CN103557007A - Support structure passing geological abnormal zone extreme crushing soft rock tunnel and construction method of support structure - Google Patents

Support structure passing geological abnormal zone extreme crushing soft rock tunnel and construction method of support structure Download PDF

Info

Publication number
CN103557007A
CN103557007A CN201310399662.6A CN201310399662A CN103557007A CN 103557007 A CN103557007 A CN 103557007A CN 201310399662 A CN201310399662 A CN 201310399662A CN 103557007 A CN103557007 A CN 103557007A
Authority
CN
China
Prior art keywords
monomer members
arc monomer
smashed
rock tunnel
support structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310399662.6A
Other languages
Chinese (zh)
Other versions
CN103557007B (en
Inventor
姚直书
程桦
唐永志
许绍东
荣传新
宋海清
蔡海兵
王晓健
郑腾龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui University of Science and Technology
Original Assignee
Anhui University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui University of Science and Technology filed Critical Anhui University of Science and Technology
Priority to CN201310399662.6A priority Critical patent/CN103557007B/en
Publication of CN103557007A publication Critical patent/CN103557007A/en
Application granted granted Critical
Publication of CN103557007B publication Critical patent/CN103557007B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a support structure passing a geological abnormal zone extreme crushing soft rock tunnel and a construction method of the support structure. The support structure comprises a steel plate high-strength concrete layer disposed peripherally along the inner wall of the tunnel. The steel plate high-strength concrete layer is formed by a plurality of arc-shaped single components which are sequentially connected. Each arc-shaped single component comprises a tubular body made of steel plates, and high-strength expansion concrete is filled in the inner cavity of the tubular body. The arc-shaped single components are constructed in a way that the bottoms are firstly mounted, then the two sides are mounted, and finally the tops are sealed. The support structure has the advantages that the whole circle of support can be assembled underground using number-adjustable prefabricated arc-shaped single components according to the section size of the circular tunnel, and the support structure is high in adaptability, reliable in quality, convenient to manufacture, and high in strength and support resistance.

Description

Cross supporting and protection structure and the job practices thereof of geologic anomaly band soft-rock tunnel smashed to pieces
Technical field
The present invention relates to mine timbering field, be specifically related to a kind of supporting and protection structure and job practices thereof of crossing geologic anomaly band soft-rock tunnel smashed to pieces.
Background technology
When the abnormal geological bands such as tomography are crossed in coal mine deep well tunnel, due to architectonic effect, in abnormal belt, rock mass is extremely broken, loose, moisture, during driving, roadway deformation amount is too large, also have " like mud-rock flow " phenomenon, caused great difficulty and had great potential safety hazard to construction and support work.
Summary of the invention
The object of the invention is to overcome above-mentioned the deficiencies in the prior art, a kind of supporting and protection structure and job practices thereof of crossing geologic anomaly band soft-rock tunnel smashed to pieces of avoiding the abnormal geological band section tunnel to occur unfavorable situations such as repeatedly destroying and reprocess is provided.
A kind of supporting and protection structure of crossing geologic anomaly band soft-rock tunnel smashed to pieces, comprise the steel plate high-strength concrete layer arranging along tunnel inwall circumferencial direction, described steel plate high-strength concrete layer is connected to form successively by several arc monomer members, described arc monomer members comprises the member body of being made by steel plate, is filled with high-strength slightly expanded concrete in the internal cavity of described member body.
Preferably,
Described arc monomer members quantity is 6~8.
Preferably,
Described high-strength slightly expanded concrete is the high-strength slightly expanded concrete of C80.
Preferably,
Described arc monomer members joint is provided with compressible backing plate.
Preferably,
The intrados of described arc monomer members and joint face place are equipped with to the holdfast of member tube intracoelomic cavity direction.
Preferably,
Uniformly on the circumferencial direction of described arc monomer members offer two injected hole/holes for hoist.
Preferably,
The end face of described arc monomer members is welded with connecting angle in the radial direction, is processed with bolt hole on connecting angle.
Preferably,
The fly-ash mortar filling bed being also provided with successively between described steel plate high-strength concrete layer and tunnel inwall and U36 type support.
A job practices of crossing geologic anomaly band soft-rock tunnel smashed to pieces, concrete steps are:
One, in tunnel, set up U36 type support;
Two, on U36 type support, lay one deck harsh concrete bed course;
Three, on harsh concrete bed course, install the arc monomer members that is positioned at bottom;
Four, on two limits of bottom arc monomer members, set up the arc monomer members that is positioned at side direction;
Five, between the arc monomer members top of two side direction, be positioned at the arc monomer members on top;
Six, after a circle arc monomer members is installed and finished, adopt pulp shooting machine to spray filler to fly-ash mortar filling bed, form integer support structure.
When down-hole arc monomer members is installed, the joint of the arc monomer members in step 3 to five is also placed with a compressible backing plate.
Structural advantage of the present invention is: 1, applicability is strong, and whole coil support can, according to the size of circular tunnel section, adopt the adjustable prefabricated arc monomer members of quantity to be assembled in down-hole.2, monomer members can adopt batch production to produce on ground, and reliable in quality is easily manufactured.3, concrete strength high (can reach C80~100), rack bearing is large, and supporting drag is large, and after the compressible backing plate by joint and wall, fly-ash mortar filling bed is realized contracting and allowed pressures, increases that to hinder characteristic good, after setting up, can carry immediately.
Method advantage of the present invention is: easy construction, the compressive strain by support with backfilling layer can reach pressure regulation effect, reduce the inhomogeneities of pressure from surrounding rock, for support provides good stress condition, is conducive to the performance of structural bearing capacity.
Accompanying drawing explanation
Fig. 1 is mounting structure schematic diagram of the present invention.
Fig. 2 is the structural representation of arc monomer members in the present invention.
The specific embodiment
Below in conjunction with specific embodiment, the present invention will be further described.Should be understood that following examples are only for the present invention is described but not for limiting the scope of the invention.
Referring to Fig. 1, a kind of supporting and protection structure of crossing geologic anomaly band soft-rock tunnel smashed to pieces provided by the invention, comprise the sheath 1 arranging along tunnel inwall circumferencial direction, in the prior art, the set-up mode that props up sheath 1 adopts the mode of bolt-spary supports and metallic support supporting conventionally, can contracting quantitative limitation but be subject to surrouding rock deformation degree and self, not can solve the technical problem described in background technology.
In order to solve the problem existing at the described current known technology of this manual background technology part and to overcome its defect, the technical scheme that the present invention takes is: as shown in Figure 1, described sheath 1 is the steel plate high-strength concrete layer being connected to form successively by 6~8 arc monomer members 2, (certainly, arc monomer members quantity also can be according to actual circular tunnel section size, carry out correspondence adjustment, 6~8 arc monomer members are optimal design.) referring to Fig. 2, described arc monomer members 2 comprises the member body 2a being made by the thick steel plate of 20mm, is filled with the high-strength slightly expanded concrete 2b of C80 in the internal cavity of described member body 2a, forms steel plate high-strength concrete arc monomer members.Monomer members adopts batch production to produce on ground, reliable in quality, and concrete strength high (can reach C80~100), has rack bearing large, the advantage that supporting drag is large.
The present invention is in order further to improve its structure, and structure of the present invention in the specific implementation, can also, on above-described technical scheme basis, adopt the following examples:
Embodiment 1
Referring to Fig. 1, the cross section of described arc monomer members 2 is rectangular, and joint is provided with the compressible backing plate 3 that 20mm is thick, and realization can be contracted and be allowed pressure.
Embodiment 2
The intrados of described arc monomer members 2 and joint face place are equipped with to the holdfast 2c (length 100mm) of cavity direction in member body 2a, strengthen with concrete bonding.
Embodiment 3
Uniformly on the circumferencial direction of described arc monomer members 2 offer two injected hole/lifting hole(eyelet)s 4, facilitated underground construction lifting and grouting behind shaft or drift lining filling.
Embodiment 4
The end face of described arc monomer members 2 is welded with connecting angle in the radial direction, is processed with bolt hole above it.Reliable connection while guaranteeing down-hole assembling.
Embodiment 5
Between described steel plate high-strength concrete layer 3 and tunnel inwall, be also provided with successively fly-ash mortar filling bed 5 and the U36 type support 6 of 200mm.Can effectively improve bearing strength of the present invention and reliability.
The present invention also provides this its job practices of crossing geologic anomaly band soft-rock tunnel smashed to pieces, and concrete steps are:
One, U36 type support 6 is set up in tunnelling after it meets design section size;
Two, on U36 type support 6, lay one deck harsh concrete bed course;
Three, on harsh concrete bed course, install the arc monomer members 2 that is positioned at bottom;
Four, on two limits of bottom arc monomer members 2, set up the arc monomer members 2 that is positioned at side direction;
Five, between arc monomer members 2 tops of two side direction, be positioned at the arc monomer members 2 on top;
Six, after circle arc monomer members 2 installations finish, adopt pulp shooting machine to spray fillers to fly-ash mortar filling bed 5, form integer support structure.
When down-hole arc monomer members 2 is installed, the joint of all arc monomer members 2 also needs to place a compressible backing plate 3.

Claims (10)

1. a supporting and protection structure of crossing geologic anomaly band soft-rock tunnel smashed to pieces, it is characterized in that: comprise the steel plate high-strength concrete layer arranging along tunnel inwall circumferencial direction, described steel plate high-strength concrete layer is connected to form successively by several arc monomer members, described arc monomer members comprises the member body of being made by steel plate, is filled with high-strength slightly expanded concrete in the internal cavity of described member body.
2. the supporting and protection structure of crossing geologic anomaly band soft-rock tunnel smashed to pieces according to claim 1, is characterized in that: described arc monomer members quantity is 6~8.
3. the supporting and protection structure of crossing geologic anomaly band soft-rock tunnel smashed to pieces according to claim 1, is characterized in that: described high-strength slightly expanded concrete is the high-strength slightly expanded concrete of C80.
4. the supporting and protection structure of crossing geologic anomaly band soft-rock tunnel smashed to pieces according to claim 1, is characterized in that: described arc monomer members joint is provided with compressible backing plate.
5. according to the supporting and protection structure of crossing geologic anomaly band soft-rock tunnel smashed to pieces described in claim 1,2,3 or 4, it is characterized in that: the intrados of described arc monomer members and joint face place are equipped with to the holdfast of member tube intracoelomic cavity direction.
6. according to the supporting and protection structure of crossing geologic anomaly band soft-rock tunnel smashed to pieces described in claim 1,2,3 or 4, it is characterized in that: uniformly on the circumferencial direction of described arc monomer members offer two injected hole/holes for hoist.
7. according to the supporting and protection structure of crossing geologic anomaly band soft-rock tunnel smashed to pieces described in claim 1,2,3 or 4, it is characterized in that: the end face of described arc monomer members is welded with connecting angle in the radial direction, on connecting angle, be processed with bolt hole.
8. according to the supporting and protection structure of crossing geologic anomaly band soft-rock tunnel smashed to pieces described in claim 1,2,3 or 4, it is characterized in that: the fly-ash mortar filling bed being also provided with successively between described steel plate high-strength concrete layer and tunnel inwall and U36 type support.
9. cross a job practices for geologic anomaly band soft-rock tunnel smashed to pieces, it is characterized in that:
Concrete steps are:
(1), in tunnel, set up U36 type support;
(2), on U36 type support, lay one deck harsh concrete bed course;
(3), on harsh concrete bed course, install the arc monomer members that is positioned at bottom;
(4), on two limits of bottom arc monomer members, set up the arc monomer members that is positioned at side direction;
(5), between the arc monomer members top of two side direction, be positioned at the arc monomer members on top;
(6), after a circle arc monomer members installs and finish, adopt pulp shooting machine to spray filler to fly-ash mortar filling bed, form integer support structure.
10. a kind of job practices of crossing geologic anomaly band soft-rock tunnel smashed to pieces according to claim 9, is characterized in that: the joint of the arc monomer members in step 3 to five is also placed with a compressible backing plate.
CN201310399662.6A 2013-08-27 2013-08-27 Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces Active CN103557007B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310399662.6A CN103557007B (en) 2013-08-27 2013-08-27 Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310399662.6A CN103557007B (en) 2013-08-27 2013-08-27 Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces

Publications (2)

Publication Number Publication Date
CN103557007A true CN103557007A (en) 2014-02-05
CN103557007B CN103557007B (en) 2015-10-21

Family

ID=50011342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310399662.6A Active CN103557007B (en) 2013-08-27 2013-08-27 Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces

Country Status (1)

Country Link
CN (1) CN103557007B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912292A (en) * 2014-04-23 2014-07-09 辽宁工程技术大学 Fault-passing roadway waterproof damping and shock-resisting coupling support method
CN104895580A (en) * 2015-05-14 2015-09-09 张晓德 Soft rock roadway surrounding rock self-support method and support stirring injection drilling machine
CN106837333A (en) * 2017-01-17 2017-06-13 济宁矿业集团有限公司霄云煤矿 A kind of fully-mechanized mining working pre-tunnel laneway road formula passing fault method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2289878Y (en) * 1996-05-07 1998-09-02 武汉水利电力大学 Water dilivery tunnel concrete tunnel liner tile
WO2006081214A2 (en) * 2005-01-26 2006-08-03 University Of Maine System Board Of Trustees Rapidly-deployable lightweight load resisting arch system
CN102877483A (en) * 2012-09-11 2013-01-16 天津大学 Foundation structure capable of being prefabricated and assembled and construction method thereof
CN202690082U (en) * 2012-05-28 2013-01-23 中交第一公路勘察设计研究院有限公司 Combined steel frame structure for preventing deformation and subsidence of tunnel
CN103133013A (en) * 2013-03-24 2013-06-05 中铁二院工程集团有限责任公司 Lining structure with rib arch-shaped open cut tunnel
CN203412589U (en) * 2013-08-27 2014-01-29 安徽理工大学 Supporting structure of extremely fractured soft rock roadway passing through geological anomaly zone

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2289878Y (en) * 1996-05-07 1998-09-02 武汉水利电力大学 Water dilivery tunnel concrete tunnel liner tile
WO2006081214A2 (en) * 2005-01-26 2006-08-03 University Of Maine System Board Of Trustees Rapidly-deployable lightweight load resisting arch system
CN202690082U (en) * 2012-05-28 2013-01-23 中交第一公路勘察设计研究院有限公司 Combined steel frame structure for preventing deformation and subsidence of tunnel
CN102877483A (en) * 2012-09-11 2013-01-16 天津大学 Foundation structure capable of being prefabricated and assembled and construction method thereof
CN103133013A (en) * 2013-03-24 2013-06-05 中铁二院工程集团有限责任公司 Lining structure with rib arch-shaped open cut tunnel
CN203412589U (en) * 2013-08-27 2014-01-29 安徽理工大学 Supporting structure of extremely fractured soft rock roadway passing through geological anomaly zone

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103912292A (en) * 2014-04-23 2014-07-09 辽宁工程技术大学 Fault-passing roadway waterproof damping and shock-resisting coupling support method
CN104895580A (en) * 2015-05-14 2015-09-09 张晓德 Soft rock roadway surrounding rock self-support method and support stirring injection drilling machine
CN104895580B (en) * 2015-05-14 2017-03-01 张晓德 A kind of autologous method for protecting support of country rock of soft rock roadway and supporting are with stirring note rig
CN106837333A (en) * 2017-01-17 2017-06-13 济宁矿业集团有限公司霄云煤矿 A kind of fully-mechanized mining working pre-tunnel laneway road formula passing fault method

Also Published As

Publication number Publication date
CN103557007B (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN109372556B (en) Sandwich arch suitable for high-stress soft rock tunnel surrounding rock support and construction method
CN103410161B (en) Oblique control slip casting steel anchor tube framework and construction method thereof
CN105201514A (en) Water-bearing rock stratum borehole wall structure and construction method
CN108035742B (en) Active and passive harmonious support method for extremely soft coal seam roadway
CN107965341A (en) A kind of large-section underground pipe canopy pipe network concrete support method
CN104047613A (en) Method for anchoring coal mine tunnel bottom plate
CN104594926A (en) Rapid composite roof roadway support method for high-stress water guiding karst cave group
CN112647969B (en) Traffic tunnel surrounding rock cooperative control system and construction method
CN104675412A (en) Closed integral bearing supporting structure for coal-mine coal-pillar bottom plate crushed surrounding rock roadway
CN104847354B (en) A kind of method that strip coal pillar performance is lifted using slip casting combined supporting anchor pole
CN208966352U (en) A kind of supporting construction in weak rocks matter region tunnel
CN109488342A (en) A kind of hoop shell perfusion type flexibility for roadway support, which allows, pressure lining cutting and applies method
CN104533483A (en) Roadway total-space prestress truss, anchor cable and anchor rod coordinated supporting method
CN103061779B (en) Novel mine tunnel supporting structure and construction method thereof
CN103557007B (en) Cross the construction method of geological anomaly zone soft-rock tunnel smashed to pieces
CN204253061U (en) The lining cutting of mine working three-dimensional bar frame antiarch
CN104358260A (en) Preloaded pressure pile sealing working device of anchor rod static pressure pile
KR20160000792A (en) Natm tunnel structure and construction method thereof
CN105134247A (en) Tunnel supporting structure in horizontal layered class-III surrounding rock and construction method
CN203412589U (en) Supporting structure of extremely fractured soft rock roadway passing through geological anomaly zone
CN112943327A (en) Underground chamber active controllable yielding support system and method for stratum support
CN205714226U (en) The Tunnel structure of steel pipe steelframe is set in a kind of
CN110513129B (en) Advanced roof-protecting supporting structure and method for roadway of soft and thick coal seam working face
CN111852505A (en) Yielding primary support system for large deformation control of high-ground-stress soft rock tunnel
CN108547635B (en) Surrounding rock reinforcing method for tunnel with pipe lining and spray anchor support alternately

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant