CN103572963B - Secondary structure concrete casting building method - Google Patents

Secondary structure concrete casting building method Download PDF

Info

Publication number
CN103572963B
CN103572963B CN201210279498.0A CN201210279498A CN103572963B CN 103572963 B CN103572963 B CN 103572963B CN 201210279498 A CN201210279498 A CN 201210279498A CN 103572963 B CN103572963 B CN 103572963B
Authority
CN
China
Prior art keywords
liner wall
beam plate
wood
split bolt
support shuttering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210279498.0A
Other languages
Chinese (zh)
Other versions
CN103572963A (en
Inventor
梁志远
赵建立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201210279498.0A priority Critical patent/CN103572963B/en
Publication of CN103572963A publication Critical patent/CN103572963A/en
Application granted granted Critical
Publication of CN103572963B publication Critical patent/CN103572963B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of secondary structure concrete casting building method, it comprises the beam plate built and the liner wall of inner side, base hole, support shuttering installed by liner wall, split bolt is equipped with in support shuttering both sides, liner wall side is connected with underground diaphragm wall, by described liner wall concrete placement to beam plate bottom at least 15cm, split bolt is arranged on beam plate bottom at least 20cm, it comprises the steps: step one: after concrete reaches intensity, remove support shuttering, retain split bolt, and liner wall end face is broken into hair side; Step 2: install seal strip, template, the lumps of wood, steel pipe and steel pipe card successively in another side of liner wall; Step 3: fix a square wood strip by expansion bolt bottom lumps of wood top, beam plate; Step 4: install Grouting Pipe on top, template one end, plasma discharge venting hole is offered on the other end top; Step 5: build liner wall residue part with mortar, be in the milk complete. The present invention can improve water-repellancy and security.

Description

Secondary structure concrete casting building method
Technical field
The present invention relates to a kind of casting method, specifically secondary structure concrete casting building method.
Background technology
In building engineering construction process, often can run into the problem that the concrete structure built affects secondary structure concrete placement below it. Such as, in the structure reverse construction process of underground, beam plate is first built with excavation of foundation pit, as the lateral brace of building enclosure. When excavation of foundation pit is complete, construct from bottom to top the secondary structures such as concrete lining wall, outsourcing post or shear wall time, the beam plate formed becomes the obstacle that concrete is built smoothly. When running into this kind of situation, usually adopting two kinds of methods, one is at the oblique Zhi Mo in secondary structure top, from hydraucone casting concrete; Two be template frame good after built by floor reserving hole. But, owing to concrete shrinks in condensation, solidification process, no matter adopt which kind of method, vibration compacting all it is difficult at beam plate and secondary structure joining place concrete, form bigger gap, affect the intensity of structure, water resistance and appearance, even the security of structure can be caused disadvantageous effect.
Summary of the invention
The present invention is intended to overcome the defect of prior art, it is provided that a kind of secondary structure concrete casting building method, it is to increase water-repellancy and security.
In order to solve the problems of the technologies described above, the present invention is achieved in that
A kind of secondary structure concrete casting building method, it comprises the beam plate built and the liner wall of inner side, base hole, support shuttering installed by liner wall, split bolt is equipped with in support shuttering both sides, liner wall side is connected with underground diaphragm wall, it is characterised in that, by described liner wall concrete placement to apart from beam plate bottom at least 15cm, split bolt is arranged on apart from beam plate bottom at least 20cm, and it comprises the steps:
Step one: after concrete reaches intensity, removes support shuttering, retains split bolt, and liner wall end face is broken into hair side;
Step 2: install seal strip, template, the lumps of wood, steel pipe and steel pipe card successively in another side of liner wall;
Step 3: fix a square wood strip by expansion bolt bottom lumps of wood top, beam plate;
Step 4: install Grouting Pipe on top, template one end, plasma discharge venting hole is offered on the other end top;
Step 5: build liner wall residue part with mortar, be in the milk complete.
The invention has the beneficial effects as follows: easy for installation, simple to operate, be convenient to draw materials, it is possible to effectively avoid the uncompacted problem of junction concrete produced between secondary structure and existing structure, it is ensured that concrete water-proof performance and appearance and security requirement.
Accompanying drawing explanation
Below in conjunction with drawings and embodiments, the present invention is described in further detail:
Fig. 1 is the structural representation of the present invention.
Fig. 2 be in Fig. 1 A-A to structural representation.
Embodiment
As shown in Figure 1 and Figure 2: a kind of secondary structure concrete casting building method, it comprises the beam plate 1 built and the liner wall 2 of inner side, base hole, liner wall is installed support shuttering 3, split bolt 4 is equipped with in support shuttering both sides, liner wall side is connected with underground diaphragm wall 5, by described liner wall concrete placement to apart from 15cm place, beam plate bottom 15, split bolt is arranged on apart from beam plate bottom 25cm, and it comprises the steps:
Step one: after concrete reaches intensity, removes support shuttering 3, retains split bolt 4, and liner wall 2 end face is broken into hair side;
Step 2: install seal strip 6, template 7, the lumps of wood 8, steel pipe 9 and steel pipe card 10 successively in another side of liner wall 2;
Step 3: fix a square wood strip 12 by expansion bolt 11 bottom the lumps of wood 8 top, beam plate 1;
Step 4: install Grouting Pipe 13 on top, template one end, plasma discharge venting hole 14 is offered on the other end top;
Step 5: build liner wall residue part with mortar, be in the milk complete.

Claims (1)

1. a secondary structure concrete casting building method, it comprises the beam plate built and the liner wall of inner side, base hole, support shuttering installed by liner wall, split bolt is equipped with in support shuttering both sides, liner wall side is connected with underground diaphragm wall, it is characterised in that, by described liner wall concrete placement to apart from beam plate bottom at least 15cm, split bolt is arranged on apart from beam plate bottom at least 20cm, and it comprises the steps:
Step one: after concrete reaches intensity, removes support shuttering, retains split bolt, and liner wall end face is broken into hair side;
Step 2: install seal strip, template, the lumps of wood, steel pipe and steel pipe card successively in another side of liner wall;
Step 3: fix a square wood strip by expansion bolt bottom lumps of wood top, beam plate;
Step 4: install Grouting Pipe on top, template one end, plasma discharge venting hole is offered on the other end top;
Step 5: build liner wall residue part with mortar, be in the milk complete.
CN201210279498.0A 2012-08-08 2012-08-08 Secondary structure concrete casting building method Expired - Fee Related CN103572963B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210279498.0A CN103572963B (en) 2012-08-08 2012-08-08 Secondary structure concrete casting building method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210279498.0A CN103572963B (en) 2012-08-08 2012-08-08 Secondary structure concrete casting building method

Publications (2)

Publication Number Publication Date
CN103572963A CN103572963A (en) 2014-02-12
CN103572963B true CN103572963B (en) 2016-06-01

Family

ID=50045615

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210279498.0A Expired - Fee Related CN103572963B (en) 2012-08-08 2012-08-08 Secondary structure concrete casting building method

Country Status (1)

Country Link
CN (1) CN103572963B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107687213A (en) * 2017-10-16 2018-02-13 华东建筑设计研究院有限公司 A kind of assembly concrete wall connecting node apparatus and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1563612A (en) * 2004-03-15 2005-01-12 中国第二十冶金建设公司 Construction method for underground structure through half reverse course of action of inverting connection
JP2005330803A (en) * 2005-06-20 2005-12-02 Geostr Corp Tunnel structure
CN201433391Y (en) * 2009-07-21 2010-03-31 中冶天工建设有限公司 Hanging mold supporting device in top down construction method adopted construction of underground wall body structure
CN201460220U (en) * 2009-04-24 2010-05-12 中冶天工上海十三冶建设有限公司 Single-head split bolt for underground continuous wall inner lining wall shuttering erection
CN201588207U (en) * 2009-07-21 2010-09-22 中冶天工建设有限公司 Concreting device at construction joints

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4449876B2 (en) * 2005-09-28 2010-04-14 羽田コンクリート工業株式会社 Large-section tunnel structure and its construction method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1563612A (en) * 2004-03-15 2005-01-12 中国第二十冶金建设公司 Construction method for underground structure through half reverse course of action of inverting connection
JP2005330803A (en) * 2005-06-20 2005-12-02 Geostr Corp Tunnel structure
CN201460220U (en) * 2009-04-24 2010-05-12 中冶天工上海十三冶建设有限公司 Single-head split bolt for underground continuous wall inner lining wall shuttering erection
CN201433391Y (en) * 2009-07-21 2010-03-31 中冶天工建设有限公司 Hanging mold supporting device in top down construction method adopted construction of underground wall body structure
CN201588207U (en) * 2009-07-21 2010-09-22 中冶天工建设有限公司 Concreting device at construction joints

Also Published As

Publication number Publication date
CN103572963A (en) 2014-02-12

Similar Documents

Publication Publication Date Title
CN103510640B (en) A kind of fabricated shear wall and assembly method thereof
CN103469798B (en) A kind of foundation pit supporting construction and construction method thereof
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
KR101572926B1 (en) the steel-concrete hybrid precast concrete beam connecting structure for a horizontal extending a building and the construction method thereof
CN103422667B (en) Double-plate prefabricated superposed wall supporting system
CN103088842A (en) Rubble retaining wall reinforced single-face pattern plate support system and construction method
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN207177286U (en) Add region mould after fabricated shear wall is reserved
CN204282399U (en) A kind of subway space enclosing structure
CN103572963B (en) Secondary structure concrete casting building method
KR101566528B1 (en) Basement extension construction method using underground structure
CN104131570A (en) Steel box enclosure device for foundation pit construction and construction method thereof
CN204919829U (en) Steel plate concrete shear force wall and basic connection structure and basic built -in fitting structure
CN204266216U (en) Bamboo beam anchoring and supporting structure of side slope
KR20090125896A (en) Construction method for basement extention
CN204252119U (en) The special-shaped supporting pile structure of X
CN203546944U (en) Assembly type shear wall
CN202990418U (en) Slurry-leaking protection device preventing cast-in-place concrete column root from rotting
JP4789549B2 (en) Reconstruction method for existing buildings
CN207228155U (en) One kind wears dividing wall support changing structure for use
JP2006002428A (en) Reinforcing method of existing floor and base isolation method of existing building
JP4947969B2 (en) Building construction method and construction structure using underground outer peripheral wall of existing building
CN203741893U (en) Reinforcing system with reverse anchor rod static pressure piles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200508

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2469

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601