CN103670277B CN201210347403.4A CN201210347403A CN103670277B CN 103670277 B CN103670277 B CN 103670277B CN 201210347403 A CN201210347403 A CN 201210347403A CN 103670277 B CN103670277 B CN 103670277B
Authority
CN
China
Prior art keywords
fairlead
expansion bracket
electric power
power line
pole tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210347403.4A
Other languages
English (en)
Other versions
CN103670277B8 (zh
CN103670277A (zh
Inventor
陈震
白坤
王峰
屈宏磊
李春斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Power Transmission And Distribution Engineering Co ltd
Maintenance Branch Of State Grid Liaoning Electric Power Co ltd
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Shenyang Aerospace University
Original Assignee
Maintenance Branch Of State Grid Liaoning Electric Power Co ltd
Liaoning Power Transmission And Transformation Project Co ltd
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Shenyang Aerospace University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maintenance Branch Of State Grid Liaoning Electric Power Co ltd, Liaoning Power Transmission And Transformation Project Co ltd, State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd, Shenyang Aerospace University filed Critical Maintenance Branch Of State Grid Liaoning Electric Power Co ltd
Priority to CN201210347403.4A priority Critical patent/CN103670277B8/zh
Publication of CN103670277A publication Critical patent/CN103670277A/zh
Application granted granted Critical
Publication of CN103670277B publication Critical patent/CN103670277B/zh
Publication of CN103670277B8 publication Critical patent/CN103670277B8/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

本发明涉及输电线路杆塔复合基础钻孔的定位机构,具体地说是一种输电线路杆塔复合基础钻孔垂直度***,包括导向套,在导向套外表面上均布有多个套管,每个套管上均设有支撑腿,其中任一套管直连有伸缩架,其余套管通过长度可调的调节杆连接有伸缩架;所述导向套套在钻机的冲击器上,通过各支撑腿支撑,所述伸缩架在钻孔时分别抵接在基础坑的坑壁上。本发明能够快速准确地定位钻孔位置,实现钻机快速开孔、精确定位,降低了劳动强度,提高了施工效率;本发明通过调节杆及伸缩架可以精确定位每个锚孔的位置,导向套通过伸缩架抵接在四面基础坑壁及各支撑腿固定,使钻杆及冲击器在钻孔时不发生摆动。

Description

一种输电线路杆塔复合基础钻孔垂直度***
技术领域
本发明涉及输电线路杆塔复合基础钻孔的定位机构,具体地说是一种输电线路杆塔复合基础钻孔垂直度***。
背景技术
复合基础是原状土掏挖和岩石锚杆基础的结合体,充分利用不同地质承载力不同这一特性将基础做到最小,节省原材料消耗、降低工程造价;同时避免大开挖、大***或掏挖基础带来的相应环保问题,达到了工程环保、节耗的目的。复合基础施工首先掏挖承台,尺寸一般边长或直径1~2米、深1.5米左右。将钻机直接支设在掏挖承台坑口上方,钻杆对准锚孔中心标记施钻。但由于钻杆深入掏挖承台下方1.5米左右,再加上部预钻杆1米,悬空2.5米的钻杆对准锚孔中心标记施钻,在钻孔定位过程中会发生跳动移位,即使可以用两台经纬仪成90度角两个方向检测到定位不准,但实施时很难保证钻孔的垂直度。
除钻杆悬空定位过程极易跳动难以保证垂直度外,新型复合基础根据地质条件不同有锚杆和锚筋两种方式,而且群锚类型多样,掏挖上部平台开口大小不一,且同一基础不同塔角钻孔也不同,基础坑有4、8、12、16、20孔五种类型,钻孔直径和间距及数量各不相同,又进一步增加了钻孔定位的难度。
发明内容
为了解决现有复合基础钻孔施工中存在的上述缺陷,本发明的目的在于提供一种输电线路杆塔复合基础钻孔垂直度***。该***能够使钻杆定位准确,钻机开孔快速。
本发明的目的是通过以下技术方案来实现的:
本发明包括导向套,在导向套外表面上均布有多个套管,每个套管上均设有支撑腿,其中任一套管直连有伸缩架,其余套管通过长度可调的调节杆连接有伸缩架;所述导向套套在钻机的冲击器上,通过各支撑腿支撑,所述伸缩架在钻孔时分别抵接在基础坑的坑壁上。
其中:所述导向套外表面上连接有四个套管,两两对称设置,其中任一套管直连有伸缩架,其余三个套管通过长度可调的调节杆连接有伸缩架;所述导向套外表面上连接有四个套管,两两对称设置,其中两个相邻的套管直连有伸缩架,其余两个套管通过长度可调的调节杆连接有伸缩架;一组对称设置的两个套管的轴向中心线与另外一组对称设置的两个套管的轴向中心线的连线垂直且共面,并均与所述导向套的轴向中心线垂直相交;所述导向套为空心的圆柱结构,该导向套由均呈半圆状的左半导向套及右半导向套组成,所述左半导向套及右半导向套分别套在钻机的冲击器上,由连接螺栓固定;所述调节杆包括多个依次嵌套的伸缩节,伸缩架与首节的伸缩节相连,各伸缩节之间及末节伸缩节与套管之间分别通过凸起及凹槽固定;所述套管的一端固接在导向套上,另一端通过连接法兰与伸缩架固接。
本发明的优点与积极效果为:
1.本发明能够快速准确地定位钻孔位置,实现钻机快速开孔、精确定位。
2.本发明通过调节杆及伸缩架可以精确定位每个锚孔的位置,导向套通过伸缩架抵接在四面基础坑壁及各支撑腿固定,使钻杆及冲击器在钻孔时不发生摆动。
3.本发明的导向套分为左右两半,便于安装拆卸,不必拆卸钻杆和冲击器,降低了劳动强度,提高了施工效率。
附图说明
图1为本发明工作状态示意图;
图2A为掏挖承台坑内为4个锚孔的钻孔示意图;
图2B为掏挖承台坑内为8个锚孔的钻孔示意图;
图2C为掏挖承台坑内为12个锚孔的钻孔示意图;
图2D为掏挖承台坑内为16个锚孔的钻孔示意图;
图2E为掏挖承台坑内为20个锚孔的钻孔示意图;
图3为本发明的结构主视图;
图4为本发明有一侧套管直接连接伸缩架的俯视图;
图5为本发明有两侧套管直接连接伸缩架的俯视图;
其中:1为钻机立架,2为钻杆,3为底座,4为冲击器,5为***,6为连接法兰,7为连接孔,8为导向套,9为支撑腿,10为调节杆,11为伸缩架,12为调节螺丝,13为左半导向套,14为连接螺栓,15为右半导向套,16为套管。
具体实施方式
下面结合附图对本发明作进一步详述。
如图3所示,本发明包括导向套8,在导向套8外表面上均布有多个套管16,本实施例在导向套8的外表面连接了四个套管16,每个套管16上均设有支撑腿9;该四个套管16两两对称设置,其中一组对称设置的两个套管16的轴向中心线与另外一组对称设置的两个套管16的轴向中心线的连线垂直且共面,并均与所述导向套8的轴向中心线垂直相交。导向套8为空心的圆柱结构,该导向套8分为左右两半,即分为均呈半圆状的左半导向套13及右半导向套15,左半导向套13与右半导向套15上各连接两个套管;左半导向套13及右半导向套15的端面边缘各设有四个连接块,连接块上均开有连接孔7;在钻孔时,左半导向套13及右半导向套15分别套在钻机的冲击器4上,由连接螺栓14***连接孔7中,将左半导向套13及右半导向套15固定。
如图4所示,四个套管16中的任一套管16远离导向套8的一端通过连接法兰6固接有伸缩架11;其余的三个套管16则通过长度可调的调节杆10连接伸缩架11。
如图5所示,四个套管16中任意两个相邻的套管16远离导向套8的一端分别通过连接法兰6固接有伸缩架11;另外两个相邻的套管16则通过长度可调的调节杆10连接伸缩架11。
调节杆10包括多个依次嵌套的伸缩节,伸缩架11与首节的伸缩节相连,各伸缩节之间及末节伸缩节与套管16之间分别通过凸起及凹槽固定;即当调节杆10进行长度调节时,一个伸缩节上的凸起落到另一个伸缩节上的凹槽内,这两个伸缩节的长度即调节完毕。
本发明的伸缩架11为机械剪式千斤顶,属于现有技术,即包括杠杆和调节螺丝12,杠杆的一端与调节杆10的首节伸缩节相连,另一端在钻孔时分别抵接在基础坑的坑壁上,通过旋转调节螺丝12使杠杆伸缩。
本发明的工作原理为:
如图2A~图2E所示,基础坑有4、8、12、16、20孔五种类型,钻孔直径和间距及数量各不相同,掏挖承台开口大小不一。由于各种钻孔类型孔中心距离基础坑四壁的距离相差不大,通过调节伸缩架11和调节杆10来调整长度以适应不同大小的掏挖尺寸及不同锚孔位置。
如图1所示,钻机立架1通过底座3放在掏挖承台上方固定,钻杆2连接冲击器4深入掏挖承台下方1.5米左右,再加上部预钻杆1米,悬空2.5米对准锚孔中心标记钻孔,钻孔定位及垂直度由***5保证。***5套在冲击器4上,间隙很小,四周通过调节杆10和伸缩架11调整长度抵接于掏挖承台四壁上,使钻杆2及冲击器4稳定不移动。具体为:
当钻机固定,冲击器4对准锚孔中心标记时,将左半导向套13和右半导向套15分别套在钻机的冲击器4上,用连接螺栓14固定,并通过各支撑腿9支撑。然后将调节杆10由套管16内拉出,配合旋转调节螺丝12使伸缩架11伸缩,使***5精确定位,施钻时保证不发生钻头摆动,实现钻机开孔快速,高精度定位。钻入设定深度定位后,利用调节螺丝12调节伸缩架11,使四周脱离壁面,再拧松连接螺栓14,分解左、右半导向套13、15,方便取出,不必拆卸钻杆2和冲击器4,提高工作效率和减轻劳动强度。然后,再次将冲击器4对准待钻的锚孔中心标记,按上述操作将***5精确定位进行钻孔即可。
为了实现***5能够在1.2m~1.8m的不同掏挖平台下精确移动定位,通过制作不同规格的调节杆10,使***5满足不同掏挖平台下跨度需求;通过伸缩架11精确调节至同一水平面上每个锚孔的位置,四个伸缩架11顶压在四面基础坑壁上以固定导向套8。

Claims (6)

1.一种输电线路杆塔复合基础钻孔垂直度***,其特征在于:包括导向套(8),在导向套(8)外表面上均布有多个套管(16),每个套管(16)上均设有支撑腿(9),其中任一套管(16)直连有伸缩架(11),其余套管(16)通过长度可调的调节杆(10)连接有伸缩架(11);所述导向套(8)套在钻机的冲击器(4)上,通过各支撑腿(9)支撑,所述伸缩架(11)在钻孔时分别抵接在基础坑的坑壁上;
所述调节杆(10)包括多个依次嵌套的伸缩节,伸缩架(11)与首节的伸缩节相连,各伸缩节之间通过凸起及凹槽固定,末节伸缩节与套管(16)之间的连接固定通过凸起及凹槽固定。
2.按权利要求1所述的输电线路杆塔复合基础钻孔垂直度***,其特征在于:所述导向套(8)外表面上连接有四个套管(16),两两对称设置,其中任一套管(16)直连有伸缩架(11),其余三个套管(16)通过长度可调的调节杆(10)连接有伸缩架(11)。
3.按权利要求1所述的输电线路杆塔复合基础钻孔垂直度***,其特征在于:所述导向套(8)外表面上连接有四个套管(16),两两对称设置,其中两个相邻的套管(16)直连有伸缩架(11),其余两个套管(16)通过长度可调的调节杆(10)连接有伸缩架(11)。
4.按权利要求2或3所述的输电线路杆塔复合基础钻孔垂直度***,其特征在于:一组对称设置的两个套管(16)的轴向中心线与另外一组对称设置的两个套管(16)的轴向中心线的连线垂直且共面,并均与所述导向套(8)的轴向中心线垂直相交。
5.按权利要求1、2或3所述的输电线路杆塔复合基础钻孔垂直度***,其特征在于:所述导向套(8)为空心的圆柱结构,该导向套(8)由均呈半圆状的左半导向套(13)及右半导向套(15)组成,所述左半导向套(13)及右半导向套(15)分别套在钻机的冲击器(4)上,由连接螺栓(14)固定。
6.按权利要求1、2或3所述的输电线路杆塔复合基础钻孔垂直度***,其特征在于:所述套管(16)的一端固接在导向套(8)上,另一端通过连接法兰(6)与伸缩架(11)固接。
CN201210347403.4A 2012-09-18 2012-09-18 一种输电线路杆塔复合基础钻孔垂直度*** Active CN103670277B8 (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210347403.4A CN103670277B8 (zh) 2012-09-18 2012-09-18 一种输电线路杆塔复合基础钻孔垂直度***

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210347403.4A CN103670277B8 (zh) 2012-09-18 2012-09-18 一种输电线路杆塔复合基础钻孔垂直度***

Publications (3)

Publication Number Publication Date
CN103670277A CN103670277A (zh) 2014-03-26
CN103670277B true CN103670277B (zh) 2016-05-11
CN103670277B8 CN103670277B8 (zh) 2016-08-03

Family

ID=50308966

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210347403.4A Active CN103670277B8 (zh) 2012-09-18 2012-09-18 一种输电线路杆塔复合基础钻孔垂直度***

Country Status (1)

Country Link
CN (1) CN103670277B8 (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105064918A (zh) * 2015-07-17 2015-11-18 中国电力科学研究院 一种输变电线路基础成孔垂直导向与除尘两用装置
CN105952386A (zh) * 2016-07-18 2016-09-21 吴江福爱梁纺织有限公司 纺织车间地源热泵钻机基座的水平控制环

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4363568A (en) * 1980-10-14 1982-12-14 Atlantic Richfield Company Conductors for a guyed tower and method for installing same
CN1380934A (zh) * 1999-09-21 2002-11-20 威尔工程合作公司 用于在土地中的钻孔内移动管件的方法和装置
CN201236631Y (zh) * 2008-03-18 2009-05-13 中冶宝钢技术服务有限公司 钻孔辅助定位装置
CN201343996Y (zh) * 2009-02-12 2009-11-11 中国电力科学研究院 输电线路杆塔岩石锚杆基础钻机底座
CN101824919A (zh) * 2010-03-26 2010-09-08 中铁隧道集团有限公司 钢管柱在富水软弱地层中深孔水下的安装定位方法
CN201829901U (zh) * 2010-08-24 2011-05-11 中国电力科学研究院 一字型可调式相间防舞金具
CN201915835U (zh) * 2010-09-30 2011-08-03 洛阳栾川钼业集团股份有限公司 一种露天矿钻孔***
CN202000891U (zh) * 2011-04-29 2011-10-05 重庆迈尔矿山设备开发有限公司 一种导向器
CN102312435A (zh) * 2010-07-02 2012-01-11 Ihc荷兰Ie有限公司 在水下地层中安装多个基础构件的模板和方法
CN202970469U (zh) * 2012-09-18 2013-06-05 辽宁省送变电工程公司 输电线路杆塔复合基础钻孔垂直度***

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03110288A (ja) * 1989-09-22 1991-05-10 Mitsui Constr Co Ltd 曲線孔掘削機
JP3110288B2 (ja) * 1995-07-21 2000-11-20 日本電気株式会社 指数対数変換回路

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4363568A (en) * 1980-10-14 1982-12-14 Atlantic Richfield Company Conductors for a guyed tower and method for installing same
CN1380934A (zh) * 1999-09-21 2002-11-20 威尔工程合作公司 用于在土地中的钻孔内移动管件的方法和装置
CN201236631Y (zh) * 2008-03-18 2009-05-13 中冶宝钢技术服务有限公司 钻孔辅助定位装置
CN201343996Y (zh) * 2009-02-12 2009-11-11 中国电力科学研究院 输电线路杆塔岩石锚杆基础钻机底座
CN101824919A (zh) * 2010-03-26 2010-09-08 中铁隧道集团有限公司 钢管柱在富水软弱地层中深孔水下的安装定位方法
CN102312435A (zh) * 2010-07-02 2012-01-11 Ihc荷兰Ie有限公司 在水下地层中安装多个基础构件的模板和方法
CN201829901U (zh) * 2010-08-24 2011-05-11 中国电力科学研究院 一字型可调式相间防舞金具
CN201915835U (zh) * 2010-09-30 2011-08-03 洛阳栾川钼业集团股份有限公司 一种露天矿钻孔***
CN202000891U (zh) * 2011-04-29 2011-10-05 重庆迈尔矿山设备开发有限公司 一种导向器
CN202970469U (zh) * 2012-09-18 2013-06-05 辽宁省送变电工程公司 输电线路杆塔复合基础钻孔垂直度***

Also Published As

Publication number Publication date
CN103670277B8 (zh) 2016-08-03
CN103670277A (zh) 2014-03-26

Similar Documents

Publication Publication Date Title
CN205638225U (zh) 一种建筑用钻孔装置
CN205349223U (zh) 一种建筑用钻孔装置
CN101319610B (zh) 井下钻孔方位尺及钻孔快速定向方法
CN208024341U (zh) 一种旋挖桩***
CN204924522U (zh) 一种用于旋挖钻机动力头的扭矩检测装置
CN104343383B (zh) 一种用于土遗址的钻孔装置
CN103670277B (zh) 一种输电线路杆塔复合基础钻孔垂直度***
CN204920938U (zh) 一种钻孔灌注桩的钻孔检测仪
CN103670286A (zh) 一种输电铁塔复合基础锚固钻机全方位移动底座
CN219365935U (zh) 一种地质勘察钻探装置
CN205805416U (zh) 一种具有高垂直度的双腰带钻孔灌注桩钻头
CN203271739U (zh) 一种用于煤电钻的支座
CN203940853U (zh) 一种方位角、倾角角度快速定位校正仪
CN202970469U (zh) 输电线路杆塔复合基础钻孔垂直度***
CN201915948U (zh) 一种用于煤层气钻井远距离穿针的旋转磁源短节
CN204532329U (zh) 钻孔精度精确控制装置
CN205532276U (zh) 一种新型的不规整地面炸点打孔装置
CN205277318U (zh) 一种矿用钻机钻孔辅助支架装置
CN203022620U (zh) 用于石油开采过程中的钻探设备
CN203188917U (zh) 用于钻细长孔的岩芯钻机底座装置
CN202630860U (zh) 长钻孔深部基点法测试装置
CN207161020U (zh) 一种用于辅助石油钻杆连接装置
CN205908258U (zh) 一种气动架柱式钻机
CN202788633U (zh) 可调式矿用钻机支架
CN206873430U (zh) 一种适用于地质灾害勘察用的静探机

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHENYANG AEROSPACE UNIVERSITY INSPECTION BRANCH CO

Free format text: FORMER OWNER: STATE GRID LIAONING ELECTRIC POWER CO., LTD. STATE GRID CORPORATION OF CHINA

Effective date: 20150819

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Applicant after: LIAONING POWER TRANSMISSION AND TRANSFORMATION PROJECT CO.,LTD.

Applicant after: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Applicant after: State Grid Corporation of China

Address before: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Applicant before: LIAONING POWER TRANSMISSION AND TRANSFORMATION PROJECT CO.,LTD.

Applicant before: Liaoning Electric Power Co.,Ltd.

Applicant before: State Grid Corporation of China

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: LIAONING ELECTRIC POWER CO., LTD. STATE GRID CORPORATION OF CHINA TO: STATE GRID LIAONING ELECTRIC POWER CO., LTD. STATE GRID CORPORATION OF CHINA

TA01 Transfer of patent application right

Effective date of registration: 20150819

Address after: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Applicant after: LIAONING POWER TRANSMISSION AND TRANSFORMATION PROJECT CO.,LTD.

Applicant after: SHENYANG AEROSPACE University

Applicant after: MAINTENANCE BRANCH OF STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Applicant after: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Applicant after: State Grid Corporation of China

Address before: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Applicant before: LIAONING POWER TRANSMISSION AND TRANSFORMATION PROJECT CO.,LTD.

Applicant before: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Applicant before: State Grid Corporation of China

C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Chen Zhen

Inventor after: Liu Yanmei

Inventor after: Li Chunbin

Inventor before: Chen Zhen

Inventor before: Bai Kun

Inventor before: Wang Feng

Inventor before: Qu Honglei

Inventor before: Li Chunbin

COR Change of bibliographic data
C53 Correction of patent of invention or patent application
CI01 Publication of corrected invention patent application

Correction item: Inventor

Correct: Chen Zhen|Liu Yanmei|Li Chunbin

False: Chen Zhen|Bai Kun|Wang Feng|Qu Honglei|Li Chunbin

Number: 19

Volume: 32

CI03 Correction of invention patent

Correction item: Inventor

Correct: Chen Zhen|Liu Yanmei|Li Chunbin

False: Chen Zhen|Bai Kun|Wang Feng|Qu Honglei|Li Chunbin

Number: 19

Page: The title page

Volume: 32

ERR Gazette correction
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Patentee after: LIAONING POWER TRANSMISSION AND DISTRIBUTION ENGINEERING Co.,Ltd.

Patentee after: SHENYANG AEROSPACE University

Patentee after: MAINTENANCE BRANCH OF STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Patentee after: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Patentee after: State Grid Corporation of China

Address before: 110021 No. 69 Tengfei street, Tiexi District, Liaoning, Shenyang

Patentee before: LIAONING POWER TRANSMISSION AND TRANSFORMATION PROJECT Co.,Ltd.

Patentee before: SHENYANG AEROSPACE University

Patentee before: MAINTENANCE BRANCH OF STATE GRID LIAONING ELECTRIC POWER Co.,Ltd.

Patentee before: STATE GRID LIAONING ELECTRIC POWER SUPPLY Co.,Ltd.

Patentee before: State Grid Corporation of China