CN103729496A CN201310581402.0A CN201310581402A CN103729496A CN 103729496 A CN103729496 A CN 103729496A CN 201310581402 A CN201310581402 A CN 201310581402A CN 103729496 A CN103729496 A CN 103729496A
Authority
CN
China
Prior art keywords
modeling
simulation
simulation model
rule base
illegal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310581402.0A
Other languages
Chinese (zh)
Other versions
CN103729496B (en
Inventor
黄少伟
陈颖
陶皖
李钧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui kangaier Electric Co., Ltd
Original Assignee
WUHU UNIVERSITY SCIENCE & TECHNOLOGY PARK DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHU UNIVERSITY SCIENCE & TECHNOLOGY PARK DEVELOPMENT Co Ltd filed Critical WUHU UNIVERSITY SCIENCE & TECHNOLOGY PARK DEVELOPMENT Co Ltd
Priority to CN201310581402.0A priority Critical patent/CN103729496B/en
Publication of CN103729496A publication Critical patent/CN103729496A/en
Application granted granted Critical
Publication of CN103729496B publication Critical patent/CN103729496B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a power system simulation model verification method. A simulation model parameter recording and model rule verification process is provided, the operation logic verification requirement in the multi-user, multi-terminal (including mobile phone and tablet personal computers) different-place modeling process is met by establishing a cloud-end simulation model parameter library and a rule base, timely inspection for simulation modeling is formed, the process is timely fed back, track information of the simulation modeling is simultaneously recorded, the simulation modeling process is improved, and the simulation modeling efficiency is improved.

Description

Electric system simulation model checking method
Technical field
The present invention relates to electric system simulation application, be specially a kind of electric system simulation model checking method.
Background technology
Along with the raising of power automation level, power system simulation software plays an important role in the design of electric system, operation and control.But current all kinds of electric system simulation model process of establishing form is single, lacks fast and effeciently authentication mechanism, and this programme will provide a kind of realistic model verification scheme, by the modeling data of continuous accumulation, improve the accuracy of modeling, improve simulation modeling efficiency.
Summary of the invention
The object of this invention is to provide a kind of electric system simulation model checking method, to overcome above-mentioned the deficiencies in the prior art.
In order to achieve the above object, the technical solution adopted in the present invention is:
Electric system simulation model checking method, it is characterized in that: in simulation modeling process, component parameters and the rule base verification according to simulation modeling judges whether modeling selection meets logic in time, if illogical, can reselect, in modeling process, record the trace information of various selections, think that analytic induction simulation modeling rule base provides data message, described trace information comprises logical or do not meet logic, i.e. time, component parameters, the front and back component information of legal or illegal modeling.
Described electric system simulation model checking method, it is characterized in that: the validation model storehouse of the sequence of positions information that comprises component parameters by structure and illegal model bank, by the sequence pattern analysis of data analysis and excavation, build component parameters and the rule base of simulation modeling, in storehouse, comprise the possible front and back component information of element, various legal or illegal position signs.
Described electric system simulation model checking method, is characterized in that: according to component parameters and the rule base of simulation modeling, in the process of selecting, by Automatically invoked correction verification module, carry out model testing at modeling element.
Described electric system simulation model checking method, is characterized in that: building early stage with the simulation model library and the illegal modeling information bank that constantly expand is the basis of carrying out element sequences pattern analysis.
Compared with prior art, tool has the following advantages in the present invention:
(1), build legal and illegal simulation model library, record the trace information of simulation modeling;
(2), by data sequence analytical approach, provide the reference information of emulation element, build emulation element and rule base, for the model checking of simulation process provides foundation, improve simulation efficiency.
Accompanying drawing explanation
Fig. 1 is FB(flow block) of the present invention.
Embodiment
As shown in Figure 1.A kind of electric system simulation model checking method, in simulation modeling process, component parameters and the rule base verification according to simulation modeling judges that modeling selects whether meet logic, can reselect if illogical in time.In modeling process, record the trace information (containing logical or do not meet logic, legal or illegal) of various selections, think that analytic induction simulation modeling rule base provides data message.
By the validation model storehouse and the illegal model bank (all comprising the sequence of positions information of component parameters in storehouse) that build, by the sequence pattern analysis of data analysis and excavation, build component parameters and the rule base of simulation modeling, in storehouse, comprise the possible front and back component information of element, various legal or illegal position signs etc.
According to component parameters and the rule base of simulation modeling, in the process of selecting at modeling element, by Automatically invoked correction verification module, carry out model testing.
The simulation model library and the illegal modeling information bank that build early stage and constantly expand are the bases of carrying out element sequences pattern analysis.

Claims (4)

1. electric system simulation model checking method, it is characterized in that: in simulation modeling process, component parameters and the rule base verification according to simulation modeling judges whether modeling selection meets logic in time, if illogical, can reselect, in modeling process, record the trace information of various selections, think that analytic induction simulation modeling rule base provides data message, described trace information comprises logical or do not meet logic, i.e. time, component parameters, the front and back component information of legal or illegal modeling.
2. electric system simulation model checking method according to claim 1, it is characterized in that: the validation model storehouse of the sequence of positions information that comprises component parameters by structure and illegal model bank, by the sequence pattern analysis of data analysis and excavation, build component parameters and the rule base of simulation modeling, in storehouse, comprise the possible front and back component information of element, various legal or illegal position signs.
3. electric system simulation model checking method according to claim 1, is characterized in that: according to component parameters and the rule base of simulation modeling, in the process of selecting, by Automatically invoked correction verification module, carry out model testing at modeling element.
4. electric system simulation model checking method according to claim 1, is characterized in that: building early stage with the simulation model library and the illegal modeling information bank that constantly expand is the basis of carrying out element sequences pattern analysis.
CN201310581402.0A 2013-11-18 2013-11-18 Power system simulation model verification method Active CN103729496B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310581402.0A CN103729496B (en) 2013-11-18 2013-11-18 Power system simulation model verification method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310581402.0A CN103729496B (en) 2013-11-18 2013-11-18 Power system simulation model verification method

Publications (2)

Publication Number Publication Date
CN103729496A true CN103729496A (en) 2014-04-16
CN103729496B CN103729496B (en) 2017-06-27

Family

ID=50453570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310581402.0A Active CN103729496B (en) 2013-11-18 2013-11-18 Power system simulation model verification method

Country Status (1)

Country Link
CN (1) CN103729496B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106157179A (en) * 2016-07-28 2016-11-23 南方电网科学研究院有限责任公司 The model matching method of a kind of Real-Time Model and system
WO2017067225A1 (en) * 2015-10-20 2017-04-27 中国电力科学研究院 System, method and storage device for cim/e model standard compliance test
CN106780116A (en) * 2016-12-01 2017-05-31 全球能源互联网研究院 The construction method of power emergency drilling method, device and its scenario models, device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080234872A1 (en) * 2007-03-22 2008-09-25 Abb Research Ltd. Validating a standardized configuration description
CN102663094A (en) * 2012-04-10 2012-09-12 国电南瑞科技股份有限公司 IEC61970CIM model checking method
WO2013097892A1 (en) * 2011-12-28 2013-07-04 Siemens Aktiengesellschaft Processing a technical system
CN103353871A (en) * 2013-05-31 2013-10-16 国家电网公司 Interoperation picture file checking method based on CIM/G standard

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080234872A1 (en) * 2007-03-22 2008-09-25 Abb Research Ltd. Validating a standardized configuration description
WO2013097892A1 (en) * 2011-12-28 2013-07-04 Siemens Aktiengesellschaft Processing a technical system
CN102663094A (en) * 2012-04-10 2012-09-12 国电南瑞科技股份有限公司 IEC61970CIM model checking method
CN103353871A (en) * 2013-05-31 2013-10-16 国家电网公司 Interoperation picture file checking method based on CIM/G standard

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
宋鑫等: "基于电力***规则的CIM-XML模型校验", 《电力信息化》 *
马平川等: "CIM数据应用性能提升方法研究", 《电力科学与技术学报》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017067225A1 (en) * 2015-10-20 2017-04-27 中国电力科学研究院 System, method and storage device for cim/e model standard compliance test
US11176028B2 (en) 2015-10-20 2021-11-16 China Electric Power Research Institute Company Limited System, method and storage device for CIM/E model standard compliance test
CN106157179A (en) * 2016-07-28 2016-11-23 南方电网科学研究院有限责任公司 The model matching method of a kind of Real-Time Model and system
CN106780116A (en) * 2016-12-01 2017-05-31 全球能源互联网研究院 The construction method of power emergency drilling method, device and its scenario models, device

Also Published As

Publication number Publication date
CN103729496B (en) 2017-06-27

Similar Documents

Publication Publication Date Title
CN103500516A (en) High-efficiency trace replay method and system based on electronic map
CN104318708A (en) Embedded intelligent security protection system of ARM-based Linux operating system
CN104715181A (en) Login system and method of application software
CN101963640A (en) Detection system and detection method of direct-current charging post
CN103593527B (en) Design method for one-click setting of different types of routing rule BGAs in PCB
CN103729496A (en) Power system simulation model verification method
CN104216826A (en) Test method and device
CN102110053A (en) Random testing method based on Android
CN103677821A (en) Method and device for publishing software development tool code
CN102156228A (en) System and method for detecting vehicular direct-current charging pile
CN107748639A (en) A kind of edit methods of curve, device, equipment and storage medium
CN103246779B (en) Method for constructing automatic detection simulation system of intelligent electric energy meter
CN103729495A (en) Power system simulation model recommendation method
CN105092996A (en) EMTP (Electro-Magnetic Transient Program)-based relay protection tester compound fault real-time simulation system
CN103760514A (en) Rapid detection method and device of electric energy meter
CN104133764A (en) Response test method and response test device of application program interface
CN101980223B (en) Power consumption and performance optimization method for processor structure and circuit design
CN105589781A (en) Automated testing method of simulating inserting and pulling of USB of car audio
CN103186465A (en) Browser compatibility testing method and system for webpage user interface
CN104361012A (en) Testing method and device for route data of urban rail traffic engineering
CN108647234A (en) Acquisition methods, device, computer equipment and the storage medium of scope of power outage
CN102542028B (en) Information iterative classification method of smart grid on basis of automatic control theory
CN204946014U (en) A kind of computer security control system
CN110557726B (en) Information pushing method and related product
CN104765616A (en) Method and system for generating IO model automatically

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191211

Address after: 241000 5th floor, management committee, high tech Industrial Development Zone, No. 83, Changjiang South Road, Yijiang District, Wuhu City, Anhui Province

Patentee after: Anhui kangaier Electric Co., Ltd

Address before: 241002 No. 83 Changjiang South Road, Yijiang hi tech Development Zone, Wuhu, Anhui

Patentee before: WUHU UNIVERSITY SCIENCE & TECHNOLOGY PARK DEVELOPMENT CO., LTD.