CN103669861A CN201310585000.8A CN201310585000A CN103669861A CN 103669861 A CN103669861 A CN 103669861A CN 201310585000 A CN201310585000 A CN 201310585000A CN 103669861 A CN103669861 A CN 103669861A
Authority
CN
China
Prior art keywords
steel plate
steel
intermediate layer
layer
layer steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310585000.8A
Other languages
Chinese (zh)
Inventor
赵伟
赵剑丽
孙学水
宗丽杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Institute of Communications
Original Assignee
Zhejiang Institute of Communications
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Institute of Communications filed Critical Zhejiang Institute of Communications
Priority to CN201310585000.8A priority Critical patent/CN103669861A/en
Publication of CN103669861A publication Critical patent/CN103669861A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a construction method of a stiffening steel plate shear wall which bears limited vertical loads. The construction method includes the following steps that firstly, the left end and the right end of a foundation steel beam is connected with a left steel column and a right steel column; secondly, a bottom layer steel plate is installed; thirdly, middle layer steel plates are installed, and deformation gaps are reserved between the bottom layer steel plate and the first middle layer steel plate and between the adjacent middle layer steel plates; fourthly, the third step is repeatedly conducted, the middle layer steel plates continue to be installed upwards until the middle layer steel plates reach a top layer steel plate, the upper portion of the top layer steel plate is connected with a (n+1)th layer steel beam, the left side and the right side of the top layer steel plate are connected with the left steel column and the right steel column respectively, deformation gaps are formed between the top layer steel plate and the (n-1)th middle layer steel plate, and after construction of a main structure is finished, the deformation gaps are welded; fifthly, after the welding operation is finished, the structure of the steel plate shear wall which bears the limited vertical loads is installed. By the adoption of the construction method, the limited vertical loads are effectively borne, construction speed is greatly increased, and the construction period is shortened.

Description

A kind of construction method of bearing the stiffened steel plate shear wall of limited vertical load
Technical field
The invention belongs to steel building field, relate in particular to a kind of construction method of shear wall.
Background technology
In highrise building steel plate shear force wall design at present, all suppose a steel plate wall Under Lateral Loading, vertical load is born by the frame column of periphery completely.Steel plate shear force wall will treat that main body binds, and mainly dead load is installed after all having completed again.The Tianjin former scheme of Jin Ta engineering adopt this sequence of construction can make the construction period of agent structure greatly extend, as can be extended the duration for 10 months; And because the additional dead loads such as finishing layer and service load are after-applied in use, vertical stress still can be delivered on steel plate shear force wall.In addition, apply at present more to draw the thin steel plate shear wall of position Theoretical Design, can the invar bucking of plate and send larger noise, the normal use of impact building in operational phase.
Summary of the invention
In order to overcome the deficiency that can not bear limited vertical load, extend the construction period of steel building of the construction method of existing highrise building steel plate shear force wall, the invention provides a kind of construction method of effectively bearing limited vertical load, greatly improving the stiffened steel plate shear wall that bears limited vertical load of speed of application, minimizing construction period.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of construction method of bearing the stiffened steel plate shear wall of limited vertical load, described stiffened steel plate shear wall comprises that steel column is connected with left and right steel column with two ends, girder steel left and right described in girder steel, girder steel comprises basic girder steel, the 2nd layer of girder steel, n+1 layer girder steel, n is the number of plies of building, and described construction method comprises the following steps:
The first step: the two ends, left and right of basic girder steel are connected with left and right steel column;
Second step: installing bottom layer steel plate, the bottom of described bottom steel plate is connected with basic girder steel, and the left and right sides of described bottom steel plate is connected with left and right steel column respectively;
The 3rd step: intermediate layer steel plate is installed, intermediate layer steel plate comprises the 1st layer of intermediate layer steel plate, the 2nd layer of intermediate layer steel plate from bottom to top, n-1 layer intermediate layer steel plate, i is natural number and 1≤i≤n-1, and the middle part of i layer intermediate layer steel plate is connected with i+1 layer girder steel, and the left and right sides at the middle part of i layer intermediate layer steel plate is connected with left and right steel column respectively, between described bottom steel plate and the 1st layer of intermediate layer steel plate, be provided with deformation gap, between neighbouring intermediate layer steel plate, be provided with deformation gap;
The 4th step: repeat above-mentioned the 3rd step, continue upwards to install intermediate layer steel plate, until top layer steel plate, the top of described top layer steel plate is connected with n+1 layer girder steel, the left and right sides of described top layer steel plate is connected with left and right steel column respectively, between described top layer steel plate and n-1 layer intermediate layer steel plate, be provided with deformation gap, until after the construction of agent structure, then carry out between described bottom steel plate and nethermost intermediate layer steel plate, the welding between adjacent intermediate layer steel plate, between described top layer steel plate and uppermost intermediate layer steel plate;
The 5th step: after work to be welded completes, bear the steel plate shear wall structure installation of limited vertical load.
Further, between two ends, described girder steel left and right and left and right steel column, between steel plate both sides, described intermediate layer and left and right steel column, between the left and right sides and left and right steel column of described bottom steel plate, between the left and right sides of described top layer steel plate and left and right steel column, be bolted;
In described second step, described bottom steel plate is connected high-strength bolt used only to carry out just twisting with steel column, is connected high-strength bolt used and carries out just twisting between intermediate layer steel plate and steel column; In described the 5th step, carry out the multiple of high-strength bolt and twist and twist eventually.
Further, in described the 4th step, between steel plate both sides, described intermediate layer and left and right steel column, weld.
The middle part of described intermediate layer steel plate and girder steel welding.This structure is now prefabricated in factory.
Bottom steel plate of the present invention, intermediate layer steel plate and top layer steel plate are the steel plate of putting more energy into, and the sidewall of steel plate is provided with the muscle of putting more energy into.
Technical conceive of the present invention is: steel plate shear force wall bears after vertical load, and horizontal shear strength must decline.Shear wall horizontal shear strength is declined and be less than 25% limited vertical load, can seriously not reduce initial stiffness and the ultimate bearing capacity of shear wall.Therefore,, as long as the vertical load of taking suitable measure to control practice of construction and operational phase is no more than limited vertical load, can guarantee that the supporting capacity of steel plate shear force wall reaches designing requirement.
For reaching steel plate shear force wall, bear the object of limited vertical load, weldering measure after taking in super highrise building.Can construct with steel frame like this, every layer along highly dividing the stiffened steel plate shear wall of two sections of liftings (every half storey one hangs) simultaneously.The weld seam of half storey eminence is constructed after checking safety again, does not delay building and installing of floor and girder steel, has greatly improved construction speed.
Beneficial effect of the present invention is mainly manifested in: effectively bear limited vertical load, greatly improve speed of application, reduce construction period.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of basic girder steel.
Fig. 2 is the schematic diagram of bottom the first block plate.
Fig. 3 is the schematic diagram of the second block plate on Fig. 2 basis.
Fig. 4 is the schematic diagram of top layer steel plate.
Fig. 5 is the overall schematic of bearing the stiffened steel plate shear wall of limited vertical load.
The specific embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
With reference to Fig. 1~Fig. 5, a kind of construction method of bearing the stiffened steel plate shear wall of limited vertical load, described stiffened steel plate shear wall comprises steel column 1 and girder steel 2, described girder steel 2 two ends, left and right are connected with left and right steel column 1 that (that is: the left end of girder steel is connected with left steel column, the right-hand member of girder steel is connected with right steel column), girder steel 2 comprises basic girder steel, the 2nd layer of girder steel ... n+1 layer girder steel, n is the number of plies of building, and described construction method comprises the following steps:
The first step: the two ends, left and right of basic girder steel are connected with left and right steel column 1;
Second step: installing bottom layer steel plate 3, the bottom of described bottom steel plate 3 is connected with basic girder steel, the left and right sides of described bottom steel plate 3 is connected respectively (that is: the left side of bottom steel plate is connected with left steel column, and the right side of bottom steel plate is connected with right steel column) with left and right steel column 1;
The 3rd step: intermediate layer steel plate 4 is installed, intermediate layer steel plate 4 comprises the 1st layer of intermediate layer steel plate from bottom to top, the 2nd layer of intermediate layer steel plate, n-1 layer intermediate layer steel plate, i is natural number and 1≤i≤n-1, the middle part of i layer intermediate layer steel plate is connected with i+1 layer girder steel, the left and right sides at the middle part of i layer intermediate layer steel plate is connected with left and right steel column respectively that (that is: the left side at the middle part of intermediate layer steel plate is connected with left steel column, the right side at the middle part of intermediate layer steel plate is connected with right steel column), between described bottom steel plate 3 and the 1st layer of intermediate layer steel plate, be provided with deformation gap, between adjacent intermediate layer steel plate 4, be provided with deformation gap,
The 4th step: repeat above-mentioned the 3rd step, continue upwards to install intermediate layer steel plate 4, until top layer steel plate 5, the top of described top layer steel plate 5 is connected with n+1 layer girder steel, the left and right sides of described top layer steel plate 5 be connected with left and right steel column respectively (that is: the left side of top layer steel plate with seat a steel column be connected, the right side of top layer steel plate is connected with right steel column), between described top layer steel plate 5 and n-1 layer intermediate layer steel plate, be provided with deformation gap, until after the construction of agent structure, carry out again between described bottom steel plate 3 and nethermost intermediate layer steel plate 4, between adjacent intermediate layer steel plate 4, welding between described top layer steel plate 5 and uppermost intermediate layer steel plate 4,
The 5th step: after work to be welded completes, bear the steel plate shear wall structure installation of limited vertical load.
Further, between described girder steel 2 two ends, left and right and left and right steel column 1, between steel plate 4 both sides, described intermediate layer and left and right steel column 1, between the left and right sides and left and right steel column 1 of described bottom steel plate 3, between the left and right sides of described top layer steel plate 5 and left and right steel column 1, be bolted;
In described second step, described bottom steel plate 3 is connected high-strength bolt used only to carry out just twisting with steel column 1, is connected high-strength bolt used and carries out just twisting between intermediate layer steel plate 4 and steel column, is connected high-strength bolt used and carries out just twisting between top layer steel plate 5 and steel column; In described the 5th step, carry out the multiple of high-strength bolt and twist and twist eventually.
In described the 4th step, welding between the left and right sides of described intermediate layer steel plate 4 and left and right steel column 1 (that is: the left side of intermediate layer steel plate and the welding of left steel column, the right side of intermediate layer steel plate and the welding of right steel column).
The middle part of described intermediate layer steel plate 4 and girder steel 2 welding.This structure is now prefabricated in factory.
The construction sequence of the stiffened steel plate shear wall that bears limited vertical load of the present embodiment is as follows:
The first step: basic steel girder erection, see Fig. 1;
Second step: installing bottom layer steel plate 3, described bottom steel plate 3 is half block shear wall only, and the floor of two layers of the aspect ratios of bottom steel plate 3 is low, and bottom steel plate 3 is connected high-strength bolt used only to carry out just twisting with steel column;
The 3rd step: the 1st layer of intermediate layer steel plate is installed, the shear wall that comprises each half storey in floor one deck and two-layer structure, that is: the middle part of the 1st layer of intermediate layer steel plate is connected with the 2nd layer of girder steel, the left and right sides at the middle part of the 1st layer of intermediate layer steel plate is connected with left and right steel column respectively, is connected high-strength bolt used and carries out just twisting between steel plate shear force wall and steel column;
The 4th step: repeat above-mentioned the 3rd step, continue intermediate layer steel plate is upwards installed, until after the construction of agent structure (containing all concreting), carry out the welding job of weld seam between the weld seam, two block plates of intermediate layer steel plate 4 and steel column 2.
The 5th step: after work to be welded completes, carry out the multiple of high-strength bolt and twist and twist eventually the steel plate shear wall structure installation of bearing limited vertical load.
Example: second phase 7# building, Mei Shan garden, Shenzhen, kindergarten, outdoor ring skill engineering are positioned at plum forests under Enterprises of Futian District, and Mei Shan Yuan7# building overall floorage is 6305.06 square metres, approximately 850 tons of steel amounts.Form of structure is concrete-filled rectangular steel tube steel framed structure.Planar dimension 65.5mX13.6m, maximum colum network size is 6.9mX7m, and four layers is podium below, and typical floor height is 4.0m, and four to 13 layers is high building, standard floor height 2.8m.Podium height 11.2m, high building height 39.2m, building general height 44.5m.Typical section form: mouthful 350 * 350 * 10/8 rectangle steel tubing string, H400 * 200 * 6 * 12/14 girder steel.

Claims (4)

1. a construction method of bearing the stiffened steel plate shear wall of limited vertical load, described stiffened steel plate shear wall comprises steel column and girder steel, two ends, described girder steel left and right are connected with left and right steel column, girder steel comprises basic girder steel, the 2nd layer of girder steel, n+1 layer girder steel, n is the number of plies of building, it is characterized in that: described construction method comprises the following steps:
The first step: the two ends, left and right of basic girder steel are connected with left and right steel column;
Second step: installing bottom layer steel plate, the bottom of described bottom steel plate is connected with basic girder steel, and the left and right sides of described bottom steel plate is connected with left and right steel column respectively;
The 3rd step: intermediate layer steel plate is installed, intermediate layer steel plate comprises the 1st layer of intermediate layer steel plate, the 2nd layer of intermediate layer steel plate from bottom to top, n-1 layer intermediate layer steel plate, i is natural number and 1≤i≤n-1, and the middle part of i layer intermediate layer steel plate is connected with i+1 layer girder steel, and the left and right sides at the middle part of i layer intermediate layer steel plate is connected with left and right steel column respectively, between the 1st layer of described bottom steel plate and intermediate layer steel plate, be provided with deformation gap, between neighbouring intermediate layer steel plate, be provided with deformation gap;
The 4th step: repeat above-mentioned the 3rd step, continue upwards to install intermediate layer steel plate, until top layer steel plate, the top of described top layer steel plate is connected with n+1 layer girder steel, the left and right sides of described top layer steel plate is connected with left and right steel column respectively, between described top layer steel plate and n-1 layer intermediate layer steel plate, be provided with deformation gap, until after the construction of agent structure, then carry out between described bottom steel plate and nethermost intermediate layer steel plate, the welding between adjacent intermediate layer steel plate, between described top layer steel plate and uppermost intermediate layer steel plate;
The 5th step: after work to be welded completes, bear the steel plate shear wall structure installation of limited vertical load.
2. construction method of bearing the stiffened steel plate shear wall of limited vertical load as claimed in claim 1, is characterized in that: between two ends, described girder steel left and right and left and right steel column, between steel plate both sides, described intermediate layer and left and right steel column, between the left and right sides and left and right steel column of described bottom steel plate, be bolted between the left and right sides of described top layer steel plate and left and right steel column;
In described second step, described bottom steel plate is connected high-strength bolt used only to carry out just twisting with steel column, is connected high-strength bolt used and carries out just twisting between intermediate layer steel plate and steel column; In described the 5th step, carry out the multiple of high-strength bolt and twist and twist eventually.
3. construction method of bearing the stiffened steel plate shear wall of limited vertical load as claimed in claim 1 or 2, is characterized in that: in described the 4th step, between steel plate both sides, described intermediate layer and left and right steel column, weld.
4. construction method of bearing the stiffened steel plate shear wall of limited vertical load as claimed in claim 1 or 2, is characterized in that: the middle part of described intermediate layer steel plate and girder steel welding.
CN201310585000.8A 2013-11-19 2013-11-19 Construction method of stiffening steel plate shear wall which bears limited vertical loads Pending CN103669861A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310585000.8A CN103669861A (en) 2013-11-19 2013-11-19 Construction method of stiffening steel plate shear wall which bears limited vertical loads

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310585000.8A CN103669861A (en) 2013-11-19 2013-11-19 Construction method of stiffening steel plate shear wall which bears limited vertical loads

Publications (1)

Publication Number Publication Date
CN103669861A true CN103669861A (en) 2014-03-26

Family

ID=50308570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310585000.8A Pending CN103669861A (en) 2013-11-19 2013-11-19 Construction method of stiffening steel plate shear wall which bears limited vertical loads

Country Status (1)

Country Link
CN (1) CN103669861A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532989A (en) * 2014-12-31 2015-04-22 广州机施建设集团有限公司 Construction method of steel plate shear wall
CN106271461A (en) * 2016-09-20 2017-01-04 江苏京沪重工有限公司 A kind of steel plate shear force wall packaging technology

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203129360U (en) * 2013-03-06 2013-08-14 北京赛博思建筑设计有限公司 Thin steel plate shear wall

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203129360U (en) * 2013-03-06 2013-08-14 北京赛博思建筑设计有限公司 Thin steel plate shear wall

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
何欢欢: ""考虑竖向荷载竖向加劲钢板剪力墙设计技术研究"", 《中国优秀硕士学位论文全文数据库,工程科技II辑》, 27 March 2013 (2013-03-27) *
杜小红等: ""北京财富中心二期写字楼全焊接钢板墙施工工艺"", 《建筑技术》, vol. 43, no. 10, 31 October 2012 (2012-10-31) *
段清星等: ""钢板剪力墙研究现状和工程应用"", 《钢结构》, 30 December 2012 (2012-12-30) *
范重等: ""钢板剪力墙结构设计与施工模拟技术"", 《施工技术》, vol. 41, no. 373, 25 September 2012 (2012-09-25) *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104532989A (en) * 2014-12-31 2015-04-22 广州机施建设集团有限公司 Construction method of steel plate shear wall
CN106271461A (en) * 2016-09-20 2017-01-04 江苏京沪重工有限公司 A kind of steel plate shear force wall packaging technology
CN106271461B (en) * 2016-09-20 2018-09-07 江苏京沪重工有限公司 A kind of steel plate shear force wall packaging technology

Similar Documents

Publication Publication Date Title
CN102127941B (en) Steel tube concrete column-double-layer steel plate combined shear wall and construction method thereof
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN201972268U (en) Combined shear wall of steel pipe concrete columns and double steel plates
CN106703197B (en) A kind of large span multilayer anti-seismic frame structure system and its construction method
CN102839678B (en) Structure for improving rigidity and stability of foundation pit steel support
CN104895229A (en) Prefabricated steel joint concrete slab-column structure and hoisting method thereof
CN103485443A (en) Window-shaped-steel-plate concrete shear wall and manufacturing method thereof
CN104929294A (en) Concrete composite plate with built-in cross hollow square steel pipes
CN103669861A (en) Construction method of stiffening steel plate shear wall which bears limited vertical loads
CN210563202U (en) Structure suitable for assembled additional elevator well
CN102828616B (en) High-formwork support system for roof
CN103195183A (en) Standard unit assembled shock isolating and damping structure system
CN104775557B (en) A kind of large span assembled integral hollow sandwich panel ceiling for storied building
CN204876252U (en) Prefabricated assembled steel node concrete slab post structure
CN104060763A (en) Z-shaped steel pipe-steel framework recycled concrete combined pillar
CN203856069U (en) High-rise building steel structure
CN203755494U (en) Stiffening steel plate shear wall capable of bearing limited vertical load
CN205776898U (en) Overall assembled reinforced concrete shear wall structure system
CN103046743A (en) High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method
CN103195162B (en) Standard unit assembled energy dissipating and damping structure system
CN108824920B (en) Novel buckling restrained energy-consumption steel plate shear wall, structural system and construction method thereof
US11414880B2 (en) Reinforcing structure of unexpired concrete building floors
CN103469892A (en) Primary and secondary module unit combination structure of high-rise module building space and connection method thereof
CN203821882U (en) Super high-rise prefabricated assembled type residential building
CN114134995A (en) Frame core tube rigid-connection floor beam structure system and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140326