CN103527221B - A kind of base plate steel tubular beam for mine deep support engineering and using method thereof - Google Patents

A kind of base plate steel tubular beam for mine deep support engineering and using method thereof Download PDF

Info

Publication number
CN103527221B
CN103527221B CN201310504200.6A CN201310504200A CN103527221B CN 103527221 B CN103527221 B CN 103527221B CN 201310504200 A CN201310504200 A CN 201310504200A CN 103527221 B CN103527221 B CN 103527221B
Authority
CN
China
Prior art keywords
tubular beam
base plate
steel tubular
steel
plate steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310504200.6A
Other languages
Chinese (zh)
Other versions
CN103527221A (en
Inventor
曹平
蒲成志
张春阳
钟涌芳
靳瑾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central South University
Original Assignee
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central South University filed Critical Central South University
Priority to CN201310504200.6A priority Critical patent/CN103527221B/en
Publication of CN103527221A publication Critical patent/CN103527221A/en
Application granted granted Critical
Publication of CN103527221B publication Critical patent/CN103527221B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of base plate steel tubular beam for mine deep support engineering and using method thereof; By at steel pipe two ends weldable steel backing plate, bar shaped backing plate and short angle limb, composition base plate steel tubular beam; Adopt roadway floor fluting to lay the construction technology of base plate steel tubular beam, while roadway's sides footing applies cross binding power, reduce the interference to vehicle operation; Base plate steel tubular beam and existing supporting association form closes support system, effectively improves supporting intensity and the rigidity of mine working base plate; And be aided with the measure of backfill rubble in groove of backbreaking, reduce floor lift in gallery to the disturbance of base plate steel tubular beam.The present invention provides cross binding power by base plate steel tubular beam, improves roadway floor ambient stress, controls floor lift in gallery, extends and reprocesses the cycle; Base plate steel tubular beam makes simple, easy to use, the recyclable recycling of material therefor.

Description

A kind of base plate steel tubular beam for mine deep support engineering and using method thereof
Art
The present invention relates to a kind of base plate steel tubular beam for mine deep support engineering and using method thereof, be particularly applied to horizontal structural s tress and give prominence to and the floor lift in gallery Deformation control that inverted arch supporting cannot be implemented.
Background technology
Along with the development of national economy, country constantly increases the demand of metal material, and domestic non-ferrous metal mining progresses into deep mining environment, under maintenance does not reduce the prerequisite of metal material output, need strict control production cost, and ensure the safety problem in recovery process.Because deep mining requirement of engineering solves the problems of rock mechanics under highland pressure, hyperosmosis environment, especially the mining area that tectonic stress is outstanding, its pressure ring border, ground is more complicated, Rock Slide Stability condition is poorer, this is carrying out in tunnelling process with regard to needs, the strength and stiffness of continuous increase supporting and protection structure, the continuous increase of corresponding is tunnel initating cost, but mine company's economic benefit aspect determines again ore extraction cost can not immoderately be increased.Add in tunnelling process, mining machinery running is frequent, causes the antiarch supporting method of Theory comparison maturation cannot apply in the mine deep tunnelling of stress condition extreme complexity.Current domestic nonferrous metals ore deep tunnel supporting method, mainly on the basis of superficial part support form, completes schematic design by increasing supporting parameter.This design concept Problems existing is: prop cannot form closed bearing structure, roadway floor is made to become the break-through point of deformation instability, especially in the mining area that in the horizontal direction tectonic stress is outstanding, the base plate of non-support measure often becomes the initiation point of supporting and protection structure inefficacy, floor lift in gallery is serious, and then has influence on the stability in whole tunnel.
Summary of the invention
For overcoming in mine deep excavation process, roadway floor cannot apply effective support, or when the closed prop of composition is had any problem, causes floor lift in gallery to be out of shape serious, and then affect the stability in whole tunnel.The present invention designs a kind of base plate steel tubular beam supporting and protection structure, and by laterally laying steel tubular beam at roadway floor fluting, forming the base plate steel tubular beam supporting in tunnel, and constituting jointly closed support system with existing supporting and protection structure.
Base plate steel tubular beam of the present invention, be symmetrically welded billet at steel pipe two ends, and every 60 ° of (or 90 °) annular solder, 6 pieces of (or 4 pieces) bar shaped backing plates on billet, then short angle limb is welded on bar shaped backing plate and steel pipe, composition steel tubular beam, the billet centre of form is positioned on steel pipe axial line.
Bar shaped backing plate is rectangular steel plates, and its thickness is not less than short angle limb steel plate thickness, and its width is not less than 3 times of thickness.
Short angle limb is for chamfering rectangular steel plates, and the angle of line of cut and steel pipe axis of chamfering is 30 ° ~ 45 °.
The Specific construction process that steel tubular beam is laid at roadway floor comprises following process:
(1) roadway floor excavation groove: cell wall and steel pipe clear distance are not less than 100mm, and bottom land minimum-depth is greater than outer diameter of steel pipes and is not less than 200mm, select bottom land to be plane or recessed curved form.
(2) overlay bottom land rubble: in the groove held successfully, overlay the rubble that grating is good, rubble paving more than 25mm, and must not be not less than outer diameter of steel pipes size to apart from roadway floor height by the maximum particle of crushed stone, leveling rubble surface.
(3) steel tubular beam is laid: base plate steel tubular beam shaping for welding assembly be laid on and overlay in the groove of rubble, and guarantee that base plate steel tubular beam axial line is in steel arch-shelf plane, check steel tubular beam simultaneously and be placed in below base plate plane, to reduce the interference normally run running vehicle.
(4) fixing steel tubular beam end: concreting in space outside billet and between crag, the connection of fixing steel tubular beam and steel arch-shelf, and note the protection of watering building body.
(5) backfill rubble in groove: backfill rubble to concordant with roadway floor in the space in groove.
The present invention has the beneficial effect of following aspect: 1, base plate steel tubular beam and existing support system constitute jointly closed support system, strengthen prop bulk strength and rigidity, 2, end billet can increase the active area of cross binding power, the concentrated stress of bar shaped backing plate energy peptizaiton on the limb of short angle, the angle of line of cut and steel pipe axis of chamfering of short angle limb is 30 ° ~ 45 °, is conducive to increasing its support strength and stability; 3, base plate fluting lays steel tubular beam, little to vehicle operation interference; 4, groove of backbreaking is interior backfills rubble, reduces the disturbance of end distension distortion to base plate steel tubular beam; 5, steel pipe adopts shaped steel, and material source is wide; 6, the processing of base plate steel tubular beam is easy with laying method.
Accompanying drawing explanation
Fig. 1 is base plate steel tubular beam associating section-steel support elevation.
Fig. 2 is the A-A sectional drawing of accompanying drawing 1.
Fig. 3 is steel tubular beam end elevation view.
Fig. 4 is the B-B sectional drawing of accompanying drawing 3.
Detailed description of the invention
For describing specific embodiment of the invention method in detail, hereafter making for the base plate steel tubular beam under section-steel support and being described with laying method.
The type selecting of steel pipe: according to design cross binding power and span length, determine steel pipe inside/outside diameter size meeting under the axial compression coefficient of stability is not less than the condition of 0.8, and meet the requirement of monolithic stability according to billet local stability, the size of form design billet 4, bar shaped backing plate 6 and short angle limb 7 according to Fig. 4.The structure of base plate steel tubular beam is: at steel pipe 1 two ends weldable steel backing plate 4, and every 90 ° of annular solder, 4 pieces of bar shaped backing plates 6 on billet 4, then short angle limb 7 is welded on bar shaped backing plate 6 with on steel pipe 1, composition steel tubular beam, the centre of form of billet 4 is positioned on the axial line of steel pipe 1.
Short angle limb is for chamfering rectangular steel plates, and the angle of line of cut and steel pipe axis of chamfering is 30 °.
The Specific construction process that steel tubular beam is laid at roadway floor comprises following process:
1. roadway floor excavation groove: as shown in Figures 1 and 2, cell wall and steel pipe 1 clear distance are not less than 100mm, bottom land minimum-depth is greater than steel pipe 1 external diameter and is not less than 200mm, and in conjunction with floor lift in gallery situation, selection bottom land is plane (end distension is not serious) or lower concave curved surface (end distension is serious) form.
2. overlay bottom land rubble 3: in the groove held successfully, overlay the good rubble of grating 3, rubble paving more than 25mm, and must not be not less than outer diameter of steel pipes size to apart from roadway floor height by the maximum particle of crushed stone, leveling rubble surface.
3. lay steel tubular beam: base plate steel tubular beam shaping for welding assembly be laid in the groove overlaying rubble 3, and guarantee that base plate steel tubular beam axial line is in steel arch-shelf plane, check steel tubular beam simultaneously and be placed in below base plate plane, to reduce the interference normally run running vehicle.
4 fixing steel tubular beam ends: as shown in Figure 2, concreting 5 in space outside billet and between crag, the connection of fixing steel tubular beam and steel arch-shelf 2, and note the protection of watering building body.
5. backfill rubble 3 in groove: backfill rubble to concordant with roadway floor in the space in groove.

Claims (5)

1. the base plate steel tubular beam for mine deep support engineering, it is characterized in that: be symmetrically welded billet at steel pipe two ends, and every 60 ° or 90 ° of annular solder, 6 pieces or 4 pieces bar shaped backing plates on billet, again short angle limb is welded on bar shaped backing plate and steel pipe, composition base plate steel tubular beam, the billet centre of form is positioned on steel pipe axial line.
2. the base plate steel tubular beam for mine deep support engineering according to claim 1, is characterized in that: described bar shaped backing plate is rectangular steel plates, its thickness is not less than short angle limb steel plate thickness, and width is not less than 3 times of thickness.
3. the base plate steel tubular beam for mine deep support engineering according to claim 1, is characterized in that: described short angle limb is for chamfering rectangular steel plates, and the angle of line of cut and steel pipe axis of chamfering is 30 ° ~ 45 °.
4., according to claim 1 for the using method of the base plate steel tubular beam of mine deep support engineering, it is characterized in that comprising the following steps:
(1) roadway floor excavation groove: cell wall and steel pipe clear distance are not less than 100mm, and bottom land minimum-depth is greater than outer diameter of steel pipes and is not less than 200mm, select bottom land to be plane or recessed curved form;
(2) overlay bottom land rubble: in the groove held successfully, overlay the rubble that grating is good, and rubble paving is not less than outer diameter of steel pipes size to apart from roadway floor height, leveling rubble surface;
(3) lay steel tubular beam: base plate steel tubular beam shaping for welding assembly be laid on and overlay in the groove of rubble, and guarantee that base plate steel tubular beam axial line is in steel arch-shelf plane, check steel tubular beam simultaneously and be placed in below base plate plane;
(4) fixing steel tubular beam end: concreting in space outside billet and between crag, the connection of fixing steel tubular beam and steel arch-shelf;
(5) backfill rubble in groove: backfill rubble to concordant with roadway floor in the space in groove.
5. according to claim 4 for the using method of the base plate steel tubular beam of mine deep support engineering, it is characterized in that: the stone sizes described in step (2) is less than 25mm, and be ganoid cobble.
CN201310504200.6A 2013-10-24 2013-10-24 A kind of base plate steel tubular beam for mine deep support engineering and using method thereof Expired - Fee Related CN103527221B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310504200.6A CN103527221B (en) 2013-10-24 2013-10-24 A kind of base plate steel tubular beam for mine deep support engineering and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310504200.6A CN103527221B (en) 2013-10-24 2013-10-24 A kind of base plate steel tubular beam for mine deep support engineering and using method thereof

Publications (2)

Publication Number Publication Date
CN103527221A CN103527221A (en) 2014-01-22
CN103527221B true CN103527221B (en) 2016-02-17

Family

ID=49929529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310504200.6A Expired - Fee Related CN103527221B (en) 2013-10-24 2013-10-24 A kind of base plate steel tubular beam for mine deep support engineering and using method thereof

Country Status (1)

Country Link
CN (1) CN103527221B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE965845C (en) * 1951-03-21 1957-06-27 Karl Gross Dr Ing Flexible joint construction in steel for routes, crosscuts, etc. like
GB816548A (en) * 1957-01-12 1959-07-15 Johann Usspurwies G M B H Improvements in or relating to mine shores
DE1118718B (en) * 1957-11-13 1961-12-07 Gemeinnuetzige Schwerbeschaedi Sole protection for the extension of the route by sole runners, especially for half-steep and steep storage
AU4566579A (en) * 1978-05-31 1979-12-06 Voest-Alpine A.G. Device for supporting a gallery or a tunnel
SU1668681A1 (en) * 1988-07-07 1991-08-07 Artyukhov Sergej P Support for mine working
CN101852083A (en) * 2010-04-16 2010-10-06 中国科学院武汉岩土力学研究所 Quick supporting method for large-deformation roadway easy to fall, break and loosen and apparatus thereof
CN102725481A (en) * 2010-01-29 2012-10-10 伊莱斯杰特尼卡公司 Rib for supporting and reinforcing an excavation
CN202851012U (en) * 2012-10-25 2013-04-03 金诚信矿业管理股份有限公司 Supporting steel arch
CN103291328A (en) * 2013-06-29 2013-09-11 湖南科技大学 Swelling rock roadway bottom plate treatment method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE965845C (en) * 1951-03-21 1957-06-27 Karl Gross Dr Ing Flexible joint construction in steel for routes, crosscuts, etc. like
GB816548A (en) * 1957-01-12 1959-07-15 Johann Usspurwies G M B H Improvements in or relating to mine shores
DE1118718B (en) * 1957-11-13 1961-12-07 Gemeinnuetzige Schwerbeschaedi Sole protection for the extension of the route by sole runners, especially for half-steep and steep storage
AU4566579A (en) * 1978-05-31 1979-12-06 Voest-Alpine A.G. Device for supporting a gallery or a tunnel
SU1668681A1 (en) * 1988-07-07 1991-08-07 Artyukhov Sergej P Support for mine working
CN102725481A (en) * 2010-01-29 2012-10-10 伊莱斯杰特尼卡公司 Rib for supporting and reinforcing an excavation
CN101852083A (en) * 2010-04-16 2010-10-06 中国科学院武汉岩土力学研究所 Quick supporting method for large-deformation roadway easy to fall, break and loosen and apparatus thereof
CN202851012U (en) * 2012-10-25 2013-04-03 金诚信矿业管理股份有限公司 Supporting steel arch
CN103291328A (en) * 2013-06-29 2013-09-11 湖南科技大学 Swelling rock roadway bottom plate treatment method

Also Published As

Publication number Publication date
CN103527221A (en) 2014-01-22

Similar Documents

Publication Publication Date Title
CN101864959B (en) Method for tunneling construction of main structure of underground station
CN106919744B (en) Method for determining support resistance of primary pressure support in shallow-buried short-distance coal seam group mining
CN102094649B (en) Method for constructing underground space by shield-shallow buried covered excavation composite method
CN108979677B (en) Spout-steel frame integral yielding primary support structure based on friction energy dissipation longitudinal beam and construction method
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN101892860A (en) Method for entry retaining for walling at sides of road in steel cylinder support mode
CN110541966B (en) Auxiliary equipment for jacking pipe joint in narrow space and application method thereof
CN103614974B (en) Prestress sectional steel reinforcing system of reinforced concrete arch shell bridge body
CN203222807U (en) Flat foundation specialized for gas film building
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN104500071B (en) Seam mining avoids the gob-side entry retaining method of dynamic pressure impact
CN103527221B (en) A kind of base plate steel tubular beam for mine deep support engineering and using method thereof
CN203035204U (en) Large-section tunnel second lining grouping formwork trolley
CN206426071U (en) A kind of tunneling shield section of jurisdiction storing unit
CN205387946U (en) Closed support
CN103542174B (en) A kind of Subsidence Land in Coal Mining Area Pipe-lining methods
CN203296778U (en) Rigid-flexible combination gob-side entry retaining roadway-side shoring device
CN204754945U (en) Mine method tunnel preliminary bracing lining cutting grid steel support make
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN103982191A (en) Reserved soil column up-down-asynchronous and left-right-synchronous excavation method
CN114017103A (en) Longwall roadway-by-roadway cemented filling coal face parameter design method
CN213016369U (en) Transverse elliptical deformation resistant shield tunnel reinforcing structure with embedded steel plates
CN204919582U (en) Collar tie beam is assembled to portable steel sheet case of special prefabricated filling of air film building
CN205046569U (en) Annular wind -powered electricity generation foundation structure based on shaping of two ripple steel cylinder
CN204112858U (en) The prefabricated enclosure wall of a kind of prestressed concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160217

Termination date: 20161024

CF01 Termination of patent right due to non-payment of annual fee