- CN103675511B CN103675511B CN201210382636.8A CN201210382636A CN103675511B CN 103675511 B CN103675511 B CN 103675511B CN 201210382636 A CN201210382636 A CN 201210382636A CN 103675511 B CN103675511 B CN 103675511B
- Authority
- CN
- China
- Prior art keywords
- unit
- formula
- lightning
- positive feeder
- carrier cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
The invention discloses a method for measuring an electrified railway double-track elevated section contact network lightning trip-out rate in an AT mode. The method comprises the steps of (1) obtaining electrified railway line parameters, (2) determining the influence areas of different lightning types of a contact network and calculating the coordinates of single side lightning type dividing points, (3) calculating a double-track induction lightning trip-out rate, (4) calculating a double-track shielding failure trip-out rate, and (5) determining a double-track total trip-out rate. The method is convenient to calculate, and a problem of the difficult calculation of the electrified railway lightning trip-out rate in the AT mode is solved.
Description
Technical field
The present invention relates to electric railway multiple line elevated bridge section contact net tripping rate with lightning strike under a kind of measurement AT power supply modes
Method, it is more particularly to a kind of electric railway multiple line elevated bridge section under AT power supply modes is calculated based on electric geometry method to connect
The method of net-fault indirect lightning strike, back flash-over rate, it is adaptable to electric railway lightning Protection Design and Lightning Transformation under AT power supply modes,
Belong to railway system's overvoltage field.
Background technology
Tractive power supply system lightning stroke trip has had a strong impact on the safe and stable operation of China's electric railway.To ensure train
Reliability of operation, accurately calculates the tripping rate with lightning strike of contact net supply line, assesses its impact to traction power supply reliability,
Often it needs to be determined that the tripping rate with lightning strike of contact net.At present, electrification railway contact net thunderbolt type is divided into sense under AT power supply modes
Should be struck by lightning (thunderbolt the earth), two kinds of shielding (thunderbolt positive feeder, carrier cable, contact line), conventional data deficiencies are to AT power supply modes
The method that lower both tripping rate with lightning strike of electric railway carry out accurate calculating, is that electric railway is entered under China's AT power supply modes
Targetedly lightning Protection Design brings very big difficulty to row with Lightning Transformation.
The content of the invention
It is an object of the invention to provide electric railway multiple line elevated bridge section contact net under a kind of measurement AT power supply modes
The method of tripping rate with lightning strike, can calculate electric railway multiple line elevated bridge section contact net under AT power supply modes every using the method
Hundred kilometers of year indirect lightning strike and back flash-over rate.
The present invention realizes that the know-why of above-mentioned purpose is using electricity under conventional electrical geometric model analysis AT power supply modes
Indirect lightning strike, the shielding situation of gasification Double-Track Railway elevated bridge section contact net, its principle is as shown in Figure 1.Multiple line contacts barrier
Section is in symmetrical structure, it is assumed that left side is uplink, and right side is downlink, and O is zero, is held with up, downlink respectively
Power rope, positive feeder position are the center of circle, and carrier cable is hit away from r with lightning leaderc, lightning leader hit away from r to positive feedergFor radius work
Camber line, then the earth is hit away from r with lightning leadereMake the straight line parallel to the earth, A, B, C, A ', B ' points, wherein H are intersected at respectively
It is overpass to ground level, hgBe positive feeder to overhead bridge floor height, hcBe carrier cable to overhead bridge floor height, a arrives for carrier cable
The distance of post inboard, b is distance of the positive feeder to post inboard, and c is multiple line up and down line centre distance.Thunder and lightning falls in A
Ground is hit when point left side and A ' right sides, induced overvoltage is now produced on contact net high-voltage conducting wires, that is, indirect lightning strike occurs;Thunder
When electricity falls in the middle of A, B and 2 points of A ', B ', the positive feeder of contact net is hit at 2 points, when falling in the middle of B, B ', hit contact at 2 points
Net carrier cable, this all will produce shielding overvoltage on contact net, that is, shielding will occur.
Under normal circumstances contact net up-downgoing structure is identical, in order to simplify calculating, it can be assumed that A points left side and A ' right side
Indirect lightning strike siding-to-siding block length it is essentially equal, shielding interval AB and A ' B ', BC and CB ' it is equal respectively, now indirect lightning strike correspondence
Siding-to-siding block length be (- ∞, xa) interval 2 times, the corresponding siding-to-siding block length of shielding is (xa, xc) 2 times.Therefore, uplink
Indirect lightning strike, back flash-over rate are respectively equal to the overhead induced lightening of the indirect lightning strike of downgoing line, back flash-over rate, i.e. multiple line
Hit, back flash-over rate be respectively unilateral circuit (upstream or downstream) indirect lightning strike, 2 times of back flash-over rate.
The technical solution adopted for the present invention to solve the technical problems is mainly included the following steps that:
The first step, obtains electric railway line parameter circuit value, including overpass, to ground level, carrier cable, positive feeder are to overhead
Bridge floor height, the distance of carrier cable, positive feeder to post inboard, multiple line up and down line centre distance, the 50% of insulator chain
Impulse sparkover voltage, positive feeder radius, Thunderstorm Day, lightning strike density, insulator chain average running voltage gradient, pillar ground connection electricity
Resistance, pillar equivalent inductance, lightning current wave head time, corona correction coefficient, inductance in parallel value of the adjacent positive feeder in pillar both sides etc..
Second step, determines the influence area of the different thunderbolt types of contact net, calculates unilateral separation A, C coordinate.
Coordinate system as shown in Figure 1 is set up, the corresponding coordinate of A points is (xa, ya), the corresponding coordinate of C points is (xc, yc),
A ' corresponding coordinate is (xa′, ya′).Now indirect lightning strike is corresponding interval for (- ∞, xa) and (xa′,+∞), shielding correspondence
Interval be (xa, xa′)。
According to the geometrical relationship of each point, the coordinate of unilateral separation A, C is calculated, each point coordinates is determined by following formula:
In formula:H is overpass to ground level (unit:M), hgBe positive feeder to overhead bridge floor height (unit:M), hcTo hold
Power rope is to overhead bridge floor height (unit:M), a is distance (unit of the carrier cable to post inboard:M), b is positive feeder to pillar
Distance (the unit of inner side:M), c is multiple line up and down line centre distance (unit:M), rcFor lightning leader carrier cable is hit away from
(unit:M), rgPositive feeder is hit away from (unit for lightning leader:M), reThe earth is hit away from (unit for lightning leader:m).
rc、rgCan be calculated using following empirical equation:
Or
In formula:I is amplitude of lightning current (unit:KA), H is overpass to ground level, hcIt is high to overhead bridge floor for carrier cable
Degree, hgBe positive feeder to overhead bridge floor height.
a0、b0、c0Value can be carried out according to field experimentation or mimic buss experimental result, it is also possible to reference to power system
Experience takes values below:
a0=10, b0=0.65;Or a0=0.67, b0=0.74, c0=0.6;Or a0=1.57, b0=0.69, c0=
0.45。
reCan be calculated as follows:
re=k2rc
Wherein k2For striking distance factor, computing formula is as follows:
k2=1.066+ (hc+H)/216.45
In formula:H is overpass to ground level, hcBe carrier cable to overhead bridge floor height.
Or k2=22/ (h+H), or k2=1.94- (h+H)/26,
Or k2=1.08- (h+H)/59, or k2=1.05- (h+H)/87.
In formula:H is overpass to ground level, and h is pillar to overhead bridge floor height (unit:m).
To simplify calculating, r can be also madec=rg=re。
3rd step, calculates multiple line indirect lightning strike trip-out rate.
First, unilateral indirect lightning strike interval (- ∞, x are calculated according to following formulaa) effective projected length:
Wherein:
In formula:H be overpass to ground level, I is amplitude of lightning current, hgBe positive feeder to overhead bridge floor height, hcFor load
Rope is to overhead bridge floor height, k0For the geometrical coupling ratio between positive feeder and carrier cable, U50%For insulator chain 50% impacts
Discharge voltage (unit:kV).
k0Can be calculated as follows:
In formula:D ' is the distance (unit between carrier cable and positive feeder mirror image:M), d is the distance between carrier cable and positive feeder
(unit:M), r is positive feeder radius (unit:m).
Then, unilateral indirect lightning strike trip-out rate is calculated according to the following formula:
Then multiple line indirect lightning strike trip-out rate is:
Wherein:Υ=0.023Td 0.3For lightning strike density (unit:Secondary/km2My god), TdFor Thunderstorm Day (unit:My god/year), f
(I) it is probability of lightning current density, η is to build lonely rate.
F (I) may be used to lower empirical equation and be calculated:
Or
Or
Or
Or
Or
The calculating of η can be carried out as the following formula:
η=(4.5E0.75-14)×10-2
In formula:E is insulator chain average running voltage gradient (unit:kV/m).
Calculate the lower limit of integral I in multiple line indirect lightning strike trip-out rate formulaeDetermine as the following formula:
Wherein:
In formula:β be pillar diverting coefficient, RiFor pillar earth resistance (unit:Ω), k is between positive feeder and carrier cable
The coefficient of coup, LtPillar equivalent inductance (unit:μ H), τfFor lightning current wave head time (unit:μs).
Wherein k=k1k0, k1For corona correction coefficient, contact net desirable 1.15.
In formula:LgFor the inductance in parallel value (unit of the adjacent positive feeder in pillar both sides:μH).
Upper limit of integral ImaxAccording to the significance level or the specific requirement value of industry of circuit, it is also possible to be by distribution probability
Amplitude of lightning current when 90% or 99% is estimated.
4th step, calculates according to the following formula multiple line back flash-over rate:
In formula:For unilateral back flash-over rate.
Lower limit of integral
Upper limit of integral ImaxValue is ibid.
5th step, total tripping rate with lightning strike of multiple line contact net is indirect lightning strike and back flash-over rate sum, i.e., according to the following formula
Calculate the total trip-out rate of multiple line:
N=ngy+nc
The solution have the advantages that and adopt electric geometry method, it is proposed that electric railway under a kind of AT power supply modes is answered
The indirect lightning strike of line elevated bridge section contact net, back flash-over rate computational methods, solve electric railway thunder under AT power supply modes
Hit the problem of trip-out rate dyscalculia.
Description of the drawings
The present invention is further illustrated with reference to the accompanying drawings and examples.
Fig. 1 is multiple line elevated bridge section contact net electric geometry method schematic diagram
Specific embodiment
Below by example, with reference to accompanying drawing 1, technical scheme is further described.
The first step, obtains line parameter circuit value.Certain Double-Track Railway elevated bridge section circuit, overpass is to ground level 10m, positive feeder pair
Overhead bridge floor height 8m, to overhead bridge floor height 7.8m, away from post inboard 3m, positive feeder is away from post inboard for carrier cable for carrier cable
0.8m, centre distance 6m of multiple line up and down line, positive feeder radius 6.25mm, insulator U50% discharge voltage 270kV, thunder
The μ s of electric current wave head time 2.6, Thunderstorm Day 40 days, insulator chain average running voltage gradient 20.36kV, pillar earth resistance 10
Ω, the μ H of pillar equivalent inductance 6.72, the μ H of inductance in parallel value 36.85 of the adjacent positive feeder in pillar both sides, corona correction coefficient 1.15.
Calculate seasonAnd a0=10, b0=0.65;Choosing probability of lightning current density is
Second step, calculates indirect lightning strike, back flash-over rate upper limit of integral and lower limit.
Indirect lightning strike lower limit of integral I is calculated using above-mentioned formulaeFor:
Ie=39kA
ImaxAmplitude of lightning current when by distribution probability being 99% is estimated:
Imax=176kA
Calculate shielding range of integration Ic、ImaxFor:
Ic=4kA, Imax=176kA
3rd step, calculates multiple line indirect lightning strike trip-out rate.
Using A, C coordinate formula in indirect lightning strike lightning current bound interval range Ie~ImaxIt is interior to calculate A, C coordinate point
Cloth, it is determined that unilateral indirect lightning strike valid interval, recycles following formula to calculate multiple line indirect lightning strike trip-out rate:
Result of calculation is ngy=0.8981 time/100km.
4th step, calculates multiple line back flash-over rate.
Using A, C coordinate formula in shielding lightning current bound interval range Ic~ImaxIt is interior to calculate the distribution of A, C coordinate, really
The shielding of order side affects interval, recycles following formula to calculate multiple line back flash-over rate:
Result of calculation is ng=8.8468 times/100km.
5th step, using following formula total trip-out rate is calculated:
N=ngy+nc
Result of calculation is n=9.7449 time/100km.
Claims (2)
1. under a kind of measurement AT power supply modes electric railway multiple line elevated bridge section contact net tripping rate with lightning strike method, its feature
It is that it is comprised the following steps:
The first step, obtains electric railway line parameter circuit value, including overpass, to ground level, carrier cable, positive feeder are to overhead bridge floor
Highly, carrier cable, positive feeder to post inboard distance, multiple line up and down line centre distance, insulator chain 50% impact
Discharge voltage, positive feeder radius, Thunderstorm Day, lightning strike density, insulator chain average running voltage gradient, pillar earth resistance,
Post equivalent inductance, lightning current wave head time, corona correction coefficient, the inductance in parallel value of the adjacent positive feeder in pillar both sides;
Second step, calculates the coordinate of unilateral separation A, C, and computing formula is as follows:
In formula:H is overpass to ground level, unit:m;hgBe positive feeder to overhead bridge floor height, unit:m;hcFor carrier cable pair
Overhead bridge floor height, unit:m;A be carrier cable to post inboard distance, unit:m;B be positive feeder to post inboard away from
From unit:m;C be multiple line up and down line centre distance, unit:m;rcCarrier cable is hit away from unit for lightning leader:m;rg
Positive feeder is hit away from unit for lightning leader:m;reThe earth is hit away from unit for lightning leader:m;
3rd step, the impact for dividing different thunderbolt types is interval, and the corresponding siding-to-siding block length of indirect lightning strike is (- ∞, xa) interval 2
Times, the corresponding siding-to-siding block length of shielding is (xa, xc) 2 times;
4th step, calculates according to the following formula multiple line indirect lightning strike trip-out rate:
Wherein:Υ=0.023Td 0.3For lightning strike density, unit:Secondary/km2My god;TdFor Thunderstorm Day, unit:My god/year, f (I) is
Probability of lightning current density, to build lonely rate, Δ L is the interval effective projected length of indirect lightning strike to η;
η computing formula are as follows:
η=(4.5E0.75-14)×10-2
In formula:E be insulator chain average running voltage gradient, unit:kV/m;
Probability of lightning current density f (I) computing formula is as follows:
Δ L computing formula are as follows:
Wherein:
In formula:H be overpass to ground level, I is amplitude of lightning current, unit:KA, hgBe positive feeder to overhead bridge floor height, hcFor
Carrier cable is to overhead bridge floor height, k0For the geometrical coupling ratio between positive feeder and carrier cable, U50%For the 50% of insulator chain
Impulse sparkover voltage, unit:kV;
k0It is calculated as follows:
In formula:D ' is the distance between carrier cable and positive feeder mirror image, unit:m;D is the distance between carrier cable and positive feeder, single
Position:m;R be positive feeder radius, unit:m;
Calculate the lower limit of integral I in indirect lightning strike trip-out rate formulaeDetermine as the following formula:
Wherein:
In formula:β be pillar diverting coefficient, RiFor pillar earth resistance, unit:Ω;K is the coupling between positive feeder and carrier cable
Coefficient, LtFor pillar equivalent inductance, unit:μH;τfFor lightning current wave head time, unit:μs;
Wherein k=k1k0, k1For corona correction coefficient, contact net takes 1.15;
In formula:LgFor the inductance in parallel value of the adjacent positive feeder in pillar both sides, unit:μH;
Upper limit of integral ImaxAccording to the significance level or the specific requirement value of industry of circuit, or by distribution probability be 90% or
Amplitude of lightning current when 99% is estimated;
5th step, calculates according to the following formula multiple line back flash-over rate:
Lower limit of integral in formula
Upper limit of integral ImaxValue is ibid;
6th step, calculates according to the following formula the total tripping rate with lightning strike of contact net multiple line:
N=ngy+nc
In formula:ngyFor multiple line indirect lightning strike trip-out rate, ncFor multiple line back flash-over rate.
2. a kind of method according to claim 1, wherein hitting away from r in unilateral separation A, C coordinate computing formulac、rgWith
Following empirical equation is calculated:
Or
In formula:I is amplitude of lightning current, unit:kA;H is overpass to ground level, hcBe carrier cable to overhead bridge floor height, hgFor
Positive feeder is to overhead bridge floor height;
a0、b0、c0Value is carried out according to field experimentation or mimic buss experimental result, or with reference to power system experience take it is following
Numerical value:
a0=10, b0=0.65;Or a0=0.67, b0=0.74, c0=0.6;Or a0=1.57, b0=0.69, c0=0.45;
reIt is calculated as follows:
re=k2rc
Wherein k2For striking distance factor, computing formula is as follows:
k2=1.066+ (hc+H)/216.45
In formula:H is overpass to ground level, hcBe carrier cable to overhead bridge floor height;
Or k2=22/ (h+H), or k2=1.94- (h+H)/26,
Or k2=1.08- (h+H)/59, or k2=1.05- (h+H)/87;
In formula:H is overpass to ground level, and h is pillar to overhead bridge floor height, unit:m;
Or to simplify calculating, make rc=rg=re。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210382636.8A CN103675511B (en) | 2012-09-20 | 2012-09-20 | Method for evaluating double-track elevated section electrified railway lightning trip-out rate in AT mode |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210382636.8A CN103675511B (en) | 2012-09-20 | 2012-09-20 | Method for evaluating double-track elevated section electrified railway lightning trip-out rate in AT mode |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103675511A CN103675511A (en) | 2014-03-26 |
CN103675511B true CN103675511B (en) | 2017-04-12 |
Family
ID=50313675
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210382636.8A Expired - Fee Related CN103675511B (en) | 2012-09-20 | 2012-09-20 | Method for evaluating double-track elevated section electrified railway lightning trip-out rate in AT mode |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103675511B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101650444A (en) * | 2008-08-11 | 2010-02-17 | 华东电力试验研究院有限公司 | Method for calculating thunderbolt density |
CN102565628A (en) * | 2012-02-07 | 2012-07-11 | 云南电力试验研究院(集团)有限公司电力研究院 | Method for identifying properties of lightning faults of overhead line on basis of amplitude interval distribution of lightning current |
CN102628913A (en) * | 2012-04-09 | 2012-08-08 | 清华大学 | Electric transmission line three-dimensional lightning calculating method based on electric transmission line structure and terrain |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100578488C (en) * | 2008-04-21 | 2010-01-06 | 国网武汉高压研究院 | Electric network thunderstorm damage distribution determination method |
-
2012
- 2012-09-20 CN CN201210382636.8A patent/CN103675511B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101650444A (en) * | 2008-08-11 | 2010-02-17 | 华东电力试验研究院有限公司 | Method for calculating thunderbolt density |
CN102565628A (en) * | 2012-02-07 | 2012-07-11 | 云南电力试验研究院(集团)有限公司电力研究院 | Method for identifying properties of lightning faults of overhead line on basis of amplitude interval distribution of lightning current |
CN102628913A (en) * | 2012-04-09 | 2012-08-08 | 清华大学 | Electric transmission line three-dimensional lightning calculating method based on electric transmission line structure and terrain |
Non-Patent Citations (3)
Title |
---|
城市轨道交通架空接触网雷电防护;赵海军等;《电气化铁道》;20081231(第5期);第23页第2栏第5行至第24页第9行 * |
牵引网雷击跳闸研究;刘靖;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20091215(第12期);第5页第3至第6行,第8页第9页至第9页第10行及第11页第2-4行 * |
计算接触网雷击参数的新方法;刘靖等;《中国铁道科学》;20110731;第32卷(第4期);第77页第1栏第1行至第80行第1栏第7行 * |
Also Published As
Publication number | Publication date |
---|---|
CN103675511A (en) | 2014-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102841280B (en) | 500kV same-tower four-circuit transmission line lightning trip-out rate simulation method | |
CN102967785A (en) | Method for evaluating lightning protection performance of high-speed railway traction network | |
CN106918762A (en) | A kind of overhead transmission line thunderbolt current monitoring method and lightning fault recognition methods | |
CN107797027A (en) | A kind of electric railway AT draws network fault positioning method | |
CN102435921A (en) | Method for determining insulation and lightning impulse withstanding properties of same-tower double-loop power transmission line | |
CN108872789B (en) | A kind of direct-furnish Traction networks electricity consumption train and high resistive fault position distinguished number | |
CN102175936B (en) | Unrestrictive expected operation life assessment method for distribution network lightning arrester under given confidence level | |
CN102662120B (en) | Low-voltage distribution line lightning trip risk evaluation method and device | |
CN105652152B (en) | A kind of Fault Locating Method and system of multiple line direct supply system contact net | |
CN110221181A (en) | A kind of AT sections of full Parallel AT tractive power supply system failure short-circuit independent positioning methods | |
CN104316833A (en) | Line selection method for medium-voltage power distribution network fault traveling wave | |
CN103675504B (en) | Method for evaluating single-track bank section electrified railway lightning trip-out rate | |
CN105426671A (en) | Method for evaluating reliability of overhead power distribution line in thunderstorm weather | |
CN102680837B (en) | Method and device for assessing induction lightning trip-out risk of distributing circuit surrounding transmission line | |
CN103777094A (en) | High-speed railway traction net lightening disaster risk evaluation method based on hierarchy analysis method | |
CN112505390A (en) | Distributed rail potential and stray current real-time monitoring method | |
CN103675505B (en) | The method of evaluation and test double-track bank section electric railway tripping rate with lightning strike | |
CN103675506B (en) | The method of evaluation and test single line elevated bridge section electric railway tripping rate with lightning strike | |
CN103675511B (en) | Method for evaluating double-track elevated section electrified railway lightning trip-out rate in AT mode | |
CN103675509B (en) | The method of double-track bank section electric railway tripping rate with lightning strike under evaluation and test AT modes | |
CN205157639U (en) | Synchronous earth mat reposition of redundant personnel vector test system of application GPS | |
CN103675507B (en) | Method for evaluating double-track elevated section electrified railway lightning trip-out rate | |
CN103675510B (en) | The method of overhead section of electric railway tripping rate with lightning strike of single line under evaluation and test AT mode | |
CN105740500A (en) | Composite tower overvoltage simulation model design method | |
CN103675508B (en) | The method of single-track bank section electric railway tripping rate with lightning strike under evaluation and test AT mode |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170412 Termination date: 20180920 |
|
CF01 | Termination of patent right due to non-payment of annual fee |