CN103551404B - A kind of production method of stainless screw-thread steel - Google Patents

A kind of production method of stainless screw-thread steel Download PDF

Info

Publication number
CN103551404B
CN103551404B CN201310545482.4A CN201310545482A CN103551404B CN 103551404 B CN103551404 B CN 103551404B CN 201310545482 A CN201310545482 A CN 201310545482A CN 103551404 B CN103551404 B CN 103551404B
Authority
CN
China
Prior art keywords
rolled piece
cooling
roll
rolling
water cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310545482.4A
Other languages
Chinese (zh)
Other versions
CN103551404A (en
Inventor
石奇良
于玉柱
巩玉玲
庞宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Taigang Stainless Steel Co Ltd
Original Assignee
Shanxi Taigang Stainless Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Taigang Stainless Steel Co Ltd filed Critical Shanxi Taigang Stainless Steel Co Ltd
Priority to CN201310545482.4A priority Critical patent/CN103551404B/en
Publication of CN103551404A publication Critical patent/CN103551404A/en
Application granted granted Critical
Publication of CN103551404B publication Critical patent/CN103551404B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Metal Rolling (AREA)

Abstract

The present invention relates to a kind of production method of stainless screw-thread steel, technological process comprises: cogging, roughing, in roll, finish rolling, it is characterized in that: finished product through in roll after, arrange Water cooling device, after cooling, enter finishing mill again, concrete steps are: before finished product rolling, increase Water cooling device, realize controlled cooling model before two-phase screw-thread steel finished product, cooling water flow is 35-45m3/ hour, and pressure is 0.4-0.6MPa, and cool time is 1-2 second.The method simple process, cooling before tandem rolling, the finished product that can effectively prevent roller repairing from bringing directly spends inadequate problem; The dimensional accuracy of product, surface quality, mechanical property all significantly improve, and production efficiency increases substantially; And the two phase stainless steel spiral prepared has many-sided advantages such as corrosion-resistant, cost is low, the life-span is long, is widely used in bridge construction etc., wide market, for enterprise creates considerable benefit.

Description

A kind of production method of stainless screw-thread steel
Technical field
The present invention relates to a kind of cooling means of stainless screw-thread steel.
Background technology
The technological process that production line of bar produces screw-thread steel is: heating, and------lowering the temperature to be rolled,---4 frame 480 2 roller horizontal mills---S4 crop end is cut, and---------------------------put in storage shear gauge hot-metal sawing machine cold bed multi-length shear pinch roll inclined guide groove 2 frame 360 2 roller horizontal mills to collect bundling by pickling---packing of weighing---in 650 3 roller coggings; When production 32,28 two-phase stainless screw-thread steel, 360 2 roller horizontal mill the 4th framves are as finished product rolling mill, and the spring of this type rolling mill is large, roll axial float is comparatively large, and screw-thread steel size is difficult to ensure, frequent wrong roller, produce a large amount of waste product, handling failure of need frequently stopping, production efficiency is low, and screw-thread steel product mechanical property is in English mark standard rolls off the production line edge, if finished product goes out Water cooling after pass, screw-thread steel can be caused directly to spend not up to standard, increase straightener, need equipment be increased, increase production cost.
Summary of the invention
In order to overcome above-mentioned deficiency, the present invention aims to provide a kind of cooling means of stainless screw-thread steel, and screw-thread steel finished product sortie is moved to pre-finish rolling, the relative two roller horizontal mills of this type rolling mill, and bounce little, precision is high, is easy to adjustment and controls.Milling train in 2 vacant framves is set up 2 and wears water-cooling apparatus, realize Water cooling controlled rolling before finished product, after cooling, carry out finish rolling, not only make two-phase stainless screw-thread steel mechanical performance index improve 12%, and do not affect the straight degree of two-phase stainless screw-thread steel.
The cooling means of stainless screw-thread steel provided by the invention, realizes by the following technical solutions:
A kind of production method of stainless screw-thread steel, technological process comprises: cogging, roughing, in roll, finish rolling, it is characterized in that: finished product through in roll after, arrange Water cooling device, after cooling, enter finishing mill again, concrete steps are: before finished product rolling, increase Water cooling device, realize controlled cooling model before two-phase screw-thread steel finished product, cooling water flow is 35-45m3/ hour, and pressure is 0.4-0.6MPa, 1-2 second cool time.
The production method of described stainless screw-thread steel, comprises the following steps:
(1) heat
Blank enters pusher-type furnace, and tapping temperature is 1100 DEG C-1200 DEG C, the size 220mmx220mmx3500mm of blank;
(2) cogging
Adopt 650 three-high bloomers, blank, through 650 mill milling 13 passages, rolls into 85mm round steel by 220mm × 220mm, and after cogging, temperature is 950 DEG C-1050 DEG C, and cooling is waited for;
(3) roughing
Roughing technique comprises 4 frame 480 2 roller horizontal mills, and enter roughing mill when blank temperature drops to below 870 DEG C, through four tandem rollings, last roughing mill rolls into 48mm round steel;
(4) shear
Through S4 cutting head and back-end crop, head and afterbody defect are cut only, crop length 300mm-350mm, back-end crop length 350mm-500mm;
(5) roll in
Middle roll process comprises 2 frame 360 2 roller horizontal mills, enters middle milling train twice tandem rolling and rolls into 36mm round steel; Rolled piece goes out temperature≤860 DEG C after milling train;
(6) Water cooling
Arrange two and wear water-cooling apparatus, round steel head enters water cooling plant, and when head leaves water cooling plant moment, water cooling plant magnetic valve starts, water cooling plant water flowing cooling rolled piece, and two groups of water cooling plants can lower the temperature 60 DEG C ~ 80 DEG C;
Workpiece front end leaves water-spraying control rolled piece after water cooling plant, and it is that water cooling plant makes rolled piece temperature reduce in order to prevent workpiece front end temperature drop from causing more greatly next sortie load to increase that head does not cool;
(7) pre-finish rolling
Adopt 275 cantilevered pre-finishing mills, pre-finishing mill is nipped after rolled piece, and Horizontal loose sleeve loop-rising roll level shifts out and makes rolled piece form semicircular arc, realizes tension free rolling;
(8) secondary finish rolling
Adopt 275 cantilevered pre-finishing mills, pre-finishing mill second rolling mill is nipped after rolled piece, vertical kink loop-rising roll moves and makes rolled piece form semicircular arc, realize tension free rolling;
Rolled piece goes out through cross roll road pinch roll after milling train, and pinch roll speed faster than rolling mill speed 8%, forms certain tension force between pinch roll and milling train, rolled piece is stretching, meanwhile, when rolled piece leaves milling train, ensures that rolled piece travels at the uniform speed;
(9) secondary shearing
Adopt multi-length shear, size sets rational multiple lengths as requested, by multi-length shear, rolled piece is cut into several cut lengths;
Multiple lengths can not exceed cold bed length, but can not be too short, prevents multiple length from knocking into the back, causes the accident;
(10) cool, pack
Rolled piece through cold bed cooling, is collected together again, the size required for becoming through hot-metal sawing machine sawing, inspection, bundling, and pickling, washes away the stainless screw-thread steel oxide on surface of dual phase steel, packaging of weighing warehouse-in.
Described Water cooling device, comprise inlet tube, entrance bearing, entrance base, connecting duct, outlet bearing, outlet, outlet base, total length 1.7m, cooling water nozzle is established in entrance bearing, nozzle inside diameter 10mm, angle with workpiece to be cooled is 11 ° ~ 15 °, is fixed on memorial archway crossbeam by entrance base; Outlet bearing is connected with entrance bearing by connecting duct, outlet bearing is provided with the osculum of two caliber 40mm, be fixed on memorial archway crossbeam by outlet base, outlet bearing rear portion outlet, inner installation contrainjector, nozzle inside diameter 8mm, is stoped cooling water to flow out from water cooling plant, is discharged by osculum.
The present invention is in two framves after milling train, and design Water cooling device, realize controlled cooling model before the stainless screw-thread steel finished product of dual phase steel, this cooling device, ensures that cooling water fully contacts with cooling piece, reduction rolled piece temperature.Rear two framves in milling train in original four framves are moved to pre-finish-rolling process, pre-finishing mill supplied materials cross section diameter increases 6mm than original supplied materials cross section diameter, the former design diapsid of pre-smart machine first roll collar of rolling mill, widen due to pass and change single-orifice type into, the outer labyrinth ring of milling train changes thin 6mm, second rolling mill is constant, according to the corresponding guide and guard of Groove Design.
Of the present invention beneficial effect:
After this milling method is implemented, the dimensional accuracy of two-phase stainless screw-thread steel, surface quality, mechanical property all significantly improve, and production efficiency increases substantially.Solving two-phase stainless screw-thread steel is not changing on the basis of main equipment, once lumber-preserving, and the two phase stainless steel spiral prepared has many-sided advantages such as corrosion-resistant, cost is low, the life-span is long, is widely used in bridge construction etc., wide market, for enterprise creates considerable benefit.
Detailed description of the invention
Further illustrate the present invention below by embodiment, but be not limited to following examples.
Embodiment 1: the production method of stainless screw-thread steel
(1) heat
Blank enters pusher-type furnace, and tapping temperature is 1100 DEG C-1120 DEG C; The size 220mmx220mmx3500mm of blank
(2) cogging
Adopt 650 three-high bloomers, blank, through 650 mill milling 13 passages, rolls into 85mm round steel by 220mm × 220mm, and after cogging, temperature is 950 DEG C-1050 DEG C, and cooling is waited for;
(3) roughing
Roughing technique comprises 4 frame 480 2 roller horizontal mills, blank temperature drops to≤870 DEG C time enter roughing mill, through four tandem rollings, last roughing mill rolls into 48mm round steel;
(4) shear
Through S4 cutting head and back-end crop, head and afterbody defect are cut only;
(5) roll in
Middle roll process comprises 2 frame 360 2 roller horizontal mills, enters middle milling train twice tandem rolling and rolls into 36mm round steel; After rolled piece goes out milling train, temperature is≤860 DEG C
(6) Water cooling
Arrange two and wear water-cooling apparatus, round steel head enters water cooling plant, and when head leaves water cooling plant moment, water cooling plant magnetic valve starts, water cooling plant water flowing cooling rolled piece, and two groups of water cooling plants make rolled piece lower the temperature 60 DEG C-100 DEG C;
Workpiece front end leaves water-spraying control rolled piece after water cooling plant, and it is that water cooling plant makes rolled piece temperature reduce in order to prevent workpiece front end temperature drop from causing more greatly next sortie load to increase that head does not cool;
(7) pre-finish rolling
Adopt 275 cantilevered finishing mills, pre-finishing mill is nipped after rolled piece, and Horizontal loose sleeve loop-rising roll level shifts out and makes rolled piece form semicircular arc, realizes tension free rolling;
(8) secondary finish rolling
Adopt 275 cantilevered finishing mills, pre-finishing mill second rolling mill is nipped after rolled piece, vertical kink loop-rising roll moves and makes rolled piece form semicircular arc, realize tension free rolling;
Rolled piece goes out through cross roll road pinch roll after milling train, and pinch roll speed faster than rolling mill speed 8%, forms certain tension force between pinch roll and milling train, rolled piece is stretching, meanwhile, when rolled piece leaves milling train, ensures that rolled piece travels at the uniform speed;
(9) secondary shearing
Adopt multi-length shear, set rational multiple lengths as requested: 28m, by multi-length shear, rolled piece is cut into cut lengths: 7m;
Multiple lengths can not exceed cold bed length, but can not be too short, prevents multiple length from knocking into the back, causes the accident;
(10) cool, pack
Rolled piece through cold bed cooling, is collected together again, the size required for becoming through hot-metal sawing machine sawing, inspection, bundling, and pickling, washes away the stainless screw-thread steel oxide on surface of dual phase steel, packaging of weighing warehouse-in.
Produce Φ 32 specification stainless steel spiral, when middle milling train is as finisher, reinforcing bar basic circle diagonal difference 0.5-1mm, rolled piece rough surface, after adopting the method for the present embodiment, reinforcing bar basic circle diagonal difference 0-0.3mm, surface roughness has had raising.
No gentle rolling before cold rolling process put into use a water-cooled, Φ32 specification stainless steel rebar yield strength 510MPa, gentle rolling before cold rolling process put into use a water-cooled, Φ32 specification stainless steel rebar yield strength of 560MPa.
Embodiment 2: the production method of stainless screw-thread steel
The processing step of the present embodiment is with embodiment 1, and finished product frame moves on to 275 cantilevered finishing mills, and single groove amount of rolling brings up to 400 tons by original 200 tons, rolled piece Water cooling before finished product.
When adopting existing technique, after Φ 32 specification stainless steel spiral rolls rear finished product, the straight degree of cooling reaches below 4mm/m; Adopt the inventive method, the straight degree≤3mm/m of cooling before Φ 32 specification stainless steel spiral finished product; The straight degree of the present embodiment gained finished product is 2.5mm/m.

Claims (2)

1. a production method for two-phase stainless screw-thread steel, technological process comprises: cogging, roughing, in roll, finish rolling, rolled piece through in roll after, Water cooling device is set, through cooling after enter finishing mill again, it is characterized in that: comprise the following steps:
(1) heat
Blank enters pusher-type furnace, and tapping temperature is 1100 DEG C-1200 DEG C, and billet size is 220mmx220mmx3500mm;
(2) cogging
Adopt 650 three-high bloomers, blank, through 650 three-high bloomer rolling 13 passages, rolls into 85mm rolled piece by 220mm × 220mm, and after cogging, temperature is 950 DEG C-1050 DEG C, and cooling is waited for;
(3) roughing
Roughing technique comprises 4 frame 480 2 roller horizontal mills, and enter 480 2 roller horizontal mills when blank temperature drops to below 870 DEG C, through four tandem rollings, last roughing mill rolls into 48mm rolled piece;
(4) shear
Through S4 cutting head and back-end crop, head and afterbody defect are cut only, crop length 300mm-350mm, back-end crop length 350mm-500mm;
(5) roll in
Middle roll process comprises two frame 360 2 roller horizontal mills, enters middle milling train two frame 360 2 roller horizontal mill and rolls into 36mm rolled piece; Rolled piece goes out temperature≤860 DEG C after 360 2 roller horizontal mills;
(6) Water cooling
Arrange two and wear water-cooling apparatus, workpiece front end enters Water cooling device, and when head leaves Water cooling device moment, Water cooling device magnetic valve starts, Water cooling device water flowing cooling rolled piece, and two groups of Water cooling devices can lower the temperature 60 DEG C ~ 80 DEG C; Cooling water flow is 35-45m3/ hour, and pressure is 0.4-0.6MPa, and cool time is 1-2 second;
(7) pre-finish rolling
Adopt 275 cantilevered finishing mills, finishing mill is nipped after rolled piece, and Horizontal loose sleeve loop-rising roll level shifts out and makes rolled piece form semicircular arc, realizes tension free rolling;
(8) secondary finish rolling
Adopt 275 cantilevered finishing mills, finishing mill second rolling mill is nipped after rolled piece, vertical kink loop-rising roll moves and makes rolled piece form semicircular arc, realize tension free rolling;
Rolled piece goes out through cross roll road pinch roll after milling train, and pinch roll speed faster than rolling mill speed 8%, forms certain tension force between pinch roll and milling train, rolled piece is stretching, meanwhile, when rolled piece leaves milling train, ensures that rolled piece travels at the uniform speed;
(9) secondary shearing
Adopt multi-length shear, size sets rational multiple lengths as requested, by multi-length shear, rolled piece is cut into several cut lengths;
(10) cool, pack
Rolled piece through cold bed cooling, is collected together again, the size required for becoming through hot-metal sawing machine sawing, inspection, bundling, and pickling, washes away two-phase stainless screw-thread steel oxide on surface, packaging of weighing warehouse-in.
2. the production method of two-phase stainless screw-thread steel according to claim 1, it is characterized in that: described Water cooling device, comprise inlet tube, entrance bearing, entrance base, connecting duct, outlet bearing, outlet, outlet base, total length 1.7m, cooling water nozzle is established in entrance bearing, cooling water nozzle internal diameter 10mm, is the angle of 11 ° ~ 15 ° with rolled piece to be cooled, is fixed on memorial archway crossbeam by entrance base; Outlet bearing is connected with entrance bearing by connecting duct, outlet bearing is provided with the osculum of two caliber 40mm, be fixed on memorial archway crossbeam by outlet base, contrainjector is installed in outlet inside, outlet bearing rear portion, contrainjector internal diameter 8mm, stop cooling water to flow out from Water cooling device, discharged by osculum.
CN201310545482.4A 2013-11-07 2013-11-07 A kind of production method of stainless screw-thread steel Active CN103551404B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310545482.4A CN103551404B (en) 2013-11-07 2013-11-07 A kind of production method of stainless screw-thread steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310545482.4A CN103551404B (en) 2013-11-07 2013-11-07 A kind of production method of stainless screw-thread steel

Publications (2)

Publication Number Publication Date
CN103551404A CN103551404A (en) 2014-02-05
CN103551404B true CN103551404B (en) 2015-09-02

Family

ID=50005852

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310545482.4A Active CN103551404B (en) 2013-11-07 2013-11-07 A kind of production method of stainless screw-thread steel

Country Status (1)

Country Link
CN (1) CN103551404B (en)

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103978030B (en) * 2014-05-19 2016-05-04 中冶赛迪工程技术股份有限公司 The production process equipment of a kind of three side spiral with ribbing
CN104357733B (en) * 2014-12-02 2016-07-06 浙江富钢金属制品有限公司 A kind of production method of stainless screw-thread steel
CN108714623A (en) * 2018-05-14 2018-10-30 盐城市联鑫钢铁有限公司 A kind of process for solving the problems, such as large gauge ribbed bar clod wash and splitting
CN108856339A (en) * 2018-06-11 2018-11-23 江苏明璐不锈钢有限公司 A kind of production method of stainless steel bars
CN109433832A (en) * 2018-10-25 2019-03-08 盐城市联鑫钢铁有限公司 It solves screw-thread steel screw thread during mantle fiber and the process of gap problem occurs
CN109731911B (en) * 2019-01-30 2020-07-17 福建泉州闽光钢铁有限责任公司 Method for improving performance of head of twisted steel wire rod
CN110314942B (en) * 2019-06-10 2021-03-19 南京钢铁股份有限公司 Process method for controlling size dispersion difference of bearing steel by hot-rolled round steel
CN110695123A (en) * 2019-10-18 2020-01-17 甘肃酒钢集团宏兴钢铁股份有限公司 Preparation process of duplex stainless steel medium plate
CN110773569A (en) * 2019-10-18 2020-02-11 甘肃酒钢集团宏兴钢铁股份有限公司 Preparation process of S32750 super duplex stainless steel coiled plate
CN111760907B (en) * 2020-06-18 2022-03-22 建龙北满特殊钢有限责任公司 Controlled rolling and cooling method for carbon structural steel
CN112170492A (en) * 2020-09-24 2021-01-05 宁夏建龙龙祥钢铁有限公司 Many segmentations production minus tolerance stabilising arrangement
CN114618889B (en) * 2022-03-23 2024-04-16 首钢水城钢铁(集团)有限责任公司 Bar hot rolling production method capable of avoiding 17 # rolling mill steel punching accident
CN115634926A (en) * 2022-10-28 2023-01-24 福建三钢闽光股份有限公司 Method for solving low head temperature of bar intermediate control cold-rolled part
CN116445829B (en) * 2023-06-16 2023-09-08 中国矿业大学(北京) Corrosion-resistant anchor rod and production process thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1213592A (en) * 1998-08-31 1999-04-14 唐山钢铁集团有限责任公司 Two-line cutting/rolling tech. for screwed steel
CN2524851Y (en) * 2001-08-22 2002-12-11 任吉堂 Strong through water cooler for hot rolling rod line material production line
CN1793389A (en) * 2005-12-26 2006-06-28 广州双菱钢铁工业有限公司 Process for producing British standard 460 grade thread reinforcing steel by ordinary carbon steel
CN102626712A (en) * 2012-05-08 2012-08-08 山西太钢不锈钢股份有限公司 Rolling equipment and method for stainless threaded steel

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2874811B2 (en) * 1991-10-28 1999-03-24 新日本製鐵株式会社 Water cooling method and water cooling device for steel bars and wires
JP5775378B2 (en) * 2011-06-23 2015-09-09 株式会社神戸製鋼所 Strip rolling method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1213592A (en) * 1998-08-31 1999-04-14 唐山钢铁集团有限责任公司 Two-line cutting/rolling tech. for screwed steel
CN2524851Y (en) * 2001-08-22 2002-12-11 任吉堂 Strong through water cooler for hot rolling rod line material production line
CN1793389A (en) * 2005-12-26 2006-06-28 广州双菱钢铁工业有限公司 Process for producing British standard 460 grade thread reinforcing steel by ordinary carbon steel
CN102626712A (en) * 2012-05-08 2012-08-08 山西太钢不锈钢股份有限公司 Rolling equipment and method for stainless threaded steel

Also Published As

Publication number Publication date
CN103551404A (en) 2014-02-05

Similar Documents

Publication Publication Date Title
CN103551404B (en) A kind of production method of stainless screw-thread steel
US8087449B2 (en) Method and plant for the production of flat rolled products
CN104084421B (en) A kind of production technology of high-speed rod-rolling mill grooveless rolling 82B wire rods
JP7308358B2 (en) Thick and medium plate production line and production method directly connected to an efficient two-stand double cutting line
CN102266866B (en) Technology for producing hot-rolled pipeline steel of roll mill with single frame furnace
CN102671940B (en) Rolling method for producing phase changes in finish rolling process of low-grade non-oriented silicon steel
WO2009036665A1 (en) Method for continuous casting, rolling intermediate and thin sheet
CN103878178A (en) Method for producing ultrathin hot-rolled coils from sheet billets by continuous casting and rolling
CN101293258A (en) Process for manufacturing hot rolled steel strips by continuous casting and rolling middle bar strip
RU2571987C2 (en) Method of rolling of flat bars and appropriate rolling mill
RU2537629C2 (en) Method and machine for metal strip ingot-less rolling
CN1640569A (en) Direct rolling process for heavy-medium plate billet continuous casting-rolling mill set
RU2568550C2 (en) Method of rolling of flat bars, and appropriate rolling mill
CN102626712B (en) Rolling equipment and method for stainless threaded steel
CN204276517U (en) A kind of production line that can replace conventional broadband steel hot continuous rolling
CN104399748B (en) A kind of production technology that can replace conventional broadband steel hot continuous rolling
CA2515097A1 (en) Method for milling thin and/or thick slabs made of steel materials into hot-rolled strip
CN101716605B (en) Hot rolling finishing stand unit rolling control method
CN1640568A (en) Marginal concurrent heating direct-rolling process for heavy-medium plate billet continuous casting-rolling mill set
CN102294356B (en) The method and apparatus of casting and continuous rolling for manufacturing elongated metal rolled products
AU2003235800B2 (en) Method and rolling stand for producing rods, bar stock or seamless tubes
CN101590488B (en) Rolling technical skill of hot strip rough rolling process
CN102343358B (en) For the manufacture of the casting of elongated metal rolled products and continuous rolling method and equipment
CN102357537A (en) Rolling method capable of improving macroscopic defects of metal bar
CN210023244U (en) System for producing cold-formed steel material by continuous casting and rolling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant