CN103595039B - The distributed cyclization risk analysis method of network system - Google Patents
The distributed cyclization risk analysis method of network system Download PDFInfo
- Publication number
- CN103595039B CN103595039B CN201310488081.XA CN201310488081A CN103595039B CN 103595039 B CN103595039 B CN 103595039B CN 201310488081 A CN201310488081 A CN 201310488081A CN 103595039 B CN103595039 B CN 103595039B
- Authority
- CN
- China
- Prior art keywords
- bus
- cyclization
- node
- network
- risk analysis
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 67
- 238000007363 ring formation reaction Methods 0.000 title claims abstract description 42
- 238000012502 risk assessment Methods 0.000 title claims abstract description 24
- 238000005192 partition Methods 0.000 claims abstract description 29
- 238000004088 simulation Methods 0.000 claims abstract description 7
- 238000004458 analytical method Methods 0.000 claims abstract description 6
- 238000004364 calculation method Methods 0.000 claims description 19
- 239000011159 matrix material Substances 0.000 claims description 10
- 238000012937 correction Methods 0.000 claims description 8
- 238000000354 decomposition reaction Methods 0.000 claims description 5
- 238000002347 injection Methods 0.000 claims description 4
- 239000007924 injection Substances 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 230000005283 ground state Effects 0.000 claims description 2
- 238000003672 processing method Methods 0.000 abstract description 2
- 230000005855 radiation Effects 0.000 abstract 1
- 238000004422 calculation algorithm Methods 0.000 description 1
- 238000000205 computational method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000000638 solvent extraction Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310488081.XA CN103595039B (en) | 2013-10-17 | 2013-10-17 | The distributed cyclization risk analysis method of network system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310488081.XA CN103595039B (en) | 2013-10-17 | 2013-10-17 | The distributed cyclization risk analysis method of network system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103595039A CN103595039A (en) | 2014-02-19 |
CN103595039B true CN103595039B (en) | 2015-08-05 |
Family
ID=50085074
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310488081.XA Active CN103595039B (en) | 2013-10-17 | 2013-10-17 | The distributed cyclization risk analysis method of network system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103595039B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103872681A (en) * | 2014-03-25 | 2014-06-18 | 国家电网公司 | Online real-time loop closing method based on integration of major network and distribution network |
CN104008462A (en) * | 2014-06-16 | 2014-08-27 | 深圳供电局有限公司 | Reliability management information system and method covering high, medium and low voltage users |
CN105207199B (en) * | 2015-09-08 | 2017-05-10 | 江苏省电力公司 | Partition power grid main supply element overload quantity filling method |
CN106300337A (en) * | 2016-08-09 | 2017-01-04 | 国网浙江德清县供电公司 | Power distribution network partition method based on dynamic Decomposition method |
CN107480109B (en) * | 2017-10-23 | 2021-06-01 | 积成电子股份有限公司 | Incomplete parallel state estimation realization method based on network structure dynamic partitioning |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101431255A (en) * | 2008-11-17 | 2009-05-13 | 国电南瑞科技股份有限公司 | Closed loop operation risk analysis method for power system |
CN102904346B (en) * | 2012-11-01 | 2015-05-20 | 宁波电业局 | On-off control method and device of loop closing switch of 10kV power distribution network |
-
2013
- 2013-10-17 CN CN201310488081.XA patent/CN103595039B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103595039A (en) | 2014-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103595039B (en) | The distributed cyclization risk analysis method of network system | |
CN102193504B (en) | Safety and stability control system modeling method in power system dynamic simulation | |
CN103825267B (en) | A kind of computational methods of MMC-MTDC dc-side short-circuit electric current | |
CN101750562B (en) | Non-PMU measure point dynamic process estimation method based on flow equation sensitiveness analysis | |
CN103973203B (en) | A kind of online equivalent modeling method in large-sized photovoltaic power station suitable in security and stability analysis | |
CN103872681A (en) | Online real-time loop closing method based on integration of major network and distribution network | |
CN102403720B (en) | Hyper-real-time setting method for superposed time sequences based on transient voltage safety margin | |
CN100466412C (en) | United accident-prevention rehearse method for provincial and city power system | |
CN107453357A (en) | A kind of State Estimation for Distribution Network based on hierarchical solving | |
CN103475010B (en) | Transient stabilization control method for interconnection electrical network after impact disturbance | |
CN103065016A (en) | Method and system for determining alternating-current system fault range resulting in direct-current commutation failure | |
CN103942372A (en) | Multi-rate interface method for transient real-time simulation of active power distribution network based on FPGA | |
CN107516896B (en) | Load recovery scheme generation method based on decision tree pruning algorithm | |
CN102832618A (en) | Practical method for calculation of closed-loop impact current of power distribution network based on combination of power transmission network and power distribution network | |
CN107392498A (en) | A kind of power network topology analysis system | |
CN103400303A (en) | Static equivalence method for external network based on internal network routine Ward equivalent circuit | |
CN103199528A (en) | Status estimating and coordinating method of wide-area power system | |
CN104113061A (en) | Three-phase load flow calculation method of power distribution network with distributed power supply | |
CN105893714B (en) | Based on the detection of automatic voltage control system closed loop and appraisal procedure under Bulk power system simulation system | |
CN103475003A (en) | Automatic regional power grid voltage reactive power control method based on regional strategy optimization | |
CN104156531A (en) | Fault current limiter distribution point optimization and capacity selection method taking operation loss into consideration | |
CN103810915B (en) | Regulation and control integrative simulation method and system | |
Fang et al. | Realization of electromechanical transient and electromagnetic transient real time hybrid simulation in power system | |
CN115622053A (en) | Automatic load modeling method and device for considering distributed power supply | |
CN103632031A (en) | Rural load type load modeling method based on load curve decomposition |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: DONGFANG ELECTRONICS CORP. Effective date: 20141021 |
|
C41 | Transfer of patent application or patent right or utility model | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Pan Kaiyan Inventor after: Song Xueqing Inventor after: Dong Wenjie Inventor after: Liu Quanchang Inventor after: Tan Dashuai Inventor after: He Qunwei Inventor after: Wang Qingling Inventor after: Li Jiyong Inventor after: Liu Zhongyao Inventor after: Liu Shangwei Inventor after: Zhao Yong Inventor after: Li Wenchao Inventor after: Hu Tiebin Inventor after: Ye Yunqin Inventor before: Wang Qingling Inventor before: Song Xueqing Inventor before: Zhao Yong Inventor before: Dong Wenjie Inventor before: Liu Quanchang Inventor before: Li Wenchao Inventor before: Hu Tiebin Inventor before: Ye Yunqin Inventor before: He Qunwei Inventor before: Pan Kaiyan Inventor before: Li Jiyong Inventor before: Liu Zhongyao Inventor before: Liu Shangwei |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: WANG QINGLING LI WENCHAO HU TIEBIN YE YUNQIN HE QUNWEI PAN KAIYAN LI JIYONG LIU ZHONGYAO LIU SHANGWEI SONG XUEQING ZHAO YONG DONG WENJIE LIU QUANCHANG TO: PAN KAIYAN WANG QINGLING LI JIYONG LIU ZHONGYAO LIU SHANGWEI ZHAO YONG LI WENCHAO HU TIEBIN YE YUNQIN SONG XUEQING DONG WENJIE LIU QUANCHANG TAN DASHUAI HE QUNWEI |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20141021 Address after: 525000 Guangdong Province, Maoming City, Guan Shan Road, No. four, No. 2 Applicant after: MAOMING POWER SUPPLY BUREAU OF GUANGDONG POWER GRID Corp. Applicant after: DONGFANG ELECTRONICS Co.,Ltd. Address before: 525000 Guangdong Province, Maoming City, Guan Shan Road, No. four, No. 2 Applicant before: MAOMING POWER SUPPLY BUREAU OF GUANGDONG POWER GRID Corp. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 525000 No.2, Guanshan 4th Road, Maoming City, Guangdong Province Patentee after: MAOMING POWER SUPPLY BUREAU, GUANGDONG POWER GRID Co.,Ltd. Patentee after: DONGFANG ELECTRONICS Co.,Ltd. Address before: 525000 No.2, Guanshan 4th Road, Maoming City, Guangdong Province Patentee before: MAOMING POWER SUPPLY BUREAU OF GUANGDONG POWER GRID Corp. Patentee before: DONGFANG ELECTRONICS Co.,Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20210224 Address after: 525000 No.2, Guanshan 4th Road, Maoming City, Guangdong Province Patentee after: MAOMING POWER SUPPLY BUREAU, GUANGDONG POWER GRID Co.,Ltd. Address before: 525000 No.2, Guanshan 4th Road, Maoming City, Guangdong Province Patentee before: MAOMING POWER SUPPLY BUREAU, GUANGDONG POWER GRID Co.,Ltd. Patentee before: DONGFANG ELECTRONICS Co.,Ltd. |
|
TR01 | Transfer of patent right |