CN103700029A - 一种电网建设项目后评价指标体系的建立方法 - Google Patents
一种电网建设项目后评价指标体系的建立方法 Download PDFInfo
- Publication number
- CN103700029A CN103700029A CN201310687431.5A CN201310687431A CN103700029A CN 103700029 A CN103700029 A CN 103700029A CN 201310687431 A CN201310687431 A CN 201310687431A CN 103700029 A CN103700029 A CN 103700029A
- Authority
- CN
- China
- Prior art keywords
- index
- evaluation
- expert
- construction project
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
一种电网建设项目后评价指标体系的建立方法。其包括确定指标、建立树状层级后评价指标结构、确定各指标权重和确定评价指标体系等步骤。本发明提供的电网建设项目后评价指标体系的建立方法具有如下有益效果:本发明采用层次分析法和德尔菲法,建立了具有指导意义的后评价指标体系,能够对电网建设项目进行全局性和整体性的评价。在电网建设项目投运几年后,对技术合理性、运行安全性、供电质量及运行经济性等各方面进行了较全面的评价。
Description
技术领域
本发明属于电网建设项目后评价技术领域,特别是涉及一种电网建设项目后评价指标体系的建立方法。
背景技术
为改善和提高电网建设项目投资管理水平,完善投资管理机制,规范项目后评估工作,需要制定一套合理、全面、通用的后评价指标体系。
电网建设项目后评价的重要意义已得到广泛认可,通过后评价可以加强固定资产投资项目管理,推进电网建设与改造工程的顺利进行,加强项目综合效益分析,提高工程管理整体水平,规范投资项目后评价工作。
通过开展项目后评价工作,能总结经验,吸取教训,得到启示,提出对策建议,改进投资决策和投资管理,以达到提高投资效益的目的。
发明内容
为了解决上述问题,本发明的目的在于提供一种电网建设项目后评价指标体系的建立方法。
为了达到上述目的,本发明提供的电网建设项目后评价指标体系的建立方法包括按顺序执行的下列步骤:
步骤一、确定指标的S01阶段:首先,确定后评价的具体目标;收集后评价各指标资料和信息,选取合理的前期、实施、投资、管理评价指标;
步骤二、建立树状层级后评价指标结构的S02阶段:建立树状层次的后评价指标结构;根据电网建设项目后评价指标之间的联系与区别,分层次构建一个包括三个层级的指标体系;
步骤三、确定各指标权重的S03阶段:采用德尔菲法进行权重分析,通过计算得到各层级各指标权重;
步骤四、确定评价指标体系的S04阶段:根据调整后的指标,利用综合评分法逐层向上计算,得到整个电网建设项目的综合评分,获得后评价的综合结果;分层次建立指标并赋予不同的测评权重,形成完整的电网建设项目的后评价指标体系。
在S03阶段中,所述的德尔菲法即为专家打分法,邀请从事电网建设的多位专家对各个指标进行评价,然后根据专家评分结果采用加权平均的方法得出各个指标权重;具体过程如下:
(1)邀请管理层专家、各专业专责及项目组工作人员、供电单位技术专责,对后评价各层级指标进行权重打分,然后根据专家评分结果采用加权平均的方法得出各个指标权重.
(2)收回所有评分结果,并计算各指标权重的平均值,将平均值作为最终的专家赋权权重;
本发明提供的电网建设项目后评价指标体系的建立方法具有如下有益效果:
本发明采用层次分析法和德尔菲法,建立了具有指导意义的后评价指标体系,能够对电网建设项目进行全局性和整体性的评价。在电网建设项目投运几年后,对技术合理性、运行安全性、供电质量及运行经济性等各方面进行了较全面的评价。
附图说明
图1为本发明提供的电网建设项目后评价指标体系的建立方法流程图。
图2为电网建设项目后评价指标体系示意图。
具体实施方式
下面结合附图和具体实施例对本发明提供的电网建设项目后评价指标体系的建立方法进行详细说明。
如图1所示,本发明提供的电网建设项目后评价指标体系的建立方法包括按顺序执行的下列步骤:
步骤一、确定指标的S01阶段:首先,确定后评价的具体目标;依据指标设立的原则:科学性,定性与定量相结合,客观性和公正性,评价指标的全面性,评价指标之间的相对独立性,可操作性和实用性,通用性和可比性,层次性等,设置既能反映项目产生效果的好坏,又能体现项目后评价的***性和评价质量的指标;依据国家电网公司颁布的后评价实施规范,收集后评价各指标资料和信息,选取合理的前期、实施、投资、管理等评价指标;
步骤二、建立树状层级后评价指标结构的S02阶段:建立树状层次的后评价指标结构;根据电网建设项目后评价指标之间的联系与区别,分层次构建一个包括三个层级的指标体系;
步骤三、确定各指标权重的S03阶段:采用德尔菲法进行权重分析,通过计算得到各层级各指标权重;
步骤四、确定评价指标体系的S04阶段:根据调整后的指标,利用综合评分法逐层向上计算,得到整个电网建设项目的综合评分,获得后评价的综合结果;分层次建立指标并赋予不同的测评权重,形成完整的电网建设项目的后评价指标体系。
在S03阶段中,所述的德尔菲法即为专家打分法,邀请从事电网建设的多位专家对各个指标进行评价,然后根据专家评分结果采用加权平均的方法得出各个指标权重;具体构成如下:
(1)邀请管理层专家、各专业专责及项目组工作人员、供电单位技术专责,对后评价各层级指标进行权重打分。然后根据专家评分结果采用加权平均的方法得出各个指标权重.
(2)收回所有评分结果,并计算各指标权重的平均值,将平均值作为最终的专家赋权权重。
本发明提供的电网建设项目后评价指标体系的建立方法结合电网建设项目的现状和具体特点,选取后评价体系包括实施管理评价、财务评价、技术评价、社会影响评价四个方面进行分析。分层次建立指标并赋予不同的测评权重,形成后评价指标体系。
电网建设项目后评价从规划目标、具体实施过程、社会经济效益、发挥作用影响等方面进行客观全面***的分析和评价。评价重点从项目决策、工程前期、工程建设、生产运行、经济效益和项目影响等六个方面对项目全过程管理进行评价。根据后评价内容选取实施管理评价、财务评价、技术评价、社会影响评价四个方面作为一级指标。为了充分评价某一个一级指标,可以在一级指标下面再根据评审需要建立若干个二级指标。
项目实施管理评价主要包括对项目前期立项评价、建设实施评价、投资控制评价、基础管理评价等二级指标的评价。
电网建设项目的技术评价应充分考虑电网的现状和相互关联性,针对后评价项目类型、特点建立各有侧重、切实可行的技术评价指标体系来进行评价。技术评价二级评价指标一般包括电网结构布局、供电可靠性、电压质量、供电能力等。
电网建设项目财务评价的主要工作是分析盈利能力和清偿能力,主要侧重于区域电网建设投入产出的经济评价。
项目社会影响评价是分析评价对象为实现所在地区各项社会发展目标所做贡献与影响以及对社会的适应性。目的是使项目与社会发展相适应和协调,保证项目顺利实施并发挥持续效益,增强项目有利影响、减轻或消除不利影响,促进社会进步与发展。主要包括:环境影响评价、对居民生活的影响、对地区经济的影响、利益相关方的效益评价四个二级指标。
为进一步展示后评价指标体系与实际工程项目的关系,保证后评价工作的可操作性,需要基于层次分析法,对各个二级指标继续分解成34个三级指标。
图2为本例中所建立的电网建设项目后评价指标体系图。
本方法的主要技术难点:
(1)电网建设项目建设周期长、投资额巨大、投资效果持续时间较长以及投资决策复杂,导致后评价指标的选择和指标体系的建立难度很大。
(2)涉及的资料很多,知识面很广,评价人员无所适从,很难保证评价标准的统一、评价结果的公正、客观。
(3)环境影响评价只能进行定性分析,很难实现定量分析。摆脱不了评价过程的随机性、评价专家主观上的不确定性和认识上的模糊性。
Claims (2)
1.一种电网建设项目后评价指标体系的建立方法,其特征在于:所述的方法包括按顺序执行的下列步骤:
步骤一、确定指标的S01阶段:首先,确定后评价的具体目标;收集后评价各指标资料和信息,选取合理的前期、实施、投资、管理评价指标;
步骤二、建立树状层级后评价指标结构的S02阶段:建立树状层次的后评价指标结构;根据电网建设项目后评价指标之间的联系与区别,分层次构建一个包括三个层级的指标体系;
步骤三、确定各指标权重的S03阶段:采用德尔菲法进行权重分析,通过计算得到各层级各指标权重;
步骤四、确定评价指标体系的S04阶段:根据调整后的指标,利用综合评分法逐层向上计算,得到整个电网建设项目的综合评分,获得后评价的综合结果;分层次建立指标并赋予不同的测评权重,形成完整的电网建设项目的后评价指标体系。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310687431.5A CN103700029A (zh) | 2013-12-16 | 2013-12-16 | 一种电网建设项目后评价指标体系的建立方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310687431.5A CN103700029A (zh) | 2013-12-16 | 2013-12-16 | 一种电网建设项目后评价指标体系的建立方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103700029A true CN103700029A (zh) | 2014-04-02 |
Family
ID=50361548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310687431.5A Pending CN103700029A (zh) | 2013-12-16 | 2013-12-16 | 一种电网建设项目后评价指标体系的建立方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103700029A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104392314A (zh) * | 2014-11-19 | 2015-03-04 | 国家电网公司 | 一种针对智能电网建设的整体评价指标体系及评价方法 |
CN104966178A (zh) * | 2015-07-29 | 2015-10-07 | 国家电网公司 | 一种产能转移指标的评价方法 |
CN105303302A (zh) * | 2015-10-12 | 2016-02-03 | 国家电网公司 | 一种电网评价指标关联性分析方法、设备以及计算设备 |
CN105335810A (zh) * | 2015-06-12 | 2016-02-17 | 国家电网公司 | 一种配电网单体项目投资效益评价方法 |
CN110020048A (zh) * | 2017-10-27 | 2019-07-16 | 北京宸信征信有限公司 | 一种基于开源数据的企业风险评价***及方法 |
CN110210733A (zh) * | 2019-05-21 | 2019-09-06 | 上海软科教育信息咨询有限公司 | 适用于办学单位的投入产出评价***、方法、终端、介质 |
CN110866694A (zh) * | 2019-11-14 | 2020-03-06 | 国网河北省电力有限公司沧州供电分公司 | 一种电网建设项目财务评价***及其方法 |
CN111160673A (zh) * | 2018-11-07 | 2020-05-15 | 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 | 一种电力建设项目后评价方法和计算设备 |
CN112085333A (zh) * | 2020-08-06 | 2020-12-15 | 国网河南省电力公司经济技术研究院 | 基于关联算法的配电网建设管控指标关联关系研究方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030158631A1 (en) * | 2000-03-10 | 2003-08-21 | Yoshinobu Masuda | Electricity charge management apparatus and its recording medium |
CN102509240A (zh) * | 2011-11-22 | 2012-06-20 | 天津市电力公司 | 一种基于多指标多层次的电网投资效益评估方法 |
-
2013
- 2013-12-16 CN CN201310687431.5A patent/CN103700029A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030158631A1 (en) * | 2000-03-10 | 2003-08-21 | Yoshinobu Masuda | Electricity charge management apparatus and its recording medium |
CN102509240A (zh) * | 2011-11-22 | 2012-06-20 | 天津市电力公司 | 一种基于多指标多层次的电网投资效益评估方法 |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104392314A (zh) * | 2014-11-19 | 2015-03-04 | 国家电网公司 | 一种针对智能电网建设的整体评价指标体系及评价方法 |
CN105335810A (zh) * | 2015-06-12 | 2016-02-17 | 国家电网公司 | 一种配电网单体项目投资效益评价方法 |
CN104966178A (zh) * | 2015-07-29 | 2015-10-07 | 国家电网公司 | 一种产能转移指标的评价方法 |
CN105303302A (zh) * | 2015-10-12 | 2016-02-03 | 国家电网公司 | 一种电网评价指标关联性分析方法、设备以及计算设备 |
CN110020048A (zh) * | 2017-10-27 | 2019-07-16 | 北京宸信征信有限公司 | 一种基于开源数据的企业风险评价***及方法 |
CN110020048B (zh) * | 2017-10-27 | 2021-09-14 | 北京宸信征信有限公司 | 一种基于开源数据的企业风险评价***及方法 |
CN111160673A (zh) * | 2018-11-07 | 2020-05-15 | 内蒙古电力(集团)有限责任公司内蒙古电力经济技术研究院分公司 | 一种电力建设项目后评价方法和计算设备 |
CN110210733A (zh) * | 2019-05-21 | 2019-09-06 | 上海软科教育信息咨询有限公司 | 适用于办学单位的投入产出评价***、方法、终端、介质 |
CN110866694A (zh) * | 2019-11-14 | 2020-03-06 | 国网河北省电力有限公司沧州供电分公司 | 一种电网建设项目财务评价***及其方法 |
CN112085333A (zh) * | 2020-08-06 | 2020-12-15 | 国网河南省电力公司经济技术研究院 | 基于关联算法的配电网建设管控指标关联关系研究方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103700029A (zh) | 一种电网建设项目后评价指标体系的建立方法 | |
Wei et al. | Energy and environmental efficiency of China’s transportation sectors considering CO2 emission uncertainty | |
CN109063976A (zh) | 基于模糊层次分析法的智能制造能力成熟度评价方法 | |
CN108846526A (zh) | 一种二氧化碳排放量预测方法 | |
CN104239687B (zh) | 一种基于航天产品信号传递路径的可靠性建模与评估方法 | |
CN102915510B (zh) | 基于多级模糊综合评价模型的电力项目网络后评价*** | |
CN102496069A (zh) | 基于模糊层次分析法的电缆多状态安全运行评估方法 | |
CN104318482A (zh) | 一套智能配电网综合评估体系和方法 | |
CN104123680A (zh) | 一种综合评价电网科技项目的后评估方法 | |
CN105184420B (zh) | 一种基于灰色关联分析的充电站规划方案评估方法 | |
CN103413207A (zh) | 基于定性标准化和影响因子评价法的科技人才评价方法 | |
CN105335810A (zh) | 一种配电网单体项目投资效益评价方法 | |
Reddy | Research on green building materials management system based on BIM | |
CN107194536A (zh) | 一种项目投资的供电可靠性负效益评估方法及装置 | |
CN103985062B (zh) | 一种配电网主设备状态检修综合评价方法 | |
Chen et al. | Sustainability evaluation of urban large-scale infrastructure construction based on dynamic fuzzy cognitive map | |
CN105912775B (zh) | 桥梁动态称重***车辆轴重数据的多模态建模方法 | |
CN112668771A (zh) | 一种海底隧道的综合评价选址方法及*** | |
CN105469180A (zh) | 基于tps的产业集群企业生产协同管理评价*** | |
CN105956684A (zh) | 一种区域电网智能化水平的预测方法 | |
CN108345975A (zh) | 一种油库失效风险评估方法及装置 | |
CN109447498B (zh) | 一种轨道交通***成本关联多域影响要素大数据驱动分析方法 | |
Wang et al. | Study on the risk evaluation model of utility tunnel project under a PPP mode | |
Qu | Research on Optimization of Human-Skilled Matching of SMEs Based on Ant Colony Optimization Algorithm | |
Huining | Research on Performance Evaluation Index System and Evaluation Method of Hospital Knowledge Management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140402 |