CN103628408B - The construction method of bridge cast in place concrete form Eight characters bracing frame - Google Patents

The construction method of bridge cast in place concrete form Eight characters bracing frame Download PDF

Info

Publication number
CN103628408B
CN103628408B CN201310538941.6A CN201310538941A CN103628408B CN 103628408 B CN103628408 B CN 103628408B CN 201310538941 A CN201310538941 A CN 201310538941A CN 103628408 B CN103628408 B CN 103628408B
Authority
CN
China
Prior art keywords
montant
bridge
battered leg
characters
along
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310538941.6A
Other languages
Chinese (zh)
Other versions
CN103628408A (en
Inventor
陈进明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Original Assignee
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of 17th Bureau of China's Railroad Group filed Critical Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority to CN201310538941.6A priority Critical patent/CN103628408B/en
Publication of CN103628408A publication Critical patent/CN103628408A/en
Application granted granted Critical
Publication of CN103628408B publication Critical patent/CN103628408B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of construction method of bridge cast in place concrete form Eight characters bracing frame, inside two pier studs along the bridge, many montants are in one line along cross-bridges direction, each montant lower end and the anchoring of pier stud cushion cap, bottom, middle part and top respectively with pier shaft anchoring; Montant upper end is connected by end distribution beam; In cross-bridges direction, be connected to each other by horizontal stull in the middle part of each montant; Each montant lower end all connects the lower end of a battered leg, by shoring connection between two battered leg upper ends along the bridge; Be connected by longitudinal stull in the middle part of battered leg along the bridge with in the middle part of montant; Connected by horizontal stull in the middle part of each battered leg in cross-bridges direction, each battered leg upper end, cross-bridges direction is connected by middle part distribution beam; Many previously prepared good Bailey truss are arranged in end and middle part distribution beam along the bridge, form Eight characters supporting & stablizing structure.Construction technology of the present invention can make below current unaffected, and without any need for temporary base, install and dismantle simple, cyclic utilization rate is high.

Description

The construction method of bridge cast in place concrete form Eight characters bracing frame
Technical field
The present invention relates to cast-in-place concrete construction of bridge technology, particularly a kind of construction method of Cast-in-situ Beam formwork-support.
Background technology
The domestic formwork-support for Cast-in-situ Beam at present, general employing raft support method and steel pipe pile Bailey truss system, these two kinds of structures all have drawback in various degree: raft support method need gather in below bowl fastening type support or tube and couple scaffold, and it arranges template system; This form is lower to foundation requirement, but steel pipe spacing is little, and conventional pitch, between 30 ~ 90cm, cannot meet the current requirement in below, and support height is unsuitable excessive, within being generally used for 15m height.Steel pipe pile Bailey truss system arranges template system on shellfish truss, below arranges the larger steel pipe of diameter as stress system, and single steel pipe is stressed all comparatively large, has requirement that is current below can meeting and height, but the method requires high to temporary base, a large amount of economic input of temporary needs.
Summary of the invention
The object of this invention is to provide a kind of construction technology of new bridge cast in place concrete form bracing frame, below can be met current unaffected, and without any need for temporary base, install and dismantle simple, cyclic utilization rate is high.
For reaching above object, the present invention takes following technical scheme to be achieved:
A construction method for bridge cast in place concrete form Eight characters bracing frame, is characterized in that, comprise the steps:
(1) montant is installed
Inside two pier studs along the bridge, many montants are in one line along cross-bridges direction, each montant lower end and the anchoring of pier stud cushion cap, the bottom of each montant, middle part and top respectively with pier shaft anchoring; Montant upper end is connected by end distribution beam; In cross-bridges direction, be connected to each other by horizontal stull in the middle part of each montant;
(2) battered leg and shore installation
Each montant lower end all connects the lower end that is adjusted the battered leg at angle of inclination in advance, by shoring connection between two battered leg upper ends along the bridge; Be connected by longitudinal stull in the middle part of battered leg along the bridge with in the middle part of montant; Connected by horizontal stull in the middle part of each battered leg in cross-bridges direction, each battered leg upper end, cross-bridges direction is connected by middle part distribution beam;
(3) trussed construction is installed
By many previously prepared good Bailey truss crane order liftings, be arranged in end and middle part distribution beam along the bridge, form Eight characters supporting & stablizing structure.
(4) dismounting of Eight characters bracing frame
After Cast-in-situ Beam concrete construction, according to trussed construction, distribution beam, shore, the order of battered leg, montant removes successively.
In said method, described in cross-bridges direction, each montant, each battered leg, except middle part is connected to each other by horizontal stull, are also provided with bridging.The connection of described montant lower end and battered leg lower end adopts the mode of gusset plate pin joint.Described battered leg upper end along the bridge and the connection of shoring, adopt the mode of gusset plate pin joint.Described inside two pier studs along the bridge, every side montant all arranges and is no less than 2.Described Bailey truss is no less than 6.
Compare existing raft support method and steel pipe pile Bailey truss method, the present invention, without the need to taking underlying space, meets the current location having strict demand; Also do not need temporary base simultaneously, be suitable for any geologic structure section, be particularly suitable for, across river, cross a river, Muddy Bottoms location, significantly to reduce construction costs.
Accompanying drawing explanation
Fig. 1 is the vertical structure schematic diagram of Eight characters bracing frame involved in the present invention.
Fig. 2 is the transversary schematic diagram of Fig. 1 Eight characters bracing frame.
Fig. 3 is the concrete structure figure of part in Fig. 1 or Fig. 2 Eight characters bracing frame.Wherein: a is montant; B is battered leg; C is for shoring.
In Fig. 1 ~ Fig. 3: 1, montant; 2, battered leg; 3, shore; 4, middle part distribution beam; 4 ' end distribution beam; 5, Bailey truss; 6, longitudinal stull; 6 ' horizontal stull; 7, bridging; 8, pier stud; 9, cushion cap; 10, Cast-in-situ Beam; 11, template.Wherein: 1-1, flange; 1-2, gusset plate; 1-3, pin-and-hole; 2-1, gusset plate; 2-2, pin-and-hole; 2-3, gusset plate; 2-4, pin-and-hole; 2-5, bearing support; 3-1, gusset plate; 3-2, pin-and-hole.
Detailed description of the invention
As shown in Figure 1 and Figure 2, a kind of bridge cast in place concrete form Eight characters bracing frame, comprises montant 1, battered leg 2, shores 3, middle part distribution beam 4, Bailey truss 5 etc., wherein, montant 1 is made up of steel pipe, flange 1-1 and gusset plate 1-2 that (Fig. 3 a), gusset plate 1-2 establishes pin-and-hole 1-3; Battered leg 2 is made up of (Fig. 3 b) steel pipe, gusset plate 2-1,2-3, pin-and-hole 2-2,2-4, bearing support 2-5; Shore 3 to be made up of (Fig. 3 c) steel pipe, gusset plate 3-1, pin-and-hole 3-2.Pin-and-hole 1-3 on montant 1 gusset plate 1-2 is connected by steel pin with the pin-and-hole 2-2 on battered leg 2 gusset plate 2-1; Pin-and-hole 2-4 on battered leg 2 gusset plate 2-3 is connected by steel pin with the pin-and-hole 3-2 shored on 3 gusset plate 3-1.
As shown in Figure 3, montant 1 is seamless steel pipe, and blue 1-1 is managed at two ends, and gusset plate 1-2 is set in bottom, gusset plate is established pin-and-hole 1-3.Battered leg 2 is seamless steel pipe, and gusset plate 2-1 is established in lower end, and gusset plate 2-3 and bearing support 2-5 is established in upper end, gusset plate is established pin-and-hole 2-2,2-4.Shore 3 for seamless steel pipe, gusset plate 3-1 is established at two ends, gusset plate is established pin-and-hole 3-2.
With reference to figure 1, montant 1 is connected by longitudinal stull 6 with pier stud 8; Montant 1 is connected by longitudinal stull 6 with battered leg 2.Middle part distribution beam 4 is welded with the bearing support 2-5 on battered leg 2, makes battered leg 2 one-tenth Eight characters structure.
With reference to figure 2, be connected with bridging 7 by horizontal stull 6 ' between montant 1 is horizontal.End distribution beam 4 ' is welded with the flange 1-1 on montant 1, and many Bailey truss 5 are vertically shelved in distribution beam.Stull is that channel-section steel assembly welding becomes " " shape structure, and is welded and fixed between montant, battered leg and built-in fitting; Bridging is angle steel, and montant, is welded and fixed between battered leg.Distribution beam is i iron group welding piece, and montant top flange, is welded and fixed between battered leg bearing support.
A kind of Fig. 1 Eight characters bracing frame construction method of installation, comprises the steps:
(1) montant is installed
With reference to figure 1 ~ Fig. 3, fixed by the built-in fitting of montant 1 with cushion cap 9 by the flange 1-1 bottom montant, built-in fitting and flange pass through bolt anchoring; After the vertical bury pipe of adjustment montant, at suitable bridge to (longitudinal direction), lower node plate 1-2 position, the middle part of montant 1 are connected with the built-in fitting of pier stud 8 with longitudinal stull 6 respectively with top; At direction across bridge, adopt four montants in one line, middle part is connected to each other by horizontal stull 6 ', and installs bridging 7; Montant 1 top is welded with end distribution beam 4 ', and so far montant installs;
(2) battered leg and shore installation
With reference to figure 1 ~ Fig. 3, along bridge to, is connected with the gusset plate 2-1 of battered leg 2 end by the gusset plate 1-2 of montant 1 bottom, connection employing pin joint; Utilize wire rope to hold battered leg 2 upper end, adjust battered leg angle; Be connected with the gusset plate 3-1 shoring 3 by the gusset plate 2-3 on battered leg 2 top, connect and adopt pin joint; Be connected in the middle part of battered leg 2 with in the middle part of montant 1 by longitudinal stull 6; Battered leg top bearing support 2-5 welds with middle part distribution beam 4, and at direction across bridge, the same montant of battered leg quantity, is also connected by stull 6 ' each other, and install bridging 7; So far battered leg 2 and shore 3 and install;
(3) trussed construction is installed
With reference to figure 2, utilize crane to lift by crane multiple (in figure being 10) Bailey truss 5 along bridge to being arranged in end distribution beam 4 ' and middle part distribution beam 4, so far whole support frame structure installs.
(4) support frame structure is removed
After cast-in-place concrete construction, according to trussed construction, middle part distribution beam 4, end distribution beam 4 ', shore 3, the order of battered leg 2, montant 1 removes successively.

Claims (4)

1. a construction method for bridge cast in place concrete form Eight characters bracing frame, is characterized in that, comprise the steps:
(1) montant is installed
Inside two pier studs along the bridge, many montants are in one line along cross-bridges direction, each montant lower end and the anchoring of pier stud cushion cap, the bottom of each montant, middle part and top respectively with pier shaft anchoring; Montant upper end is connected by end distribution beam; In cross-bridges direction, be connected to each other by horizontal stull in the middle part of each montant;
(2) battered leg and shore installation
Each montant lower end all connects the lower end that is adjusted the battered leg at angle of inclination in advance, by shoring connection between two battered leg upper ends along the bridge, is connected in the middle part of battered leg along the bridge with in the middle part of montant by longitudinal stull; Connected by horizontal stull in the middle part of each battered leg in cross-bridges direction, each battered leg upper end, cross-bridges direction is connected by middle part distribution beam; Wherein, the connection of montant lower end and battered leg lower end adopts the mode of gusset plate pin joint; Battered leg upper end along the bridge and the connection of shoring, adopt the mode of gusset plate pin joint;
(3) trussed construction is installed
By many previously prepared good Bailey truss crane order liftings, be arranged in end and middle part distribution beam along the bridge, form Eight characters supporting & stablizing structure;
(4) dismounting of Eight characters bracing frame
After Cast-in-situ Beam concrete construction, according to trussed construction, distribution beam, shore, the order of battered leg, montant removes successively.
2. the construction method of bridge cast in place concrete form Eight characters bracing frame as claimed in claim 1, is characterized in that, described in cross-bridges direction, and each montant, each battered leg, except middle part is connected to each other by horizontal stull, are also provided with bridging.
3. the construction method of bridge cast in place concrete form Eight characters bracing frame as claimed in claim 1, is characterized in that, described inside two pier studs along the bridge, every side montant all arranges and is no less than 2.
4. the construction method of bridge cast in place concrete form Eight characters bracing frame as claimed in claim 1, it is characterized in that, described Bailey truss is no less than 6.
CN201310538941.6A 2013-11-01 2013-11-01 The construction method of bridge cast in place concrete form Eight characters bracing frame Active CN103628408B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310538941.6A CN103628408B (en) 2013-11-01 2013-11-01 The construction method of bridge cast in place concrete form Eight characters bracing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310538941.6A CN103628408B (en) 2013-11-01 2013-11-01 The construction method of bridge cast in place concrete form Eight characters bracing frame

Publications (2)

Publication Number Publication Date
CN103628408A CN103628408A (en) 2014-03-12
CN103628408B true CN103628408B (en) 2016-03-02

Family

ID=50209835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310538941.6A Active CN103628408B (en) 2013-11-01 2013-11-01 The construction method of bridge cast in place concrete form Eight characters bracing frame

Country Status (1)

Country Link
CN (1) CN103628408B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104963295A (en) * 2015-07-27 2015-10-07 中铁九局集团第二工程有限公司 Support frame for non-ground internal-force balanced cast-in-place beam and construction method thereof
CN106087746A (en) * 2016-06-14 2016-11-09 江苏燕宁建设工程有限公司 A kind of cast-in-situ box girder falsework construction method and bridge
CN106939557B (en) * 2017-05-11 2019-01-22 中铁第五勘察设计院集团有限公司 A kind of pin-connected panel bracket casting platform of brace support
CN110565528A (en) * 2019-08-08 2019-12-13 中铁五局集团有限公司 Novel assembled cast in situ concrete support

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3536269B2 (en) * 1996-01-08 2004-06-07 清水建設株式会社 Construction method of concrete bridge and feed girder used for the construction method
JP3610828B2 (en) * 1999-06-07 2005-01-19 ピーシー橋梁株式会社 High-strength lightweight composite girder bridge and its construction method
CN100406677C (en) * 2006-05-24 2008-07-30 杨秋利 Tunnel lining trolley
CN100526573C (en) * 2008-08-28 2009-08-12 温州建设集团公司 Construction method of structure conversion layer concrete girder steel bracket formwork support
CN101481902A (en) * 2009-01-21 2009-07-15 中铁三局集团有限公司 V type pier inclined leg combined type support for continuous rigid frame bridge and layered cast-in-situ construction method
CN201648977U (en) * 2010-04-28 2010-11-24 中铁三局集团有限公司 Slant legged rigid frame bracket system of cast-in-place prestressed concrete continuous beam at bridge site
CN202543806U (en) * 2012-03-30 2012-11-21 中铁大桥局集团第五工程有限公司 Self-floating carrier frame bracket for bridge construction

Also Published As

Publication number Publication date
CN103628408A (en) 2014-03-12

Similar Documents

Publication Publication Date Title
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN204803896U (en) Adjusting device that deep basal pit steel shotcrete prestressing force was applyed
CN103628408B (en) The construction method of bridge cast in place concrete form Eight characters bracing frame
CN203904851U (en) Continuous beam side span straight section hanger support system
CN102828469B (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN105862878A (en) Supporting system for deep foundation pit
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN105317052B (en) Tower crane foundation bolt fixing method
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN205062832U (en) Different bottom width of non - equal span is adjustable, and T type roof beam prefabricates pedestal
CN203546618U (en) Splayed supporting frame for bridge cast-in-place concrete formwork
CN204780622U (en) Girder 0# piece construction bracket
CN202658590U (en) Integral assembled drilling platform
CN205257790U (en) Fixed high -low leg handle portal crane
CN202131600U (en) Dual cross fixing end
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN103835238B (en) A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing
CN102828616B (en) High-formwork support system for roof
CN208685457U (en) Cast-in-place box beam bracket device
CN211037310U (en) Novel steel pipe bundle tower crane buttress
CN204644886U (en) Two cam combination bracket
CN205000340U (en) Regard as foundation ditch of vertical cantilever fulcrum to go along with sb. to guard him system with underground continuous wall
CN212200101U (en) Supporting upright post and structure for suspended casting of box girder at triangular area of hollow rigid frame bridge
CN103938877B (en) The installation method of crab-bolt stock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant