Prior art keywords
bottom plate
gutter
fulcrum
draining board
sump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210298732.4A
Other languages
English (en)
Other versions
CN103628502A (zh
Inventor
邹新建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Sancai Technology Development Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210298732.4A priority Critical patent/CN103628502B/zh
Publication of CN103628502A publication Critical patent/CN103628502A/zh
Application granted granted Critical
Publication of CN103628502B publication Critical patent/CN103628502B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Building Environments (AREA)

Abstract

用塑料排水板做地下工程底板中空地坪的方法,是在地下工程底板室内部位用塑料排水板作中空砼地坪,用于排水、隔潮,达到工程防水的目的。在这一个总发明包含结构面找坡、排水沟、排水板产品联接方式和施工工艺等多项发明内容。首先在结构底板表面要有找坡,当底板的结构面是整体平面时,渗漏水进入集水井,清洗水先进排水沟,再进集水井。自粘塑料排水板有卷状空心支点,用胶条粘接或搭接联接,排水板与墙面之间有接缝条,最后施工时砼可以二次浇捣或一次浇捣。将排水板支点做成方形、棱形,侧面有凹凸加筋肋,支点排列是正交行列或交叉行列。

Description

用塑料排水板做地下工程底板中空地坪的方法
技术领域
本发明属于建筑防水范围,特别是地下工程底板室内部位用塑料排水板做中空砼地坪用于排水、隔潮达到工程防水目的,在地下工程底板排水隔潮这一个总发明中包含结构面找坡、排水沟、排水板产品、联接方式和施工工艺多项权利要求。
背景技术
《地下工程防水技术规程》GB50108-2008,防水设防为“1、明挖法地下工程一级,应选防水混凝土和其他一道防水材料;2、暗挖法地下工程一级,应选衬砌结构和一种防水材料”。本发明是针对明挖法地下工程,该工程在结构地板的室内表面都要另外再做一层50~300mm厚的砼地坪,本发明就是在结构层与面层之间做出空隙层,可以排除渗漏水,达到建筑工程永久防水隔潮目的。
发明内容
首先分析渗漏水的来源和排水方向,结构底板的渗漏水是在底板的结构面上空隙层中流向集水井,以集水井边沿为±0.00测量整个结构面,在底板的结构面上要有30~200mm高的找坡,使地下渗漏水自然流入集水井。
凡是堵挡排水路线的隔墙、门槛和排水沟都要放过水管,使水流通畅。还要解决地面清洗水与排水沟的关系;当底板的结构面是整体平面时,底板的渗漏水从空隙层中进集水井,地面清洗水进排水沟流入集水井;当底板的结构面有凹下的排水沟时,底板渗漏水从空隙层中进排水沟和集水井,地面清洗水进排水沟,再进集水井。
卷状空心支点的塑料排水板是滚筒式连续生产,生产时在排水板的左右两侧挤上一~四条丁基胶条,可在常温下自粘,胶条上面盖离型纸条,是自粘塑料排水板。施工时左右可以搭扣一排支点粘合或平板叠合粘合;排水板的前后搭扣一排支点,支点间的平面上粘一根胶条。为了使塑料支点有足够的抗压强度承受施工荷载,将支点做成方形、棱形,支点侧面有凹凸加筋肋,支点排列是正交行列式、交叉行列式。以上塑料排水板的联接也可以不用粘胶,则采用前后、左右搭扣一排支点的联接方式。
在联成整体的排水板与墙面接缝部位,为了防止砼漏浆,再粘贴一条30~100mm宽的塑料平板或泡沫板条,填平缝隙。然后是扎钢筋浇砼面层,在联成整体的排水板上先将空心支点用砼垫平,养护后再扎钢筋,浇整体砼或直接在塑料板上扎钢筋后,再一次性浇砼面层。
附图说明
图1是地下工程底板结构剖视图。
图2a、图2b是地下工程底板结构、面层排水沟剖视图。
图3a、图3b、图3c、图3d是自粘塑料排水板左右胶条粘接剖视图。
图4a、图4b是前后支点搭接剖视图。
图5a、图5b、图5c是排水板墙边接缝和浇砼过程剖视图。
图6是隔墙、门槛的过水管剖视图。
图7a、图7b、图7c、图7d是塑料支点、俯视、正视、正交行列、交叉行列图。
具体实施方法
图1地下工程底板结构剖视看到,以集水井2的边沿4为±0.00,在底板的结构面1上要有30~200mm高的找坡3,使地下渗漏水自然流入集水井。
图2a底板的结构面1是整体平面,底板的渗漏水从空隙层5中排入集水井2,地面清洗水从排水沟6流入集水井2,排水沟的找坡层中应埋过水管7。图2b当底板的结构面1有凹下的排水沟8,底板渗漏水从空隙层5进排水沟8和集水井2,地面清洗水进排水沟8再进集水井2。
图3a、图3b、图3c采用聚乙烯排水板9,生产时左右挤上一~四条胶条10盖上离型纸,施工时撕开离型纸左右可以搭扣一排支点粘合。图3b是左右叠合粘合。
图4a、图4b是排水板9前后搭扣一排支点,其中的图4a施工时再用手工粘一个胶条10。
图5a是联成整体的排水板9与墙面接缝的部位,粘贴一条30~100mm宽的塑料平板或泡沫板条11填平缝隙,底板的结构面1,局部找坡3。图5b在联成整体的排水板9上,先将空心支点用砼12垫平,养护后再扎钢筋浇整体砼13。图5c是直接在塑料板9上扎钢筋14,再一次性浇砼面层13。
图6是底板的结构面1上部有隔墙、门槛等,要放过水管7,使水流畅通。
图7a、图7b是排水板支点外形,支点平顶15,支点侧面是凹凸加筋肋。
图7c是支点正交行列平面布置,图7d是支点交叉行列布置。

Claims (6)

1.用塑料排水板做地下工程底板中空地坪的方法,是在底板的结构面与砼面层之间做出排水空隙,其特征是:还要解决地面清洗水与排水沟的关系,当底板的结构面是整体平面时,底板的渗漏水从空隙层中进集水井,地面清洗水进排水沟流入集水井;当底板的结构面有凹下的排水沟时,底板渗漏水从空隙层中进排水沟和集水井,地面清洗水进排水沟,再进集水井。
2.根据权利要求1用塑料排水板做地下工程底板中空地坪的方法,其特征是:在底板的结构面与砼面层之间做出排水空隙,以集水井边沿为±0.00,在底板的结构面上要有30~200mm高的找坡,使地下渗漏水自然流入集水井。
3.根据权利要求1用塑料排水板做地下工程底板中空地坪的方法,其特征是:在底板的结构面与砼面层之间做出排水空隙,凡是阻挡排水路线的隔墙、门槛和排水沟都要放过水管,使水流通畅。
4.根据权利要求1用塑料排水板做地下工程底板中空地坪的方法,其特征是:用卷状有空心支点的塑料排水板生产时在排水板的左右两侧挤上一~四条胶条,盖上离型纸,是自粘塑料排水板。
5.根据权利要求1用塑料排水板做地下工程底板中空地坪的方法,其特征是:当卷状有空心支点的塑料排水板施工时不用粘胶,则采用前后、左右搭扣一排支点的联接方式。
6.根据权利要求1用塑料排水板做地下工程底板中空地坪的方法,其特征是:提高排水板支点抗压强度将支点做成方形、棱形,侧面有凹凸加筋肋,支点排列是正交行列式或交叉行列式。
CN201210298732.4A 2012-08-21 2012-08-21 用塑料排水板做地下工程底板中空地坪的方法 Active CN103628502B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210298732.4A CN103628502B (zh) 2012-08-21 2012-08-21 用塑料排水板做地下工程底板中空地坪的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210298732.4A CN103628502B (zh) 2012-08-21 2012-08-21 用塑料排水板做地下工程底板中空地坪的方法

Publications (2)

Publication Number Publication Date
CN103628502A CN103628502A (zh) 2014-03-12
CN103628502B true CN103628502B (zh) 2018-07-27

Family

ID=50209929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210298732.4A Active CN103628502B (zh) 2012-08-21 2012-08-21 用塑料排水板做地下工程底板中空地坪的方法

Country Status (1)

Country Link
CN (1) CN103628502B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612267A (zh) * 2018-04-04 2018-10-02 上海三彩塑料排水板工程有限公司 在屋面中采用截断渗漏水联通管消除水压力的方法

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059946A (zh) * 2017-06-20 2017-08-18 中国华西企业有限公司 一种地下室排水板及其施工工法
CN107700554B (zh) * 2017-09-29 2021-12-14 上海三彩科技发展有限公司 地下工程中空地坪与墙、柱的隔潮做法
CN108589794A (zh) * 2018-04-04 2018-09-28 上海三彩塑料排水板工程有限公司 地下工程渗漏、潮湿的修缮方法
CN108868185B (zh) * 2018-06-30 2020-05-12 厦门防水博士建筑工程有限公司 一种楼地面窜水渗漏修缮***
CN111779039A (zh) * 2019-04-04 2020-10-16 上海三彩科技发展有限公司 在地下室底板预埋清洗水和结构渗水收集观察箱的方法
CN111851288A (zh) * 2019-04-28 2020-10-30 上海三彩科技发展有限公司 在地下室底板中设置渗水收集坑的方法
CN111173046A (zh) * 2019-09-16 2020-05-19 邹新建 一种在地下工程室内中空地坪安装玻璃观察片的方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101307647A (zh) * 2008-06-06 2008-11-19 邹新建 一种注塑杯状混凝土模板和应用方法
CN201593203U (zh) * 2010-01-25 2010-09-29 江苏双楼建设集团有限公司 地下室底板暗布式防渗导水***

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0321726A (ja) * 1989-06-16 1991-01-30 Toho:Kk ブロックを用いた湧水処理構造

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101307647A (zh) * 2008-06-06 2008-11-19 邹新建 一种注塑杯状混凝土模板和应用方法
CN201593203U (zh) * 2010-01-25 2010-09-29 江苏双楼建设集团有限公司 地下室底板暗布式防渗导水***

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108612267A (zh) * 2018-04-04 2018-10-02 上海三彩塑料排水板工程有限公司 在屋面中采用截断渗漏水联通管消除水压力的方法
CN108612267B (zh) * 2018-04-04 2022-02-11 上海三彩塑料排水板工程有限公司 在屋面中采用截断渗漏水联通管消除水压力的方法

Also Published As

Publication number Publication date
CN103628502A (zh) 2014-03-12

Similar Documents

Publication Publication Date Title
CN103628502B (zh) 用塑料排水板做地下工程底板中空地坪的方法
CN202830997U (zh) 地铁车站主体侧墙变形缝防水结构
CN104632277A (zh) 一种公路、铁路隧道用粘结式柔性防排水卷材及其铺设方法
CN208363452U (zh) 一种双层排水保温屋面结构
CN104514230B (zh) 地下室防水变形缝
CN109930631A (zh) 建筑基础隔振结构及其施工方法
CN108104164A (zh) 一种地下管廊防水结构
RU2679150C1 (ru) Многослойная защитная панель и система для стен подвала
CN211735533U (zh) 一种地下室顶板后浇带防水结构
CN113235767A (zh) 一种外墙外保温关键节点的施工方法
CN106638710A (zh) 新旧地下建筑接头施工缝防水处理工艺
KR200427712Y1 (ko) 터널용 방수시트 사이의 누수방지장치
CN103883073B (zh) 底部断冷桥的冷库保温墙板、冷库及其施工方法
CN207959270U (zh) 一种地下管廊防水结构
CN207959269U (zh) 一种用于地下管廊的底板防水节点
CN204476468U (zh) 一种公路、铁路隧道用粘结式柔性防排水卷材
KR101171037B1 (ko) 구간 분리를 이용한 터널 방수 시공 방법
CN212453367U (zh) 一种种植屋面高低变形缝处防根刺连接节点结构
CN207512792U (zh) 一种地下室底板的沉降缝导水机构
CN208700961U (zh) 一种保温隔音的防水卷材
CN207954893U (zh) 一种防水卷材
CN204356808U (zh) 地下室防水变形缝
CN207392262U (zh) 一种地下室顶板变形缝防水结构
CN209081794U (zh) 一种新型橡胶复合防水卷材
CN103628630A (zh) 种植屋面工程的综合技术和施工方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191231

Address after: 201824 room 404, No. 10, Lane 1930, Cao'an Road, Jiading District, Shanghai

Patentee after: SHANGHAI SANCAI TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 200444 Shanghai city Baoshan District Fengxiang Road 128 Lane 101

Patentee before: Zou Xinjian

TR01 Transfer of patent right
OL01 Intention to license declared