CN103696618B - Railing is safeguarded for construction work and the modular of highway construction - Google Patents
Railing is safeguarded for construction work and the modular of highway construction Download PDFInfo
- Publication number
- CN103696618B CN103696618B CN201310720933.3A CN201310720933A CN103696618B CN 103696618 B CN103696618 B CN 103696618B CN 201310720933 A CN201310720933 A CN 201310720933A CN 103696618 B CN103696618 B CN 103696618B
- Authority
- CN
- China
- Prior art keywords
- post
- component
- horizontal short
- wall body
- body skeleton
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to a kind of for construction work and highway construction is removable, spell assembly type safeguard railing, comprise post component, wall body skeleton and architectural surface.The all skeletons of enclosed structure adopt angle steel, architectural surface adopts aluminium sheet, by installing pilot hole at connecting portion, bolt is utilized to fix each parts, form the double enclosed structure of steel work that deadweight is heavier, squeeze in ground at post member base by bolt, resistance to overturning can meet the requirements of and also can meet resistance to capsizing simultaneously, post component and wall body component arranged in a crossed manner, the resistance to overturning not only increasing structure more meets continuity.Ensure that the recycled for multiple times of spelling, tearing open and the environmental requirement of enclosed structure.
Description
Technical field
The present invention relates to field of civil engineering, particularly relate to a kind of for assembly type enclosed structure that is removable in construction work, highway engineering construction, that spell.
Background technology
Building (road) construction maintenance structure present stage mostly adopts brick masonry or color steel to close and safeguards site operation, brick enclosure wall is in building process, mortar is generally on-the-spot mixing, affect environment and the cycle of building by laying bricks or stones long, in use go through wind and rain easily to occur metope cracking, pile up dust and affect attractive in appearance, after completion of works is transferred, enclosure wall loses its effect, destroyed and become building waste, single input amount is large; Because belonging to the steel plate structure of individual layer, easily there is the phenomenons such as distortion, cracking, corrosion in color steel, after project terminates, steel plate loses its function utilized substantially, as scrap iron in use procedure.As continuous in project, then can cause and newly hold project at every turn and all need again to inject capital into, this not only adds project cost and drop into and be more unfavorable for environmental protection construction, so a kind ofly novel to spell, the formula enclosed structure of tearing open arises at the historic moment.This enclosed structure is undertaken assembled by angle steel, and connecting portion adopts bolt to fix, and not only can be recycled, and also can reach overall resistance to capsizing simultaneously, meet the requirement of enclosed structure.
Summary of the invention
In order to solve the above-mentioned deficiency of existing enclosed structure, the invention provides a kind of for assembly type enclosed structure that is removable in construction work, highway engineering construction, that spell.
Concrete technical scheme of the present invention is as follows:
Safeguard railing for construction work and the modular of highway construction, be made up of post component, wall body skeleton and decoration panel assembly; Post component along need lay safeguard the building of railing or road edge uniform, between adjacent two post components, be connected with wall body skeleton; Decoration panel assembly is coated with at the external surface of post component and wall body skeleton; Post component is made up of the horizontal short component 6 of pedestal 2, spinous process of the seventh cervical vertebra frame 3 and post; Described pedestal 2 is the rectangle frame surrounded by angle steel; By bolt or rivet, pedestal 2 is fixedly connected with basis; Spinous process of the seventh cervical vertebra frame 3 is fixed with at the top of pedestal 2; Described spinous process of the seventh cervical vertebra frame 3 forms by four angle steel with the horizontal short components 6 of five posts, and wherein, four angle steel are separately fixed at the corner of pedestal 2 and extend straight up; The rectangle frame that the horizontal short component 6 of post surrounds for angle steel; By post horizontal short component 6, the shaft of four angle steel is flatly linked together; Five horizontal short components 6 of post are followed successively by the horizontal short component 62 of horizontal short component 61, second post of the first post, the horizontal short component 63 of the 3rd post, the horizontal short component 64 of the 4th post and the horizontal short component 65 of the 5th post from bottom to top; Wherein, the horizontal short component 61 of first post and pedestal 2 300mm apart, the horizontal short component 62 of second post and the horizontal short component 61 of the first post are at a distance of 950mm, the bottom of the horizontal short component 62 of the 3rd post is connected with the end face of the horizontal short component 62 of the second post, the horizontal short component 62 of 4th post and the horizontal short component 62 of the 3rd post are at a distance of 950mm, and the horizontal short component 62 of the 5th post and the horizontal short component 62 of the 4th post are at a distance of 300mm;
By lateral keel 8, two spinous process of the seventh cervical vertebra framves 3 between adjacent two post components and inside being simultaneously in are linked together, linked together by two spinous process of the seventh cervical vertebra framves 3 between adjacent two post components and outside being simultaneously in by lateral keel 8, above-mentioned lateral keel 8 between adjacent pillars component forms a wall body skeleton;
Decoration panel assembly comprises post component vertical plane decorative panel 10, post component top saliva paperback decoration panel 11, wall body skeleton vertical plane decorative panel 12 and wall body skeleton top mouth decorative panel 13; Be coated with post component top saliva paperback decoration panel 11 at the top of post component, be all coated with post component vertical plane decorative panel 10 in the inside and outside both sides of post component, the end face of post component safeguarding railing two ends is coated with post component vertical plane decorative panel 10; All be coated with wall body skeleton vertical plane decorative panel 12 in the inside and outside both sides of wall body skeleton, be coated with wall body skeleton top mouth decorative panel 13 at the top of wall body skeleton; Namely hidden completely by the surface of decoration panel assembly by post component, wall body skeleton.
Say further, be provided with six roots of sensation lateral keel 8 between two spinous process of the seventh cervical vertebra framves 3 between adjacent two post components and inside being simultaneously in, the installation site of above-mentioned six roots of sensation lateral keel 8 is corresponding with the position of pedestal 2 and five horizontal short components 6 of post successively.
Say further, pedestal 2 is the rectangle frame of 200mm × 200mm.
Say further, the spacing between post component is 2000mm ~ 2500mm.
Say further, decoration panel assembly is aluminium sheet, and post component and wall body skeleton material are steel.
Say further, post component and wall body skeleton are evenly equipped with circular hole, removably decoration panel assembly are fixed on the surface of post component and wall body skeleton by bolt.
Advantageous Effects of the present invention has
This product, can also recycled for multiple times in guarantee structure light structure durable in use and while stability, globality, resistance to capsizing, economizes on material, environmental protection, walks the road of sustainable development;
As seen from the above table, after adopting this product, there is significant economic benefit and environment-friendly advantage.
Accompanying drawing explanation
Fig. 1 is this product elevational schematic view.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the A-A sectional view of Fig. 1.
Sequence number in figure is: the horizontal short component 6 of pedestal 2, spinous process of the seventh cervical vertebra frame 3, post, lateral keel 8, post component vertical plane decorative panel 10, post component top saliva paperback decoration panel 11, wall body skeleton vertical plane decorative panel 12, the horizontal short component 62 of horizontal short component 61, second post of wall body skeleton top mouth decorative panel 13, first post, the horizontal short component 63 of the 3rd post, the horizontal short component 64 of the 4th post, the horizontal short component 65 of the 5th post.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further described.
See Fig. 1, safeguard railing for construction work and the modular of highway construction, be made up of post component, wall body skeleton and decoration panel assembly; Post component along need lay safeguard the building of railing or road edge uniform, between adjacent two post components, be connected with wall body skeleton; Decoration panel assembly is coated with at the external surface of post component and wall body skeleton; Post component is firm overall enclosed structure mainly, and wall body skeleton mainly plays lateral ties effect and supports fixing decoration panel effect in the enclosed structure of entirety, and decoration panel mainly plays to be closed and decoration function.
Post component is made up of the horizontal short component 6 of pedestal 2, spinous process of the seventh cervical vertebra frame 3 and post; Described pedestal 2 is the rectangle frame surrounded by angle steel; By bolt or rivet, pedestal 2 is fixedly connected with basis; Pedestal 2 is that the effect connecting ground is played on the basis of post component, and spinous process of the seventh cervical vertebra frame 3 is vertical structures of composition post component.
Spinous process of the seventh cervical vertebra frame 3 is fixed with at the top of pedestal 2; Described spinous process of the seventh cervical vertebra frame 3 forms by four angle steel with the horizontal short components 6 of five posts, and wherein, four angle steel are separately fixed at the corner of pedestal 2 and extend straight up; By post horizontal short component 6, the shaft of four angle steel is flatly linked together.
See Fig. 2, the rectangle frame that the horizontal short component 6 of post surrounds for angle steel; Five horizontal short components 6 of post are followed successively by the horizontal short component 62 of horizontal short component 61, second post of the first post, the horizontal short component 63 of the 3rd post, the horizontal short component 64 of the 4th post and the horizontal short component 65 of the 5th post from bottom to top; Wherein, the horizontal short component 61 of first post and pedestal 2 300mm apart, the horizontal short component 62 of second post and the horizontal short component 61 of the first post are at a distance of 950mm, the bottom of the horizontal short component 62 of the 3rd post is connected with the end face of the horizontal short component 62 of the second post, the horizontal short component 62 of 4th post and the horizontal short component 62 of the 3rd post are at a distance of 950mm, the horizontal short component 62 of 5th post and the horizontal short component 62 of the 4th post, at a distance of 300mm, refer to Fig. 3; By lateral keel 8, two spinous process of the seventh cervical vertebra framves 3 between adjacent two post components and inside being simultaneously in are linked together, linked together by two spinous process of the seventh cervical vertebra framves 3 between adjacent two post components and outside being simultaneously in by lateral keel 8, above-mentioned lateral keel 8 between adjacent pillars component forms a wall body skeleton;
Decoration panel assembly comprises post component vertical plane decorative panel 10, post component top saliva paperback decoration panel 11, wall body skeleton vertical plane decorative panel 12 and wall body skeleton top mouth decorative panel 13; Be coated with post component top saliva paperback decoration panel 11 at the top of post component, be all coated with post component vertical plane decorative panel 10 in the inside and outside both sides of post component, the end face of post component safeguarding railing two ends is coated with post component vertical plane decorative panel 10;
All be coated with wall body skeleton vertical plane decorative panel 12 in the inside and outside both sides of wall body skeleton, be coated with wall body skeleton top mouth decorative panel 13 at the top of wall body skeleton;
Namely hidden completely by the surface of decoration panel assembly by post component, wall body skeleton.
See Fig. 1, be provided with six roots of sensation lateral keel 8 between two spinous process of the seventh cervical vertebra framves 3 between adjacent two post components and inside being simultaneously in, the installation site of above-mentioned six roots of sensation lateral keel 8 is corresponding with the position of pedestal 2 and five horizontal short components 6 of post successively.
See Fig. 3, pedestal 2 and the horizontal short component 6 of post are the rectangle frame of 200mm × 200mm.
See Fig. 1, the spacing between post component is 2000mm ~ 2500mm.
Say further, decoration panel assembly is aluminium sheet, and post component and wall body skeleton material are steel.
Say further, post component and wall body skeleton are evenly equipped with circular hole, removably decoration panel assembly are fixed on the surface of post component and wall body skeleton by bolt.
Claims (6)
1. safeguard railing for construction work and the modular of highway construction, it is characterized in that: be made up of post component, wall body skeleton and decoration panel assembly; Post component along need lay safeguard the building of railing or road edge uniform, between adjacent two post components, be connected with wall body skeleton; Decoration panel assembly is coated with at the external surface of post component and wall body skeleton; Post component is made up of the horizontal short component (6) of pedestal (2), spinous process of the seventh cervical vertebra frame (3) and post; Described pedestal (2) is the rectangle frame surrounded by angle steel; By bolt or rivet, pedestal (2) is fixedly connected with basis; Spinous process of the seventh cervical vertebra frame (3) is fixed with at the top of pedestal (2); Described spinous process of the seventh cervical vertebra frame (3) is made up of four angle steel and five horizontal short components (6) of post, and wherein, four angle steel are separately fixed at the corner of pedestal (2) and extend straight up; The rectangle frame that the horizontal short component (6) of post surrounds for angle steel; By post horizontal short component (6), the shaft of four angle steel is flatly linked together; Five horizontal short components (6) of post are followed successively by the horizontal short component (61) of the first post, the horizontal short component (62) of the second post, the horizontal short component (63) of the 3rd post, the horizontal short component (64) of the 4th post and the horizontal short component (65) of the 5th post from bottom to top; Wherein, the horizontal short component (61) of first post and pedestal (2) 300mm apart, the horizontal short component (62) of second post and the horizontal short component (61) of the first post are at a distance of 950mm, the bottom of the horizontal short component (62) of the 3rd post is connected with the end face of the horizontal short component (62) of the second post, the horizontal short component (62) of 4th post and the horizontal short component (62) of the 3rd post are at a distance of 950mm, and the horizontal short component (62) of the 5th post and the horizontal short component (62) of the 4th post are at a distance of 300mm;
By lateral keel (8), two spinous process of the seventh cervical vertebra framves (3) between adjacent two post components and inside being simultaneously in are linked together, two spinous process of the seventh cervical vertebra framves (3) between adjacent two post components and outside being simultaneously in linked together by lateral keel (8), above-mentioned lateral keel (8) between adjacent pillars component forms a wall body skeleton;
Decoration panel assembly comprises post component vertical plane decorative panel (10), post component top saliva paperback decoration panel (11), wall body skeleton vertical plane decorative panel (12) and wall body skeleton top mouth decorative panel (13); Post component top saliva paperback decoration panel (11) is coated with at the top of post component, all be coated with post component vertical plane decorative panel (10) in the inside and outside both sides of post component, the end face of post component safeguarding railing two ends is coated with post component vertical plane decorative panel (10); All be coated with wall body skeleton vertical plane decorative panel (12) in the inside and outside both sides of wall body skeleton, be coated with wall body skeleton top mouth decorative panel (13) at the top of wall body skeleton; Namely hidden completely by the surface of decoration panel assembly by post component, wall body skeleton.
2. safeguard railing for construction work and the modular of highway construction as claimed in claim 1, it is characterized in that, be provided with six roots of sensation lateral keel (8) between two spinous process of the seventh cervical vertebra framves (3) between adjacent two post components and inside being simultaneously in, the installation site of above-mentioned six roots of sensation lateral keel (8) is corresponding with the position of pedestal (2) and five horizontal short components (6) of posts successively.
3. safeguard railing for construction work and the modular of highway construction as claimed in claim 1, it is characterized in that, the rectangle frame that pedestal (2) is 200mm × 200mm.
4. safeguard railing for construction work and the modular of highway construction as claimed in claim 1, it is characterized in that, the spacing between post component is 2000mm ~ 2500mm.
5. safeguard railing for construction work and the modular of highway construction as claimed in claim 1, it is characterized in that, decoration panel assembly is aluminium sheet, and post component and wall body skeleton material are steel.
6. safeguard railing for construction work and the modular of highway construction as claimed in claim 1, it is characterized in that, post component and wall body skeleton are evenly equipped with circular hole, removably decoration panel assembly are fixed on the surface of post component and wall body skeleton by bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310720933.3A CN103696618B (en) | 2013-12-24 | 2013-12-24 | Railing is safeguarded for construction work and the modular of highway construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310720933.3A CN103696618B (en) | 2013-12-24 | 2013-12-24 | Railing is safeguarded for construction work and the modular of highway construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103696618A CN103696618A (en) | 2014-04-02 |
CN103696618B true CN103696618B (en) | 2016-04-27 |
Family
ID=50358266
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310720933.3A Expired - Fee Related CN103696618B (en) | 2013-12-24 | 2013-12-24 | Railing is safeguarded for construction work and the modular of highway construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103696618B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104005598B (en) * | 2014-06-11 | 2016-05-04 | 中建一局华江建设有限公司 | Can have enough to meet the need multipurpose protective stent |
CN106150005B (en) * | 2016-08-19 | 2018-10-23 | 深圳市亚泰国际建设股份有限公司 | A kind of Zhongting barrage armrest and mounting process with hidden lights |
CN107143204B (en) * | 2017-05-31 | 2019-04-26 | 中国十九冶集团有限公司 | Detachable assembling enclosure construction method |
CN110397344A (en) * | 2019-08-15 | 2019-11-01 | 中国建筑第七工程局有限公司 | A kind of construction site Multifunctional protection handrail |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3372873D1 (en) * | 1983-09-30 | 1987-09-10 | Georges Harhoura | Technical barrier, especially for security enclosures |
US4671495A (en) * | 1986-04-07 | 1987-06-09 | Margaret G. Garland | Particulate material control apparatus |
CN2197417Y (en) * | 1994-02-25 | 1995-05-17 | 夏长才 | Guardrail for building |
CN2198342Y (en) * | 1994-05-21 | 1995-05-24 | 成都铝材厂 | Fence |
CN203684798U (en) * | 2013-12-24 | 2014-07-02 | 中建四局第六建筑工程有限公司 | Assembled safeguard handrail for constructional engineering and road engineering |
-
2013
- 2013-12-24 CN CN201310720933.3A patent/CN103696618B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103696618A (en) | 2014-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103696618B (en) | Railing is safeguarded for construction work and the modular of highway construction | |
CN203821961U (en) | Assembled-type wall | |
CN205894387U (en) | Novel can dismantle wallboard | |
CN204965909U (en) | Building entity teaching mode | |
CN202519869U (en) | Hollow lightweight partition board with lateral connecting ribs | |
CN202324807U (en) | Detachable mobile wall | |
CN204112860U (en) | Detachable enclosure wall | |
CN203684798U (en) | Assembled safeguard handrail for constructional engineering and road engineering | |
CN102644408A (en) | Assembly type reinforced concrete prefabricated wall | |
CN204551796U (en) | Building structure at the bottom of a kind of Vierendeel girder | |
CN207568036U (en) | A kind of nail connection timber buildings roof system, superstructure | |
CN203669172U (en) | Sealing structure of curtain wall panels | |
CN207177467U (en) | Prefabricated enclosure wall | |
CN2739277Y (en) | Wall-decorating building-block type member combination system | |
CN211851254U (en) | Turnover-usable chessboard type unit baffle for on-site assembling construction enclosure | |
CN204821284U (en) | Car as a house modelled after an antique | |
CN203361410U (en) | Lightweight composite wallboard for building partition wall | |
CN202249145U (en) | Novel environmentally-friendly wall upright | |
CN206267376U (en) | A kind of glass, stone material mixing curtain wall | |
Fatta et al. | The muqarnas ceiling of the Palatina Chapel in Palermo | |
CN207004150U (en) | A kind of environmentally friendly flag platform easy to assemble that can be reused | |
CN204252494U (en) | Reduce deviation building structure | |
CN108648604A (en) | A kind of civil engineering class colleges and universities assembled architecture model and architectural teaching model | |
CN204126371U (en) | A kind of novel precast assembly enclosure wall | |
CN212129576U (en) | Green energy-saving assembled building wall component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160427 Termination date: 20161224 |
|
CF01 | Termination of patent right due to non-payment of annual fee |