CN103594996A - 一种减小输电线路舞动装置及使用方法 - Google Patents

一种减小输电线路舞动装置及使用方法 Download PDF

Info

Publication number
CN103594996A
CN103594996A CN201310469611.6A CN201310469611A CN103594996A CN 103594996 A CN103594996 A CN 103594996A CN 201310469611 A CN201310469611 A CN 201310469611A CN 103594996 A CN103594996 A CN 103594996A
Authority
CN
China
Prior art keywords
bar
coil
transmission line
permanent magnet
acceleration transducer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310469611.6A
Other languages
English (en)
Other versions
CN103594996B (zh
Inventor
刘君
胡绍刚
刘诚
张朝龙
孙道军
张连贵
梁凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anshan Power Supply Co Of State Grid Liaoning Electric Power Co
State Grid Corp of China SGCC
Original Assignee
State Grid Corp of China SGCC
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310469611.6A priority Critical patent/CN103594996B/zh
Publication of CN103594996A publication Critical patent/CN103594996A/zh
Application granted granted Critical
Publication of CN103594996B publication Critical patent/CN103594996B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Alarm Systems (AREA)
  • Emergency Alarm Devices (AREA)

Abstract

本发明提供一种减小输电线路舞动装置及使用方法,装置包括加速度传感器、发热电阻、稳压器、IGBT整流电路、永磁体、弹簧、线圈、穿杆、壳体、底封板、太阳能锂电池、监控站。使用方法是:壳体固定在绝缘子串下端,穿杆端部的吊耳与输电线路相连接,舞动时,弹簧带动永磁体做往复运动,永磁体外部的线圈产生电流,并通过发热电阻消耗电能,使穿杆升温;加速度传感器将检测信号发送到监控站上,对穿杆运动情况进行实时监测。本发明的有益效果是:通过弹簧弹力对输电线路进行减震,缩小电缆振幅,同时,由线圈为发热电阻供电,避免了穿杆在冬季结冰的现象发生。

Description

一种减小输电线路舞动装置及使用方法
技术领域
本发明涉及一种减小输电线路舞动装置及使用方法。 
背景技术
架空输电线路的舞动是导线产生低频率大振幅的自激振动,舞动可导致多方面的危害,轻者有闪络、跳闸,重者则金具及绝缘子损坏、导线断股、断线,甚至倒塔等重大电网事故,舞动主要由3方面因素引发:覆冰、导线的结构参数以及风激励。 
舞动振幅过大易导致悬垂绝缘子串线夹出口处的导线发升损伤折断的情况;导线张力发生变化时,由于普通悬垂线夹与导线的握着力大,导线不能在悬垂线夹中活动,导致直线杆塔的绝缘子串顺导线方向倾斜,有时绝缘子串的倾斜夹角可大于10度,当一个耐张段内导线的不平衡张力达到一定的程度时,铁塔会受到损害。 
导线动能向铁塔传递的结点即导线与铁塔的连接结点,该结点具有导线的柔性向铁塔相对刚性急变的特点。在该结点上,导线对铁塔形成巨大的冲击,破坏了铁塔结构的完整性,如螺栓松动、螺孔开裂、塔材变形、结构失效等。 
同时,由于覆冰、风激励受导线所处地区的微地形、微气象等因素的影响,导线舞动的发生具有很大的随机性,舞动的特征也各不相同,所以通过监测计算相关舞动参量实现导线舞动的在线监测比较困难。 
发明内容
为克服现有技术的不足,本发明的目的是提供一种减小输电线路舞动装置及使用方法,减小舞动振幅,防止导线发生损伤折断和铁塔发生损害,并能实现输电线路舞动的在线监测。 
为实现上述目的,本发明通过以下技术方案实现: 
一种减小输电线路舞动装置,包括加速度传感器、发热电阻、稳压器、IGBT整流电路、永磁体、弹簧、线圈、穿杆、壳体、底封板、太阳能锂电池、监控站,壳体内壁设有永磁体,永磁体内设有线圈,壳体底部固定连接底封板,穿杆一端固定有线圈,另一端伸出底封板,并与吊耳固定连接,弹簧一端于线圈固定,另一端抵靠在底封板上,所述的加 速度传感器固定在穿杆上,线圈输出端与设在穿杆的发热电阻相连接,所述的加速度传感器由太阳能锂电池供电,加速度传感器将信号发送到监控站。 
所述的监控站包括控制器、报警器、显示屏、GPRS无线通讯模块、网络信号采集器,控制器与报警器、显示屏、GPRS无线通讯模块相连接,所述的控制器上设有网络信号采集器,加速度传感器将收集的穿杆速度信息转换成信号传输到网络信号采集器,控制器通过Profibus-DP及Modbus现场总线与网络信号采集器相连。 
减小输电线路舞动装置实现的使用方法,壳体固定在绝缘子串下端,穿杆端部的吊耳与输电线路相连接,舞动时,弹簧带动永磁体做往复运动,永磁体外部的线圈产生电流,并通过发热电阻消耗电能,使穿杆升温;加速度传感器将检测信号发送到监控站上,对穿杆运动情况进行实时监测。 
与现有技术相比,本发明的有益效果是: 
通过弹簧弹力对输电线路进行减震,缩小电缆振幅,同时,由线圈为发热电阻供电,避免了穿杆在冬季结冰的现象发生;穿杆运动发生变化时,通过加速度传感器将信息发到监控站,由监控站进行处理,并报警。 
附图说明
图1是本发明的结构示意图。 
图2是监控站的结构图。 
图中:1-壳体  2-永磁体  3-线圈  4-弹簧  5-底封板  6-发热电阻  7-加速度传感器8-穿杆。 
具体实施方式
下面结合说明书附图对本发明进行详细地描述,但是应该指出本发明的实施不限于以下的实施方式。 
见图1,一种减小输电线路舞动装置,包括加速度传感器7、发热电阻6、稳压器、IGBT整流电路、永磁体2、弹簧4、线圈3、穿杆8、壳体1、底封板5、太阳能锂电池、监控站,壳体1内壁设有永磁体2,永磁体2内设有线圈3,壳体1底部固定连接底封板5,穿杆8一端固定有线圈3,另一端伸出底封板5,并与吊耳固定连接,弹簧4一端与线圈3固定,另一端抵靠在底封板5上,所述的加速度传感器7固定在穿杆8上,线圈3输出端与设在穿杆8的发热电阻6相连接,所述的加速度传感器7由太阳能锂电池供电,加速度传感器7将信号发送到监控站。 
减小输电线路舞动装置实现的使用方法,壳体1固定在绝缘子串下端,穿杆8端部的 吊耳与输电线路相连接,电缆舞动时,弹簧4带动永磁体2做往复运动,永磁体2外部的线圈3产生电流,并通过发热电阻6消耗电能,使穿杆8升温,可防止冬季穿杆8结冰,影响防舞动效果;加速度传感器7将检测信号发送到监控站上,对穿杆8运动情况进行实时监测。 
所述的监控站包括控制器、报警器、显示屏、GPRS无线通讯模块、网络信号采集器,控制器与报警器、显示屏、GPRS无线通讯模块相连接,所述的控制器上设有网络信号采集器,加速度传感器7将收集的穿杆8速度信息转换成信号传输到网络信号采集器,控制器通过Profibus-DP及Modbus现场总线与网络信号采集器相连。 
信号采集器可采集8个加速度传感器7的信号,信号采集器将采集的信号发到控制器,控制器汇总处理信号,通过GPRS无线通讯模块发到控制***,并通过显示屏显示,一旦发现穿杆8加速度异常,控制器将给报警器发出指令报警。 
本发明装置通过弹簧弹力对输电线路进行减震,缩小电缆振幅,同时,由线圈为发热电阻供电,避免了穿杆在冬季结冰的现象发生;穿杆运动发生变化时,通过加速度传感器将信息发到监控站,由监控站进行处理,并报警,监控站可将汇总信息发送的控制***进行处理。 

Claims (3)

1.一种减小输电线路舞动装置,其特征在于,包括加速度传感器、发热电阻、稳压器、IGBT整流电路、永磁体、弹簧、线圈、穿杆、壳体、底封板、太阳能锂电池、监控站,壳体内壁设有永磁体,永磁体内设有线圈,壳体底部固定连接底封板,穿杆一端固定有线圈,另一端伸出底封板,并与吊耳固定连接,弹簧一端于线圈固定,另一端抵靠在底封板上,所述的加速度传感器固定在穿杆上,线圈输出端与设在穿杆的发热电阻相连接,所述的加速度传感器由太阳能锂电池供电,加速度传感器将信号发送到监控站。
2.根据权利要求1所述的一种减小输电线路舞动装置,其特征在于,所述的监控站包括控制器、报警器、显示屏、GPRS无线通讯模块、网络信号采集器,控制器与报警器、显示屏、GPRS无线通讯模块相连接,所述的控制器上设有网络信号采集器,加速度传感器将收集的穿杆速度信息转换成信号传输到网络信号采集器,控制器通过Profibus-DP及Modbus现场总线与网络信号采集器相连。
3.根据权利要求1所述的一种减小输电线路舞动装置的使用方法,其特征在于,壳体固定在绝缘子串下端,穿杆端部的吊耳与输电线路相连接,舞动时,弹簧带动永磁体做往复运动,永磁体外部的线圈产生电流,并通过发热电阻消耗电能,使穿杆升温,加速度传感器将检测信号发送到监控站上,对穿杆运动情况进行实时监测。
CN201310469611.6A 2013-10-10 2013-10-10 一种减小输电线路舞动装置及使用方法 Active CN103594996B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310469611.6A CN103594996B (zh) 2013-10-10 2013-10-10 一种减小输电线路舞动装置及使用方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310469611.6A CN103594996B (zh) 2013-10-10 2013-10-10 一种减小输电线路舞动装置及使用方法

Publications (2)

Publication Number Publication Date
CN103594996A true CN103594996A (zh) 2014-02-19
CN103594996B CN103594996B (zh) 2016-07-06

Family

ID=50085031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310469611.6A Active CN103594996B (zh) 2013-10-10 2013-10-10 一种减小输电线路舞动装置及使用方法

Country Status (1)

Country Link
CN (1) CN103594996B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104501856A (zh) * 2014-12-18 2015-04-08 国家电网公司 一种低空电力线摆动监测装置
CN105244831A (zh) * 2015-10-30 2016-01-13 国网山东省电力公司东营供电公司 智能防震锤
CN105337235A (zh) * 2015-10-30 2016-02-17 国网山东省电力公司东营供电公司 电磁避震式智能防震锤
CN107268819A (zh) * 2017-06-05 2017-10-20 山东大学 一种多维电阻耗能减振装置
CN109379409A (zh) * 2018-09-25 2019-02-22 黄华 基于物联网的机房设备耗电监控设备
RU209764U1 (ru) * 2021-05-31 2022-03-22 Общество с ограниченной ответственностью "Скайворд" Адаптивный магнитореологический демпфер пляски и вибрации проводов воздушных линий электропередачи
RU217141U1 (ru) * 2022-12-27 2023-03-20 Акционерное общество "Россети Тюмень" Устройство для сброса гололедно-изморозевых отложений с проводов воздушной линии электропередачи

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101840864B1 (ko) * 2017-12-29 2018-03-21 주식회사 신원기술단 건축구조물 전기배관 안전장치

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3675471A (en) * 1967-04-10 1972-07-11 Raymond R Bouche Method of measuring vibration characteristics of structures
DE4225979C2 (de) * 1992-08-06 1996-03-07 Abb Patent Gmbh Erfassung von Seilbewegungen einer Hochspannungsfreileitung
CN101571413A (zh) * 2009-06-17 2009-11-04 西安工程大学 基于加速度传感器的输电线路舞动在线监测***
CN201476814U (zh) * 2009-06-23 2010-05-19 西安工程大学 输电线路舞动在线监测***中的传感器装置
CN101820152A (zh) * 2010-04-19 2010-09-01 河北省电力研究院 一种利用涡流发热阻止输电导线舞动的装置
CN101820151A (zh) * 2010-04-19 2010-09-01 河北省电力研究院 一种防止导线舞动及其对铁塔产生破坏的装置
CN102097773A (zh) * 2010-12-23 2011-06-15 李艳龙 重锤式能量转换防舞动金具

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3675471A (en) * 1967-04-10 1972-07-11 Raymond R Bouche Method of measuring vibration characteristics of structures
DE4225979C2 (de) * 1992-08-06 1996-03-07 Abb Patent Gmbh Erfassung von Seilbewegungen einer Hochspannungsfreileitung
CN101571413A (zh) * 2009-06-17 2009-11-04 西安工程大学 基于加速度传感器的输电线路舞动在线监测***
CN201476814U (zh) * 2009-06-23 2010-05-19 西安工程大学 输电线路舞动在线监测***中的传感器装置
CN101820152A (zh) * 2010-04-19 2010-09-01 河北省电力研究院 一种利用涡流发热阻止输电导线舞动的装置
CN101820151A (zh) * 2010-04-19 2010-09-01 河北省电力研究院 一种防止导线舞动及其对铁塔产生破坏的装置
CN102097773A (zh) * 2010-12-23 2011-06-15 李艳龙 重锤式能量转换防舞动金具

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104501856A (zh) * 2014-12-18 2015-04-08 国家电网公司 一种低空电力线摆动监测装置
CN105244831A (zh) * 2015-10-30 2016-01-13 国网山东省电力公司东营供电公司 智能防震锤
CN105337235A (zh) * 2015-10-30 2016-02-17 国网山东省电力公司东营供电公司 电磁避震式智能防震锤
CN107268819A (zh) * 2017-06-05 2017-10-20 山东大学 一种多维电阻耗能减振装置
CN107268819B (zh) * 2017-06-05 2023-08-18 山东大学 一种多维电阻耗能减振装置
CN109379409A (zh) * 2018-09-25 2019-02-22 黄华 基于物联网的机房设备耗电监控设备
CN109379409B (zh) * 2018-09-25 2021-05-28 网思科技股份有限公司 基于物联网的机房设备耗电监控设备
RU209764U1 (ru) * 2021-05-31 2022-03-22 Общество с ограниченной ответственностью "Скайворд" Адаптивный магнитореологический демпфер пляски и вибрации проводов воздушных линий электропередачи
RU217141U1 (ru) * 2022-12-27 2023-03-20 Акционерное общество "Россети Тюмень" Устройство для сброса гололедно-изморозевых отложений с проводов воздушной линии электропередачи

Also Published As

Publication number Publication date
CN103594996B (zh) 2016-07-06

Similar Documents

Publication Publication Date Title
CN103594996A (zh) 一种减小输电线路舞动装置及使用方法
CN103762536B (zh) 一种架空输电线路主动防舞装置
CN202928615U (zh) 输电塔应变及振动健康状态在线监测及远程监视***
CN201133921Y (zh) 交流特高压送电线路微风振动监测装置
CN103852694A (zh) 电力电缆智能接地箱
CN102288281A (zh) 基于振动发电的高压线微风振动在线监测装置及方法
CN111030025B (zh) 一种安全节能型高架电缆用防积雪装置
CN104065016B (zh) 利用外激谐振的输电线路在线防结冰防覆雪方法
CN104280683A (zh) 电力变压器电机和风扇的机械故障监测装置
CN102545124A (zh) 一种具有自适用调频功能的输电线路防舞装置
CN205178650U (zh) 一种接触网供电设备地面监测网络
CN208674830U (zh) 一种大阻尼防舞动装置
CN203352102U (zh) 一种电磁防振锤
CN207649756U (zh) 输电线路微风振动实时预警装置
CN205175547U (zh) 输电线路导线振动综合在线监测传感器
CN202793581U (zh) 一种基于力学分析输电线路导线舞动在线监测***
CN201188527Y (zh) 一种防止高压线结冰挂雪的自动除冰装置
CN203690859U (zh) 一种架空输电线路主动防舞执行机构
CN104917303B (zh) 取电装置及包括该取电装置的无人直升机
CN203690508U (zh) 一种750千伏带电线路地线接地装置
CN202678896U (zh) 防滑预绞防震装置
CN105406430A (zh) 一种用于单回路输电线路的防舞装置
CN206820436U (zh) 一种架空地线的智能耐张线夹
CN201438632U (zh) 一种预绞式间隔棒
CN204142926U (zh) 电力变压器电机和风扇的机械故障监测装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
CB03 Change of inventor or designer information

Inventor after: Liu Jun

Inventor after: Zhang Shuangshuang

Inventor after: Hu Shaogang

Inventor after: Liu Cheng

Inventor after: Zhang Chaolong

Inventor after: Sun Daojun

Inventor after: Zhang Liangui

Inventor after: Liang Kai

Inventor before: Liu Jun

Inventor before: Hu Shaogang

Inventor before: Liu Cheng

Inventor before: Zhang Chaolong

Inventor before: Sun Daojun

Inventor before: Zhang Liangui

Inventor before: Liang Kai

COR Change of bibliographic data
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Anshan Power Supply Company of State Grid Liaoning Electric Power Company

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: ANSHAN POWER SUPPLY COMPANY, LIAONING ELECTRIC POWER Co.,Ltd.

CP03 Change of name, title or address

Address after: 114002 Anshan South Road, Tiedong District, Liaoning, Shengli Road, No. 52

Patentee after: Anshan Power Supply Company of State Grid Liaoning Electric Power Company

Patentee after: State Grid Corporation of China

Address before: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee before: State Grid Corporation of China

Patentee before: Anshan Power Supply Company of State Grid Liaoning Electric Power Company