CN103631571B - The control method and device of a kind of progress bar - Google Patents

The control method and device of a kind of progress bar Download PDF

Info

Publication number
CN103631571B
CN103631571B CN201210299107.1A CN201210299107A CN103631571B CN 103631571 B CN103631571 B CN 103631571B CN 201210299107 A CN201210299107 A CN 201210299107A CN 103631571 B CN103631571 B CN 103631571B
Authority
CN
China
Prior art keywords
progress
current task
task
time
run time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210299107.1A
Other languages
Chinese (zh)
Other versions
CN103631571A (en
Inventor
郭凌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tencent Technology Shenzhen Co Ltd
Original Assignee
Tencent Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tencent Technology Shenzhen Co Ltd filed Critical Tencent Technology Shenzhen Co Ltd
Priority to CN201210299107.1A priority Critical patent/CN103631571B/en
Publication of CN103631571A publication Critical patent/CN103631571A/en
Application granted granted Critical
Publication of CN103631571B publication Critical patent/CN103631571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Debugging And Monitoring (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of control method of progress bar and device, belong to computer safety field.This method includes:Obtain the last time run time of current task;The currently used state of terminal device is obtained, and corresponding factor of influence is determined according to the currently used state;According to the last time run time and the factor of influence of the current task, this run time of the current task is obtained;According to this run time of the current task, this operation progress of control progress bar.The equipment includes:First acquisition module, the second acquisition module, computing module and logging modle.The present invention constantly calculates the run time of current task, progress bar is accurately reflected the implementation status of task, optimize the usage experience of user by obtaining the last time run time of current task and the currently used state of terminal device.

Description

The control method and device of a kind of progress bar
Technical field
The present invention relates to computer safety field, the control method and device of more particularly to a kind of progress bar.
Background technology
Progress bar is terminal device in the task of processing, in real time with the speed of graphic form display processing task, complete Size and the time to be processed may be needed that degree, residue are not completed, the executive process to express task.The use of progress bar Scope is quite extensive, it is every data processing, file read-write, database processing, software installation and unloading etc. processing during all It can use, and the application of progress bar is all embodied by progress, thus it is also just particularly important to the control of progress bar progress.
At present, the control method of progress bar mainly has two kinds:One kind is to calculate required operation before task run first Task number and run total times of all tasks, then according to each task run Mean Speed progress bar control into Degree;It is another to be, in task run, directly according to the Runtime control obtained before by many experiments statistics calculating The operation progress of progress bar processed.
During the present invention is realized, inventor has found that prior art at least has problems with:
The control method of the first existing progress bar, calculating is gone due to needing to consume the substantial amounts of time before task run The task number of required operation and the total time for running all tasks, this just increases the real time of task run, and same The task that terminal device is handled in one time is too many, and progress bar can not accurately reflect tasks carrying progress;Second progress bar Control method, the operation progress that obtained Runtime directly controls progress bar is calculated according to by many experiments statistics, Because the terminal device software of user is different with hardware environment, the progress and task execution time for causing progress bar are mismatched, Such as progress bar is gone to end or completed, and task is also in the situation of execution so that the progress of progress bar can not be accurately anti- Reflect tasks carrying situation.
The content of the invention
In order that the progress of progress bar can accurately reflect the implementation status of task, the embodiments of the invention provide one kind The control method and device of progress bar.The technical scheme is as follows:
The embodiments of the invention provide a kind of control method of progress bar, methods described includes:
Obtain the last time run time of current task;
The currently used state of terminal device is obtained, and corresponding factor of influence is determined according to the currently used state;
According to the last time run time and the factor of influence of the current task, this fortune of the current task is obtained The row time;
According to this run time of the current task, this operation progress of control progress bar.
Wherein, the last time run time for obtaining current task, is specifically included:
When the current task is to run first, then the run time first of the current task is individually calculated, and obtain Take the operation total time first of the current task;
When the current task for it is non-run first when, then directly acquisition current task last time run time;
When the current task includes task and at least one non-running first for task that at least one runs first, The run time first of being run first described in then individually calculating for task, and directly obtain the upper of non-running first for the task Secondary run time, by the run time first of being run first described in calculating for task and non-times run first obtained The last time run time of business adds up, and obtains the last time run time of the current task.
Further, it is described when the current task is to run first, then individually calculate the current task first Run time, and the operation total time first of the current task is obtained, including:
Individually calculate the run time first of the current task;
Run time first according to calculating time for being consumed and described in calculating, obtains the current task first Total time is run, and records the run time first of the current task.
Further, described this run time according to the current task, this operation progress of control progress bar, Also include:
One section of progress bar is reserved at the beginning of the progress bar of the current task, according to the calculating time control consumed The progress of the reserved progress bar.
Wherein, described this run time according to the current task, this operation progress of control progress bar, is also wrapped Include:
When including multiple tasks, buffering area is set between the corresponding progress of each two task;
When the progress of the task in the current task accelerates suddenly, by the buffering area and the task it is corresponding enter Degree merges into implementation progress, controls the progress bar of the task to be run in the implementation progress;
When the progress of the task in the current task can not slowly be completed in corresponding progress, the task is controlled Progress bar runs slowly in the buffering area.
Wherein, after described this run time according to the current task, this operation progress for controlling progress bar, Also include:
After the completion of this operation progress of the progress bar, this run time of the current task is recorded, with toilet Obtained when stating current task operation next time.
The embodiment of the present invention additionally provides a kind of control device of progress bar, and described device includes:
First acquisition module, the last time run time for obtaining current task;
Second acquisition module, the currently used state for obtaining terminal device, and it is true according to the currently used state Fixed corresponding factor of influence;
Computing module, for the last time run time and the factor of influence according to the current task, obtains described work as This run time of preceding task;
Control module, for this run time according to the current task, this operation progress of control progress bar.
Wherein, first acquisition module, is specifically included:
First acquisition unit, during for being run first when the current task, then individually calculates the current task Run time, and obtain the operation total time first of the current task first;
Second acquisition unit, for when the current task for it is non-run first when, then directly acquisition current task it is upper Secondary run time;
3rd acquiring unit, for including the task that at least one runs first and at least one when the current task Non- running first for task, then the run time first of individually being run first described in calculating for task, and directly obtain described non- The last time run time of running first for task, by the run time first of being run first described in calculating for task and acquisition The last time run time of non-running first for the task adds up, and obtains the last time run time of the current task.
Further, the first acquisition unit, is additionally operable to calculate the run time first of the current task;According to institute The calculating time of consumption and the run time first calculated, determine the operation total time first of the current task, and Record the run time first of the current task.
Further, the control module, in addition to:
Prearranged elements, for after the run time first of the current task is calculated, in the progress of the current task One section of progress bar is reserved at the beginning of bar, according to the progress for the progress bar reserved described in the calculating time control consumed.
Wherein, the control module, in addition to:
Setting unit, for when including multiple tasks, buffering area to be set between the corresponding progress of each two task;
Combining unit, for when the progress of the task in the current task accelerates suddenly, by the buffering area and institute State the corresponding progress of task and merge into implementation progress, control the progress bar of the task to be run in the implementation progress;
Deceleration unit, for when the progress of the task in the current task can not slowly be completed in corresponding progress, The progress bar of the task is controlled to be run slowly in the buffering area.
Wherein, described device, in addition to:
Logging modle, for after the completion of this operation progress of the progress bar, recording this of the current task Run time, is obtained during so as to current task operation next time.
The beneficial effect that technical scheme provided in an embodiment of the present invention is brought is:
The control method and device of progress bar provided in an embodiment of the present invention, by the last time run time for obtaining progress bar Record and constantly obtain terminal device currently used state, constantly calculating current task run time, determined with this Determine the operation progress of progress bar, and obtained when this run time is recorded after end of run to run next time, make progress Bar can accurately reflect the implementation status of task, optimize the usage experience of user.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Fig. 1 is a kind of flow chart of the control method for progress bar that the embodiment of the present invention one is provided;
Fig. 2 is a kind of flow chart of the control method for progress bar that the embodiment of the present invention two is provided;
Fig. 3 is a kind of structural representation of the control device for progress bar that the embodiment of the present invention three is provided;
Fig. 4 is a kind of another structural representation of the control device for progress bar that the embodiment of the present invention three is provided.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing to embodiment party of the present invention Formula is described in further detail.
Embodiment one
Fig. 1 is the embodiments of the invention provide a kind of flow chart of the control method of progress bar, referring to Fig. 1, the embodiment Including:
101st, the last time run time of current task is obtained;
102nd, the currently used state of terminal device is obtained, and corresponding factor of influence is determined according to currently used state;
103rd, according to the last time run time and factor of influence of current task, this run time of current task is obtained;
104th, according to this run time of current task, this operation progress of control progress bar.
Wherein, the last time run time of current task is obtained, is specifically included:
Current task obtains current task when running first, then individually to calculate the run time first of current task Operation total time first;
Current task for it is non-run first when, then directly acquisition current task last time run time;
Current task includes the task and at least one non-running first for task that at least one runs first, then individually The run time first of running first for task is calculated, and directly obtains the last time run time of non-running first for task, will The last time run time of the run time first of running first for the task calculated and non-running first for the task obtained adds up, Obtain the last time run time of current task.
Further, current task is when running first, then individually calculates the run time first of current task, and obtains The operation total time first of current task, including:
Individually calculate the run time first of current task;
According to the calculating time consumed and the run time first calculated, when operation is total first of current task is obtained Between, and record the run time first of current task.
Further, according to this run time of current task, this operation progress of control progress bar, in addition to:
One section of progress bar is reserved at the beginning of the progress bar of current task, it is reserved according to the calculating time control consumed Progress bar progress.
Wherein, according to this run time of current task, this operation progress of control progress bar, in addition to:
When including multiple tasks, buffering area is set between the corresponding progress of each two task;
When the progress of task in current task accelerates suddenly, buffering area and the corresponding progress of task are merged into perform into Degree, the progress bar of control task is run in implementation progress;
The progress of task in current task slowly can not be when corresponding progress be completed, and the progress bar of control task is slow Area is rushed to run slowly.
Wherein, according to this run time of current task, after this operation progress for controlling progress bar, in addition to:
After the completion of this operation progress of progress bar, this run time of current task is recorded, so as under current task Obtained during secondary operation.
The control method of progress bar provided in an embodiment of the present invention, the record of the last time run time by obtaining progress bar And the currently used state of terminal device is constantly obtained, the run time of current task is constantly calculated, progress is determined with this The operation progress of bar, and obtained when this run time is recorded after end of run to run next time, enable progress bar Accurately the implementation status of reflection task, improves the usage experience of user.
Embodiment two
Fig. 2 is that the embodiments of the invention provide a kind of flow chart of the control method of progress bar.Referring to Fig. 2, the embodiment Including:
201st, the last time run time of current task is obtained;
Specifically, if current task is when running first, individually calculates the run time first of current task, and obtain Take the operation total time first of current task;
The run time first of current task is individually calculated, a thread can be individually enabled and goes to calculate the head of current task Secondary run time;
According to the calculating time consumed and the run time first calculated, when operation is total first of current task is obtained Between, and record the run time first of current task.Such as current task completes to need 59 seconds, calculates the consumed calculating time For 18 seconds, then the total time of operation first of current task was 77 seconds.
When running current task first, also need to record the run time first of the current task calculated, so as to fortune next time Obtained during row current task.Further, when running current task first, current task has during multiple tasks, it is necessary to count respectively Calculate the run time first of each task in current task, will each Runtime adds up first, obtain current task Run time, and record the run time first of each task first, is obtained during so as to next operation task.
Specifically, if current task for it is non-run first when, directly acquisition current task last time run time;
If current task there are multiple tasks, the last time run time of each task recorded in current task is obtained, And the last time run time of each task adds up, obtain the last time run time of current task.
Specifically, if current task includes task that at least one runs first and at least one non-runs first Task, then individually calculate the run time first of running first for task, and directly obtains the last time of non-running first for task Run time, the last time of the run time first of running first for the task of calculating and non-running first for the task obtained is transported The row time adds up, and obtains the last time run time of current task.
If there is multiple tasks in current task, and some tasks are to run first, and some tasks are run first to be non-, single Solely calculate the run time first of running first for task, and by the run time first of running first for the task calculated and The last time run time for the non-operation task first being directly obtained be added, obtain the last time run time of current task.
202nd, the currently used state of terminal device is obtained, and corresponding factor of influence is determined according to currently used state;
Specifically, because the currently used state such as cpu usage and internal memory service condition of terminal device are continuous Change, so obtaining once currently used state when needing according to the default time or often having performed a task, constantly Ground obtains currently used state, and corresponding factor of influence is determined according to the currently used state of acquisition;
Such as, factor of influence when currently used state is extremely busy commonplace is 1.8, influence when currently used state is busy The factor is 1.4, and factor of influence when currently used state is normal is 1, and factor of influence when currently used state is the free time is 0.8, factor of influence when currently used state is very idle is 0.5.Wherein, the determination of factor of influence can be by repeatedly counting Calculate and obtain to or according to predetermined rule.
203rd, according to the last time run time and factor of influence of current task, this run time of current task is obtained;
Specifically, the last time run time and factor of influence of current task are done into product, obtained operation result as work as This run time of preceding task;The last time run time of such as current task is 100 seconds, when currently used state is busy Factor of influence is 1.4, then this run time of current task is 140 seconds.
204th, according to this run time of current task, this operation progress of control current task;
Specifically, according to this run time of current task, on a progress bar equal control this operation progress.
Wherein, when current task includes multiple tasks, buffering area is set between the corresponding progress of each two task;
If the progress of the task in current task accelerates suddenly, buffering area and the corresponding progress of task are merged into and held Traveling degree, the progress bar of control task is run in implementation progress;
If the progress of the task in current task slowly can not be when corresponding progress be completed, the progress bar of control task Run slowly in buffering area.
Further, according to this run time of current task, this operation progress of control progress bar, in addition to:
If running current task first, one section of progress bar is reserved at the beginning of the progress bar of current task, according to institute The progress of the reserved progress bar of the calculating time control of consumption.Because the calculating needs of run time first for calculating current task disappear The regular hour is consumed, so one section of progress will be reserved at the beginning of the progress bar of current task in the embodiment of the present invention, so as to The calculating of current task run time is completed, prevents from making user feel that progress bar is motionless when calculating current task run time Cause the illusion crashed.
205th, after the completion of this operation progress of progress bar, this run time of current task is recorded, so as to as predecessor Obtained during progress bar operation next time of business.
Specifically, after the completion of this operation progress of progress bar, i.e., it is necessary to when recording this operation after the completion of current task Between local, directly obtained during so as to operation current task next time.
The control method of progress bar provided in an embodiment of the present invention, the record of the last time run time by obtaining progress bar And the currently used state of terminal device is constantly obtained, the run time of current task is constantly calculated, progress is determined with this The operation progress of bar, and obtained when this run time is recorded after end of run to run next time, enable progress bar Accurately the implementation status of reflection task, improves the usage experience of user.
Embodiment three
Fig. 3 is that, the embodiments of the invention provide a kind of control device of progress bar, referring to Fig. 3, the equipment includes:
First acquisition module 301, the last time run time for obtaining current task;
Second acquisition module 302, the currently used state for obtaining terminal device, and determined according to currently used state Corresponding factor of influence;
Computing module 303, for the last time run time and factor of influence according to current task, obtains the sheet of current task Secondary run time;
Control module 304, for this run time according to current task, this operation progress of control progress bar.
Wherein, the first acquisition module 301, is specifically included:
First acquisition unit, is when running first, then when individually calculating the operation first of current task for current task Between, and obtain the operation total time first of current task;
Second acquisition unit, for current task for it is non-run first when, then directly obtain current task last time run Time;
3rd acquiring unit, includes task that at least one runs first for current task and at least one is non-first The task of operation, then individually calculate the run time first of running first for task, and directly obtains non-running first for task Last time run time, by the run time first of running first for the task of calculating and non-running first for the task obtained Last time run time adds up, and obtains the last time run time of current task.
Further, first acquisition unit, is additionally operable to calculate the run time first of current task;According to the meter consumed Evaluation time and the run time first calculated, determine the operation total time first of current task, and record the head of current task Secondary run time.
Further, control module 304, in addition to:
Prearranged elements, for after the run time first of current task is calculated, in the beginning of the progress bar of current task Place reserves one section of progress bar, the progress for the progress bar reserved according to the calculating time control consumed.
Wherein, control module 304, in addition to:
Setting unit, for when including multiple tasks, buffering area to be set between the corresponding progress of each two task;
Combining unit, when the progress for the task in current task accelerates suddenly, by buffering area and task it is corresponding enter Degree merges into implementation progress, and the progress bar of control task is run in implementation progress;
Deceleration unit, the progress for the task in current task can not slowly be controlled to appoint when corresponding progress is completed The progress bar of business runs slowly in buffering area.
Wherein, referring to Fig. 4, the device also includes:
Logging modle 305, for after the completion of this operation progress of progress bar, during this operation of record current task Between, obtained during so as to current task operation next time.
The control device of progress bar provided in an embodiment of the present invention, the record of the last time run time by obtaining progress bar And the currently used state of terminal device is constantly obtained, the run time of current task is constantly calculated, progress is determined with this The operation progress of bar, and obtained when this run time is recorded after end of run to run next time, enable progress bar Accurately the implementation status of reflection task, improves the usage experience of user.
It should be noted that:The control device for the progress bar that above-described embodiment is provided is when controlling progress bar, only with above-mentioned The division progress of each functional module is for example, in practical application, as needed can distribute above-mentioned functions by different Functional module is completed, i.e., the internal structure of the control device of progress bar is divided into different functional modules, retouched with completing the above The all or part of function of stating.In addition, the control device and the control method of progress bar of the progress bar that above-described embodiment is provided Embodiment belongs to same design, and it implements process and refers to embodiment of the method, repeats no more here.
One of ordinary skill in the art will appreciate that realizing that all or part of step of above-described embodiment can be by hardware To complete, the hardware of correlation can also be instructed to complete by program, described program can be stored in a kind of computer-readable In storage medium, storage medium mentioned above can be read-only storage, disk or CD etc..
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (8)

1. a kind of control method of progress bar, it is characterised in that methods described includes:
Obtain the last time run time of current task;
Wherein, the last time run time for obtaining current task, including:It is when the current task is to run first, then single The run time first of the current task is solely calculated, and obtains the operation total time first of the current task;
The currently used state of terminal device is obtained, and corresponding factor of influence is determined according to the currently used state;
According to the last time run time and the factor of influence of the current task, when obtaining this operation of the current task Between;
According to this run time of the current task, this operation progress of control progress bar;
Wherein, described this run time according to the current task, this operation progress of control progress bar, including:When The current task is when running first, one section of progress bar to be reserved at the beginning of the progress bar of the current task, according to institute The progress for the progress bar reserved described in the calculating time control of consumption.
2. it is according to the method described in claim 1, it is characterised in that described when the current task is to run first, then single The run time first of the current task is solely calculated, and obtains the operation total time first of the current task, including:
Individually calculate the run time first of the current task;
Run time first according to calculating time for being consumed and described in calculating, obtains the operation first of the current task Total time, and record the run time first of the current task.
3. according to the method described in claim 1, it is characterised in that described this run time according to the current task, This operation progress of progress bar is controlled, in addition to:
When including multiple tasks, buffering area is set between the corresponding progress of each two task;
When the progress of the task in the current task accelerates suddenly, the buffering area and the corresponding progress of the task are closed And be implementation progress, control the progress bar of the task to be run in the implementation progress;
When the progress of the task in the current task can not slowly be completed in corresponding progress, the progress of the task is controlled Bar runs slowly in the buffering area.
4. according to the method described in claim 1, it is characterised in that described this run time according to the current task, After this operation progress for controlling progress bar, in addition to:
After the completion of this operation progress of the progress bar, this run time of the current task is recorded, is worked as so as to described Obtained during preceding operation task next time.
5. a kind of control device of progress bar, it is characterised in that described device includes:
First acquisition module, the last time run time for obtaining current task;
Wherein, first acquisition module includes first acquisition unit, and the first acquisition unit is used to work as the current task During to run first, then the run time first of the current task is individually calculated, and obtain the fortune first of the current task Row total time;
Second acquisition module, the currently used state for obtaining terminal device, and according to the currently used state determination pair The factor of influence answered;
Computing module, for the last time run time and the factor of influence according to the current task, obtains described as predecessor This run time of business;
Control module, for this run time according to the current task, this operation progress of control progress bar;
Wherein, the control module includes Prearranged elements, and the Prearranged elements are used for when the current task is to run first, One section of progress bar is reserved at the beginning of the progress bar of the current task, is reserved according to described in the calculating time control consumed Progress bar progress.
6. device according to claim 5, it is characterised in that the first acquisition unit, is additionally operable to calculate described current The run time first of task;Run time first according to calculating time for being consumed and described in calculating, it is determined that described work as The operation total time first of preceding task, and record the run time first of the current task.
7. device according to claim 5, it is characterised in that the control module, in addition to:
Setting unit, for when including multiple tasks, buffering area to be set between the corresponding progress of each two task;
Combining unit, for when the progress of the task in the current task accelerates suddenly, by the buffering area and described Corresponding progress of being engaged in merges into implementation progress, controls the progress bar of the task to be run in the implementation progress;
Deceleration unit, for when the progress of the task in the current task can not slowly be completed in corresponding progress, controlling The progress bar of the task runs slowly in the buffering area.
8. device according to claim 5, it is characterised in that described device, in addition to:
Logging modle, this operation for after the completion of this operation progress of the progress bar, recording the current task Time, obtained during so as to current task operation next time.
CN201210299107.1A 2012-08-21 2012-08-21 The control method and device of a kind of progress bar Active CN103631571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210299107.1A CN103631571B (en) 2012-08-21 2012-08-21 The control method and device of a kind of progress bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210299107.1A CN103631571B (en) 2012-08-21 2012-08-21 The control method and device of a kind of progress bar

Publications (2)

Publication Number Publication Date
CN103631571A CN103631571A (en) 2014-03-12
CN103631571B true CN103631571B (en) 2017-09-22

Family

ID=50212672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210299107.1A Active CN103631571B (en) 2012-08-21 2012-08-21 The control method and device of a kind of progress bar

Country Status (1)

Country Link
CN (1) CN103631571B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105988913B (en) * 2015-02-27 2019-06-28 阿里巴巴集团控股有限公司 A kind of tempo instructions method and process indicating device
US10289281B2 (en) 2015-11-30 2019-05-14 International Business Machines Corporation Progress bar updated based on crowd sourced statistics
CN108399092B (en) * 2018-02-27 2021-04-06 北京酷我科技有限公司 Method for generating segmented progress bar

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1540516A (en) * 2003-04-22 2004-10-27 英业达股份有限公司 Method of carrying out testing state of application program in preset timing through interactive routine
CN102141953A (en) * 2011-04-01 2011-08-03 奇智软件(北京)有限公司 Method and device for showing progress bar
CN102207863A (en) * 2011-04-01 2011-10-05 奇智软件(北京)有限公司 Method and device for controlling progress bar to advance

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7110995B2 (en) * 2002-02-27 2006-09-19 International Business Machines Corporation Apparatus and method for generating graphic presentation of estimated time of completion of a server request
US7213059B2 (en) * 2002-10-17 2007-05-01 International Business Machines Corporation Method, apparatus, and computer program product to determine the progress of Web page downloads
US20070168861A1 (en) * 2006-01-17 2007-07-19 Bell Denise A Method for indicating completion status of user initiated and system created tasks

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1540516A (en) * 2003-04-22 2004-10-27 英业达股份有限公司 Method of carrying out testing state of application program in preset timing through interactive routine
CN102141953A (en) * 2011-04-01 2011-08-03 奇智软件(北京)有限公司 Method and device for showing progress bar
CN102207863A (en) * 2011-04-01 2011-10-05 奇智软件(北京)有限公司 Method and device for controlling progress bar to advance

Also Published As

Publication number Publication date
CN103631571A (en) 2014-03-12

Similar Documents

Publication Publication Date Title
Lu et al. Log-based abnormal task detection and root cause analysis for spark
CN103631571B (en) The control method and device of a kind of progress bar
US8151250B2 (en) Program trace method using a relational database
CN106980538A (en) The method and device of data processing
CN110427256A (en) Job scheduling optimization method, equipment, storage medium and device priority-based
CN109064538A (en) View rendering method, apparatus, storage medium and intelligent terminal
CN103812713A (en) Method and apparatus for testing webpage loading time
CN115150471B (en) Data processing method, apparatus, device, storage medium, and program product
CN104375912A (en) Method and device for measuring blockage of mobile terminal
CN103279846A (en) Project acceptance method and system based on BIM model
CN109426603A (en) A kind of method and apparatus for analyzing application program Caton
CN110287038A (en) Promote the method and system of the data-handling efficiency of Spark Streaming frame
CN104572301A (en) Resource distribution method and system
CN102521855A (en) Handwriting regulation method and device based on touch platform
CN104484282A (en) Internal storage recovery method and device
CN103793316A (en) Software performance determining method and system
DE102013109250B4 (en) Low power application execution in a low utilization data processing device of a graphics processing unit
CN110851297A (en) Method, device, system and medium for processing interface jitter state
CN104251913B (en) Rotating machinery monitors system start and stop intelligent determination method
CN111159124B (en) Asynchronous write caching method, device and medium for Linux kernel file system
WO2020224218A1 (en) Hbase-based data writing method, system, device, and readable storage medium
CN105573877A (en) Information processing method and electronic equipment
CN109032775A (en) A kind of method, terminal device and storage medium obtaining Task Progress
CN108198582A (en) A kind of NAND Flash control methods, device and SSD
CN115713395A (en) Flink-based user wind control management method, device and equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant