CN103670317A - Simulation pipe string rigidity pigging method - Google Patents

Simulation pipe string rigidity pigging method Download PDF

Info

Publication number
CN103670317A
CN103670317A CN201310662837.8A CN201310662837A CN103670317A CN 103670317 A CN103670317 A CN 103670317A CN 201310662837 A CN201310662837 A CN 201310662837A CN 103670317 A CN103670317 A CN 103670317A
Authority
CN
China
Prior art keywords
well
drifting
pigging
drill pipe
drilling assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310662837.8A
Other languages
Chinese (zh)
Inventor
唐亮
姚建鹏
王铁臣
秦勇
刘青贺
丁志河
王强
李丙陆
赵越超
李志刚
王文东
刘晶磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNPC Great Wall Drilling Co
Original Assignee
CNPC Great Wall Drilling Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Great Wall Drilling Co filed Critical CNPC Great Wall Drilling Co
Priority to CN201310662837.8A priority Critical patent/CN103670317A/en
Publication of CN103670317A publication Critical patent/CN103670317A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a well completion pigging method of a directional well, a horizontal well and a large-displacement well, in particular to a simulation pipe string rigidity pigging method. The method includes the following steps that the size and the specification of a pigging centering device needing to be used are adjusted according to the condition of a well in the construction process, a drilling assembly is reasonably combined, a secondary pigging mode is adopted, testability pigging is conducted first, the construction drilling assembly and parameters are the same as those of a conventional pigging mode, and the drilling assembly comprises a lead, a short drill pipe, an anti-jamming centering device, a drill collar, a heavy weight drill pipe and a drill pipe; afterwards, simulation pigging is carried out, and the drilling assembly comprises a lead with a well wall reaming and trimming function, a short drill pipe, an anti-jamming centering device, a drill collar, a twist-reducing anti-jamming centering device, a heavy weight drill pipe and a drill pipe. By the adoption of the method, well cleaning is achieved, well tracks are more expedite and smooth, the tripping-in state of a completion pipe string is fully simulated, the purpose that a casing string can be tripped in smoothly is achieved, the construction method is simple, convenient and visual, and the pigging effect is good.

Description

A kind of simulation tubing string rigidity drifting method
Technical field:
The present invention relates to a kind of directional well, horizontal well, extended reach well completion drifting method, particularly a kind of simulation tubing string rigidity drifting method.
Background technology:
In horizontal well, the on-the-spot drilling process of directional well, often because not enough to the prediction of the deflecting ability of instrument, cause in directed drilling process, change frequently screw rod and (adjust screw rod angle, to reach the build angle rate of expection), meet hole trajectory control requirement, this has just caused the well track of real brill and design well track to have larger difference, drilled wellbore trajectories is rough, the completion setting of casing difficult problem such as be frequently hampered.
Summary of the invention:
The technical problem to be solved in the present invention is to provide a kind of simulation tubing string rigidity drifting method, and the method has realized clean well, makes well track more unobstructed smooth, fully simulation completion tubular column is lowered to state, reach the object that casing string is lowered to smoothly, construction method is easy, directly perceived, and drifting is effective.Overcome existing level well, directional well drilled wellbore trajectories is rough, the deficiency that completion setting of casing is frequently hampered.
The technical solution used in the present invention is: a kind of simulation tubing string rigidity drifting method, the method step is as follows: in work progress, according to the situation of well, adjust size and the specification of the drifting centralizer that needs use, reasonable combination drilling assembly, the mode of employing secondary drifting, first carries out tentative drifting, its construction drilling assembly and parameter are identical with conventional drifting mode, and its drilling assembly is: introduction+short drill pipe+anti-sticking centralizer+drill collar+heavy weight drill pipe+drilling rod; Carry out afterwards simulation drifting, its drilling assembly is: have introduction+short drill pipe+anti-sticking centralizer+drill collar of reaming hole finishing borehole wall function+subtract and turn round anti-sticking centralizer+heavy weight drill pipe+drilling rod; Experimental drifting first adopts high discharge capacity to circulate, to reach best effect of hole cleaning, simulation drifting subsequently, process in three stages, first the mode that 40 ° of well section employings before of hole deviation are directly lowered to, to being lowered to difficulty or the position of the card that is hampered, repeatedly operate, reach smoothly unobstructed till; Well section for hole deviation between 40 °-90 ° adopts every and carries out reaming, and has recorded frictional resistance and the moment of torsion of reaming, for setting of casing process, carries out reference; For net horizontal section or high angle hole section, can adopt the mode being directly lowered to, to being lowered to difficulty or the position of the card that is hampered, carry out reaming, until well is unobstructed.
The invention has the beneficial effects as follows: the present invention is owing to having adopted the mode of simulation drifting, thereby there is clean well, make the more unobstructed smooth effect of well track, fully simulation completion tubular column is lowered to state, reach the object that casing string is lowered to smoothly, construction method is easy, directly perceived, and drifting is effective.
Accompanying drawing explanation:
Below in conjunction with the drawings and specific embodiments, the present invention will be further described in detail.
Fig. 1 is the structural representation of the drilling assembly of simulation drifting of the present invention.
The specific embodiment:
As shown in Figure 1, a kind of simulation tubing string rigidity drifting method, the method step is as follows: in work progress, according to the situation of well, adjust size and the specification of the drifting centralizer that needs use, reasonable combination drilling assembly, adopt the mode of secondary drifting, first carry out tentative drifting, its construction drilling assembly and parameter are identical with conventional drifting mode, and its drilling assembly is: introduction+short drill pipe+anti-sticking centralizer+drill collar+heavy weight drill pipe+drilling rod; Carry out afterwards simulation drifting, its drilling assembly is: introduction 1+ short drill pipe+anti-sticking centralizer 2+ drill collar 3+ with reaming hole finishing borehole wall function subtracts and turns round anti-sticking centralizer 4+ heavy weight drill pipe+drilling rod 5; Experimental drifting first adopts high discharge capacity to circulate, to reach best effect of hole cleaning, simulation drifting subsequently, process in three stages, first the mode that 40 ° of well section employings before of hole deviation are directly lowered to, to being lowered to difficulty or the position of the card that is hampered, repeatedly operate, reach smoothly unobstructed till; Well section for hole deviation between 40 °-90 ° adopts every and carries out reaming, and has recorded frictional resistance and the moment of torsion of reaming, for setting of casing process, carries out reference; For net horizontal section or high angle hole section, can adopt the mode being directly lowered to, to being lowered to difficulty or the position of the card that is hampered, carry out reaming, until well is unobstructed.Adopt reaming mode to be lowered to, can be well by directional well section drilling process, the tortuous rough problem of well causing that changes of hole curvature causing due to frequent replacing screw rod overcomes, simultaneously because slip is crept into and hocketing that rotating disk creeps into, make well occur numerous shoulders, by reaming, can overcome well borehole wall shoulder, thereby make with drilling well eye more unobstructed, simultaneously can the scraping borehole wall by simulation drifting, clean well, well section for moment of torsion and frictional resistance increasing can be dredged well, and then be lowered to smoothly for completion tubular column the reference that provides strong, guaranteed being lowered to smoothly of completion tubular column simultaneously.
Be understandable that, above about specific descriptions of the present invention, only for being described, the present invention is not limited to the described technical scheme of the embodiment of the present invention, those of ordinary skill in the art is to be understood that, still can modify or be equal to replacement the present invention, to reach identical technique effect; As long as meet, use needs, all within protection scope of the present invention.

Claims (1)

1. simulate tubing string rigidity drifting method for one kind, it is characterized in that: the method step is as follows: in work progress, according to the situation of well, adjust size and the specification of the drifting centralizer that needs use, reasonable combination drilling assembly, the mode of employing secondary drifting, first carries out tentative drifting, its construction drilling assembly and parameter are identical with conventional drifting mode, and its drilling assembly is: introduction+short drill pipe+anti-sticking centralizer+drill collar+heavy weight drill pipe+drilling rod; Carry out afterwards simulation drifting, its drilling assembly is: have introduction (1)+short drill pipe+anti-sticking centralizer (the 2)+drill collar (3) of reaming hole finishing borehole wall function+subtract and turn round anti-sticking centralizer (4)+heavy weight drill pipe+drilling rod (5); Experimental drifting first adopts high discharge capacity to circulate, to reach best effect of hole cleaning, simulation drifting subsequently, process in three stages, first the mode that 40 ° of well section employings before of hole deviation are directly lowered to, to being lowered to difficulty or the position of the card that is hampered, repeatedly operate, reach smoothly unobstructed till; Well section for hole deviation between 40 °-90 ° adopts every and carries out reaming, and has recorded frictional resistance and the moment of torsion of reaming, for setting of casing process, carries out reference; For net horizontal section or high angle hole section, can adopt the mode being directly lowered to, to being lowered to difficulty or the position of the card that is hampered, carry out reaming, until well is unobstructed.
CN201310662837.8A 2013-12-06 2013-12-06 Simulation pipe string rigidity pigging method Pending CN103670317A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310662837.8A CN103670317A (en) 2013-12-06 2013-12-06 Simulation pipe string rigidity pigging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310662837.8A CN103670317A (en) 2013-12-06 2013-12-06 Simulation pipe string rigidity pigging method

Publications (1)

Publication Number Publication Date
CN103670317A true CN103670317A (en) 2014-03-26

Family

ID=50309007

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310662837.8A Pending CN103670317A (en) 2013-12-06 2013-12-06 Simulation pipe string rigidity pigging method

Country Status (1)

Country Link
CN (1) CN103670317A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131782A (en) * 2014-07-10 2014-11-05 上海大学 Drifting bottom hole assembly determining method
CN107304657A (en) * 2016-04-19 2017-10-31 中国石油天然气股份有限公司 Centralizer and simulation drifting tubing string
CN107676042A (en) * 2017-10-26 2018-02-09 中国石油集团西部钻探工程有限公司 Oil drilling three-dimensional horizontal well rigidity drifting BHA
CN109322618A (en) * 2018-10-19 2019-02-12 成都科盛石油科技有限公司 Heterogeneous shale gas well Reservoir Section finishing drilling method
CN110984924A (en) * 2019-12-20 2020-04-10 新疆恒智伟业石油工程技术开发有限公司 Easy-drilling-and-grinding open hole well completion pipe string construction method
CN111287662A (en) * 2020-04-05 2020-06-16 新疆正通石油天然气股份有限公司 Shale stratum drilling open hole drifting method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85100990A (en) * 1985-04-01 1986-08-13 大港石油管理局科技处 Straight well cable drifting process and drifting device
CN1032056A (en) * 1987-09-13 1989-03-29 华北石油管理局第三采油厂 Fixed style multipurpose well clearer
US20060278405A1 (en) * 2005-06-14 2006-12-14 Turley Rocky A Method and apparatus for friction reduction in a downhole tool
CN201074483Y (en) * 2007-09-13 2008-06-18 刘伟 Centralizer for prevent horizontal well oil tube from blocking and reducing friction
EP2402548A1 (en) * 2006-11-21 2012-01-04 Swelltec Limited Downhole apparatus and method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85100990A (en) * 1985-04-01 1986-08-13 大港石油管理局科技处 Straight well cable drifting process and drifting device
CN1032056A (en) * 1987-09-13 1989-03-29 华北石油管理局第三采油厂 Fixed style multipurpose well clearer
US20060278405A1 (en) * 2005-06-14 2006-12-14 Turley Rocky A Method and apparatus for friction reduction in a downhole tool
EP2402548A1 (en) * 2006-11-21 2012-01-04 Swelltec Limited Downhole apparatus and method
CN201074483Y (en) * 2007-09-13 2008-06-18 刘伟 Centralizer for prevent horizontal well oil tube from blocking and reducing friction

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
冀东石油勘探开发公司井下作业公司: "《井下作业与试油技术实用手册》", 30 June 2003, article "通井", pages: 36 *
张乐启等: "滨435块非常规水平井钻井技术的应用", 《科技信息》, no. 19, 5 July 2013 (2013-07-05), pages 413 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131782A (en) * 2014-07-10 2014-11-05 上海大学 Drifting bottom hole assembly determining method
CN107304657A (en) * 2016-04-19 2017-10-31 中国石油天然气股份有限公司 Centralizer and simulation drifting tubing string
CN107304657B (en) * 2016-04-19 2020-08-07 中国石油天然气股份有限公司 Centralizer and simulation drifting tubular column
CN107676042A (en) * 2017-10-26 2018-02-09 中国石油集团西部钻探工程有限公司 Oil drilling three-dimensional horizontal well rigidity drifting BHA
CN109322618A (en) * 2018-10-19 2019-02-12 成都科盛石油科技有限公司 Heterogeneous shale gas well Reservoir Section finishing drilling method
CN110984924A (en) * 2019-12-20 2020-04-10 新疆恒智伟业石油工程技术开发有限公司 Easy-drilling-and-grinding open hole well completion pipe string construction method
CN111287662A (en) * 2020-04-05 2020-06-16 新疆正通石油天然气股份有限公司 Shale stratum drilling open hole drifting method

Similar Documents

Publication Publication Date Title
CN103670317A (en) Simulation pipe string rigidity pigging method
CN105518251B (en) The drilling automation realized using Stochastic Optimal Control
WO2012066325A3 (en) Method of and apparatus for drilling a subterranean borehole
WO2013154420A3 (en) Apparatus and method to remotely control fluid flow in tubular strings and wellbore annulus
AU2013221032B2 (en) Method for establishment of a new well path from an existing well
WO2013152073A3 (en) Drilling control and information system
GB2534734A (en) Systems and methods for optimizing drilling operations using transient cuttings modeling and real-time data
WO2012145637A3 (en) Apparatus and method for tool face control using pressure data
WO2014186415A3 (en) Method and apparatus for operating a downhole tool
WO2013101333A3 (en) Apparatus and method for removing debris from a well
MX2015007886A (en) Automated directional drilling system and method using steerable motors.
CN204457756U (en) A kind of horizontal well in segments pressure and pressure fall-off test tubing string
MX2017004409A (en) Valve for use with downhole tools.
WO2014210539A3 (en) Stabilizer
WO2014138301A3 (en) Through tubing perpendicular boring
CN204283371U (en) Completion tubular column
CN204040947U (en) Flow string fetching device
WO2014006466A3 (en) Orientable downhole drilling assembly and method of using same
US10626716B2 (en) Wellbore trajectory visualization and ranging measurement location determination
CN208168852U (en) A kind of down-hole string is logical to scrape integrated apparatus
CN204457741U (en) Sand-proof type machinery box cupling orientation tool
EP3701119B1 (en) Well design and associated well structures
CN203394522U (en) High-speed slurry pulse generator
CN106593311A (en) Drilling tool and use method thereof
CN204024548U (en) A kind of half novel box-like single rotary double core barrel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140326