CN103669565B - A kind of construction method to wearing the steel-concrete group frame that bolt type connects - Google Patents

A kind of construction method to wearing the steel-concrete group frame that bolt type connects Download PDF

Info

Publication number
CN103669565B
CN103669565B CN201310598288.2A CN201310598288A CN103669565B CN 103669565 B CN103669565 B CN 103669565B CN 201310598288 A CN201310598288 A CN 201310598288A CN 103669565 B CN103669565 B CN 103669565B
Authority
CN
China
Prior art keywords
steel
concrete
construction
steel pipe
pipe column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310598288.2A
Other languages
Chinese (zh)
Other versions
CN103669565A (en
Inventor
李威
钱炜武
韩林海
赵晓林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
Original Assignee
Tsinghua University
Filing date
Publication date
Application filed by Tsinghua University filed Critical Tsinghua University
Priority to CN201310598288.2A priority Critical patent/CN103669565B/en
Publication of CN103669565A publication Critical patent/CN103669565A/en
Application granted granted Critical
Publication of CN103669565B publication Critical patent/CN103669565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of steel concrete group frame and construction method to wearing bolt type connection in the Structural Engineering field belonged in civil engineering.First lift the circular interior steel pipe column within steel tube concrete superposed column with girder steel to the position specified, with to wearing bolt through the hole on end plate and interior steel pipe column, it is made to be connected with steel pipe member in tight, rear gate spool inner core concrete is in interior steel pipe column, then periphery is indulged muscle and stirrup colligation, forms peripheral steel reinforcement cage, manage outer formwork and be supported on outside peripheral steel reinforcement cage, and managing the outer concrete layer of gate spool in outer formwork, complete a floor and construct.Floor of the present invention construction is that lower floor concrete construction is carried out with upper floors Construction of Steel Structure simultaneously, and the node power transmission of this class framework is clear and definite, dependable performance and easy construction, it is adaptable to high building structure;Meanwhile, the construction organization of this class framework is efficiently, quickly, it is adaptable to have certain requirements structure to the engineering time.

Description

A kind of construction method to wearing the steel-concrete group frame that bolt type connects
Invention field
The present invention relates to the Structural Engineering field in civil engineering, particularly to a kind of to wearing steel-concrete group frame and the construction method that bolt type connects.
Background technology
The advantages such as steel-concrete combined structure takes full advantage of steel and the loading characteristic of concrete bi-material, therefore has mechanical property good, easy construction.Conventional steel-concrete combined structure has steel-concrete composite beam, steel reinforced concrete, concrete filled steel tube, steel reinforced concrete etc..Steel tube concrete superposed column is on the basis of traditional steel core concrete column, and one layer of armored concrete of outsourcing forms.Interior steel pipe column and the outer concrete of pipe can be circular, square or other cross-sectional shape.This class A of geometric unitA has the features such as bearing capacity is high, fire protecting performance is good, it is adaptable to major diameter post and other coupled columns bearing capacity in bridge pier and skyscraper require higher structure.
In existing frame structure, steel tube concrete superposed column generally links together with reinforced beam or girder steel.In framework, the design of steel tube concrete superposed column-steel beam connecting joint is the key link of this class framework, directly influences integral rigidity and the stress performance of structure, is also related to construction speed and the cost of structure entirety simultaneously.Traditional framework typically uses outer ring plate and connection with inner diaphragm, is coupled together by welding manner and girder steel, and this needs substantial amounts of welding job amount.Additionally, outer ring plate and arranging of internal partition can affect the cast of concrete inside and outside pipe, difficulty of construction is big, and progress is slower.Accordingly, it would be desirable to a kind of power transmission is clear and definite, functional and node type of attachment easily of constructing, so that the structural system that this rigidity of steel tube concrete superposed framework is big, fire resistance is good is widely applied in engineering.
Summary of the invention
It is an object of the invention to provide a kind of to wearing bolted steel-concrete group frame and construction method, it is characterized in that, described to wearing bolted steel-concrete group frame by steel tube concrete superposed column 1 and girder steel 2 being connected wearing bolt 9, formed multiple to wearing bolt connection node 3;In interior steel pipe column 4 periphery, vertical levelling dividing plate 12 welds with vertical levelling dividing plate 12 against interior steel pipe column outer wall, end plate 7 side, and opposite side is connected with girder steel 2;Stirrup 11 becomes peripheral steel reinforcement cage 8 with the colligation of vertical muscle 10;Manage outer formwork 13 to be supported on outside peripheral steel reinforcement cage 8, formed in Concrete Filled formwork 13 outside and manage outer concrete layer 6;Pipe inner core concrete 5 is filled in interior steel pipe column 4.
Described to wearing bolt connection node part, described to wearing bolt 9 screw rod through end plate 7 and the reserved hole of interior steel pipe column 4, and at two nut screwing clamping;By linking together to wearing the bolt 9 interior steel pipe column 4 by the end plate 7 welded with vertical levelling dividing plate 12 and steel tube concrete superposed column 1, thus realize girder steel 2 and the connection of steel tube concrete superposed column 1, transmission major part axle power, shearing and moment of flexure.
The construction method of described steel-concrete group frame, to each floor, first lifting superposed column internal steel tubing string and girder steel, by to wearing after bolt connects, intrusion pipe inner core concrete 5, muscle 10 is indulged in colligation periphery and stirrup 11 forms peripheral steel reinforcement cage 8, manages outer formwork 13 and is supported on outside peripheral steel reinforcement cage 8, and the outer concrete layer 6 of gate spool, complete this layer of construction;Pouring into a mould after due to steel tube concrete superposed column peripheral concrete being, the construction of upper floors steel construction part can be carried out with the construction of lower floor concrete parts simultaneously, thus is effectively improved efficiency of construction, it is achieved framework rapid construction.
Described it is through whole steel tube section to wearing bolt.
Described interior steel pipe column cross section is square or circular.
The outer concrete layer cross section of described pipe is square or circular.
Described girder steel is steel I-beam, steel box-girder, steel truss or jointing, and it is welding or bolt connection with the connection of end board assembly.
Described is plain bolt or friction-type bolt to wearing bolt.
Concrete construction method is as follows:
(1) reserved good hole on interior steel pipe column, lifts in place;
(2) connection is had the steel beam lifting of end board assembly to the position specified, with to wearing bolt through the hole on end plate and interior steel pipe column;
(3) two nut screwing clamping is to wearing bolt so that it is is connected with interior steel pipe column member in tight, completes connection procedure, afterwards steel pipe column inner core concrete in cast, colligation periphery steel reinforcement cage, the outer concrete layer of gate spool, completes a floor construction;
(4) lower floor concrete construction is carried out with upper floors Construction of Steel Structure simultaneously, it is achieved framework rapid construction;
The described side at interior steel pipe column or offside are provided with vertical levelling dividing plate (12);To adapt to the alignment on steel pipe column surface in the inner circular of node area, if interior steel pipe column is square-section, vertical levelling dividing plate can be not provided with.
The invention has the beneficial effects as follows the deficiency overcoming existing steel-concrete group frame, such frame stiffness is big, bearing capacity is high, fire resistance is good, its node power transmission clearly, dependable performance and easy construction.Meanwhile, the construction organization of this class framework is efficiently, quickly, it is adaptable to have certain requirements engineering structure to the engineering time.This analogous frame structure uses be applicable to skyscraper.Have a characteristic that
(1) node connection aspect, or internal partition formula board-like with traditional outer annular-stiffer connects node and compares, use and need not or have only to little Site Welding workload to wearing bolted node, only need on steel pipe reserving hole, easy to process, reduce the impact such as welding processing workload and residual deformation;Owing to there is no the setting of ring flat-plate or dividing plate, facilitate in pipe, manage the cast of outer concrete.
(2) moment of flexure, axle power and shearing can effectively be undertaken to wearing bolt connection node, it is possible to need to be designed to just to connect according to difference, semi-rigid joint or hinged joint.Node force-transmission mechanism is: can the axle power on girder steel be delivered on steel tube concrete superposed column by end plate with to wearing bolt;By upper and lower row, the moment of flexure on girder steel can be delivered on steel tube concrete superposed column by the layout wearing bolt;By to wear bolt can be by the most of Shear transfer on girder steel to core concrete filled steel tube, on a part of Shear transfer to peripheral concrete.
(3) use at the construction field (site) manually to tighten and can realize steel tube concrete superposed column-steel beam joint and connect wearing bolt, installment work simple and fast, it is suitable for general job site or wild environment construction;Utilizing the feature of superposed column, can pour into a mould concrete in lower floor while upper strata sets up steel construction, upper and lower floor can be constructed simultaneously, improves efficiency of construction, shortens construction period.
Accompanying drawing explanation
Fig. 1 is the steel-concrete composite frame structure schematic diagram of floor.
Fig. 2 is the side view of the node of Fig. 1.
Fig. 3 is the Section A-A sectional view of Fig. 2 node.
In figure, 1. steel tube concrete superposed column, 2. girder steel, 3. to wearing bolt connection node, 4. in steel pipe column, 5. pipe inner concrete, 6. pipe outer concrete layer, 7. end plate, 8. peripheral steel reinforcement cage, 9. to wearing bolt, 10. indulging muscle, 11. stirrups, 12. vertical levelling dividing plates, 13. manage outer formwork.
Detailed description of the invention
The present invention provides a kind of to wearing bolted steel-concrete group frame and construction method, and the present invention is further detailed explanation with embodiment below in conjunction with the accompanying drawings.
Fig. 1-3 show the steel-concrete composite frame structure schematic diagram of floor;In figure, to wearing bolted steel-concrete group frame by steel tube concrete superposed column 1 and girder steel 2 being connected wearing bolt 9, formed multiple to wearing bolt connection node 3;Interior steel pipe column 4 periphery (interior steel pipe column 4 cross section is square or circular), vertical levelling dividing plate 12 welds with vertical levelling dividing plate 12 against interior steel pipe column 4 outer wall, end plate 7 side, and opposite side is connected with girder steel 2;Stirrup 11 becomes peripheral steel reinforcement cage 8 with the colligation of vertical muscle 10;Managing outer formwork 13 to be supported on outside peripheral steel reinforcement cage 8, formed and manage outer concrete layer 6 in Concrete Filled formwork 13 outside, it is square or circular for managing outer concrete layer 6 cross section;Pipe inner core concrete 5 is filled in interior steel pipe column 4.Described is plain bolt or friction-type bolt to wearing bolt 9, runs through whole interior steel pipe column 4 cross section.
Above-mentioned girder steel 2 uses steel I-beam, steel box-girder, steel truss or jointing, and it is welding or bolt connection with the connection of end board assembly.
Embodiment 1
To wearing bolted steel-concrete group frame and the detailed description of the invention of construction, shown to wearing the construction of bolted steel-concrete composite frame structure according to Fig. 1-3, during construction, for each floor, the first circular interior steel pipe column 4 within lifting steel tube concrete superposed column 1 and girder steel 2, it is lifted into the position specified, with to wearing bolt through the hole on end plate 7 and interior steel pipe column 4, two nut screwing clamping is to wearing bolt, it is made to be connected with steel pipe member in tight, after connecting, gate spool inner core concrete 5 is in interior steel pipe column 4, then periphery is indulged muscle 10 and stirrup 11 colligation, form peripheral steel reinforcement cage 8, manage outer formwork 13 to be supported on outside peripheral steel reinforcement cage 8, and concrete is cast in the outer formwork 13 of pipe, formed and manage outer concrete layer 6, complete a floor construction;It is circular or square for managing outer concrete layer cross section, and for each floor of whole building, it is consistent for managing outer concrete layer cross section.Pouring into a mould after due to steel tube concrete superposed column 1 peripheral concrete being, the construction of upper floors steel construction part can be carried out with the construction of lower floor concrete parts simultaneously, thus is effectively improved efficiency of construction, it is achieved framework rapid construction.
Embodiment 2
Construction method is identical with embodiment 1, and except for the difference that steel tube concrete superposed column is internal is square interior steel pipe column.

Claims (1)

1. the construction method to the steel-concrete group frame wearing bolt type connection, described steel-concrete The construction method of group frame, to each floor, steel pipe column (4) and steel in first lifting superposed column is internal Beam puts in place, and by wearing after bolt connects, intrusion pipe inner core concrete (5), muscle is indulged in colligation periphery (10) and stirrup (11) forms peripheral steel reinforcement cage (8), manage outer formwork (13) and be supported on periphery reinforcing bar Cage (8) outward, and the outer concrete layer (6) of gate spool, complete this layer of construction;It is characterized in that, specifically Construction procedure is as follows:
(1) reserved good hole on interior steel pipe column, lifts in place;
(2) connection is had the steel beam lifting of end board assembly to the position specified, with to wearing bolt through end plate With the hole on interior steel pipe column;
(3) two nut screwing clamping is to wearing bolt so that it is be connected with interior steel pipe column member in tight, the company of completing Termination process, afterwards steel pipe column inner core concrete in cast, colligation periphery steel reinforcement cage, the outer coagulation of gate spool Soil layer, completes a floor construction;
(4) pour into a mould after due to steel tube concrete superposed column peripheral concrete being, upper floors steel construction portion Give work to carry out with the construction of lower floor concrete parts simultaneously, thus be effectively improved efficiency of construction, Realize framework rapid construction.
CN201310598288.2A 2013-11-22 A kind of construction method to wearing the steel-concrete group frame that bolt type connects Active CN103669565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310598288.2A CN103669565B (en) 2013-11-22 A kind of construction method to wearing the steel-concrete group frame that bolt type connects

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310598288.2A CN103669565B (en) 2013-11-22 A kind of construction method to wearing the steel-concrete group frame that bolt type connects

Publications (2)

Publication Number Publication Date
CN103669565A CN103669565A (en) 2014-03-26
CN103669565B true CN103669565B (en) 2016-11-30

Family

ID=

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003206569A (en) * 2002-01-10 2003-07-25 Shimizu Corp Connection structure of complex structure building
CN1603536A (en) * 2004-10-28 2005-04-06 湖南大学 Round steel pipe concrete column joint for beam column connection and method for manufacturing the same
CN101624842A (en) * 2009-08-06 2010-01-13 清华大学 Hollow sandwich filled steel tubular column-steel beam connection adopting one-way fastening bolt
CN201474083U (en) * 2009-08-04 2010-05-19 华侨大学 Novel steel-concrete combined panel node
CN103306376A (en) * 2013-07-04 2013-09-18 清华大学 Assembled concrete-filled steel tube composite-column-steel reinforced concrete beam node
CN203238783U (en) * 2013-05-20 2013-10-16 山东科技大学 Rectangular concrete filled steel tubular column and steel beam semi-rigid node structure
CN203654455U (en) * 2013-11-22 2014-06-18 清华大学 Steel and concrete combination frame of oppositely-penetrating bolt type connection

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003206569A (en) * 2002-01-10 2003-07-25 Shimizu Corp Connection structure of complex structure building
CN1603536A (en) * 2004-10-28 2005-04-06 湖南大学 Round steel pipe concrete column joint for beam column connection and method for manufacturing the same
CN201474083U (en) * 2009-08-04 2010-05-19 华侨大学 Novel steel-concrete combined panel node
CN101624842A (en) * 2009-08-06 2010-01-13 清华大学 Hollow sandwich filled steel tubular column-steel beam connection adopting one-way fastening bolt
CN203238783U (en) * 2013-05-20 2013-10-16 山东科技大学 Rectangular concrete filled steel tubular column and steel beam semi-rigid node structure
CN103306376A (en) * 2013-07-04 2013-09-18 清华大学 Assembled concrete-filled steel tube composite-column-steel reinforced concrete beam node
CN203654455U (en) * 2013-11-22 2014-06-18 清华大学 Steel and concrete combination frame of oppositely-penetrating bolt type connection

Similar Documents

Publication Publication Date Title
CN208586936U (en) A kind of control protects brick mixed building joist and demolishes walls constructing device
CN105113389A (en) Assembled type bridge pier column member with steel-concrete composite structure
CN108505433B (en) Pier structure and construction method thereof
CN203145194U (en) Internal diaphragm joint of variable flange steel I-beam and square concrete filled steel tubular column
CN101851984B (en) Prefabricated steel-concrete composite beam
CN202831402U (en) Concrete filled steel tubular column with inner-connected circular pipe and outer-sleeved concrete filled steel tube
CN105256917A (en) Prestressed shear wall and vertical joint combining-connecting structure and construction method thereof
CN103104039A (en) Assembled framework beam-column joint adopting cover plate connection and construction method thereof
CN206873730U (en) A kind of steel bar truss floor structure
CN106869326B (en) The frame system and construction method that hollow steel tube concrete integral node is constituted
CN103967206A (en) Combined lattice type hollow component
CN102071747A (en) Joint of square steel tube concrete column and reinforced concrete floor and production method thereof
WO2020098452A1 (en) Anti-seismic and energy-consuming fabricated beam-column joint structure located in plastic zone
CN106638957A (en) Cold-formed thin-walled steel-structure house outer wall structure system
CN106436903B (en) Light gauge cold-formed steel shape house interlayer strengthening part
CN205822459U (en) A kind of assembled post girder construction of building in the style of the ancients
CN108265823A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L-shaped connecting node
CN109267489B (en) Construction method for cable-stayed bridge cable tower anchoring area
CN108678164B (en) Connecting beam type assembled building structure
CN208023735U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam T shape connecting nodes
CN103669565B (en) A kind of construction method to wearing the steel-concrete group frame that bolt type connects
CN103924669B (en) A kind of assembled steel reinforced concrete composite frame structure
CN217537350U (en) Assembled type steel reinforced concrete beam column connecting node with inner and outer steel sleeves
CN206267358U (en) A kind of built-in girder steel shear wall
CN108301562A (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam cross connecting node