CN103628489A - Highway side slope reinforced structure - Google Patents

Highway side slope reinforced structure Download PDF

Info

Publication number
CN103628489A
CN103628489A CN201310653558.5A CN201310653558A CN103628489A CN 103628489 A CN103628489 A CN 103628489A CN 201310653558 A CN201310653558 A CN 201310653558A CN 103628489 A CN103628489 A CN 103628489A
Authority
CN
China
Prior art keywords
slope
anchor pole
side slope
concrete frame
ruggedized construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310653558.5A
Other languages
Chinese (zh)
Other versions
CN103628489B (en
Inventor
胡庆国
徐书苑
谭积青
何忠明
朱志勤
段跃华
宋新智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201310653558.5A priority Critical patent/CN103628489B/en
Publication of CN103628489A publication Critical patent/CN103628489A/en
Application granted granted Critical
Publication of CN103628489B publication Critical patent/CN103628489B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a highway side slope reinforcing structure, wherein a plurality of concrete frame beams (3) are longitudinally arranged along a slope surface, a plurality of prestressed rust-proof steel strands (4) which are prestressed are transversely paved along the slope surface, the prestressed rust-proof steel strands (4) are fixedly paved on the upper layer of the concrete frame beams (3), two ends of the prestressed rust-proof steel strands are respectively fixed on a first anchor rod (1) and a second anchor rod (2), and the first anchor rod (1) and the second anchor rod (2) are respectively fixed at the toe of the side slope and in a rock-soil layer with better mechanical properties at the top end of the side slope. On the basis of ensuring effective reinforcement of the highway side slope, the invention reduces the concrete consumption and the occupied area, thereby increasing the greening area; the method reduces the manual and mechanical demands of construction during slope reinforcement, reduces the rock and soil volume during slope excavation, avoids environmental pollution and damage, and finally reduces the total cost.

Description

A kind of expressway slope ruggedized construction
Technical field
The present invention relates to a kind of expressway slope and reinforce set a series of reinforcement measure, particularly relate to a kind of expressway slope ruggedized construction.
Background technology
The reinforcing of side slope is newly-built or the very important ingredient of reorganization and expansion speedway, the Expressway High-Slope Strengthening engineering quantity of most is large, human input is higher, vertical construction of frame beam difficulty is larger, and adopts other reinforcing technique expenses such as antislide pile and anchor pole relatively high.For this situation, in the present invention, vertical frame girder construction is substituted with steel strand, can effectively to side slope, reinforce, not only reduced greatly construction volume and human input, improve expressway slope strengthening construction progress simultaneously.
Summary of the invention
Technical problem to be solved by this invention is expressway slope ruggedized construction and the construction method that proposes a kind of stability of slope, saves engineering cost, accelerating construction progress.
In order to solve the problems of the technologies described above, expressway slope ruggedized construction provided by the invention, along the domatic multiple tracks concrete frame beam that is vertically arranged with, along the domatic multiple tracks that is laterally equipped with, be applied in prestressed antirust prestress wire, upper strata and its two ends that described steel strand are fixedly laid on described concrete frame beam are separately fixed on the first anchor pole and the second anchor pole, and the first described anchor pole and the second anchor pole are separately fixed in the toe place of side slope and the reasonable rock-soil layer of top mechanical property of side slope.
At other gutter and the drain hole of being provided with of described concrete frame beam.
Described gutter and drain hole be spaced apart 2m~4m.
The lateral separation distance of described concrete frame beam is 2m~4m, and evenly lays fixing.
The setting of gutter and drain hole is in the soil layer on the side of concrete frame beam.
The first described anchor pole and the second anchor pole adopt the form of mechanical hole reaming to be fixed in the reasonable rock-soil layer of top mechanical property of side slope toe place and side slope.
The longitudinal separation distance of described steel strand is 1m~3m, and evenly lays fixing.
Described concrete frame beam is anchor rod anchored in rock-soil layer with common shallow layer grouting.
Adopt the expressway slope ruggedized construction of technique scheme, hole reaming of anchor rod is squeezed into respectively in relevant position on expressway slope toe place and side slope top, hole reaming of anchor rod can have stronger resistance to tension with respect to common bolt, upper and lower anchor pole is used for fixing and applies prestressed steel strand, the prestressing force that steel strand apply equals to make side slope to have stable active force, and the horizontally set interval of steel strand is 1~3m.The method that the calculating of the first anchor pole and the second anchor-holding force of anchor bolt provides according to building slope technical specification simultaneously.
If described anchor pole need to separately add anchor pole in the centre position of side slope, need depending on concrete edge slope structure.
Concrete frame beam is anchor rod anchored in rock-soil layer with common shallow layer grouting, and concrete frame beam and steel strand have formed rectangle net structure, comprehensively fixed slope.
In the formed rectangular configuration of described steel strand and concrete frame beam, at interval of 2m~4m, one gutter and drain hole are set, the setting in gutter is in the soil layer on the side of concrete frame beam, gutter leads to Side Drain for Expressway downwards along the path of steel strand as far as possible, steel strand are under prestressed effect, near it, rock-soil layer can, to lower recess, be convenient to draining under the prestressing force effect applying.
At described anchor pole and soil body junction injection cement grout, fixed.
The setting principle in described gutter is that classification is dammed, combination in length and breadth; The draining of high gradient slope or the not good enough side slope of geotechnical stability takes classification to dam, in conjunction with the method for draining, process in length and breadth.Surface water beyond top, slope is drained from gutter; Each step of classification side slope arranges gutter draining; Toe is established gutter draining.High gradient slope should arrange the gutter of vertical route at a certain distance according to landform and domatic size, makes surface water discharge as early as possible side slope.
Side slope surface layer in the rectangular extent that described Vierendeel girder is gone with steel strand will carry out ecological protection, in the situation that side slope is soil-slope, and Turf Culture in rectangular extent; When side slope is rock side slope, first layer overlay thick-layer base material on domatic, and then by the composite material spray attachment that contains nutrient and grass seeds to domatic upper, make greening side slope.In the other 1m of the toe place of side slope Side Drain for Expressway left and right, excavate plantation heatable adobe sleeping platform, cultivate trailing plant.
The present invention guarantees bolt anchorage, and steel strand prestress setting can cooperatively interact, and in the hope of reaching stability of slope, this method can reach saving engineering cost, accelerating construction progress simultaneously.
In sum, the technology of the present invention has solved the problem that in expressway slope work progress, construction cost is high, progress is slow, take into account structure slim and graceful simultaneously, reasonable stress, take full advantage of the material advantage of transverse frame beam and steel strand, practicality is stronger, handsome in appearance, is a kind of expressway slope ruggedized construction of safe and reliable, attractive in appearance, ecological, environmental protective.
Accompanying drawing explanation
Fig. 1 is the side schematic view of highway engineering slope reinforcement structure.
Fig. 2 is the structural representation of highway engineering slope reinforcement structure.
The specific embodiment
Below in conjunction with accompanying drawing, patent of the present invention is described further.
Referring to Fig. 1 and Fig. 2, along the domatic concrete frame beam 3 that is vertically arranged with multiple tracks lateral separation 2m~4m, along domatic, be laterally equipped with multiple tracks longitudinal separation 1m~3m and be applied in prestressed antirust prestress wire 4, upper strata and its two ends that steel strand 4 adopt common shallow-layer anchor pole 6 anchorings to be fixedly laid on concrete frame beam 3 are separately fixed on the first anchor pole 1 and the second anchor pole 2, the first anchor pole 1 and the second anchor pole 2 adopt the form of mechanical hole reaming to be separately fixed in the toe place of side slope and the reasonable rock-soil layer of top mechanical property of side slope, on domatic, be provided with the gutter 5 that is spaced apart 2m~4m.
The prestressing force that steel strand 4 apply should reach the needed anchored force of stability of slope, the method that the calculating of the first anchor pole 1 and the second anchor pole 2 anchored force provides according to building slope technical specification simultaneously.
The setting of gutter 5 and drain hole 8 is in the rock-soil layer of the side of concrete frame beam 3, gutter 5 leads to Side Drain for Expressway downwards along the path of steel strand 4 as far as possible, antirust prestress wire 4 is under prestressed effect, near it, soil layer can, to lower recess, be convenient to draining under the prestressing force effect applying.
At the first anchor pole 1 and the second anchor pole 2, fixed with Rock And Soil junction injection cement grout.
The setting principle in gutter 5 is that classification is dammed, combination in length and breadth; The draining of high gradient slope or the not good enough side slope of geotechnical stability takes classification to dam, in conjunction with the method for draining, process in length and breadth.Surface water beyond slope top 5 is drained from gutter; Each step of classification side slope arranges gutter 5 drainings; Toe is established gutter draining.Water in the body of slope out flows into gutter 5 from drain hole 8, then from gutter, 5 enters gutter and drains.High gradient slope should arrange the gutter of vertical route at a certain distance according to landform and domatic size, makes surface water discharge as early as possible side slope.
Side slope surface layer in the rectangular extent that concrete frame beam 3 is gone with antirust prestress wire 4 will carry out ecological protection, and in the situation that side slope is soil-slope, in rectangular extent, Turf Culture 9; When side slope is rock side slope, first layer overlay thick-layer base material on domatic, and then by the composite material spray attachment that contains nutrient and grass seeds to domatic upper, make greening side slope.In the other 1m of the toe place of side slope Side Drain for Expressway left and right, excavate plantation heatable adobe sleeping platform, cultivate trailing plant.
Referring to Fig. 1 and Fig. 2, the construction method that the expressway slope that the present invention adopts is reinforced is:
(1), first expressway slope is cleared up, uneven place is scabbled as far as possible, the stone of removing rubble simultaneously and easily pitching, facilitates the construction of concrete frame beam and the tensioning construction of antirust prestress wire of side slope.
(2), at top, slope and the toe place of expressway slope, squeeze into respectively hole reaming of anchor rod.
(3), antirust prestress wire is by the anchoring reinforcement measure of anchor pole, prestressed stretch-draw should be carried out at the two ends of high slope simultaneously simultaneously, prevents the stretch-draw that tensioned at one end occurs inhomogeneous, there is the phenomenon of destroying in side slope geologic structure.
(4), antirust prestress wire arranges protector with the junction of concrete frame beam, prevent that steel strand are offset, and guarantee that concrete frame beam can not destroy because of the stressed power transmission of steel strand.
(5), the ecological protection of the side slope mode that adopts slope body vegetation and toe climbing plant to combine, make full use of the advantage of ecological protection, environmental protection attractive in appearance, prevents that in ecological mode side slope rubble, soil layer from destroying.
(6), to add in addition the situation of anchor pole in side slope according to need for environment, need separately to add anchor pole, guarantee two ends simultaneous tension prestressing force simultaneously, for example there are three anchor poles, in the middle of anchor pole position need stretch-draw twice.

Claims (8)

1. an expressway slope ruggedized construction and construction method, it is characterized in that: along the domatic multiple tracks concrete frame beam (3) that is vertically arranged with, along the domatic multiple tracks that is laterally equipped with, be applied in prestressed antirust prestress wire (4), described steel strand (4) are fixedly laid on the upper strata of described concrete frame beam (3) and its two ends are separately fixed at the first anchor pole (1) and the second anchor pole (2) is upper, and described the first anchor pole (1) and the second anchor pole (2) are separately fixed in the toe place of side slope and the reasonable rock-soil layer of top mechanical property of side slope.
2. expressway slope ruggedized construction according to claim 1, is characterized in that: on domatic, be provided with gutter (5), be provided with drain hole (8) in gutter.
3. expressway slope ruggedized construction according to claim 1, is characterized in that: described gutter (5) and drain hole (8) be spaced apart 2m~4m.
4. expressway slope ruggedized construction according to claim 1, is characterized in that: the setting of described gutter (5) and drain hole (8) is in the side rock-soil layer of described concrete frame beam (3).
5. expressway slope ruggedized construction according to claim 1 and 2, is characterized in that: the lateral separation distance of described concrete frame beam (3) is 2m~4m, and evenly lays fixing.
6. expressway slope ruggedized construction according to claim 1 and 2, is characterized in that: described the first anchor pole (1) and the second anchor pole (2) adopt the form of mechanical hole reaming to be fixed in the reasonable rock-soil layer of top mechanical property of side slope toe place and side slope.
7. expressway slope ruggedized construction according to claim 1 and 2, is characterized in that: the longitudinal separation distance of described antirust prestress wire (4) is 1m~3m, and evenly lays and fix, and need apply in advance prestressing force fixedly time.
8. expressway slope ruggedized construction according to claim 1 and 2, is characterized in that: described concrete frame beam (3) is anchored in rock-soil layer with common shallow layer grouting anchor pole (6).
CN201310653558.5A 2013-12-05 2013-12-05 Highway side slope reinforced structure Expired - Fee Related CN103628489B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310653558.5A CN103628489B (en) 2013-12-05 2013-12-05 Highway side slope reinforced structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310653558.5A CN103628489B (en) 2013-12-05 2013-12-05 Highway side slope reinforced structure

Publications (2)

Publication Number Publication Date
CN103628489A true CN103628489A (en) 2014-03-12
CN103628489B CN103628489B (en) 2015-08-12

Family

ID=50209916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310653558.5A Expired - Fee Related CN103628489B (en) 2013-12-05 2013-12-05 Highway side slope reinforced structure

Country Status (1)

Country Link
CN (1) CN103628489B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436724A (en) * 2016-11-11 2017-02-22 四川大学 Root-anchor system reinforcing ecological slope protection method for fill slope
CN107237334A (en) * 2017-06-12 2017-10-10 江苏旭辰交通科技发展有限公司 A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN108360537A (en) * 2018-01-31 2018-08-03 河海大学 A kind of microorganism consolidates the bank protection anchor structure used in sand engineering and its application method
CN108487262A (en) * 2018-03-12 2018-09-04 沙洲职业工学院 A kind of mine slope prevents the robust structure on landslide

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005213977A (en) * 2004-02-02 2005-08-11 Ps Mitsubishi Construction Co Ltd Slope stabilizing technique
CN201343733Y (en) * 2009-01-15 2009-11-11 四川省交通厅交通勘察设计研究院 Ecological protection structure with steady rock side slope
CN201610546U (en) * 2010-01-07 2010-10-20 贵州省交通规划勘察设计研究院 Prestress anchoring frame plat
CN102330431A (en) * 2011-06-16 2012-01-25 兰州理工大学 Flexible support structure of pre-stress anchor rod for lattice type frame and construction method of flexible support structure
CN202969394U (en) * 2012-10-22 2013-06-05 中国水电建设集团路桥工程有限公司 Device for reinforcing protection structure
CN103334441A (en) * 2013-07-23 2013-10-02 重庆交通大学 Road slope protecting structure and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005213977A (en) * 2004-02-02 2005-08-11 Ps Mitsubishi Construction Co Ltd Slope stabilizing technique
CN201343733Y (en) * 2009-01-15 2009-11-11 四川省交通厅交通勘察设计研究院 Ecological protection structure with steady rock side slope
CN201610546U (en) * 2010-01-07 2010-10-20 贵州省交通规划勘察设计研究院 Prestress anchoring frame plat
CN102330431A (en) * 2011-06-16 2012-01-25 兰州理工大学 Flexible support structure of pre-stress anchor rod for lattice type frame and construction method of flexible support structure
CN202969394U (en) * 2012-10-22 2013-06-05 中国水电建设集团路桥工程有限公司 Device for reinforcing protection structure
CN103334441A (en) * 2013-07-23 2013-10-02 重庆交通大学 Road slope protecting structure and construction method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436724A (en) * 2016-11-11 2017-02-22 四川大学 Root-anchor system reinforcing ecological slope protection method for fill slope
CN106436724B (en) * 2016-11-11 2018-08-28 四川大学 Root anchor system reinforces embankment slope ecological bank protecting method
CN107237334A (en) * 2017-06-12 2017-10-10 江苏旭辰交通科技发展有限公司 A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN107237334B (en) * 2017-06-12 2019-04-02 南通大学 A kind of road foundation execavated rockmass frame gird type slope protection code builds the construction method of plant biological bag greening
CN108360537A (en) * 2018-01-31 2018-08-03 河海大学 A kind of microorganism consolidates the bank protection anchor structure used in sand engineering and its application method
CN108487262A (en) * 2018-03-12 2018-09-04 沙洲职业工学院 A kind of mine slope prevents the robust structure on landslide

Also Published As

Publication number Publication date
CN103628489B (en) 2015-08-12

Similar Documents

Publication Publication Date Title
CN106638634A (en) Road rock slope vine ecological protection structure and construction method
CN203403426U (en) Supporting structure of expensive earth road cutting side slope
CN208717925U (en) A kind of high precipitous rock slope ecological safeguard structure
CN103628489B (en) Highway side slope reinforced structure
CN204780949U (en) Rock slope is planted living concrete and is moulded stone and combines ecological landscape protective structure
CN206736931U (en) Highway Lithological Slope liana ecological safeguard structure
CN103774679A (en) Rock side slope net hanging method
CN103343542A (en) Reorganization and expansion highway slope protection system
CN109208617A (en) Redbed rock slope flexible comprehensive supporting structure and construction method thereof
CN112544350A (en) Construction method for protecting side slope of ecological grass planting roadbed in geocell
CN203960921U (en) A kind of existing cut slope stake board wall ruggedized construction
CN203174614U (en) Prestressed anchor cable pile slab wall
CN109610482A (en) A kind of bamboo anchoring-bolt-work stub joint protective slope structure and its construction method
CN103953053B (en) Plant-growing type eco-concrete anti-overflow device and construction method are built in inclined-plane
CN203284795U (en) Buttressed retaining wall with anchor board
CN203334301U (en) Cave slope strengthening protection structure
CN108222030A (en) The lattice safeguard structure and construction method of a kind of not equidistant dregs side slope of transverse direction
CN203639927U (en) Highway side slope reinforced structure
CN203755320U (en) Crush rock zone side slope reinforcing structure
CN207904939U (en) A kind of ecological revetment grass planting plane
CN203924077U (en) A kind of constructing structure for the greening of wound steep rocky slope
CN104695454A (en) Steep slope reinforcement and protection device and paving method thereof
CN203361182U (en) Unequal-length bottom-expanded rock anchor pile of power transmission pole tower
CN105926646A (en) Reinforcing method for swelling rock cut slope
RU2596164C1 (en) Construction of road pavement for temporary roads for agricultural purposes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20191205

CF01 Termination of patent right due to non-payment of annual fee