CN103629470A - Pipeline nonstop-transmission holing and plugging system and process method thereof - Google Patents

Pipeline nonstop-transmission holing and plugging system and process method thereof Download PDF

Info

Publication number
CN103629470A
CN103629470A CN201310680994.1A CN201310680994A CN103629470A CN 103629470 A CN103629470 A CN 103629470A CN 201310680994 A CN201310680994 A CN 201310680994A CN 103629470 A CN103629470 A CN 103629470A
Authority
CN
China
Prior art keywords
pipeline
upper joint
joint sleeve
gate valve
sleeve cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310680994.1A
Other languages
Chinese (zh)
Inventor
张俊
徐复盛
蔡宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Hydrau Mechanical & Electronic Engineering Co Ltd
Original Assignee
Shanghai Hydrau Mechanical & Electronic Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Hydrau Mechanical & Electronic Engineering Co Ltd filed Critical Shanghai Hydrau Mechanical & Electronic Engineering Co Ltd
Priority to CN201310680994.1A priority Critical patent/CN103629470A/en
Publication of CN103629470A publication Critical patent/CN103629470A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/10Means for stopping flow from or in pipes or hoses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B9/00Cleaning hollow articles by methods or apparatus specially adapted thereto 
    • B08B9/02Cleaning pipes or tubes or systems of pipes or tubes
    • B08B9/027Cleaning the internal surfaces; Removal of blockages
    • B08B9/04Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes
    • B08B9/043Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes
    • B08B9/0436Cleaning the internal surfaces; Removal of blockages using cleaning devices introduced into and moved along the pipes moved by externally powered mechanical linkage, e.g. pushed or drawn through the pipes provided with mechanical cleaning tools, e.g. scrapers, with or without additional fluid jets
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/18Appliances for use in repairing pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)

Abstract

The invention discloses a pipeline nonstop-transmission holing and plugging system and a process method thereof. The system comprises a bracket, a pipeline roundness recovering device and a pressured pipeline cleaning device, wherein the bracket adopts a steel saddle-shaped bracket and is connected with a nonstop-transmission holing and plugging operating pipeline; the pipeline roundness recovering device is integrally made of aluminum alloy material and is installed in a position, which is required to be holed, of the nonstop-transmission holing and plugging operating pipeline; the pressured pipeline cleaning device is installed on the steel saddle-shaped bracket. The pipeline nonstop-transmission holing and plugging system meets the requirements of polyethylene pipeline nonstop-transmission holing and plugging and the special requirement on the ellipticity of the inner wall of the pipeline when a gas polyethylene pipeline is plugged, is high in structural strength and reliable in connection, has good pressure resistance and shock resistance and a simple structure, and is convenient and practical.

Description

Pipeline is stopping transportation plugging holes system and technological method thereof not
Technical field
The present invention relates to not stopping transportation plugging holes system of a kind of pipeline, also relate to the not technological method of stopping transportation plugging holes system of a kind of pipeline.
Background technique
Polyethylene pipe is for the conveying of combustion gas etc., has the features such as long, corrosion-resistant, easy construction of life-span, in industries such as combustion gas, water supply, obtained extensive utilization.In the evolution of Gas Polyethylene pipeline network construction, often can run into existing Gas Polyethylene relocation of services changes its course, some areas pipeline is abolished, the various situations such as embedding threeway on original pipeline, if take original operation technique of stopping the supple of gas or steam that main valve or polyethylene flattening instrument are died of closing, to large size user be caused to the long-time impact of interrupting of air feed, and bring direct economic loss, in addition, use polyethylene pipe flattening instrument to die, to being greater than the middle pressure pipe of 200mm and being greater than the low pressure pipeline of 63mm, common every side needs two groups to flatten instrument, between flattening instrument and flattening instrument, and need certain distance between flattening instrument and polyethylene weld bond, therefore traditional band crimping branch technique needs a large amount of man power and materials, and need very large working space, adopt the operation of dying of polyethylene flattening instrument to cause damage to line for polyethylene gas pipes simultaneously.
At present, existing line for polyethylene gas pipes not stopping transportation plugging holes technology be not still well positioned to meet the specific (special) requirements of pressure piping installation license; Because the distinctive not garden of polyethylene pipe degree impact, particularly in-service line for polyethylene gas pipes are after long-time running, pipeline Bu garden degree increases, and causes in stopping transportation perforate operation, not being difficult to realize effective shutoff at existing line for polyethylene gas pipes simultaneously; And in not stopping transportation plugging holes operation process with pressure, requirement to the perforate operation turbidity test of pipeline reach noresidue, without blanking, avoid follow-up shutoff work surface to cause the tightly impact of shutoff, perforate residue also will pollute for whole pipeline, cause the fault such as not smooth of pipe network operation.
Summary of the invention
The object of the present invention is to provide not stopping transportation plugging holes system of a kind of pipeline, this system can meet the requirement of pressure piping installation license, realizes effective shutoff, and has improved the turbidity test of perforate operation.
Goal of the invention of the present invention is achieved by the following technical solution:
Pipeline is a stopping transportation plugging holes system not, comprises support, pipeline fourth contact device and pipeline with pressure cleaning apparatus, and described support is the saddle type support of steel material, is connected with stopping transportation plugging holes operation pipeline not; Described pipeline fourth contact device integral body is to be made by aluminum alloy material, is arranged on the position of the not required perforate of stopping transportation plugging holes operation pipeline; Described pipeline with pressure cleaning apparatus is arranged on the saddle type support of described steel material.
Further, the saddle type support of described steel material is to be connected with stopping transportation plugging holes operation pipeline not by seal ring.
Further, described pipeline fourth contact device is comprised of upper lower slips and bolt.
Further, described pipeline with pressure cleaning apparatus comprises scraping board and the cleaning skirt of cleaning pipe and lower end thereof.
The saddle type supporting structure intensity of above-mentioned steel material is high, it is reliable to connect, pressure-proof and impact resistance is good, and material high and low temperature resistance is good, is better than line for polyethylene gas pipes material aspect structural strength; Between saddle type support and perforate pipeline, adopt seal ring, sealing is tight, and shock-resistant, corrosion-resistant, the life-span is long, and connection flexibility and reliability has simple to operately, and preparation of construction is few, easy operation, the advantage of reliable performance.Described pipeline fourth contact device adopts aluminum alloy casting, by upper lower slips and high-strength bolt, formed, structural strength is high, lightweight, be convenient to disassembling section, can any direction flattening deformation be no more than to the circularity of 20% old spool road fourth contact to 98% in 60 minutes, while meeting shutoff for the requirement of inner-walls of duct circularity.And fourth contact speed is fast, and fourth contact is effective, in fourth contact process, pipeline is not carried out to destructive procedure.Described pipeline with pressure cleaning apparatus, adopt the scraping of flexible cleaning skirt thoroughly to clean the post-job tube wall residue of perforate, and utilize and manage diffusing of inner high voltage gas, residual bore operation polyethylene chip blanking thing is taken out of with the discharge of pressurized gas, thoroughly reached the discharge completely to residue in pipeline.
Another object of the present invention is to provide the not technological method of stopping transportation plugging holes system of a kind of pipeline, it is characterized in that, comprises following process step:
1) determine the pipeline position need to carry out plugging holes operation, carry out pipeline excavation before non-stop plugging operation and the cleaning work of pipeline surface;
2) carry out the fourth contact operation of pipeline, two fourth contact devices are installed in parallel on the position of required perforate, tighten locking nut until turn motionless till, after spending 30 minutes, carry out once more fastening, to turn motionless till, after this every 10 minutes once fastening, until be tightened onto stop collar position, within about 60 minutes, completes fourth contact;
3) carry out saddle type support and frame installation exercise, first remove a fourth contact slips group of fourth contact operation, and plugging device saddle type support is arranged on to the position of removing, screw nut between the upper and lower of saddle type support until reach stop collar position and twist motionless, then frame is arranged on the land of saddle type support, finally by the pinch tube locking of frame both sides;
4) the fourth contact device slips group shifting out is arranged on to frame near saddle type bracket side, and carries out fastening until be tightened onto stop collar;
5) carry out perforate operation, first the selected operation boring cutter size for the treatment of, and be arranged on perforator, the blade of boring cutter is smeared to a small amount of lubricant oil, unclamp and land between locking locknut, open frame gate valve to enable possition, perforator is put into frame, and drilling rod main shaft is transferred to blade drill and countersink and PE pipe outer wall 2-3cm position, bolt between locking land and upper joint sleeve cylinder, after confirmation, screw and land between locking locknut, then clockwise rotate boring cutter feeding handle, slow decreasing carries out perforate operation; After dropping to graduation line, main shaft shows that perforate completes, now the pressure gauge show value on frame upper joint sleeve cylinder is current pipeline predetermined pressure, reversion feeding handle, until screw thread is outwarded winding, now unclamp the locking locknut on land, slowly promote perforate main shaft to more than gate valve, close rapidly gate valve, unclamp the bolt between perforator land and upper joint sleeve cylinder, take out perforator;
6) carry out pipe-line purging operation, check cleaning apparatus, and cleaning pipe ball valve is rotated in closed position, bleeding device is inserted to upper joint sleeve cylinder, bolt between locking land and upper joint sleeve cylinder, after confirmation, opening gate valve balance bleeding device is designated as after pipeline predetermined pressure until upper joint sleeve cylinder pressure, rotate gate valve to enable possition, then hold and diffuse operating grip and be depressed into extreme lower position, and rotation scraping 3-5 circle, then mention 3-5cm and open exhaust stack ball valve, diffuse until do not have foreign material discharge to stop ball valve rotating to closed position, mention exhaust stack to the above position of gate valve, rapid closing gate valve, unclamp the bolt between cleaning apparatus and coupling sleeve, take out bleeding device,
7) carry out shutoff operation, before operation, check the integrity of plugging leather cup and connect whether flexibly, whether the plane after leather cup launches is smooth, check after confirmation, blocking machine leather cup is shunk and inserted in upper joint sleeve cylinder, and whether the direction of confirming leather cup aligns with frame marking line, then lock the bolt between land and upper joint sleeve cylinder, after confirmation, opening gate valve balance bleeding device is designated as after pipeline predetermined pressure until upper joint sleeve cylinder pressure, rotate gate valve to enable possition, slowly shutoff main shaft is transferred to entering swivel nut, then keep major axes orientation constant, rotation swivel nut slowly makes main shaft decline, enter in PE pipe and leather cup is launched completely, counterrotating 1-2 circle, at this moment the pressure show value of upper joint sleeve cylinder is exactly the pipeline pressure value after shutoff, now shutoff operation completes,
8) repeating step 1-7 carries out the plugging holes operation of downstream position;
9) complete after the construction operation of shutoff region, from down, swim over to upstream detaching device, backfill operation.
Pipeline provided by the invention not stopping transportation plugging holes system has adapted to the not requirement of stopping transportation plugging holes of line for polyethylene gas pipes, and the saddle type supporting structure intensity of steel material is high, it is reliable to connect, pressure-proof and impact resistance is good; Meanwhile, adopt the pipeline fourth contact device of integral Al-alloy, while having met line for polyethylene gas pipes shutoff for the specific (special) requirements of inner-walls of duct out of roundness; Pipeline with pressure cleaning apparatus, adopts the drive of high pressure draught and the cleaning work mode of the scraping of flexible cleaning skirt use, cleans clean noresidue, guarantees the not reliability of stopping transportation plugging holes.This system has well met the not requirement of stopping transportation plugging holes operation of line for polyethylene gas pipes, simple in structure, convenient and practical.
Accompanying drawing explanation
Fig. 1 is not stopping transportation plugging holes system architecture schematic diagram of pipeline of the present invention;
Fig. 2 is fourth contact apparatus structural representation of the present invention;
Fig. 3 is saddle type supporting structure schematic diagram of the present invention;
Fig. 4 is perforate operation schematic diagram of the present invention;
Fig. 5 is cleaning work schematic diagram of the present invention;
Fig. 6 is shutoff operation schematic diagram of the present invention;
Fig. 7 is lower obstruction operation schematic diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing, preferred forms of the present invention is further described in detail.
As shown in Fig. 1-7, a kind of pipeline is stopping transportation plugging holes system not, comprises support 1, pipeline fourth contact device 2 and pipeline with pressure cleaning apparatus 3, and support 1 is the saddle type support 1 of steel material, is connected with stopping transportation plugging holes operation pipeline 4 not; Pipeline fourth contact device 2 integral body are to be made by aluminum alloy material, are arranged on the position of not stopping transportation plugging holes operation pipeline 4 required perforates; Pipeline with pressure cleaning apparatus 3 with pressure is arranged on the saddle type support 1 of described steel material.The saddle type support 1 of steel material is to be connected with stopping transportation plugging holes operation pipeline 4 not by seal ring 5.Pipeline fourth contact device 2 is comprised of upper lower slips 6 and bolt 7.Pipeline with pressure cleaning apparatus 3 comprises scraping board 9 and the cleaning skirt 10 of cleaning pipe 8 and lower end thereof.
Pipeline is a technological method for stopping transportation plugging holes system not, comprises following process step:
1, determine the pipeline position need to carry out plugging holes operation, carry out pipeline excavation before non-stop plugging operation and the cleaning work of pipeline surface.
2, carry out the fourth contact operation of pipeline, two fourth contact devices 2 are installed in parallel on the position of required perforate, tighten locking nut until turn motionless till, after spending 30 minutes, carry out once more fastening, to turn motionless till, after this every 10 minutes once fastening, until be tightened onto stop collar position, within about 60 minutes, completes fourth contact.
3, carry out saddle type support and frame installation exercise, first remove a fourth contact slips group of fourth contact operation, and plugging device saddle type support 1 is arranged on to the position of removing, the installation situation of inspection saddle type support 1 inner seal ring 5 and whether intact, screw nut between the upper and lower of saddle type support 1 until reach stop collar position and twist motionless, then frame is arranged on the land 18 of saddle type support 1, check the integrity degree of land 18 middle asbestos seal pads, finally by the pinch tube locking of frame both sides.
4, the fourth contact device slips group shifting out is arranged on to frame near a side of saddle type support 1, and carries out fastening until be tightened onto stop collar.
5, carry out perforate operation, first selected operation boring cutter 15 sizes for the treatment of, and be arranged on perforator 12, the blade of boring cutter 15 is smeared to a small amount of lubricant oil, unclamp and land 18 between locking locknut, open frame gate valve 14 to enable possition, perforator 12 is put into frame, and drilling rod main shaft is transferred to blade drill and countersink and PE pipe outer wall there is 2.5cm position, bolt between locking land 18 and upper joint sleeve cylinder 13, rotatable handle 11 after confirming, screw and land 18 between locking locknut, then clockwise rotate boring cutter 15 feeding handles 19, slow decreasing carries out perforate operation, perforate dynamics arrives heavy and then light on the lenient side, when main shaft drops to after graduation line, show that perforate completes.Now the pressure gauge show value on frame upper joint sleeve cylinder is current pipeline predetermined pressure.Reversion feeding handle 19, main shaft slowly rises, until screw thread is outwarded winding.Now unclamp the locking locknut on land 18, slowly promote perforate main shaft till gate valve more than 14.Closing gate valve 14, unclamps the bolt between perforator land 18 and upper joint sleeve cylinder 13 rapidly, takes out perforator 12.
6, carry out pipe-line purging operation, check cleaning apparatus, and cleaning pipe ball valve 16 is rotated in closed position.Bleeding device is inserted to upper joint sleeve cylinder 13, the bolt between locking land 18 and upper joint sleeve cylinder 13.After confirmation, open gate valve balance bleeding device and be designated as after pipeline predetermined pressure until upper joint sleeve cylinder 13 pressure, rotate gate valve 14 to enable possition.Then hold and diffuse operating grip 17 and be depressed into extreme lower position, and rotation scraping 4 circles, then mention a little 4cm and open exhaust stack ball valve, diffuse until do not have foreign material to discharge to stop ball valve rotating to closed position.Mention exhaust stack to the above position of gate valve 14, rapidly closing gate valve.Unclamp the bolt between cleaning apparatus and coupling sleeve, take out bleeding device.
7, carry out shutoff operation, check whether the integrity of plugging leather cup 20 and connection be flexible before operation, whether the plane after leather cup 20 launches is smooth.Check after confirmation, blocking machine leather cup 20 is shunk and inserted in upper joint sleeve cylinders 13, and confirm whether the direction of leather cup 20 aligns with frame marking line.Then lock the bolt between land 18 and upper joint sleeve cylinder 13.After confirmation, open gate valve balance bleeding device and be designated as after pipeline predetermined pressure until upper joint sleeve cylinder pressure, rotate gate valve 14 to enable possition.Slowly shutoff main shaft is transferred to entering swivel nut, in decentralization process, keep calibrating main direction consistent with frame graduation line direction.Then keep major axes orientation constant, rotation swivel nut slowly makes main shaft decline, and enters in PE pipe and leather cup 20 is launched completely.When main shaft drops to the position that can not decline again, be that leather cup 20 launches completely, counterrotating 2 circles.At this moment the pressure show value of upper joint sleeve cylinder 13 is exactly the pipeline pressure value after shutoff, and now shutoff operation completes.
8, repeating step 1-7 carries out the plugging holes operation of downstream position.
9, complete after the construction operation of shutoff region, first carry out the dismounting of downstream blocking device, the feeding handle of counterrotating blocking machine, slowly packs up plugging leather cup, and it is brisk rapidly that in the process rising at main shaft, appropriate left-right rotation main shaft makes the recovery of main shaft.When main shaft revolves, exit after thread bush, mention rapidly main shaft and more than 14, get final product rapid closing gate valve 14 to gate valve, unclamp the bolt between blocking machine and coupling sleeve, take out blocking machine.
10, carry out lower obstruction operation, check that whether the seal ring of obstruction 22 is intact before operation, whether the pliers of lower stifled machine is manually done flexible.After confirming to check, obstruction 22 is put into pliers hand 21 clamping.Then the lower stifled machine transplanting of rice is entered in upper joint sleeve cylinder 13, then the bolt between the lower stifled machine land 18 of locking and upper joint sleeve cylinder 13.After confirmation, open gate valve balance bleeding device and be designated as after pipeline predetermined pressure until upper joint sleeve cylinder pressure, rotate gate valve 14 to enable possition.Under depress stifled cleaner handgrip and slowly make main shaft transfer to saddle type support thread bush position, screw clockwise handle 2 circles, then mention a little main shaft, if main shaft is unable to lift precession thread bush, slowly clockwise precession is motionless to revolving, and main shaft drops to graduation line position, lower plug successfully.Unscrew pliers hand 21 handwheels, until throw off completely.Mention lower plug owner axle to the above position of gate valve 14, closing gate valve 14, unclamps the bolt between lower stifled machine land 18 and upper joint sleeve cylinder 13, removes the operation of frame under taking out after stifled machine.
11, the lower plug operation of upstream, with reference to step 9, is closed UNICOM's ball valve and is removed not stopping transportation flexible pipe.
12,, after upstream and downstream shutoff frame is removed, saddle type support 1 sealing protecting cover is installed, and by bolt-locking, i.e. complete operation operation, prepares backfill operation.
Pipeline of the present invention is stopping transportation plugging holes system not, because it has used pipeline fourth contact device and the pipeline with pressure cleaning apparatus of steel material saddle type support, integral Al-alloy, structural strength is high, connection is reliable, pressure-proof and impact resistance is good, adapt to the not specific (special) requirements of stopping transportation plugging holes of line for polyethylene gas pipes, guaranteed the not safety and reliability of stopping transportation plugging holes of line for polyethylene gas pipes.
It should be noted that, foregoing is not the enumerating of preferred forms of stopping transportation plugging holes system equipment device of a kind of line for polyethylene gas pipes based on steel saddle type support of the present invention, the part of wherein not describing in detail to the greatest extent, is construed as with the general fashion of the art and is implemented.Meanwhile, for one of ordinary skill in the art, equivalent transformation and the modification within not departing from spiritual category of the present invention, the present invention done, all by within falling into the protection domain of claim of the present invention.

Claims (5)

1. a pipeline stopping transportation plugging holes system not, comprises support, pipeline fourth contact device and pipeline with pressure cleaning apparatus, it is characterized in that: described support is the saddle type support of steel material, is connected with stopping transportation plugging holes operation pipeline not; Described pipeline fourth contact device integral body is to be made by aluminum alloy material, is arranged on the position of the not required perforate of stopping transportation plugging holes operation pipeline; Described pipeline with pressure cleaning apparatus is arranged on the saddle type support of described steel material.
2. pipeline as claimed in claim 1 stopping transportation plugging holes system not, is characterized in that: the saddle type support of described steel material is to be connected with stopping transportation plugging holes operation pipeline not by seal ring.
3. pipeline as claimed in claim 1 stopping transportation plugging holes system not, is characterized in that: described pipeline fourth contact device is comprised of upper lower slips and bolt.
4. pipeline as claimed in claim 1 stopping transportation plugging holes system not, is characterized in that: described pipeline with pressure cleaning apparatus comprises scraping board and the cleaning skirt of cleaning pipe and lower end thereof.
5. the pipeline as claimed in claim 1 technological method of stopping transportation plugging holes system not, is characterized in that, comprises following process step:
1) determine the pipeline position need to carry out plugging holes operation, carry out pipeline excavation before non-stop plugging operation and the cleaning work of pipeline surface;
2) carry out the fourth contact operation of pipeline, two fourth contact devices are installed in parallel on the position of required perforate, tighten locking nut until turn motionless till, after spending 30 minutes, carry out once more fastening, to turn motionless till, after this every 10 minutes once fastening, until be tightened onto stop collar position, within about 60 minutes, can complete fourth contact;
3) carry out saddle type support and frame installation exercise, first remove a fourth contact slips group of fourth contact operation, and plugging device saddle type support is arranged on to the position of removing, screw nut between the upper and lower of saddle type support until reach stop collar position and twist motionless, then frame is arranged on the land of saddle type support, finally by the pinch tube locking of frame both sides;
4) the fourth contact device slips group shifting out is arranged on to frame near saddle type bracket side, and carries out fastening until be tightened onto stop collar;
5) carry out perforate operation, first the selected operation boring cutter size for the treatment of, and be arranged on perforator, the blade of boring cutter is smeared to a small amount of lubricant oil, unclamp and land between locking locknut, open frame gate valve to enable possition, perforator is put into frame, and drilling rod main shaft is transferred to blade drill and countersink and PE pipe outer wall 2-3cm position, bolt between locking land and upper joint sleeve cylinder, after confirmation, screw and land between locking locknut, then clockwise rotate boring cutter feeding handle, slow decreasing carries out perforate operation; After dropping to graduation line, main shaft shows that perforate completes, now the pressure gauge show value on frame upper joint sleeve cylinder is current pipeline predetermined pressure, reversion feeding handle, until screw thread is outwarded winding, now unclamp the locking locknut on land, slowly promote perforate main shaft to more than gate valve, close rapidly gate valve, unclamp the bolt between perforator land and upper joint sleeve cylinder, take out perforator;
6) carry out pipe-line purging operation, check cleaning apparatus, and cleaning pipe ball valve is rotated in closed position, bleeding device is inserted to upper joint sleeve cylinder, bolt between locking land and upper joint sleeve cylinder, after confirmation, opening gate valve balance bleeding device is designated as after pipeline predetermined pressure until upper joint sleeve cylinder pressure, rotate gate valve to enable possition, then hold and diffuse operating grip and be depressed into extreme lower position, and rotation scraping 3-5 circle, then mention 3-5cm and open exhaust stack ball valve, diffuse until do not have foreign material discharge to stop, ball valve is rotated to closed position, mention exhaust stack to the above position of gate valve, rapid closing gate valve, unclamp the bolt between cleaning apparatus and coupling sleeve, take out bleeding device,
7) carry out shutoff operation, before operation, check the integrity of plugging leather cup and connect whether flexibly, whether the plane after leather cup launches is smooth, check after confirmation, blocking machine leather cup is shunk and inserted in upper joint sleeve cylinder, and whether the direction of confirming leather cup aligns with frame marking line, then lock the bolt between land and upper joint sleeve cylinder, after confirmation, opening gate valve balance bleeding device is designated as after pipeline predetermined pressure until upper joint sleeve cylinder pressure, rotate gate valve to enable possition, slowly shutoff main shaft is transferred to entering swivel nut, then keep major axes orientation constant, rotation swivel nut slowly makes main shaft decline, enter in PE pipe and leather cup is launched completely, counterrotating 1-2 circle, at this moment the pressure show value of upper joint sleeve cylinder is exactly the pipeline pressure value after shutoff, now shutoff operation completes,
8) repeating step 1-7 carries out the plugging holes operation of downstream position;
9) complete after the construction operation of shutoff region, from down, swim over to upstream detaching device, backfill operation.
CN201310680994.1A 2013-12-12 2013-12-12 Pipeline nonstop-transmission holing and plugging system and process method thereof Pending CN103629470A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310680994.1A CN103629470A (en) 2013-12-12 2013-12-12 Pipeline nonstop-transmission holing and plugging system and process method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310680994.1A CN103629470A (en) 2013-12-12 2013-12-12 Pipeline nonstop-transmission holing and plugging system and process method thereof

Publications (1)

Publication Number Publication Date
CN103629470A true CN103629470A (en) 2014-03-12

Family

ID=50210796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310680994.1A Pending CN103629470A (en) 2013-12-12 2013-12-12 Pipeline nonstop-transmission holing and plugging system and process method thereof

Country Status (1)

Country Link
CN (1) CN103629470A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912758A (en) * 2014-04-22 2014-07-09 钊田 High-performance online pipeline plugging device and plugging method thereof
CN105736894A (en) * 2016-04-25 2016-07-06 青岛理工大学 Hydraulic quick plugging device for offshore platform high-pressure process pipeline
CN105987253A (en) * 2015-01-29 2016-10-05 胡炎兴 Oil-gas pipeline blocking system and method
CN106112518A (en) * 2016-08-18 2016-11-16 德科隆(无锡)流体控制有限公司 Pipeline increases valve or the installation method of equipment online and installs accessory
CN106247073A (en) * 2016-07-29 2016-12-21 辽宁石油化工大学 The online sealer under pressure of shearing blind plate of a kind of pipe with small pipe diameter pressure piping and method for blocking
CN106764190A (en) * 2016-12-29 2017-05-31 武汉理工大学 A kind of combination unit that branch pipe is installed for conveyance conduit with pressure
CN108544059A (en) * 2018-04-20 2018-09-18 邳州中燃城市燃气发展有限公司 A kind of method of the in-service welding of gas pipeline
CN110360381A (en) * 2019-06-26 2019-10-22 山东科技大学 Emergency drainage exempts from termination of pumping pipeline continued access equipment and its application method
CN110666211A (en) * 2019-10-19 2020-01-10 王叮叮 Circular steel pipe surface tapping processing equipment for automobile framework
CN110756860A (en) * 2019-12-09 2020-02-07 江苏师范大学 Pipeline drilling device
CN113597526A (en) * 2019-03-07 2021-11-02 Tdw特拉华有限公司 Polyethylene pipe service system comprising quick connection means for polyethylene pipe perforating, plugging and completion operations
CN114263805A (en) * 2021-12-24 2022-04-01 新疆润霖新能源技术有限公司 Device and method for blocking pipeline under pressure without stopping fire during non-stop transportation

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2416331Y (en) * 1999-12-06 2001-01-24 北京兴远燃气实业公司 Means for placing plug without pipeline shutdown
CN2465028Y (en) * 2001-02-20 2001-12-12 上海奕达燃气设备有限公司 Polyvinyl gas pipe blocking device
DE20117781U1 (en) * 2001-10-31 2002-03-07 Penke Lutz Pipe cleaning head for horizontal drilling systems
CN2705246Y (en) * 2004-05-01 2005-06-22 刘科 Non stop conveyer belt opening hole blocking machine with pressure
CN2793505Y (en) * 2005-04-30 2006-07-05 河北宝硕管材有限公司 Fast joint for repairing PE water supply pipe without water interruption
CN2903636Y (en) * 2006-03-07 2007-05-23 大庆油田长垣管业有限公司 Steel rainforced plastic composite pipeline plugging apparatus with crimping branching line
CN201162505Y (en) * 2008-03-12 2008-12-10 武汉武大巨成加固实业有限公司 Concrete deep borehole air pressure type hole clearing device
JP2009047244A (en) * 2007-08-20 2009-03-05 Cosmo Koki Co Ltd Attaching/detaching device of accessory component
JP2012176337A (en) * 2011-02-25 2012-09-13 Cosmo Koki Co Ltd Fluid pipe cleaning apparatus
CN202752451U (en) * 2012-07-17 2013-02-27 上海中油天宝巴圣钢管有限公司 Revising mould for ovality of pipe ends of welded steel pipe

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2416331Y (en) * 1999-12-06 2001-01-24 北京兴远燃气实业公司 Means for placing plug without pipeline shutdown
CN2465028Y (en) * 2001-02-20 2001-12-12 上海奕达燃气设备有限公司 Polyvinyl gas pipe blocking device
DE20117781U1 (en) * 2001-10-31 2002-03-07 Penke Lutz Pipe cleaning head for horizontal drilling systems
CN2705246Y (en) * 2004-05-01 2005-06-22 刘科 Non stop conveyer belt opening hole blocking machine with pressure
CN2793505Y (en) * 2005-04-30 2006-07-05 河北宝硕管材有限公司 Fast joint for repairing PE water supply pipe without water interruption
CN2903636Y (en) * 2006-03-07 2007-05-23 大庆油田长垣管业有限公司 Steel rainforced plastic composite pipeline plugging apparatus with crimping branching line
JP2009047244A (en) * 2007-08-20 2009-03-05 Cosmo Koki Co Ltd Attaching/detaching device of accessory component
CN201162505Y (en) * 2008-03-12 2008-12-10 武汉武大巨成加固实业有限公司 Concrete deep borehole air pressure type hole clearing device
JP2012176337A (en) * 2011-02-25 2012-09-13 Cosmo Koki Co Ltd Fluid pipe cleaning apparatus
CN202752451U (en) * 2012-07-17 2013-02-27 上海中油天宝巴圣钢管有限公司 Revising mould for ovality of pipe ends of welded steel pipe

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912758A (en) * 2014-04-22 2014-07-09 钊田 High-performance online pipeline plugging device and plugging method thereof
CN103912758B (en) * 2014-04-22 2016-01-27 钊田 A kind of on-line production expansion duct closing type device
CN105987253A (en) * 2015-01-29 2016-10-05 胡炎兴 Oil-gas pipeline blocking system and method
CN105987253B (en) * 2015-01-29 2019-01-25 上海乾恒实业有限公司 Oil-gas pipeline method for blocking
CN105736894A (en) * 2016-04-25 2016-07-06 青岛理工大学 Hydraulic quick plugging device for offshore platform high-pressure process pipeline
CN106247073A (en) * 2016-07-29 2016-12-21 辽宁石油化工大学 The online sealer under pressure of shearing blind plate of a kind of pipe with small pipe diameter pressure piping and method for blocking
CN106112518A (en) * 2016-08-18 2016-11-16 德科隆(无锡)流体控制有限公司 Pipeline increases valve or the installation method of equipment online and installs accessory
CN106764190B (en) * 2016-12-29 2018-11-30 武汉理工大学 A kind of combination unit for conveyance conduit with pressure installation branch pipe
CN106764190A (en) * 2016-12-29 2017-05-31 武汉理工大学 A kind of combination unit that branch pipe is installed for conveyance conduit with pressure
CN108544059A (en) * 2018-04-20 2018-09-18 邳州中燃城市燃气发展有限公司 A kind of method of the in-service welding of gas pipeline
CN113597526A (en) * 2019-03-07 2021-11-02 Tdw特拉华有限公司 Polyethylene pipe service system comprising quick connection means for polyethylene pipe perforating, plugging and completion operations
CN110360381A (en) * 2019-06-26 2019-10-22 山东科技大学 Emergency drainage exempts from termination of pumping pipeline continued access equipment and its application method
CN110360381B (en) * 2019-06-26 2020-06-05 山东科技大学 Emergency drainage pump-stopping-free pipeline splicing equipment and use method thereof
AU2019385784B2 (en) * 2019-06-26 2021-06-17 Shandong University Of Science And Technology A kind of pipeline connecting equipment for emergency drainage without stopping the pump and its application method
CN110666211A (en) * 2019-10-19 2020-01-10 王叮叮 Circular steel pipe surface tapping processing equipment for automobile framework
CN110756860A (en) * 2019-12-09 2020-02-07 江苏师范大学 Pipeline drilling device
CN114263805A (en) * 2021-12-24 2022-04-01 新疆润霖新能源技术有限公司 Device and method for blocking pipeline under pressure without stopping fire during non-stop transportation

Similar Documents

Publication Publication Date Title
CN103629470A (en) Pipeline nonstop-transmission holing and plugging system and process method thereof
CN107676569A (en) The construction method of heat distribution pipeline original position liner reparation
CN104747859B (en) Excavation-free pipeline quick repair method and traction rod for same
CN104438249B (en) Gas piping on-line cleaning device and method
CN107654789A (en) A kind of analogy method of long oil/gas pipe line dimension repairing process
CN208847417U (en) A kind of portable pipe package seal checker
CN203757286U (en) Hough type pipeline connecting and repairing device
CN204267975U (en) Inserted pipeline provided with pressure plugging device
Kou et al. Application progress of oil and gas pipeline rehabilitation technology
CN203907114U (en) Pipeline pressure-bearing leak-repairing device
CN206583582U (en) Complete set of rapid pressure testing device for pipeline of pipeline gallery
CN203743719U (en) Quick plugging device
RU2198340C1 (en) Method of repair of main pipe lines
US10024479B2 (en) System and method for providing upkeep and maintenance to piping systems
CN204254144U (en) Auxiliary fixing device for pipeline repairing piece
CN207438022U (en) A kind of pipe pressurized quick connector
CN2132060Y (en) Leakage-stopping unit for pipeline with water or steam running in it
CN206617704U (en) A kind of pipe plugging head feed mechanism
CN207486325U (en) A kind of connector tooling for tubular service
CN102818090A (en) Hole opening and blocking method of gas pipeline with pressure
CN206112515U (en) Device is changed on line to gas drainer downtake valve
US20180363821A1 (en) Water Main Tapping Devices and Methods
CN204805837U (en) Connecting device is moulded to steel
RO127040B1 (en) Process and flexible tubing for collecting accidentally leaking petroleum products
CN104174894B (en) A kind of method of the coal gas online perforate of instrument pressure pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 201801 Shanghai city Jiading District Malu Li Xue Lu No. 525

Applicant after: Shanghai Haijiao Mechanical & Electrical Engineering Co., Ltd.

Address before: 201801 Shanghai city Jiading District Malu Li Xue Lu No. 525

Applicant before: SHANGHAI HYDRAU MECHANICAL & ELECTRONIC ENGINEERING COMPANY LIMITED

COR Change of bibliographic data
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140312