CN103661831B - Bow has the Z-drive tug of two anchor winch - Google Patents

Bow has the Z-drive tug of two anchor winch Download PDF

Info

Publication number
CN103661831B
CN103661831B CN201310580941.2A CN201310580941A CN103661831B CN 103661831 B CN103661831 B CN 103661831B CN 201310580941 A CN201310580941 A CN 201310580941A CN 103661831 B CN103661831 B CN 103661831B
Authority
CN
China
Prior art keywords
anchor winch
tubing string
checking bollard
guide part
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310580941.2A
Other languages
Chinese (zh)
Other versions
CN103661831A (en
Inventor
刘林伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU ZHENJIANG SHIPYARD (GROUP) CO Ltd
Original Assignee
JIANGSU ZHENJIANG SHIPYARD (GROUP) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU ZHENJIANG SHIPYARD (GROUP) CO Ltd filed Critical JIANGSU ZHENJIANG SHIPYARD (GROUP) CO Ltd
Priority to CN201310580941.2A priority Critical patent/CN103661831B/en
Publication of CN103661831A publication Critical patent/CN103661831A/en
Application granted granted Critical
Publication of CN103661831B publication Critical patent/CN103661831B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses the Z-drive tug that a kind of bow has two anchor winch, comprise abrasionproof cable bridge, checking bollard and two anchor winches, abrasionproof cable bridge is arranged on the line of centers of ship bow part leading edge main deck; Two anchor winches are symmetricly set on ship bow part main deck line of centers both sides, and distance bulwark is not less than 700mm place, and the distribution in splayed, splay closing in end face is to stem; Checking bollard is between abrasionproof cable bridge and anchor winch, and the distance between checking bollard and anchor winch is less than the distance between checking bollard and abrasionproof cable bridge; Checking bollard is equiped with mooring pipe, and the center of mooring pipe and the interlayer of anchor winch master rotor are positioned at same level; Checking bollard has guide part, the outside of guide part end and the inner side baffle plane of anchor winch master rotor tangent.The present invention is broken down solving single anchor winch, while work problem, cannot also reduce the wearing and tearing of hawser in towing astern operation, such that maintenance cost is lower, degree of safety is higher.

Description

Bow has the Z-drive tug of two anchor winch
Technical field
The present invention relates to a kind of Z-drive tug, particularly relate to the Z-drive tug that a kind of bow has two anchor winch, belong to Marine engineering technical field.
Background technology
If Z-drive tug anchor winch when reality uses of single anchor winch breaks down, then cannot work, bow arranges two anchor winch, and two anchor winches can be for subsequent use each other.
Summary of the invention
Goal of the invention: the present invention is broken down solving single anchor winch, while work problem, cannot also reduce the wearing and tearing of hawser in towing astern operation, such that maintenance cost is lower, degree of safety is higher.
Technical scheme: bow of the present invention has the Z-drive tug of two anchor winch, comprise abrasionproof cable bridge, checking bollard and two anchor winches, abrasionproof cable bridge is arranged on the line of centers of ship bow part leading edge main deck; Two anchor winches are symmetricly set on ship bow part main deck line of centers both sides, and distance bulwark is not less than 700mm place, and the distribution in splayed, splay closing in end face is to stem; Checking bollard is between abrasionproof cable bridge and anchor winch, and the distance between checking bollard and anchor winch is less than the distance between checking bollard and abrasionproof cable bridge; Checking bollard is equiped with mooring pipe, and the center of mooring pipe and the interlayer of anchor winch master rotor are positioned at same level; Checking bollard has guide part, the outside of guide part end and the inner side baffle plane of anchor winch master rotor tangent.Described checking bollard is preferably four post checking bollards, comprises the first guide part be made up of the first vertical tubing string, the second vertical tubing string and the first horizontal tubing string; The support portion that second vertical tubing string, the 3rd vertical tubing string and the second horizontal tubing string are formed; The second guide part that 3rd vertical tubing string, the 4th vertical tubing string and the 3rd horizontal tubing string are formed; Described support portion is perpendicular to main deck line of centers, and the first guide part, the second guide part and main deck line of centers have angle; Described mooring pipe is installed on the second horizontal tubing string of support portion.Further, the level height of described first horizontal tubing string, the 3rd horizontal tubing string is higher than the level height of mooring pipe; First horizontal tubing string, the 3rd horizontal tubing string serve the effect of location for hawser, limiting hawser can not jump out guide part and damage master rotor baffle plate.Preferably, described mooring pipe inside face is coated with stainless steel layer.Described first guide part, the second pilot surface are coated with stainless steel layer.
Beneficial effect: the present invention is broken down solving single anchor winch, while work problem, cannot also reduce the wearing and tearing of hawser in towing astern operation, such that maintenance cost is lower, degree of safety is higher.Two anchor winches are that splayed is symmetricly set on ship bow part main deck line of centers both sides, and hawser is able to inclination angle poly-in main deck line of centers and goes out the guide part that cable to checking bollard is arranged; The outside of guide part end and the inner side baffle plane of anchor winch master rotor tangent, what limit hawser goes out cable angle, is easy to the manipulation of boats and ships, protects windlass master rotor two side shield; Checking bollard also serves the effect of heaving pile simultaneously, and the part that tubing string exceeds can store the towing cable of a part.Retain with bulwark the passage being not less than 700mm, be convenient to the current of crewman; The interlayer of the center of mooring pipe and anchor winch master rotor is placed in same level, reduces the friction of hawser through mooring pipe; Towboat is between operational period, very large work-hours is had to be pushing tow operation, the haulage gear arranged in order to avoid ship bow part when pushing tow operation scratch to the other side's planking, produce extra unnecessary cost, distance between checking bollard and anchor winch is arranged the distance be less than between checking bollard and abrasionproof cable bridge, and from mooring pipe extend hawser not with any form touch of bow except abrasionproof cable bridge, avoid the wearing and tearing of hawser.
Accompanying drawing explanation
Fig. 1 is birds-eye view of the present invention;
Fig. 2 is schematic diagram of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing and instantiation, the present invention is described in detail.
As shown in Figure 1, 2, bow of the present invention has the Z-drive tug of two anchor winch, and comprise abrasionproof cable bridge 1, checking bollard 2 and two anchor winches 3, abrasionproof cable bridge 1 is arranged on the line of centers of ship bow part leading edge main deck; Two anchor winches 3 are symmetricly set on ship bow part main deck line of centers both sides, and distance bulwark is not less than 700mm place, and the distribution in splayed, splay closing in end face is to stem; Checking bollard 2 is between abrasionproof cable bridge 1 and anchor winch 3, and the distance between checking bollard 2 and anchor winch 3 is less than the distance between checking bollard 2 and abrasionproof cable bridge 1; Described checking bollard 2 is four post checking bollards, comprises the first guide part be made up of the first vertical tubing string 8 of vertical tubing string 7, second and the first horizontal tubing string 9; The support portion that second vertical tubing string 8, the 3rd vertical tubing string 10 and the second horizontal tubing string 11 are formed; The second guide part that 3rd vertical tubing string 10, the 4th vertical tubing string 12 and the 3rd horizontal tubing string 13 are formed; Described support portion is perpendicular to main deck line of centers, and the first guide part, the second guide part and main deck line of centers have angle; And the first guide part, the second pilot surface are coated with stainless steel layer; Inner side baffle 6 plane of two anchor winch 3 master rotors 5 respectively with the 4th vertical tubing string 12 of the first vertical tubing string 7, second guide part end of the first guide part end outside tangent; Second horizontal tubing string 11 of support portion is equiped with mooring pipe 4, and the center of mooring pipe 4 and the interlayer of anchor winch 3 master rotor 5 are positioned at same level; The level height of the first horizontal tubing string 9, the 3rd horizontal tubing string 13 is higher than the level height of mooring pipe 4; Restriction hawser can not be jumped out guiding tubing string and damage the baffle plate 6 of master rotor 5.Mooring pipe 4 inside face is coated with stainless steel layer.

Claims (5)

1. a bow has the Z-drive tug of two anchor winch, it is characterized in that, comprise abrasionproof cable bridge (1), checking bollard (2) and anchor winch (3), abrasionproof cable bridge (1) is arranged on the line of centers of bow leading edge main deck; Anchor winch (3) is symmetricly set on bow main deck line of centers both sides, and distance bulwark is not less than 700mm place, and distribute in splayed, splay closing in end face is to stem; Checking bollard (2) is between abrasionproof cable bridge (1) and anchor winch (3), and the distance between checking bollard (2) and anchor winch (3) is less than the distance between checking bollard (2) and abrasionproof cable bridge (1); Checking bollard (2) is equiped with mooring pipe (4), the center of mooring pipe (4) and the interlayer of anchor winch (3) master rotor (5) are positioned at same level; Checking bollard (2) has guide part, the outside of guide part end and inner side baffle (6) plane of anchor winch (3) master rotor (5) tangent.
2. bow according to claim 1 has the Z-drive tug of two anchor winch, it is characterized in that, described checking bollard is four post checking bollards, comprises the first guide part be made up of the first vertical tubing string (7), the second vertical tubing string (8) and the first horizontal tubing string (9); The support portion that second vertical tubing string (8), the 3rd vertical tubing string (10) and the second horizontal tubing string (11) are formed; The second guide part that 3rd vertical tubing string (10), the 4th vertical tubing string (12) and the 3rd horizontal tubing string (13) are formed; Described support portion is perpendicular to main deck line of centers, and the first guide part, the second guide part and main deck line of centers have angle; Described mooring pipe (4) is installed on the second horizontal tubing string (11) of support portion.
3. bow according to claim 2 has the Z-drive tug of two anchor winch, it is characterized in that, the level height of described first horizontal tubing string (9), the 3rd horizontal tubing string (13) is higher than the level height of mooring pipe (4).
4. bow according to claim 1 has the Z-drive tug of two anchor winch, it is characterized in that, described mooring pipe (4) inside face is coated with stainless steel layer.
5. bow according to claim 2 has the Z-drive tug of two anchor winch, it is characterized in that, described first guide part, the second pilot surface are coated with stainless steel layer.
CN201310580941.2A 2013-11-18 2013-11-18 Bow has the Z-drive tug of two anchor winch Active CN103661831B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310580941.2A CN103661831B (en) 2013-11-18 2013-11-18 Bow has the Z-drive tug of two anchor winch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310580941.2A CN103661831B (en) 2013-11-18 2013-11-18 Bow has the Z-drive tug of two anchor winch

Publications (2)

Publication Number Publication Date
CN103661831A CN103661831A (en) 2014-03-26
CN103661831B true CN103661831B (en) 2016-03-02

Family

ID=50300853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310580941.2A Active CN103661831B (en) 2013-11-18 2013-11-18 Bow has the Z-drive tug of two anchor winch

Country Status (1)

Country Link
CN (1) CN103661831B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104097744B (en) * 2014-06-17 2016-08-17 武昌船舶重工集团有限公司 The bulwark of a kind of extraordinary towboat and line style method for trimming thereof
CN113386902B (en) * 2021-07-29 2022-10-11 广船国际有限公司 Mooring method and mooring system of ship and ship
CN114919692B (en) * 2022-06-28 2024-03-01 江苏省镇江船厂(集团)有限公司 Full-rotation towboat cable pressing device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001048083A (en) * 1999-08-03 2001-02-20 Kayaba Ind Co Ltd Mooring device
CN2711040Y (en) * 2004-06-07 2005-07-20 李振国 Multiple ships combination towboat
CN101094788A (en) * 2004-11-03 2007-12-26 欧洲智能有限公司 Tug with movable towing installation
CN101249876A (en) * 2008-04-08 2008-08-27 山东诚基工程建设有限公司 Disanchor equipment and ship craft having the same
JP2009269683A (en) * 2008-04-30 2009-11-19 Os System Kk Rope winch for tugboat
JP2011219239A (en) * 2010-04-12 2011-11-04 Os System Kk Winch for tugboat
CN202279211U (en) * 2011-10-27 2012-06-20 中国国际海运集装箱(集团)股份有限公司 Layout structure for anchoring and mooring fittings of container ship
CN203714157U (en) * 2013-11-18 2014-07-16 江苏省镇江船厂(集团)有限公司 Full-rotation tugboat with two anchor winches at fore body

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001048083A (en) * 1999-08-03 2001-02-20 Kayaba Ind Co Ltd Mooring device
CN2711040Y (en) * 2004-06-07 2005-07-20 李振国 Multiple ships combination towboat
CN101094788A (en) * 2004-11-03 2007-12-26 欧洲智能有限公司 Tug with movable towing installation
CN101249876A (en) * 2008-04-08 2008-08-27 山东诚基工程建设有限公司 Disanchor equipment and ship craft having the same
JP2009269683A (en) * 2008-04-30 2009-11-19 Os System Kk Rope winch for tugboat
JP2011219239A (en) * 2010-04-12 2011-11-04 Os System Kk Winch for tugboat
CN202279211U (en) * 2011-10-27 2012-06-20 中国国际海运集装箱(集团)股份有限公司 Layout structure for anchoring and mooring fittings of container ship
CN203714157U (en) * 2013-11-18 2014-07-16 江苏省镇江船厂(集团)有限公司 Full-rotation tugboat with two anchor winches at fore body

Also Published As

Publication number Publication date
CN103661831A (en) 2014-03-26

Similar Documents

Publication Publication Date Title
CN102381440B (en) Guide chain device
JP5192396B2 (en) Deep-sea ship
CN104229066B (en) A kind of ship mooring localization method
CN102381455A (en) Unilateral positioning method for secondary docking of ship in dock
CN205150165U (en) Ship's fix anchor system
CN103661831B (en) Bow has the Z-drive tug of two anchor winch
CN105083471A (en) Ship positioning anchor system
CN103407552A (en) Counterweight anchor chain of single point mooring system
CN201367096Y (en) Magnetic ship docking device
CN204775850U (en) Roller fairlead
KR20140120150A (en) mooring device and method using magnetic force
CN203714157U (en) Full-rotation tugboat with two anchor winches at fore body
CN106232468B (en) Outer capstan head with steering framing wheel
CN103661813B (en) The method for arranging of the two anchor winch of Z-drive tug bow
CN102358406A (en) Positioning device for secondary pier falling of ship in dock
CN102361315B (en) Three synchronous laying construction method of underground cable in sea area
CN108438153A (en) A kind of cable ship moving device
KR20160073096A (en) Hull Structure for Side-by-side Mooring System of Floating Offshore Structure
CN204659966U (en) A kind of ship cable fender guard
KR101628805B1 (en) Floating marine structure and method for coming alongside between the floating marine structure and shuttle by using anchoring ropes
CN104802925B (en) The method for dismounting of ocean platform propeller
KR20150004186A (en) Mooring apparatus for floating marine structure
CN208181366U (en) A kind of cable ship moving device
CN208278276U (en) A kind of floating body, which is stepped on, multiplies stage apparatus
CN203581342U (en) Full circle swinging type tugboat with towing device arranged on bow

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant