CN103693546B - The fast hoisting method of forging AP1000 main nuclear power pipeline - Google Patents
The fast hoisting method of forging AP1000 main nuclear power pipeline Download PDFInfo
- Publication number
- CN103693546B CN103693546B CN201310700519.6A CN201310700519A CN103693546B CN 103693546 B CN103693546 B CN 103693546B CN 201310700519 A CN201310700519 A CN 201310700519A CN 103693546 B CN103693546 B CN 103693546B
- Authority
- CN
- China
- Prior art keywords
- pipeline
- suspension hook
- yoke plate
- nuclear power
- steel wire
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The present invention relates to hanging device field, particularly relate to and a kind ofly forge the suspender of AP1000 main nuclear power pipeline in cold section and hot arc solution heat treatment process and fast hoisting method, it is characterized in that, when Nuclear piping carries out solution treatment, concrete handling is carried out in the steps below: 1) before shove charge, according to the concrete size of pipeline, the chain sling length of predetermined yoke plate and the concrete hanging position of profiling suspension hook; 2) contact site of profiling suspension hook and both sides yoke plate and pipeline is covered with the sheet steel of pipeline with material; 3) on the coupler body of yoke plate both sides and profiling suspension hook, respectively traction steel wire is installed; 4) determine overhead traveling crane and spreader position, traction steel wire operator erect-position, each post personnel all prepare at assigned address; 5), when coming out of the stove, each post personnel, by predetermined scheme operation, complete solution treatment.Compared with prior art, the invention has the beneficial effects as follows: the operating standard that can be used as the solution heat treatment of nuclear power forging steel pipe is promoted, and has the advantage of convenient and reliable operation.
Description
Technical field
The present invention relates to hanging device field, particularly relate to and a kind ofly forge the suspender of AP1000 main nuclear power pipeline in cold section and hot arc solution heat treatment process and fast hoisting method.
Background technology
Forging AP1000 main nuclear power pipeline is first production in the world, cold section that wherein forges AP1000 main nuclear power pipeline is irregular pipe fitting with hot arc, surface strength under the condition of high temperature is very low, the lifting position of profiling tongs is difficult to control the center of gravity predetermined, pipeline is laid particular stress on, cause local to occur severe nick, cause pipeline to be scrapped.Technology for Heating Processing requires that heat treatment fire door opens to the handling of pipe fitting one integral piece and submerges in water and must control in 3 minutes in addition, and the time is very short, requires supporting suspender to mount rapidly and handling, and can not reduce the surface quality of pipeline.Existing suspender cannot meet AP1000 main nuclear power pipeline heat treatment related request: 1) high temperature come out of the stove and submerge water to forging entirety within 3 minutes; 2) hot stage main pipeline does not allow the metallic contact with other material; 3) consider unpredictable problem on deformation, any position of main pipeline, has not allowed any cut, to prevent because distortion causes surplus not enough.
Summary of the invention
The object of this invention is to provide a kind of suspender and fast hoisting method of forging AP1000 main nuclear power pipeline, for the requirement to handling in forging AP1000 main nuclear power pipeline solution heat treatment process, reach in heat treatment process and improve pipeline and to come out of the stove speed, and strictly control pipeline surface quality and deflection object.
For achieving the above object, the present invention is achieved through the following technical solutions:
The suspender of forging AP1000 main nuclear power pipeline, comprise hanging beam, yoke plate and profiling suspension hook, be arranged with spacing tooth plate at the top at the two ends of hanging beam, profiling suspension hook is hung below the middle part of hanging beam by chain, and two yoke plates are hung below the spacing tooth plate at hanging beam two ends respectively by chain symmetry; Described yoke plate is arc and two ends are porose, and the length of yoke plate is 0.75 ~ 0.8 of the girth of lifting place pipeline, and the coupler body of yoke plate both sides and profiling suspension hook installs traction steel wire respectively.The top of described spacing tooth plate is provided with 6 ~ 10 grooves perpendicular to its length direction along its length.
The quick handling method of forging AP1000 main nuclear power pipeline, when Nuclear piping carries out solution treatment, concrete handling is carried out in the steps below:
1) before shove charge, according to the concrete size of pipeline, the chain sling length of predetermined yoke plate and the concrete hanging position of profiling suspension hook;
2) covered with the sheet steel of pipeline with material the contact site of profiling suspension hook and both sides yoke plate and pipeline, when avoiding coming out of the stove, main nuclear power pipeline directly contacts with suspension hook, yoke plate;
3) respectively traction steel wire is installed in yoke plate both sides and profiling suspension hook rear portion, when determining to come out of the stove, operates the personnel positions of traction steel wire simultaneously;
4) after shove charge, first lift by crane in advance pipeline, according to lifting by crane result in advance, determine overhead traveling crane and spreader position, traction steel wire operator erect-position, each post personnel all prepare at assigned address;
5), when coming out of the stove, each post personnel, by predetermined scheme operation, make pipeline come out of the stove by predetermined scheme fast hoisting and proceed in pond within 3 minutes, complete solution treatment.
Compared with prior art, the invention has the beneficial effects as follows:
The inventive method is applicable to the solid solution stage of cold section of AP1000 nuclear power Nuclear power plant main pipeline and hot arc, ensure that entering the water time from oven door opening to workpiece is no more than 3 minutes, the technological requirement of all pipe surface quality and deflection can be met, the operating standard that the present invention can be used as the solution heat treatment of nuclear power forging steel pipe is promoted, and has the advantage of convenient and reliable operation.
Accompanying drawing explanation
Fig. 1 is suspender example structure schematic diagram of the present invention.
In figure: 1-hanging beam 2-yoke plate 3-profiling suspension hook 4-spacing tooth plate 5-chain 6-groove 7-traction steel wire
Detailed description of the invention
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is described in further detail.
See Fig. 1, it is the suspender example structure schematic diagram that the present invention forges AP1000 main nuclear power pipeline, comprise hanging beam 1, yoke plate 2 and profiling suspension hook 3, spacing tooth plate 4 is arranged with at the top at the two ends of hanging beam 1, profiling suspension hook 3 is hung below the middle part of hanging beam 1 by chain 5, and two yoke plates 2 are hung below the spacing tooth plate 4 at hanging beam 1 two ends respectively by chain 5 symmetry; Yoke plate 2 is arc and two ends are porose, and the length of yoke plate 2 is advisable with 0.75 ~ 0.8 of the girth of lifting place pipeline.The coupler body of yoke plate 2 both sides and profiling suspension hook 3 installs traction steel wire 7 respectively.The top of spacing tooth plate 4 is provided with 6 ~ 10 grooves 6 perpendicular to its length direction along its length, spacing for yoke plate 2, avoids transitional slide.
When suspender of the present invention is for forging the quick handling of AP1000 main nuclear power pipeline, when Nuclear piping carries out solution treatment, concrete handling is carried out in the steps below:
1) before shove charge, according to the concrete size of pipeline, the shape of design hanging beam 1 and length, chain sling 5 length of predetermined yoke plate and the concrete hanging position of profiling suspension hook;
2) profiling suspension hook 3 and the contact site of both sides yoke plate 2 with pipeline are covered with the sheet steel of pipeline with material, when avoiding coming out of the stove, main nuclear power pipeline directly contacts with suspension hook, yoke plate;
3) on the coupler body of yoke plate 2 both sides and profiling suspension hook 3, traction steel wire 7 is installed respectively, operate the personnel positions of traction steel wire when determining to come out of the stove simultaneously, the object installing traction steel wire additional yoke plate and profiling suspension hook can be hung over rapidly on pipeline when coming out of the stove, and can adjust the particular location of hanging comparatively accurately simultaneously;
4) after shove charge, first lift by crane in advance pipeline, according to lifting by crane result in advance, determine overhead traveling crane and spreader position, traction steel wire operator erect-position, each post personnel all prepare at assigned address;
5) when coming out of the stove, each post personnel, by predetermined scheme operation, make pipeline come out of the stove by predetermined scheme fast hoisting and proceed in pond within 3 minutes, complete solution treatment, finally ensure that pipeline is come out of the stove rapidly and ensures surface quality and deflection.
Claims (1)
1. forge the quick handling method of AP1000 main nuclear power pipeline, the suspender of the forging AP1000 main nuclear power pipeline that the method adopts comprises hanging beam, yoke plate and profiling suspension hook, spacing tooth plate is arranged with at the top at the two ends of hanging beam, profiling suspension hook is hung below the middle part of hanging beam by chain, and two yoke plates are hung below the spacing tooth plate at hanging beam two ends respectively by chain symmetry; Described yoke plate is arc and two ends are porose, and the length of yoke plate is 0.75 ~ 0.8 of the girth of lifting place pipeline, and the coupler body of yoke plate both sides and profiling suspension hook installs traction steel wire respectively; The quick handling method of described forging AP1000 main nuclear power pipeline, is characterized in that, when Nuclear piping carries out solution treatment, concrete handling is carried out in the steps below:
1) before shove charge, according to the concrete size of pipeline, the chain sling length of predetermined yoke plate and the concrete hanging position of profiling suspension hook;
2) covered with the sheet steel of pipeline with material the contact site of profiling suspension hook and both sides yoke plate and pipeline, when avoiding coming out of the stove, main nuclear power pipeline directly contacts with suspension hook, yoke plate;
3) respectively traction steel wire is installed in yoke plate both sides and profiling suspension hook rear portion, when determining to come out of the stove, operates the personnel positions of traction steel wire simultaneously;
4) after shove charge, first lift by crane in advance pipeline, according to lifting by crane result in advance, determine overhead traveling crane and spreader position, traction steel wire operator erect-position, each post personnel all prepare at assigned address;
5), when coming out of the stove, each post personnel, by predetermined scheme operation, make pipeline come out of the stove by predetermined scheme fast hoisting and proceed in pond within 3 minutes, complete solution treatment.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310700519.6A CN103693546B (en) | 2013-12-17 | 2013-12-17 | The fast hoisting method of forging AP1000 main nuclear power pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310700519.6A CN103693546B (en) | 2013-12-17 | 2013-12-17 | The fast hoisting method of forging AP1000 main nuclear power pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103693546A CN103693546A (en) | 2014-04-02 |
CN103693546B true CN103693546B (en) | 2015-10-28 |
Family
ID=50355249
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310700519.6A Active CN103693546B (en) | 2013-12-17 | 2013-12-17 | The fast hoisting method of forging AP1000 main nuclear power pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103693546B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2443722A1 (en) * | 1974-09-12 | 1976-03-25 | Toyo Kikai Kinzoku K K | Load handline spreader - has expansion links to lifting eye of variable length to suit centre of gravity |
SU1117274A1 (en) * | 1982-06-29 | 1984-10-07 | Предприятие П/Я М-5219 | Arrangement for engaging elongated loads |
CN201495022U (en) * | 2009-08-14 | 2010-06-02 | 汤翊宇 | Steel tube lifting appliance |
CN201501729U (en) * | 2009-09-27 | 2010-06-09 | 中国石化集团第十建设公司 | Air turning device of equipment |
CN201553534U (en) * | 2009-11-10 | 2010-08-18 | 鞍钢电气有限责任公司 | Novel lifting appliance for transformer coil |
CN202195159U (en) * | 2011-08-05 | 2012-04-18 | 沈阳飞研航空设备有限公司 | Roller hanging basket for lowering pipe into groove |
CN202594616U (en) * | 2012-05-04 | 2012-12-12 | 国营武汉长虹机械厂 | Multifunctional combined hanger |
CN203187290U (en) * | 2013-03-25 | 2013-09-11 | 南车戚墅堰机车车辆工艺研究所有限公司 | Balance hoisting tool for overturning sand box |
CN203624811U (en) * | 2013-12-17 | 2014-06-04 | 鞍钢重型机械有限责任公司 | Lifting appliance for forging main AP1000 nuclear power pipeline |
-
2013
- 2013-12-17 CN CN201310700519.6A patent/CN103693546B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2443722A1 (en) * | 1974-09-12 | 1976-03-25 | Toyo Kikai Kinzoku K K | Load handline spreader - has expansion links to lifting eye of variable length to suit centre of gravity |
SU1117274A1 (en) * | 1982-06-29 | 1984-10-07 | Предприятие П/Я М-5219 | Arrangement for engaging elongated loads |
CN201495022U (en) * | 2009-08-14 | 2010-06-02 | 汤翊宇 | Steel tube lifting appliance |
CN201501729U (en) * | 2009-09-27 | 2010-06-09 | 中国石化集团第十建设公司 | Air turning device of equipment |
CN201553534U (en) * | 2009-11-10 | 2010-08-18 | 鞍钢电气有限责任公司 | Novel lifting appliance for transformer coil |
CN202195159U (en) * | 2011-08-05 | 2012-04-18 | 沈阳飞研航空设备有限公司 | Roller hanging basket for lowering pipe into groove |
CN202594616U (en) * | 2012-05-04 | 2012-12-12 | 国营武汉长虹机械厂 | Multifunctional combined hanger |
CN203187290U (en) * | 2013-03-25 | 2013-09-11 | 南车戚墅堰机车车辆工艺研究所有限公司 | Balance hoisting tool for overturning sand box |
CN203624811U (en) * | 2013-12-17 | 2014-06-04 | 鞍钢重型机械有限责任公司 | Lifting appliance for forging main AP1000 nuclear power pipeline |
Also Published As
Publication number | Publication date |
---|---|
CN103693546A (en) | 2014-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103420264A (en) | Stretcher jaw clamping device and mounting method thereof | |
CN102876873B (en) | Feeding device of inclined-bottom heating furnace | |
CN204281799U (en) | Large-scale workpiece thermal treatment lifting device | |
CN103693546B (en) | The fast hoisting method of forging AP1000 main nuclear power pipeline | |
CN203624811U (en) | Lifting appliance for forging main AP1000 nuclear power pipeline | |
CN211199297U (en) | Lifting device for metal quenching | |
CN202558887U (en) | Stepped feeding mechanism of induction heat penetration equipment | |
CN203284431U (en) | Sleeve and pipe parts heat treatment tool | |
CN202199767U (en) | Tundish quick-changing tool of middle and large-scale continuous casting blanks | |
CN203474850U (en) | Quenching device for super-thick steel plate | |
CN203159681U (en) | Improved fixing structure of heat-resisting sliding blocks of heating furnace | |
CN103803397A (en) | Hanger for mounting universal shaft of vertical mill and application method of hanger | |
CN207259022U (en) | One discharge plate cabinet installs ancillary equipment | |
CN206799702U (en) | A kind of heating furnace changes the auxiliary lifting device of water beam | |
CN204508566U (en) | The dedicated lifting hook of base accident is fallen in a kind of fast processing heating | |
CN202090029U (en) | Device for thermal-treating long straight pipe of pit-type furnace | |
CN204433273U (en) | A kind of grid tray | |
CN203639502U (en) | Hanger for thermal treatment of sleeve and tube parts | |
CN211999837U (en) | Improve annealing stove for copper article of structure | |
CN203237939U (en) | Quick water-entry device for large-sized high manganese steel cast product | |
CN202897785U (en) | Furnace shell hanger | |
CN214114653U (en) | Inner gear ring hoisting fixture | |
CN213415990U (en) | Lifting appliance for lifting nuclear power bent pipe | |
CN202575696U (en) | Plate lifting device | |
CN203498399U (en) | Blast furnace cooling wall mounting angle adjustment device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |