CN103590319A - Constraint device between cable-stayed bridge main beam and concrete main tower - Google Patents

Constraint device between cable-stayed bridge main beam and concrete main tower Download PDF

Info

Publication number
CN103590319A
CN103590319A CN201310610967.7A CN201310610967A CN103590319A CN 103590319 A CN103590319 A CN 103590319A CN 201310610967 A CN201310610967 A CN 201310610967A CN 103590319 A CN103590319 A CN 103590319A
Authority
CN
China
Prior art keywords
steel
cambered surface
horizontal
arc face
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310610967.7A
Other languages
Chinese (zh)
Other versions
CN103590319B (en
Inventor
高宗余
杜萍
朱旭初
石建华
刘汉顺
张德平
李翠霞
周建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Original Assignee
China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Reconnaissance and Design Institute Co Ltd filed Critical China Railway Major Bridge Reconnaissance and Design Institute Co Ltd
Priority to CN201310610967.7A priority Critical patent/CN103590319B/en
Publication of CN103590319A publication Critical patent/CN103590319A/en
Application granted granted Critical
Publication of CN103590319B publication Critical patent/CN103590319B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to a constraint device between a cable-stayed bridge main beam and a concrete main tower. A horizontal beam is arranged below the main tower. Semi-U-shaped arc face steel structure limiting stopping blocks are arranged on the two sides of a bridge center line through a prestress thick steel rib and an anchor bolt respectively in a connecting mode. The two semi-U-shaped arc face steel structure limiting stopping blocks form a whole semi-U-shaped arc face steel structure limiting stopping block, the U-shaped arc face steel structure limiting stopping block is in arc face contact with the contact face of a horizontal steel beam bracket. The horizontal beam is arranged below the main tower, the U-shaped arc face steel structure limiting stopping blocks are connected into the two sides of the bridge center line, borne horizontal force is transmitted to the steel main beam through a truss structure arranged between the horizontal beam and the steel main beam, then the horizontal force is converted to axial force borne by the main steel beam, the capacity for resisting horizontal resisting force is improved, and rotating constraint releasing is achieved by rotating of a steel plate arc face. According to the constraint device, the requirement for hinged constraint of large-tonnage horizontal load bearing can be met, and meanwhile additional bending stress generated by longitudinal horizontal load on the main steel rib can be lowered as much as possible.

Description

Restraint device between cable stayed bridge steel girder and concrete king-tower
Technical field
The present invention relates to the restraint device between a kind of cable stayed bridge steel girder and concrete king-tower.
Background technology
In bridge design, the mode that constraint between bridge superstructure and lower junction member adopts is conventionally dissimilar bearing, the ability of the load that the vertical constraint that bearing can bear produces is stronger, but due to the restriction of bearing self structure, the horizontal loading ability of the opposing horizontal restraint that it can provide is lower.Often only have hundreds of tons.In three pylon cable-stayed bridges, in order to meet the system stiffness requirement of structure, reduce the mobile load displacement of three pylon cable-stayed bridges simultaneously, at Zhong Tachu, be designed to the hinged supporting system of tower beam, only retrain the degree of freedom of longitudinal, vertical both direction, discharge rotational restraint.The span of cable stayed bridge is very large, the longitudinal horizontal force that middle tower place needs restraint is often up to more than 1000~2000 tons, the constraint of traditional pedestal cannot reach designing requirement, the moment of flexure simultaneously being produced by the longitudinal horizontal force of constraint place can produce additional bending stress to steel girder, to the stressed generation of steel girder adverse influence extremely.One of creationary design can meet the hinged constraint of bearing large-tonnage horizontal loading for this reason, reduce as far as possible again vertical equity load and steel girder is produced to the structure of additional bending stress, can optimize greatly the supporting constraint design of tower in large span three pylon cable-stayed bridges or suspension bridge simultaneously.
Summary of the invention
The object of the invention is for above-mentioned present situation, aim to provide a kind of energy and meet the hinged constraint of bearing large-tonnage horizontal loading, reduce as far as possible again vertical equity load simultaneously steel girder is produced to the cable stayed bridge steel girder of additional bending stress and the restraint device between concrete king-tower.
The implementation of the object of the invention is, restraint device between cable stayed bridge steel girder and concrete king-tower, king-tower lower transverse beam, be positioned at bridge center line both sides and be respectively connected with half U-shaped cambered surface steel structure positive stop by prestressed thick reinforcement and crab-bolt, two halves U-shaped cambered surface steel structure positive stop shape half U-shaped cambered surface steel structure positive stop in aggregates, forms cambered surface by cambered surface steel plate between U-shaped cambered surface steel structure positive stop and gooseneck bracket contact surface and contacts.
The present invention is at king-tower lower transverse beam, be arranged in bridge center line both sides and connect U-shaped cambered surface steel structure positive stop, the horizontal force bearing is given to steel girder by the trussed construction being located between crossbeam and steel girder, and then changes into the axial force that steel girder bears, and has strengthened the ability of opposing horizontal resist forces; The release of rotational restraint realizes by the rotation of the steel plate cambered surface of encouraging one another.
The present invention can meet the hinged constraint of bearing large-tonnage horizontal loading, reduces as far as possible again vertical equity load simultaneously steel girder is produced to additional bending stress.
Accompanying drawing explanation
Fig. 1 is U-shaped cambered surface steel structure positive stop elevation,
Fig. 3 is the 1-1 direction view of Fig. 2,
Fig. 3 is the trussed construction plan view between crossbeam and steel girder,
Fig. 4 is cambered surface steel plate structure schematic diagram.
The specific embodiment
At king-tower place, according to structure stress, require to need to adopt the hinged supporting system of tower beam, only need the degree of freedom of longitudinal, the vertical both direction of constraint, discharge rotational restraint.
With reference to Fig. 1,2,3, the present invention is at king-tower lower transverse beam, be positioned at bridge center line both sides and be respectively connected with half U-shaped cambered surface steel structure positive stop (see figure 3) by prestressed thick reinforcement 6 and crab-bolt 7, two halves U-shaped cambered surface steel structure positive stop shape half U-shaped cambered surface steel structure positive stop 2(in aggregates is shown in Fig. 2).For fear of steel girder, bear the additional bending moment that this horizontal force produces, during design, longitudinal spacing block is located near the centre of form height of girder.Make horizontal force that U-shaped cambered surface steel structure positive stop 2 transmits via the crossbeam bracket structure 3 contacting with U-shaped cambered surface steel structure positive stop 2, and by the trussed construction 5 being located between crossbeam 1 and steel girder 4, longitudinal horizontal force is given to steel girder 4, change into that steel girder bears axial force, strengthened the ability of opposing horizontal resist forces.
With reference to Fig. 4, between U-shaped cambered surface steel structure positive stop and gooseneck bracket contact surface, by cambered surface steel plate 8, form cambered surfaces and contact, with the cambered surface way of contact, meet the requirement that structure is rotated.The cambered surface radius of cambered surface steel plate 8 can be definite according to the bearing strength at the corner requirement of constraint place and cambered surface place, and the chord length of curved plate is determined according to the thickness of the locus of structure and cambered surface steel plate.
The present invention is the application of the two rope face bondbeam cable stayed bridges of three towers of (90+160+616+616+160+90) m a span, and girder adopts i shaped steel superposed beam, and the gooseneck between steel girder also adopts I shape.By computational analysis, under least favorable state, middle tower place longitudinal horizontal force is up to 2500 tons, by being set at Zhong Tachu, two and half U-shaped cambered surface steel structure positive stops consider, single half U-shaped cambered surface steel structure positive stop need bear the horizontal force of 1250 tons, the radius of curved plate adopts 2000mm, chord length 800mm.

Claims (2)

1. the restraint device between cable stayed bridge steel girder and concrete king-tower, it is characterized in that king-tower lower transverse beam, be positioned at bridge center line both sides and be respectively connected with half U-shaped cambered surface steel structure positive stop by prestressed thick reinforcement and crab-bolt, two halves U-shaped cambered surface steel structure positive stop shape half U-shaped cambered surface steel structure positive stop in aggregates, forms cambered surface by cambered surface steel plate between U-shaped cambered surface steel structure positive stop and gooseneck bracket contact surface and contacts.
2. the restraint device between cable stayed bridge steel girder according to claim 1 and concrete king-tower, wherein the cambered surface radius of curved plate can be determined according to the corner requirement of constraint place and the bearing strength at cambered surface place, and the chord length of curved plate is determined according to the thickness of the locus of structure and cambered surface steel plate.
CN201310610967.7A 2013-11-26 2013-11-26 Restraint device between cable stayed bridge steel girder and concrete king-tower Active CN103590319B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310610967.7A CN103590319B (en) 2013-11-26 2013-11-26 Restraint device between cable stayed bridge steel girder and concrete king-tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310610967.7A CN103590319B (en) 2013-11-26 2013-11-26 Restraint device between cable stayed bridge steel girder and concrete king-tower

Publications (2)

Publication Number Publication Date
CN103590319A true CN103590319A (en) 2014-02-19
CN103590319B CN103590319B (en) 2015-09-30

Family

ID=50080622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310610967.7A Active CN103590319B (en) 2013-11-26 2013-11-26 Restraint device between cable stayed bridge steel girder and concrete king-tower

Country Status (1)

Country Link
CN (1) CN103590319B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112048986A (en) * 2020-08-13 2020-12-08 中铁大桥勘测设计院集团有限公司 Inclined arch tower cable-stayed bridge

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004300744A (en) * 2003-03-31 2004-10-28 Jfe Engineering Kk Windproof bridge
CN101424071A (en) * 2008-12-03 2009-05-06 中交公路规划设计院有限公司 Supporting system of long span stayed-cable bridge
CN101798796A (en) * 2010-02-10 2010-08-11 武汉艾尔格桥梁新技术开发有限公司 Speed associated wind-resistant support
CN102505625A (en) * 2011-12-19 2012-06-20 同济大学 Limiting method for preventing main tower system of stayed-cable bridge of floating system from being damaged through arranging stay wire below beam end
CN102747685A (en) * 2011-04-19 2012-10-24 中交公路规划设计院有限公司 Multifunctional comprehensive restraint device for whole construction and operation process of long-span hybrid-beam cable-stayed bridge
KR20130000642A (en) * 2011-06-23 2013-01-03 주식회사 교량과 고속철도 A construction method of steel cable-stayed bridge with stu for additional longitudinal forces control of continuous welded rail

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004300744A (en) * 2003-03-31 2004-10-28 Jfe Engineering Kk Windproof bridge
CN101424071A (en) * 2008-12-03 2009-05-06 中交公路规划设计院有限公司 Supporting system of long span stayed-cable bridge
CN101798796A (en) * 2010-02-10 2010-08-11 武汉艾尔格桥梁新技术开发有限公司 Speed associated wind-resistant support
CN102747685A (en) * 2011-04-19 2012-10-24 中交公路规划设计院有限公司 Multifunctional comprehensive restraint device for whole construction and operation process of long-span hybrid-beam cable-stayed bridge
KR20130000642A (en) * 2011-06-23 2013-01-03 주식회사 교량과 고속철도 A construction method of steel cable-stayed bridge with stu for additional longitudinal forces control of continuous welded rail
CN102505625A (en) * 2011-12-19 2012-06-20 同济大学 Limiting method for preventing main tower system of stayed-cable bridge of floating system from being damaged through arranging stay wire below beam end

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112048986A (en) * 2020-08-13 2020-12-08 中铁大桥勘测设计院集团有限公司 Inclined arch tower cable-stayed bridge

Also Published As

Publication number Publication date
CN103590319B (en) 2015-09-30

Similar Documents

Publication Publication Date Title
CN102021889A (en) Bridge erection method
CN103437300A (en) Construction method for erecting double cantilevers for pier top steel beam without pier-side bracket
CN101858053A (en) Stayed-cable anchor plate type anchoring structure of stayed-cable bridge cable tower
CN107988924B (en) Steel-concrete composite girder bridge system conversion system and conversion method based on old bridge reconstruction
CN103374878A (en) Cable-stayed bridge cable force transfer structure of steel truss with reversed trapezoid section
CN208668250U (en) The good Mid and minor spans steel plate combination beam of cracking resistance
CN103018114B (en) A kind of external prestressing precast assembly concrete component seam shear strength test device
CN203583378U (en) Floor plate truss trolley for mounting bridge deck slab of composite structure bridge
CN211848838U (en) Device for improving stress of hogging moment area of steel-concrete combined continuous beam
CN103590319B (en) Restraint device between cable stayed bridge steel girder and concrete king-tower
CN201738238U (en) Cable stayed anchor plate type anchor of cable stayed bridge cable tower
CN105603890A (en) Extradosed type external cable reinforced girder bridge
CN205669166U (en) A kind of cable-stayed bridge main-beam section structure using rotator construction
CN111101434A (en) Cable-stayed bridge with tensioned midspan girder
CN202416173U (en) Wide girder bridge floor system structure with horizontal K support
CN105421251A (en) Plate-girder jacking support mechanism and plate-girder jacking support tool
CN205804149U (en) Bridge rigid pulling force is put
Jiang et al. Key technologies of whole incremental launching construction control for inclined continuous box girder with steep longitudinal gradient
CN104988843A (en) Bridge combined by steel structural box girder and concrete bridge deck panel
CN201943006U (en) Main tower zone movable bracket for assisting non-variable amplitude girder erecting crane to erect steel box girders
CN210066473U (en) Bridge seismic isolation and reduction system
CN109537472B (en) Precast beam end bottom die rotating hinge device and application method thereof
CN201952736U (en) Auxiliary pier movable bracket for assisting invariable-amplitude beam erecting crane in erecting steel box girder
CN102926318A (en) Fully assembled emergency combination bridge device
CN102433838A (en) Wide-purlin bridge floor system structure with horizontal K support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant