CN103543357B - 一种换流阀换相失败的预判方法 - Google Patents

一种换流阀换相失败的预判方法 Download PDF

Info

Publication number
CN103543357B
CN103543357B CN201310502750.4A CN201310502750A CN103543357B CN 103543357 B CN103543357 B CN 103543357B CN 201310502750 A CN201310502750 A CN 201310502750A CN 103543357 B CN103543357 B CN 103543357B
Authority
CN
China
Prior art keywords
commutation
converter valve
current
inverter side
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310502750.4A
Other languages
English (en)
Other versions
CN103543357A (zh
Inventor
刘济豪
刘文静
许韦华
阳岳希
王鑫
赵成勇
郭春义
唐新建
李贞�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
North China Electric Power University
Global Energy Interconnection Research Institute
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
North China Electric Power University
China EPRI Electric Power Engineering Co Ltd
Smart Grid Research Institute of SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd, North China Electric Power University, China EPRI Electric Power Engineering Co Ltd, Smart Grid Research Institute of SGCC filed Critical State Grid Corp of China SGCC
Priority to CN201310502750.4A priority Critical patent/CN103543357B/zh
Publication of CN103543357A publication Critical patent/CN103543357A/zh
Application granted granted Critical
Publication of CN103543357B publication Critical patent/CN103543357B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Inverter Devices (AREA)
  • Rectifiers (AREA)

Abstract

本发明提供一种换流阀换相失败的预判方法,包括以下步骤:计算逆变侧交流电流电压幅值标幺值和直流电流标幺值;计算逆变侧换流阀的触发角上限;预判是否发生换相失败。本发明提供一种换流阀换相失败的预判方法,可以准确判断出由逆变侧交流***故障或直流***过载等常见原因导致的换相失败,为预防换相失败提供信息。判断迅速,故障发生后约1ms即可得到换相失败判断信息,有助于迅速采取措施预防换相失败。判断准确,根据理论推导得到的触发角上限计算方法,该方法可以准确判断出换相失败的发生。

Description

一种换流阀换相失败的预判方法
技术领域
本发明涉及一种预判方法,具体涉及一种换流阀换相失败的预判方法。
背景技术
电力电子技术经过了20世纪70~80年代的晶闸管阀时期,使直流输电得到了大发展,并在大电网互联方面展现了更多优势,传统的纯交流电网已发展成为交直流混合电网;采用晶闸管作为换相元件的常规电网换相高压直流输电(Line-Commutated-ConverterHighVoltageDirectCurrent,LCC-HVDC)以其大容量远距离输电、有功功率快速可控等特点在世界范围内得到了快速的发展。
换流站的换相失败(CommutationFailure,CF)和直流线路故障是直流***较为常见的故障形式。当电网发生故障或三相严重不对称时,会导致交流母线电压下降,线电压过零点可能提前,LCC-HVDC阀臂的换流重叠角将增大,关断角将减小,有可能导致换相失败。换相失败的发生严重限制了直流***传输功率,使得传输功率从正常值突然下降到很小的值甚至是零,为整个交直交***带来巨大的扰动。
导致换相失败的原因主要是逆变侧发生接地或相间短路故障、交流母线电压降低、直流电流突然上升等,另外,晶闸管故障和触发***异常也可能导致换相失败。
在国外,同一公司的直流输电技术装置的控制保护平台基本都是采用一种共性平台的方式,针对不同类型的直流工程要求而使用相应的控制保护模块,而其控制保护平台的体系与结构基本保持不变。ABB,SIEMENS等作为国际上少数可以完整对直流输电控制保护***设计制造的公司,国内目前采用的控制保护***也主要采用以上两个公司的方案,而国内对HVDC***故障时的控制保护策略研究的相对薄弱;并且ABB提出的换相失败预判方法只能判断出交流侧故障的发生,不能判断出此次故障能否导致换相失败。为预防换相失败首先需要对换相失败进行预判,因此换相失败的预判方法成为预防换相失败的首要研究对象。
发明内容
为了克服上述现有技术的不足,本发明提供一种换流阀换相失败的预判方法,可以准确判断出由逆变侧交流***故障或直流***过载等常见原因导致的换相失败,为预防换相失败提供信息。
为了实现上述发明目的,本发明采取如下技术方案:
本发明提供一种换流阀换相失败的预判方法,所述方法包括以下步骤:
步骤1:计算逆变侧交流电流电压幅值标幺值和直流电流标幺值;
步骤2:计算逆变侧换流阀的触发角上限;
步骤3:预判是否发生换相失败。
所述步骤1中,所述步骤1包括以下步骤:
步骤1-1:测量逆变侧交流电流线电压幅值UL和工作条件下的直流电流瞬时值Id
步骤1-2:逆变侧交流电流电压幅值标幺值和直流电流标幺值分别用表示,分别表示为:
U L * = U L / U LN - - - ( 1 )
I d * = I d / I dN - - - ( 2 )
其中,ULN为额定线电压幅值,IdN为额定直流电流值。
所述步骤2包括以下步骤:
步骤2-1:计算额定工作条件下的换流阀换相所需的换相面积;
步骤2-2:计算当前工作条件下换相所需的换相面积;
步骤2-3:计算逆变侧换流阀的触发角上限。
所述步骤2-1中,按通用编号顺序,uba为换流阀1向换流阀3换相的换流电压,其在额定工作条件下的表达式为:
uba(t)=ULNsin(ωt)(3)
其中,uba(t)为t时刻,在额定工作条件下,换流阀1向换流阀3换相的换流电压;ULN为额定换相电压幅值;ω为换流电压uba的角频率;
设逆变侧的额定触发角为αN,逆变侧的额定关断角为γN;换相开始时刻,换流电压uba的相位为αN,换相结束时刻,换流电压uba的相位为π-γN
于是,额定工作条件下的换流阀换相所需的换相面积表示为:
A N = 1 ω ∫ α N π - γ N U LN sin ( ωt ) dωt = 1 ω N U LN [ cos α N + cos γ N ] - - - ( 4 )
其中,AN为额定工作条件下的换流阀换相所需的换相面积。
所述步骤2-2中,当前工作条件下换相所需的换相面积表示为:
A f A N = I d I dN - - - ( 5 )
其中,Af为当前工作条件下换相所需的换相面积;Id为当前工作条件下的直流电流;IdN为额定工作条件下的直流电流;
结合(4)和(5),可得:
A f = I d I dN · 1 ω U LN ( cos α N + cos γ N ) - - - ( 6 )
所述步骤2-3中,由于当前工作条件下,换相电压会发生波动,逆变侧换流阀的触发角达到触发角上限αlimit时,关断角为γ0,则换相电压发生波动后,换相电压幅值由ULN变为UL,换相所需的换相面积为:
A f ' = 1 ω ∫ α limit π - γ 0 U L sin ( ωt ) dωt = 1 ω U L ( cos α limit + cos γ 0 ) - - - ( 7 )
其中,A′f为换相电压发生波动后,当前工作条件下换相所需的换相面积;
结合(6)和(7),可得:
α limit = arccos [ U LN U L · I d I dN ( cos α N + cos γ N ) - cos γ 0 ] - - - ( 8 )
所述步骤3中,通过比较换流阀的控制保护***输出的触发角与逆变侧换流阀的触发角上限,即可预判是否发生换相失败;控制保护***输出的触发角用α表示,判断过程具体为:
A)若α<αlimit,则可判断出换流阀未发生换相失败;
B)若α>αlimit,导致换流阀的关断角γ小于换流阀的最小关断角γ0,进而导致换流阀发生换相失败。
与现有技术相比,本发明的有益效果在于:
1.判断迅速,故障发生后约1ms即可得到换相失败判断信息,有助于迅速采取措施预防换相失败。
2.判断准确,根据理论推导得到的触发角上限计算方法,该方法可以准确判断出换相失败的发生。
3.可以准确判断出由逆变侧交流***故障或直流***过载等常见原因导致的换相失败,为预防换相失败提供信息。
附图说明
图1是换流阀换相失败的预判方法流程图;
图2是两相换相等值电路示意图;
图3是换相电压uba波形及换流阀1向换流阀3换相过程示意图;
图4是当t=2.0s发生故障时,触发角指令与触发角上限αlimit波形图。
具体实施方式
下面结合附图对本发明作进一步详细说明。
如图1,本发明提供一种换流阀换相失败的预判方法,所述方法包括以下步骤:
步骤1:计算逆变侧交流电流电压幅值标幺值和直流电流标幺值;
步骤2:计算逆变侧换流阀的触发角上限;
步骤3:预判是否发生换相失败。
所述步骤1中,所述步骤1包括以下步骤:
步骤1-1:测量逆变侧交流电流线电压幅值UL和工作条件下的直流电流瞬时值Id
步骤1-2:逆变侧交流电流电压幅值标幺值和直流电流标幺值分别用表示,分别表示为:
U L * = U L / U LN - - - ( 1 )
I d * = I d / I dN - - - ( 2 )
其中,ULN为额定线电压幅值,IdN为额定直流电流值。
如图2,为两相换相等值电路图。设t1为换相开始时刻,t2为换相结束时刻,那么在t∈[t1,t2]时,由换流电感上的电压关系和换相开始前后换流阀上的电流关系,有其中:Lr为换流电感,Id为直流电流,u′ba(t)为AB两相之间线电压,A为换相面积。
定义换相电压对时间的积分为换相电压时间面积(以下简称换相面积,记为A),说明了完成换相过程所需的换相面积A为一固定值,且换相面积A与直流电流成正比关系。换相面积A的大小决定了换相过程的快慢,也决定了换相角μ的大小。
所述步骤2中,触发角增大时,关断角会随之减小;当触发角增大至关断角等于最小关断角γ0时,如果继续增大触发角,则必将导致关断角小于最小关断角γ0,进而导致换相失败。因此,使关断角等于最小关断角γ0的触发角即为不会导致换相失败的最大触发角,这里称为触发角上限(记为αlimit)。具体包括以下步骤:
步骤2-1:计算额定工作条件下的换流阀换相所需的换相面积;
步骤2-2:计算当前工作条件下换相所需的换相面积;
步骤2-3:计算逆变侧换流阀的触发角上限。
所述步骤2-1中,以逆变侧换相电压uba的波形和换流阀1向换流阀3换相的换相过程来说明额定工作条件下换相面积AN的计算方法。假设换相电压uba波形为标准正弦波形,且角频率不发生变化,逆变侧换相电压uba波形如图3所示,按通用编号顺序,uba为换流阀1向换流阀3换相的换流电压,其在额定工作条件下的表达式为:
uba(t)=ULNsin(ωt)(3)
其中,uba(t)为t时刻,在额定工作条件下,换流阀1向换流阀3换相的换流电压;ULN为额定换相电压幅值;ω为换流电压uba的角频率;
设逆变侧的额定触发角为αN,逆变侧的额定关断角为γN;换相开始时刻,换流电压uba的相位为αN,换相结束时刻,换流电压uba的相位为π-γN
于是,额定工作条件下的换流阀换相所需的换相面积表示为:
A N = 1 ω ∫ α N π - γ N U LN sin ( ωt ) dωt = 1 ω N U LN [ cos α N + cos γ N ] - - - ( 4 )
其中,AN为额定工作条件下的换流阀换相所需的换相面积。
所述步骤2-2中,当前工作条件下换相所需的换相面积表示为:
A f A N = I d I dN - - - ( 5 )
其中,Af为当前工作条件下换相所需的换相面积;Id为当前工作条件下的直流电流;IdN为额定工作条件下的直流电流;
结合(4)和(5),可得:
A f = I d I dN · 1 ω U LN ( cos α N + cos γ N ) - - - ( 6 )
所述步骤2-3中,由于当前工作条件下,换相电压会发生波动,逆变侧换流阀的触发角达到触发角上限αlimit时,关断角为γ0,则换相电压发生波动后,换相电压幅值由ULN变为UL,换相所需的换相面积为:
A f ' = 1 ω ∫ α limit π - γ 0 U L sin ( ωt ) dωt = 1 ω U L ( cos α limit + cos γ 0 ) - - - ( 7 )
其中,A′f为换相电压发生波动后,当前工作条件下换相所需的换相面积;
结合(6)和(7),可得:
α limit = arccos [ U LN U L · I d I dN ( cos α N + cos γ N ) - cos γ 0 ] - - - ( 8 )
所述步骤3中,通过比较换流阀的控制保护***输出的触发角与逆变侧换流阀的触发角上限,即可预判是否发生换相失败;控制保护***输出的触发角用α表示,判断过程具体为:
A)若α<αlimit,则可判断出换流阀未发生换相失败;
B)若α>αlimit,导致换流阀的关断角γ小于换流阀的最小关断角γ0,进而导致换流阀发生换相失败。
图4为2.0s发生交流侧故障时,触发角上限和控制保护***触发角指令波形。故障发生后约1ms即可判断出换相失败的发生,得到预判结果。
最后应当说明的是:以上实施例仅用以说明本发明的技术方案而非对其限制,尽管参照上述实施例对本发明进行了详细的说明,所属领域的普通技术人员应当理解:依然可以对本发明的具体实施方式进行修改或者等同替换,而未脱离本发明精神和范围的任何修改或者等同替换,其均应涵盖在本发明的权利要求范围当中。

Claims (4)

1.一种换流阀换相失败的预判方法,其特征在于:所述方法包括以下步骤:
步骤1:计算逆变侧交流电流电压幅值标幺值和直流电流标幺值;
步骤2:计算逆变侧换流阀的触发角上限;
步骤3:预判是否发生换相失败;
所述步骤1中,所述步骤1包括以下步骤:
步骤1‐1:测量逆变侧交流电流线电压幅值UL和工作条件下的直流电流瞬时值Id
步骤1‐2:逆变侧交流电流电压幅值标幺值和直流电流标幺值分别用表示,分别表示为:
U L * = U L / U L N - - - ( 1 )
I d * = I d / I d N - - - ( 2 )
其中,ULN为额定线电压幅值,IdN为额定直流电流值;
所述步骤2包括以下步骤:
步骤2‐1:计算额定工作条件下的换流阀换相所需的换相面积;
步骤2‐2:计算当前工作条件下换相所需的换相面积;
步骤2‐3:计算逆变侧换流阀的触发角上限;
所述步骤2‐1中,按通用编号顺序,uba为换流阀1向换流阀3换相的换流电压,其在额定工作条件下的表达式为:
uba(t)=ULNsin(ωt)(3)
其中,uba(t)为t时刻,在额定工作条件下,换流阀1向换流阀3换相的换流电压;ULN为额定换相电压幅值;ω为换流电压uba的角频率;
设逆变侧的额定触发角为αN,逆变侧的额定关断角为γN;换相开始时刻,换流电压uba的相位为αN,换相结束时刻,换流电压uba的相位为π-γN
于是,额定工作条件下的换流阀换相所需的换相面积表示为:
A N = 1 ω ∫ α N π - γ N U L N s i n ( ω t ) d ω t = 1 ω U L N [ cosα N + cosγ N ] - - - ( 4 )
其中,AN为额定工作条件下的换流阀换相所需的换相面积。
2.根据权利要求1所述的换流阀换相失败的预判方法,其特征在于:所述步骤2‐2中,当前工作条件下换相所需的换相面积表示为:
A f = I d I d N A N - - - ( 5 )
其中,Af为当前工作条件下换相所需的换相面积;Id为当前工作条件下的直流电流;IdN为额定工作条件下的直流电流;
结合(4)和(5),可得:
A f = I d I d N · 1 ω U L N ( cosα N + cosγ N ) - - - ( 6 ) .
3.根据权利要求2所述的换流阀换相失败的预判方法,其特征在于:所述步骤2‐3中,由于当前工作条件下,换相电压会发生波动,逆变侧换流阀的触发角达到触发角上限αlimit时,关断角为γ0,则换相电压发生波动后,换相电压幅值由ULN变为UL,换相所需的换相面积为:
A f ′ = 1 ω ∫ α lim i t π - γ 0 U L s i n ( ω t ) d ω t = 1 ω U L ( cosα lim i t + cosγ 0 ) - - - ( 7 )
其中,A′f为换相电压发生波动后,当前工作条件下换相所需的换相面积;
结合(6)和(7),可得:
α lim i t = a r c c o s [ U L N U L · I d I d N ( cosα N + cosγ N ) - cosγ 0 ] - - - ( 8 ) .
4.根据权利要求1所述的换流阀换相失败的预判方法,其特征在于:所述步骤3中,通过比较换流阀的控制保护***输出的触发角与逆变侧换流阀的触发角上限,即可预判是否发生换相失败;控制保护***输出的触发角用α表示,判断过程具体为:
A)若α<αlimit,则可判断出换流阀未发生换相失败;
B)若α>αlimit,导致换流阀的关断角γ小于换流阀的最小关断角γ0,进而导致换流阀发生换相失败。
CN201310502750.4A 2013-10-23 2013-10-23 一种换流阀换相失败的预判方法 Active CN103543357B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310502750.4A CN103543357B (zh) 2013-10-23 2013-10-23 一种换流阀换相失败的预判方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310502750.4A CN103543357B (zh) 2013-10-23 2013-10-23 一种换流阀换相失败的预判方法

Publications (2)

Publication Number Publication Date
CN103543357A CN103543357A (zh) 2014-01-29
CN103543357B true CN103543357B (zh) 2015-12-02

Family

ID=49966993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310502750.4A Active CN103543357B (zh) 2013-10-23 2013-10-23 一种换流阀换相失败的预判方法

Country Status (1)

Country Link
CN (1) CN103543357B (zh)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103812129B (zh) * 2014-01-16 2016-01-20 东北电力大学 一种多馈入直流输电***换相失败的判断方法
CN104333027B (zh) * 2014-08-12 2017-05-24 许昌开普检测技术有限公司 预测型换相失败预防方法、装置和设备
CN105024393B (zh) * 2015-06-24 2018-03-02 国家电网公司 一种直流输电***换相面积计算方法及换相失败检测方法
CN105866602B (zh) * 2016-06-08 2024-07-09 全球能源互联网研究院 一种高压直流输电换流阀换相失败防御装置
CN106787896B (zh) * 2017-03-02 2018-12-21 南方电网科学研究院有限责任公司 避免熄弧角测量异常电路和避免直流输电换相失败电路
CN110021949B (zh) * 2018-01-09 2023-12-15 国家电网公司 一种抑制两层逆变器同时换相失败的方法和控制器
CN110460082B (zh) * 2018-05-07 2022-09-02 中国电力科学研究院有限公司 一种多馈入高压直流***换相失败风险判别方法及***
CN109462237A (zh) * 2018-09-07 2019-03-12 山东大学 计及直流分层结构交直流混联潮流计算的方法及***
CN111781453B (zh) * 2020-07-04 2022-07-29 国家电网公司华中分部 一种基于故障时刻的直流***换相失败风险评估方法
CN112421666B (zh) * 2020-11-10 2022-09-09 国网新疆电力有限公司经济技术研究院 一种高压直流输电***后续换相失败风险评估及抑制方法
CN113162105B (zh) * 2021-05-31 2023-10-20 南方电网科学研究院有限责任公司 基于触发角自适应调节的换相失败控制、仿真方法及装置
CN113725886B (zh) * 2021-08-09 2024-06-07 南京邮电大学 一种抑制直流连续换相失败的交直流混联***功率协调控制方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1896757A (zh) * 2006-06-28 2007-01-17 南京南瑞继保电气有限公司 用计次识别换相失败的方法
CN101662217A (zh) * 2009-07-13 2010-03-03 华南理工大学 高压直流输电***换流器等值阻抗频率特性的求解方法
CN101701996A (zh) * 2009-11-26 2010-05-05 华南理工大学 一种高压直流***换相失败的判别方法及装置
CN102353874A (zh) * 2011-07-11 2012-02-15 四川大学 基于换相电流时间面积指标的换相失败检测方法
CN103311946A (zh) * 2013-06-08 2013-09-18 国家电网公司 一种直流输电控制***定熄弧面积控制方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100238187B1 (ko) * 1997-09-02 2000-01-15 윤종용 3상 교류 전원의 상 전압 에러 검출 장치

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1896757A (zh) * 2006-06-28 2007-01-17 南京南瑞继保电气有限公司 用计次识别换相失败的方法
CN101662217A (zh) * 2009-07-13 2010-03-03 华南理工大学 高压直流输电***换流器等值阻抗频率特性的求解方法
CN101701996A (zh) * 2009-11-26 2010-05-05 华南理工大学 一种高压直流***换相失败的判别方法及装置
CN102353874A (zh) * 2011-07-11 2012-02-15 四川大学 基于换相电流时间面积指标的换相失败检测方法
CN103311946A (zh) * 2013-06-08 2013-09-18 国家电网公司 一种直流输电控制***定熄弧面积控制方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高压直流输电***换相失败的判断标准;何朝荣等;《电网技术》;20061130;第30卷(第22期);第19-23、58页 *

Also Published As

Publication number Publication date
CN103543357A (zh) 2014-01-29

Similar Documents

Publication Publication Date Title
CN103543357B (zh) 一种换流阀换相失败的预判方法
US10411587B2 (en) Fault isolation and system restoration using power converter
US9019673B2 (en) Fault detection and short circuit current management technique for inverter based distributed generators (DG)
US10516257B2 (en) Voltage source converter based direct current deicer and controlling method thereof
CN104753043B (zh) 一种具有直流故障穿越能力的多电平换流器及工作方法
CN103323790B (zh) 基于直流输电逆变侧两相短路故障的换相失败分析方法
CN104009486B (zh) 一种三相三线制svg的非对称补偿限流方法
US10236793B2 (en) Grid connection power conversion device and output current control method thereof
CN103248013B (zh) 变流器限流保护***控制装置及其限流控制方法
CN103855717B (zh) 一种低压svg的无冲击软启动方法
CN104362651A (zh) 三相不平衡下级联型h桥静止同步无功补偿器及补偿方法
CN103337870A (zh) 一种高压直流输电换相失败的防御方法
CN203813384U (zh) 基于电压源型换流器的直流融冰装置
CN103997033A (zh) 一种具备直流故障穿越能力的高压直流输电***
CN103401263A (zh) 一种混合型三极直流输电***及其控制方法
CN107181276A (zh) 混合直流输电***换相失败恢复的方法及装置
CN104283235A (zh) 风力发电机组的变流器、变流器的控制方法及装置
CN108923450B (zh) 电流源型高压直流输电***的控制及运行方法
CN107134801B (zh) 计及换相失败预测控制的直流输电换相失败概率求取方法
CN104979846B (zh) 一种多电平逆变器低电压穿越控制方法、设备及***
CN103296874B (zh) 一种变流器并联运行切换控制装置及其切换控制方法
CN204258316U (zh) 三相不平衡下级联型h桥静止同步无功补偿器
CN111769585A (zh) 基于逆变器能量累积特征的换相失败预测方法及装置
CN203562765U (zh) 变流器限流保护***控制装置
Liu et al. A concurrent commutation failure detection method for multi-infeed HVDC systems

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: INSTITUTE OF STATE GRID INTELLIGENT ELECTRIC GRIDS

Free format text: FORMER OWNER: INSTITUTE OF STATE GRID INTELLIGENT ELECTRIC GRIDS C-EPRI ELECTRIC POWER ENGINEERING CO., LTD. STATE GRID CORPORATION OF CHINA

Effective date: 20150105

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Jihao

Inventor after: Liu Wenjing

Inventor after: Xu Weihua

Inventor after: Yang Yuexi

Inventor after: Wang Xin

Inventor after: Zhao Chengyong

Inventor after: Guo Chunyi

Inventor after: Tang Xinjian

Inventor after: Li Zhen

Inventor before: Liu Jihao

Inventor before: Liu Wenjing

Inventor before: Xu Weihua

Inventor before: Yang Yuexi

Inventor before: Zhao Chengyong

Inventor before: Guo Chunyi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU JIHAO LIU WENJING XU WEIHUA YANG YUEXI ZHAO CHENGYONG GUO CHUNYI TO: LIU JIHAO LIU WENJING XU WEIHUA YANG YUEXI WANG XIN ZHAO CHENGYONG GUO CHUNYI TANG XINJIAN LI ZHEN

TA01 Transfer of patent application right

Effective date of registration: 20150105

Address after: 102206 Changping District North Road, No. 2, Beijing

Applicant after: North China Electric Power University

Applicant after: State Grid Smart Grid Institute

Applicant after: China-EPRI Electric Power Engineering Co., Ltd.

Applicant after: State Grid Corporation of China

Applicant after: Electric Power Research Institute of State Grid Shandong Electric Power Company

Address before: 102206 Changping District North Road, No. 2, Beijing

Applicant before: North China Electric Power University

Applicant before: State Grid Smart Grid Institute

Applicant before: China-EPRI Electric Power Engineering Co., Ltd.

Applicant before: State Grid Corporation of China

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 102206 Changping District North Road, No. 2, Beijing

Co-patentee after: GLOBAL ENERGY INTERCONNECTION RESEARCH INSTITUTE

Patentee after: North China Electric Power University

Co-patentee after: China-EPRI Electric Power Engineering Co., Ltd.

Co-patentee after: State Grid Corporation of China

Co-patentee after: Electric Power Research Institute of State Grid Shandong Electric Power Company

Address before: 102206 Changping District North Road, No. 2, Beijing

Co-patentee before: State Grid Smart Grid Institute

Patentee before: North China Electric Power University

Co-patentee before: China-EPRI Electric Power Engineering Co., Ltd.

Co-patentee before: State Grid Corporation of China

Co-patentee before: Electric Power Research Institute of State Grid Shandong Electric Power Company

CP03 Change of name, title or address
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170717

Address after: 102206 Changping District North Road, No. 2, Beijing

Co-patentee after: GLOBAL ENERGY INTERCONNECTION RESEARCH INSTITUTE

Patentee after: North China Electric Power University

Co-patentee after: State Grid Corporation of China

Co-patentee after: Electric Power Research Institute of State Grid Shandong Electric Power Company

Address before: 102206 Changping District North Road, No. 2, Beijing

Co-patentee before: GLOBAL ENERGY INTERCONNECTION RESEARCH INSTITUTE

Patentee before: North China Electric Power University

Co-patentee before: China-EPRI Electric Power Engineering Co., Ltd.

Co-patentee before: State Grid Corporation of China

Co-patentee before: Electric Power Research Institute of State Grid Shandong Electric Power Company