CN103673233A - 一种新风热回收装置 - Google Patents

一种新风热回收装置 Download PDF

Info

Publication number
CN103673233A
CN103673233A CN201310726165.2A CN201310726165A CN103673233A CN 103673233 A CN103673233 A CN 103673233A CN 201310726165 A CN201310726165 A CN 201310726165A CN 103673233 A CN103673233 A CN 103673233A
Authority
CN
China
Prior art keywords
new
fresh air
exhaust duct
bellows
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310726165.2A
Other languages
English (en)
Other versions
CN103673233B (zh
Inventor
史幼迪
盛旭东
陆浩民
叶钧明
邵春浩
王峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sanyi Building Industry Coltd
Shanghai Sanyi Automatic Control Engineering Coltd
Original Assignee
Shanghai Sanyi Building Industry Coltd
Shanghai Sanyi Automatic Control Engineering Coltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Sanyi Building Industry Coltd, Shanghai Sanyi Automatic Control Engineering Coltd filed Critical Shanghai Sanyi Building Industry Coltd
Priority to CN201310726165.2A priority Critical patent/CN103673233B/zh
Publication of CN103673233A publication Critical patent/CN103673233A/zh
Application granted granted Critical
Publication of CN103673233B publication Critical patent/CN103673233B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/56Heat recovery units

Landscapes

  • Central Heating Systems (AREA)
  • Duct Arrangements (AREA)

Abstract

一种新风热回收装置,其特征是:将排风管以蛇形方式布放在新风箱中,新风箱中设置必要的挡风条,使新风以与排风管正交的蛇形方式流动,以增加新风与排风之间的热交换面积和延长新风与排风之间的热交换时间,使热交换能充分的进行,提高热回收的效率;整个装置由(除风口外)密闭的新风箱和蛇形排风管(2)组成,其中新风箱由新风进风口(1)、新风箱外端板(3)、新风箱顶板(4)、新风箱内端板(6)、新风出风口(7)、新风箱底板(8)、新风箱旁板(9)等构成,在新风箱底板(8)上和新风箱顶板(4)上按蛇形排风管的间距交替隔行安装挡风条(5),以阻挡新风直接通过,迫使新风以与蛇形排风管(2)正交的蛇形方向绕排风管(2)流动。

Description

一种新风热回收装置
技术领域
本发明涉及一种空气处理装置,尤其是一种新风热回收装置。
背景技术
随着社会的进步,人们对工作、生活的环境要求越来越高,空调已成为建筑物中最重要的设备之一。
空调就是将室内空气的温湿度及新鲜度等调节到人体舒适的范围。要达到此目的需耗费大量的能量,尤其是新风量大的情况。据相关统计,普通空调***新风耗能占总能耗的25%~40%。如何降低新风的能耗,一直是业内关注的重点。为此,中国专利号为200510049945.3的“一种新风热回收方法及其装置”中提出了一种很好的热回收方法,但在其示例的装置中,由于结构原因,风道长度受到很大限制,也就使排风与进风的热交换不可能充分进行,从而降低了热回收效率。
发明内容
众所周知,热交换的条件除了要有温差、热导体之外,还需要一定的交换时间。对空气的热交换而言,时间要求更高。
为延长排风与新风的热交换时间,本发明提供一种新风热回收装置,其特征是:将排风管以蛇形方式布放在新风箱中,新风箱中设置必要的挡风条,使新风以与排风管正交的蛇形方式流动,以增加新风与排风之间的热交换面积和延长新风与排风之间的热交换时间,使热交换能充分的进行,提高热回收的效率;整个装置由(除风口外)密闭的新风箱和蛇形排风管(2)组成,其中新风箱由新风进风口(1)、新风箱外端板(3)、新风箱顶板(4)、新风箱内端板(6)、新风出风口(7)、新风箱底板(8)、新风箱旁板(9)等构成,在新风箱底板(8)上和新风箱顶板(4)上按蛇形排风管的间距交替隔行安装挡风条(5),以阻挡新风直接通过,迫使新风以与蛇形排风管(2)正交的蛇形方向绕排风管(2)流动。
本发明结构简单,组装方便,体积小巧,并可根据需要改变风道的长度(只需改变蛇形排风管的弯曲次数和配置相应的挡风条),使新风与排风之间的热交换得以充分地进行,大大提高新风热回收的效率。
附图说明
图1是一种新风热回收装置的主剖视图。
图2是一种新风热回收装置的俯剖视图。
图3是一种新风热回收装置的端面视图。
具体实施方式
如附图1和附图2所示,一种新风热回收装置实施例由(除风口外)密闭的新风箱和蛇形排风管2组成,其中新风箱由新风进风口1、新风箱外端板3、新风箱顶板4、新风箱内端板6、新风出风口7、新风箱底板8、新风箱旁板9等构成,在新风箱底板8上和新风箱顶板4上按蛇形排风管的间距交替隔行安装挡风条5,以阻挡新风直接通过,迫使新风以与蛇形排风管2正交的蛇形方向流动。装置工作时,排风从附图2所示右侧的排风进口进入排风管2,经过箭头所示流向从排风出口排出;新风从附图1所示的新风箱左侧的新风进风口1流入,受挡风条5的阻挡和导向,沿箭头所示方向,绕着排风管2流动,从新风出风口7流出;在排风和新风的相向流动中,由于排风与新风存在温度差,因此排风和新风不断地通过排风管壁进行热交换;制冷工况下,室内温度低于室外温度,排风不断地从新风中吸收热量,使排风温度自右向左逐渐升高直至接近室外温度,同时新风不断地向排风释放热量,使新风温度自左向右逐渐降低直至接近室内温度;制热工况下,室内温度高于室外温度,排风不断地向新风中释放热量,使排风温度自右向左逐渐降低直至接近室外温度,同时新风不断地从排风吸收热量,使新风温度自左向右逐渐升高直至接近室内温度;从而实现了新风的热回收。

Claims (1)

1.一种新风热回收装置,其特征是:将排风管以蛇形方式布放在新风箱中,新风箱中设置必要的挡风条,使新风以与排风管正交的蛇形方式流动,以增加新风与排风之间的热交换面积和延长新风与排风之间的热交换时间,使热交换能充分的进行,提高热回收的效率;整个装置由(除风口外)密闭的新风箱和蛇形排风管(2)组成,其中新风箱由新风进风口(1)、新风箱外端板(3)、新风箱顶板(4)、新风箱内端板(6)、新风出风口(7)、新风箱底板(8)、新风箱旁板(9)等构成,在新风箱底板(8)上和新风箱顶板(4)上按蛇形排风管的间距交替隔行安装挡风条(5),以阻挡新风直接通过,迫使新风以与蛇形排风管(2)正交的蛇形方向绕排风管(2)流动。
CN201310726165.2A 2013-12-24 2013-12-24 一种新风热回收装置 Expired - Fee Related CN103673233B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310726165.2A CN103673233B (zh) 2013-12-24 2013-12-24 一种新风热回收装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310726165.2A CN103673233B (zh) 2013-12-24 2013-12-24 一种新风热回收装置

Publications (2)

Publication Number Publication Date
CN103673233A true CN103673233A (zh) 2014-03-26
CN103673233B CN103673233B (zh) 2017-05-17

Family

ID=50311547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310726165.2A Expired - Fee Related CN103673233B (zh) 2013-12-24 2013-12-24 一种新风热回收装置

Country Status (1)

Country Link
CN (1) CN103673233B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103398424A (zh) * 2013-07-31 2013-11-20 上海林客蒎节能环保技术有限公司 双向净化换能器
CN106918127A (zh) * 2017-03-22 2017-07-04 杭州奥普卫厨科技有限公司 一种新风机用热交换芯
CN110514034A (zh) * 2019-09-02 2019-11-29 王春霞 一种聚氯乙烯脱水优化设备
CN110686394A (zh) * 2019-09-18 2020-01-14 珠海格力电器股份有限公司 一种全热交换芯体和空调机
CN111947260A (zh) * 2020-08-21 2020-11-17 金华平雪加热设备有限公司 一种厂房内温度调节设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1498621A (en) * 1975-06-16 1978-01-25 Page R Heat exchanger
CN101122446A (zh) * 2007-09-12 2008-02-13 北京科技大学 一种连续蓄热式烟气余热回收装置
CN101889186A (zh) * 2007-12-10 2010-11-17 贝洱两合公司 热交换器,特别是用于汽车的加热体
CN102654304A (zh) * 2012-06-05 2012-09-05 上海市七宝中学 一种室用热交换装置
CN203785187U (zh) * 2013-12-24 2014-08-20 上海三意自动化控制工程有限公司 一种新风热回收装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1498621A (en) * 1975-06-16 1978-01-25 Page R Heat exchanger
CN101122446A (zh) * 2007-09-12 2008-02-13 北京科技大学 一种连续蓄热式烟气余热回收装置
CN101889186A (zh) * 2007-12-10 2010-11-17 贝洱两合公司 热交换器,特别是用于汽车的加热体
CN102654304A (zh) * 2012-06-05 2012-09-05 上海市七宝中学 一种室用热交换装置
CN203785187U (zh) * 2013-12-24 2014-08-20 上海三意自动化控制工程有限公司 一种新风热回收装置

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103398424A (zh) * 2013-07-31 2013-11-20 上海林客蒎节能环保技术有限公司 双向净化换能器
CN103398424B (zh) * 2013-07-31 2016-04-27 上海林客蒎节能环保技术有限公司 双向净化换能器
CN106918127A (zh) * 2017-03-22 2017-07-04 杭州奥普卫厨科技有限公司 一种新风机用热交换芯
CN106918127B (zh) * 2017-03-22 2022-09-02 奥普家居股份有限公司 一种新风机用热交换芯
CN110514034A (zh) * 2019-09-02 2019-11-29 王春霞 一种聚氯乙烯脱水优化设备
CN110686394A (zh) * 2019-09-18 2020-01-14 珠海格力电器股份有限公司 一种全热交换芯体和空调机
CN111947260A (zh) * 2020-08-21 2020-11-17 金华平雪加热设备有限公司 一种厂房内温度调节设备

Also Published As

Publication number Publication date
CN103673233B (zh) 2017-05-17

Similar Documents

Publication Publication Date Title
CN103673233A (zh) 一种新风热回收装置
CN105180388A (zh) 垂直式双季用热管热回收机组
CN204301373U (zh) 一种冷凝器散热结构
CN203011097U (zh) 热泵除湿干燥装置
CN204963028U (zh) 电控箱置于冷凝器内部的空调的电控箱散热装置
CN103411284A (zh) 一种带有热回收的新风处理装置
CN106871395B (zh) 一种双板双冷源热回收新风机组
CN204555177U (zh) 节能通风换热装置
CN203785187U (zh) 一种新风热回收装置
CN203758311U (zh) 多功能一体化的集成换热器
CN207662252U (zh) 翅片结构及包括其的换热器
CN202532623U (zh) 立式空调器
CN104197416A (zh) 机房热气流室外冷却交换装置
CN201285134Y (zh) 智能隔离式逆流空气换热器
CN204014394U (zh) 新型风道式换热装置
CN210089079U (zh) 一种空气换热器芯体
CN206669984U (zh) 一种双板双冷源热回收新风机组
CN203190528U (zh) 一种过渡季节节能运行的空调通风装置
CN205208733U (zh) 一种盘管装置及空调机
CN202403386U (zh) 空调换热器、数据中心机房用空调机
CN104595998A (zh) 一种蜂窝式水温空调
CN203704237U (zh) 通风热交换器
CN202274562U (zh) 一种半导体空调
CN201892286U (zh) 集成式加热排气装置
CN203163204U (zh) 用于房间新风冷热回收装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Shi Youdi

Inventor after: Liu Dihong

Inventor after: Sheng Xudong

Inventor after: Lu Haomin

Inventor after: Ye Junming

Inventor after: Shao Chunhao

Inventor after: Wang Feng

Inventor before: Shi Youdi

Inventor before: Sheng Xudong

Inventor before: Lu Haomin

Inventor before: Ye Junming

Inventor before: Shao Chunhao

Inventor before: Wang Feng

CB03 Change of inventor or designer information
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170517

Termination date: 20211224

CF01 Termination of patent right due to non-payment of annual fee