CN103634977A - Energy storage LED street lamp intelligent management system - Google Patents

Energy storage LED street lamp intelligent management system Download PDF

Info

Publication number
CN103634977A
CN103634977A CN201310051862.2A CN201310051862A CN103634977A CN 103634977 A CN103634977 A CN 103634977A CN 201310051862 A CN201310051862 A CN 201310051862A CN 103634977 A CN103634977 A CN 103634977A
Authority
CN
China
Prior art keywords
energy storage
electrically connected
interface
communication
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310051862.2A
Other languages
Chinese (zh)
Other versions
CN103634977B (en
Inventor
黄涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Bersn Opto-Electronics Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310051862.2A priority Critical patent/CN103634977B/en
Publication of CN103634977A publication Critical patent/CN103634977A/en
Application granted granted Critical
Publication of CN103634977B publication Critical patent/CN103634977B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B20/00Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
    • Y02B20/72Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps in street lighting

Landscapes

  • Circuit Arrangement For Electric Light Sources In General (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention provides an energy storage LED street lamp intelligent management system which comprises an energy storage device, an energy storage control device, a lighting device, a lighting control device and a communication device. The energy storage device is electrically connected with the energy storage control device, an external power grid and the lighting device. The lighting device is electrically connected with the energy storage device and the external power grid. The control output interface of the lighting control device is electrically connected with the lighting device. The communication interface is communicated with the communication device which is communicated with terminal control equipment. The lighting device is an LED street lamp. The system is provided with an energy storage module, when the electricity use is in a slack time and the price of electricity is low, the energy storage device is charged to store energy; when the electricity use is in peak time and the price of the electricity is high, the energy storage device discharges; and the supplement of the power grid is realized, and an effect of peak load shifting is achieved. The energy storage LED street lamp intelligent management system also comprises the communication device which is electrically connected with the lighting control device, and the lighting device can be controlled remotely.

Description

Energy storage LED road lamp intelligent management system
Technical field
The present invention relates to street lamp field, especially design a kind of energy storage LED road lamp intelligent management system.
Background technology
At present, especially coastal developed regions, all parts of the country, power supply shortage, the measures such as taked to use electricity in off-peak hours in many areas, power cuts to limit consumption, difference electricity price, alleviate imbalance between power supply and demand.Along with economic fast development, the paces newly-built, enlarging of electrical network do not stop all the time, still, never catch up with the growth of electricity needs, meanwhile, under the cry of energy-conservation, consumption reduction, low-carbon (LC), environmental protection, continue new enlarging generating set, are relatively difficult things yet.And electrical network is in the process of large-scale development; inevitably there is the imbalance of structural unreasonable and current demand; as system installed capacity be difficult to meet the demand of peak load, but when the valley, the outlet that the unnecessary electric energy of having nothing for it but is sought energy storage or drain charge.
Summary of the invention
The object of the present invention is to provide a kind of LED road lamp intelligent management system of can Long-distance Control, can energy storage.
For achieving the above object, the invention provides a kind of energy storage LED road lamp intelligent management system, comprise energy storage device, energy storage control device, lighting device, illumination control apparatus and communication device;
Described energy storage device is provided with control inputs interface, power supply input interface and power supply output interface, and the control inputs interface of energy storage device is electrically connected to energy storage control device, and the power supply input interface of energy storage device is electrically connected to external power grid; Described lighting device is provided with the first power supply input interface, the second power supply input interface and control inputs interface, the first power supply input interface of lighting device is electrically connected to the power supply output interface of energy storage device, and the second power supply input interface of lighting device is electrically connected to external power grid; Illumination control apparatus is provided with controls output interface and communication interface, and the control output interface of illumination control apparatus is electrically connected to the control inputs interface of lighting device, and the communication interface of illumination control apparatus is connected with communication device communication; Described energy storage control device stores the time parameter of peak of power consumption and low power consumption, and within the time period of low power consumption, it is energy storage device charging that energy storage control device is controlled external power grid, and it is lighting device power supply that illumination control apparatus is controlled external power grid; Within the time period of peak of power consumption, under the co-controlling of energy storage control device and illumination control apparatus, energy storage device is lighting device power supply; Described communication device is connected with terminal control device communication; Described lighting device is LED street lamp.
Wherein, energy storage LED road lamp intelligent management system also comprises voltage, the electric weight that can gather energy storage device, the monitoring device of monitoring energy storage device operating state, described monitoring device is provided with input interface and output interface, the input interface of monitoring device is electrically connected to energy storage device, and monitoring device output interface is connected with communication device communication.
Wherein, energy storage LED road lamp intelligent management system also comprises can prevent that energy storage device from overcharging and overdischarge and prevent the protective circuit of lighting device short circuit; described protective circuit is provided with input interface, the first output interface and the second output interface; the input interface of protective circuit is electrically connected to external power grid; the first output interface of protective circuit is electrically connected to lighting device, and the second output interface of protective circuit is electrically connected to energy storage device.
Wherein, described communication device is connected with terminal control device with less radio-frequency, power carrier, 485 buses, GPRS, 2.4G, 3G, 4G, ZigBee and Dali communication standard.
Wherein, described LED street lamp comprises multi-way LED lamp pearl, and every street lamp pearl is electrically connected to illumination control apparatus respectively.
The invention has the beneficial effects as follows: energy storage LED road lamp intelligent management system provided by the invention, be provided with energy-storage module, when low power consumption, electricity price are lower, to energy storage device charging, realize energy storage; When peak of power consumption, electricity price are higher, energy storage device electric discharge, realizes supplementing electrical network to load power supply; Play the effect of peak load shifting.The present invention also comprises communication device, and communication device is electrically connected to illumination control apparatus, can carry out Long-distance Control by the terminal control device illumination apparatus being connected with communication device communication.
Accompanying drawing explanation
Fig. 1 is the schematic appearance of energy storage LED road lamp intelligent management system of the present invention;
Fig. 2 is the block diagram of the first embodiment of the present invention;
Fig. 3 is the block diagram of the second embodiment of the present invention.
Main element symbol description is as follows:
1, energy storage device 2, energy storage control device
3, lighting device 4, illumination control apparatus
5, communication device 6, monitoring device
7, protective circuit 8, external power grid
9, control room
Embodiment
In order more clearly to explain the present invention, below in conjunction with accompanying drawing, the present invention is further described.Consult Fig. 1 and Fig. 2, Figure 1 shows that Fig. 1 of the present invention is the schematic appearance of energy storage LED road lamp intelligent management system provided by the invention, comprise lighting device 3 and control room 9, energy storage device 1, energy storage control device 2, illumination control apparatus 4 and communication device 5 are installed in control room 9.
Fig. 2 is the block diagram of the first embodiment of the present invention.As shown in the figure, the invention provides a kind of energy storage LED road lamp intelligent management system, comprise energy storage device 1, energy storage control device 2, lighting device 3, illumination control apparatus 4 and communication device 5;
Energy storage device 1 is provided with control inputs interface, power supply input interface and power supply output interface, and the control inputs interface of energy storage device 1 is electrically connected to energy storage control device 2, and the power supply input interface of energy storage device 1 is electrically connected to external power grid 8; Lighting device 3 is provided with the first power supply input interface, the second power supply input interface and control inputs interface, the first power supply input interface of lighting device 3 is electrically connected to the power supply output interface of energy storage device 1, and the second power supply input interface of lighting device 3 is electrically connected to external power grid 8; Illumination control apparatus 4 is provided with controls output interface and communication interface, and the control output interface of illumination control apparatus 4 is electrically connected to the control inputs interface of lighting device 3, and the communication interface of illumination control apparatus 4 is connected with communication device 5 communications;
Energy storage control device 2 stores the time parameter of peak of power consumption and low power consumption, and within the time period of low power consumption, it is energy storage device 1 charging that energy storage control device 2 is controlled external power grid 8, and illumination control apparatus is controlled 4 external power grids 8 for lighting device 3 power supplies; Within the time period of peak of power consumption, under the co-controlling of energy storage control device 2 and illumination control apparatus 4, energy storage device 1 is lighting device 3 power supplies;
Communication device 5 is connected with terminal control device communication; Lighting device 4 is LED street lamp.
Lighting device 3 of the present invention has two kinds of supply power modes, and a kind of is directly by external power grid 8, to be powered, and another kind is to power by energy storage device 1.Energy storage device 1 is electrically connected to external power grid 8, and when low power consumption, electricity price are lower, energy storage device 1 charges by external power grid 8, realizes energy storage; When peak of power consumption, electricity price are higher, energy storage device 1 electric discharge, gives lighting device 3 power supplies, realizes supplementing electrical network; Play the effect of peak load shifting.The present invention also comprises communication device 5, and communication device 5 is electrically connected to control device, can carry out Long-distance Control by the terminal control device illumination apparatus 3 being connected with communication device 5 communications.
Fig. 3 is the block diagram of the second embodiment of the present invention.On the basis of the first embodiment, the second embodiment has set up monitoring device 6, and monitoring device 6 is provided with input interface and output interface, and the input interface of monitoring device 6 is electrically connected to energy storage device 1, and the output interface of monitoring device 6 is connected with communication device 5 communications.Monitoring device 6 gathers voltage, the electric weight of energy storage device 1, the operating state of monitoring energy storage device 1, and record charges and discharge number of times and service data, and sends these data messages to communication device 5.Set up after monitoring device 6, we can formulate renewal and the recycle program of energy storage device 1 in advance by energy storage device 1 being charged and discharged to the management in number of times and life-span, shorten and change the ,Fan factory time, and can repeat recycling, reduce purchase cost.
Overcharge and refer to that battery is full of after electricity through certain charging process, then continue the behavior of charging.Overcharge and can make battery distortion, leakage, and its electrical property is being shown reduce.Overdischarge refers to that battery discharges the electric weight of internal reservoir, and voltage reaches after certain value, continues the behavior of electric discharge.Battery over-discharge has a strong impact on the electrical property of battery, and battery capacity obviously decays.
For fear of energy storage device 1, overcharge with overdischarge and prevent lighting device 3 short circuits; the present invention is also provided with protective circuit 7; protective circuit 7 is provided with input interface, the first output interface and the second output interface; the input interface of protective circuit 7 is electrically connected to external power grid 8; the first output interface of protective circuit 7 is electrically connected to lighting device 3, and the second output interface of protective circuit 7 is electrically connected to energy storage device 1.This protective circuit 7, has become the general knowledge in this field, at this, its structure is repeated no more.
Communication device 5 of the present invention is connected with terminal control device with less radio-frequency, power carrier, 485 buses, GPRS, 2.4G, 3G, 4G, ZigBee and Dali communication standard.Terminal equipment can be computer, the Internet, mobile phone etc.Communication device 5 receives the data message that monitoring device 6 sends on the one hand, and these data messages are sent to terminal control device, realizes the remote monitoring to energy storage device 1; The control command of communication device 5 receiving terminal control appliances on the other hand, and these instructions are sent to control device, realize the Long-distance Control of illumination apparatus 3.Above-mentioned connected mode is the communication connected mode of often using now, and the present invention is not limited to this, also can adopt other communication connected mode, as long as can realize communication device 5, is connected with terminal control device communication.
The LED street lamp that the present invention adopts comprises multi-way LED lamp pearl, and every street lamp pearl is electrically connected to illumination control apparatus 4 respectively, and every street lamp pearl is controlled by illumination control apparatus 4 all can independently.Can, by controlling the switch of every lamppost, realize and regulate brightness adjusting and colour temperature like this.At misty rain weather, after midnight, festivals or holidays in particular cases, by brightness adjusting and colour temperature, can make LED street lamp keep optimum operating state, be both well positioned to meet illumination demand, also energy savings to greatest extent.
Advantage of the present invention is: the present invention is provided with communication module, communication module is connected with terminal control device, can and control energy storage device and the work of lighting device by terminal control device remote monitoring, in addition the present invention can also illumination apparatus and energy storage device automatically control.Under normal conditions, adopt automatically and control, intelligence is convenient, and long-range manual control is used for processing special circumstances.
Such as the charge and discharge process of energy storage device, can automatically realize, also can long-range manual control; Street lamp power supply, road lamp power supply pattern can realize automatically, also can long-range manual control; The switch of street lamp, light modulation, color-temperature regulating, can realize automatically, also can long-rangely by computer, the Internet, control.
The operational datas such as the voltage of monitoring device 6 collection energy storage devices 1, electric weight, the operating state of monitoring energy storage device 1, record charges and discharge number of times and service data, and sends these data messages to communication device.We can be according to these data, the work of long-range manual control energy storage device, and such as data have shown the electric weight deficiency in energy storage device, we can Long-distance Control be energy storage device charging.We can also realize management life expectancy of energy storage device (storage battery) and recycling management according to these data, can formulate in advance renewal and the recycle program of energy storage device 1, shorten and change the ,Fan factory time, and can repeat recycling, reduce purchase cost.
The foregoing is only the preferred embodiment of the present invention; it should be pointed out that for those skilled in the art, do not departing under the prerequisite of the technology of the present invention principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (5)

1. an energy storage LED road lamp intelligent management system, is characterized in that, comprises energy storage device, energy storage control device, lighting device, illumination control apparatus and communication device;
Described energy storage device is provided with control inputs interface, power supply input interface and power supply output interface, and the control inputs interface of energy storage device is electrically connected to energy storage control device, and the power supply input interface of energy storage device is electrically connected to external power grid; Described lighting device is provided with the first power supply input interface, the second power supply input interface and control inputs interface, the first power supply input interface of lighting device is electrically connected to the power supply output interface of energy storage device, and the second power supply input interface of lighting device is electrically connected to external power grid; Illumination control apparatus is provided with controls output interface and communication interface, and the control output interface of illumination control apparatus is electrically connected to the control inputs interface of lighting device, and the communication interface of illumination control apparatus is connected with communication device communication;
Described energy storage control device stores the time parameter of peak of power consumption and low power consumption, and within the time period of low power consumption, it is energy storage device charging that energy storage control device is controlled external power grid, and it is lighting device power supply that illumination control apparatus is controlled external power grid; Within the time period of peak of power consumption, under the co-controlling of energy storage control device and illumination control apparatus, energy storage device is lighting device power supply;
Described communication device is connected with terminal control device communication; Described lighting device is LED street lamp.
2. energy storage LED road lamp intelligent management system according to claim 1, it is characterized in that, energy storage LED road lamp intelligent management system also comprises voltage, the electric weight that can gather energy storage device, the monitoring device of monitoring energy storage device operating state, described monitoring device is provided with input interface and output interface, the input interface of monitoring device is electrically connected to energy storage device, and monitoring device output interface is connected with communication device communication.
3. energy storage LED road lamp intelligent management system according to claim 1; it is characterized in that; energy storage LED road lamp intelligent management system also comprises can prevent that energy storage device from overcharging and overdischarge and prevent the protective circuit of lighting device short circuit; described protective circuit is provided with input interface, the first output interface and the second output interface; the input interface of protective circuit is electrically connected to external power grid; the first output interface of protective circuit is electrically connected to lighting device, and the second output interface of protective circuit is electrically connected to energy storage device.
4. energy storage LED road lamp intelligent management system according to claim 1, it is characterized in that, described communication device is connected with terminal control device with less radio-frequency, power carrier, 485 buses, GPRS, 2.4G, 3G, 4G, ZigBee and Dali communication standard, terminal control device is sent to data the server stores of Surveillance center, and accepts user instruction.
5. energy storage LED road lamp intelligent management system according to claim 1, is characterized in that, described LED street lamp comprises multi-way LED lamp pearl, and every street lamp pearl is electrically connected to illumination control apparatus respectively.
CN201310051862.2A 2013-02-17 2013-02-17 Energy storage LED street lamp intelligent management Active CN103634977B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310051862.2A CN103634977B (en) 2013-02-17 2013-02-17 Energy storage LED street lamp intelligent management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310051862.2A CN103634977B (en) 2013-02-17 2013-02-17 Energy storage LED street lamp intelligent management

Publications (2)

Publication Number Publication Date
CN103634977A true CN103634977A (en) 2014-03-12
CN103634977B CN103634977B (en) 2016-12-28

Family

ID=50215469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310051862.2A Active CN103634977B (en) 2013-02-17 2013-02-17 Energy storage LED street lamp intelligent management

Country Status (1)

Country Link
CN (1) CN103634977B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5986901A (en) * 1998-07-09 1999-11-16 Matsushita Electric Works R&D Laboratory, Inc. Power factor correction circuit for a power supply
CN101009961A (en) * 2007-01-23 2007-08-01 鲁莽 Energy-saving control system for the self-adapted luminescence network
CN201910959U (en) * 2010-12-15 2011-07-27 青岛锐晶光电科技有限公司 LED road lamp control system
CN102364804A (en) * 2011-11-14 2012-02-29 合肥联信电源有限公司 Independent electrical energy storage system
CN203289691U (en) * 2013-02-17 2013-11-13 黄涛 Energy storage LED street lamp intelligent management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5986901A (en) * 1998-07-09 1999-11-16 Matsushita Electric Works R&D Laboratory, Inc. Power factor correction circuit for a power supply
CN101009961A (en) * 2007-01-23 2007-08-01 鲁莽 Energy-saving control system for the self-adapted luminescence network
CN201910959U (en) * 2010-12-15 2011-07-27 青岛锐晶光电科技有限公司 LED road lamp control system
CN102364804A (en) * 2011-11-14 2012-02-29 合肥联信电源有限公司 Independent electrical energy storage system
CN203289691U (en) * 2013-02-17 2013-11-13 黄涛 Energy storage LED street lamp intelligent management system

Also Published As

Publication number Publication date
CN103634977B (en) 2016-12-28

Similar Documents

Publication Publication Date Title
CN101534592A (en) Remote monitoring solar street lamp controller based on cell phone network
CN104079238B (en) A kind of solar electric power supply system for tunnel entrances strengthening segment and control method
CN203289691U (en) Energy storage LED street lamp intelligent management system
CN104883779A (en) Solar power generation high-voltage direct-current centralized-power-supply LED street lamp system
KR101167971B1 (en) Controlling method of complex style solar developmental controller
CN105444077A (en) Solar street lamp system based on mutual complementing of commercial power
CN206118131U (en) Street lamp system based on solar energy
CN202634798U (en) Single lamp networking energy saving control terminal
CN204719450U (en) A kind of equipment of Based Intelligent Control multiple stage charging pile
CN201298955Y (en) Power supply control circuit and an illuminator
CN109496030A (en) A kind of solar energy lamp intelligence system
CN202750289U (en) Zigbee-based controller for solar street lamps
CN103634977A (en) Energy storage LED street lamp intelligent management system
WO2014178003A1 (en) Solar-powered mobile devices' battery charger installed in public places
CN204597583U (en) Charging gun
CN204104198U (en) A kind of solar street lamp controller of intelligent PWM light modulation
CN209267250U (en) A kind of solar powered control device and its lighting control system
CN207410577U (en) Heavy duty detergent solar energy illuminating light intelligent controller
CN105554950A (en) Intelligent street lamp control system and control method therefor
CN107508334B (en) Online management system of storage battery pack
CN206077733U (en) A kind of LED street lamp power supply management system with charging pile function
CN206370704U (en) With reference to PLC intelligent charging spot
CN104767238A (en) Power supply management system for public facilities in cities and towns
CN205566705U (en) Streetlight system
CN220874759U (en) Wireless remote control's energy storage formula LED street lamp system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190424

Address after: 518000 4th Floor of Jiaanda Science and Technology Industrial Park, East of Huafang Road, Tongsheng Community, Dalang Street, Longhua District, Shenzhen City, Guangdong Province

Patentee after: SHENZHEN BERSN OPTO-ELECTRONICS CO., LTD.

Address before: 518000 Dalang Street Tongsheng Community Huarong Road, Baoan District, Shenzhen City, Guangdong Province, 1 Building and 2 Floors

Patentee before: Huang Tao

TR01 Transfer of patent right