehicle control system, resource management device, vehicle control method, and program
CN104599497A (en) Codebook model based vehicle overload monitoring method
CN104494652B (en) Method for automatically searching optimal route in information collection and closure system
JP5491977B2 (en) Train control device and ground control device
CN203005470U (en) Risk control system for shunting service

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100070 Beijing science and Technology Park of Fengtai District Haiying Road No. 6 hospital of Beijing, the headquarters of the International 2 Building No. 3

Applicant after: TRAFFIC CONTROL TECHNOLOGY Co.,Ltd.

Address before: 100070 Beijing science and Technology Park of Fengtai District Haiying Road No. 6 hospital of Beijing, the headquarters of the International 2 Building No. 3

Applicant before: Beijing Traffic Control Technology Co., Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 100070 Beijing science and Technology Park of Fengtai District Seahawks Hospital No. 6 2, No. 3 (Park)

Patentee after: TRAFFIC CONTROL TECHNOLOGY Co.,Ltd.

Address before: 100070 Beijing science and Technology Park of Fengtai District Haiying Road No. 6 hospital of Beijing, the headquarters of the International 2 Building No. 3

Patentee before: TRAFFIC CONTROL TECHNOLOGY Co.,Ltd.