CN103527219A - 用于大变形地层的隧道支护结构及其施工工法 - Google Patents

用于大变形地层的隧道支护结构及其施工工法 Download PDF

Info

Publication number
CN103527219A
CN103527219A CN201310491598.4A CN201310491598A CN103527219A CN 103527219 A CN103527219 A CN 103527219A CN 201310491598 A CN201310491598 A CN 201310491598A CN 103527219 A CN103527219 A CN 103527219A
Authority
CN
China
Prior art keywords
preliminary bracing
deformation
internal layer
secondary lining
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310491598.4A
Other languages
English (en)
Other versions
CN103527219B (zh
Inventor
郑建国
李玉文
林国进
王联
郑金龙
李晓洪
田尚志
高世军
田志宇
丁尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Highway Planning Survey and Design Institute Ltd
Original Assignee
Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute filed Critical Sichuan Department of Transportation Highway Planning Prospecting and Design Research Institute
Priority to CN201310491598.4A priority Critical patent/CN103527219B/zh
Publication of CN103527219A publication Critical patent/CN103527219A/zh
Application granted granted Critical
Publication of CN103527219B publication Critical patent/CN103527219B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及隧道支护结构及其施工工法,提供了一种用于大变形地层的隧道支护结构,在其初期支护和二次衬砌之间设置有内层初期支护;其施工工法,当初期支护变形量达到可控变形量时,施作内层初期支护,否则不施作内层初期支护,并根据初期支护或内层初期支护的实际内轮廓施作二次衬砌。通过初期支护和内层初期支护的配合,使得对围岩的支护先柔后刚、先放后抗,实现对围岩变形的主动适应,并通过由初期支护、内层初期支护以及二次衬砌构成的强支撑实现对围岩的永久支护,因此,能够有效解决大变形地段的支护问题,能够保证隧道运营期间的稳定性和安全性。

Description

用于大变形地层的隧道支护结构及其施工工法
技术领域
本发明涉及隧道支护结构及其施工工法,尤其是一种用于大变形地层的隧道支护结构及其施工工法。
背景技术
隧道是一种修建在地下的工程结构物,被广泛地应用于交通、矿山、水利及国防等领域。目前的隧道,通常采用新奥法施工,支护结构为复合式衬砌结构,沿隧道环向包括拱顶、仰拱及两侧边墙,沿隧道径向包括外侧的初期支护、内侧的二次衬砌以及位于初期支护和二次衬砌之间的防水层。
新奥法施工的核心为充分发挥围岩的自承能力。进一步的讲,要求P=P-P-P,其中,P为支护结构的支护力;P为地层使围岩向临空面位移的合力,包括重力、水作用力、膨胀力、构造应力、工程偏力;P为以变形的形式转化的工程力,也即塑性能以变形的方式释放;P为围岩的自承力,由围岩本身强度分担。施工时,在洞室开挖后及时施作初期支护,初期支护本身具有一定的柔性和变形特性,因而能在开挖后及时有效地控制和调整围岩应力的重分布,最大限度的保护岩体结构和力学特性,使得围岩与初期支护在共同变形的过程中取得自身稳定,充分利用围岩的自承能力;复合式衬砌结构的二次衬砌采用钢筋混凝土结构,承受后期围岩压力,要使P最小,则应使P、P同时达到最大。过早施作二次衬砌,围岩的自承能力并未达到最佳状态,进而使得二次衬砌承受更大的围岩压力;拖后施作二次衬砌,则会影响初期支护的稳定性,因此,复合式衬砌结构的二次衬砌通常要求在初期支护稳定后及时施作;但在实际施工过程中,可能遇到各种地质灾害,使得实际的施工条件更为复杂。
隧道工程围岩的变形破坏主要有岩爆、坍塌和大变形。其中隧道围岩大变形,由于围岩的变形量值特别大,洞壁位移后往往侵入模注混凝土衬砌净空,使施工处理十分困难,因此在各类地质灾害中,是一类容易造成施工困难、毁坏施工设备、延误工期、增加工程成本的地质灾害。国内外学者,针对隧道围岩大变形进行了不少的探索工作,但由于研究者们仅从各自的角度开展隧道围岩大变形问题的研究,其研究成果有一定的局限性,因此,目前还没有就围岩大变形形成一致的和明确的定义。但根据隧道围岩大变形的破坏形式,可以将其理解为:在隧道工程中,由软弱岩体构成的围岩,在高地应力、地下水或自身膨胀性能的作用下,其自承能力丧失或部分丧失,产生具有累进性和明显时间效应的塑性变形且变形得不到有效约束的现象。
针对围岩大变形的施工,目前的基本方针是管超前、严注浆、短进尺、强支护、紧封闭、勤量测。但大变形地段的围岩,初期来压快,变形量大,不加控制会发生坍塌,而刚性支护不能适应大变形,将很快被压坏。具体的讲,支护体刚度大于围压刚度,围岩膨胀性能量不能转化为变形能释放,而施加在支护体,形成过载破坏;支护体刚度小于围岩刚度,围岩产生的过量变形得不到限制,将其承担的荷载传递到支护体,形成过载破坏;围岩的变形并非均匀的变形,非均匀的荷载作用在等强的支护体上,形成局部过载破坏,导致支护体失稳。
针对上述问题,目前提出了一种解决思路,其是在二次衬砌和初期支护之间填充一层高分子弹性材料,为围岩一个变形释放空间,并通过U型钢架及二次衬砌使得该变形释放空间是一个可控的变形释放空间,如专利号为200910062525.7、发明名称为高地应力软岩卸压施工方法的发明专利。上述专利,其具体的施工步骤是:A、锚喷支护施工,锚喷支护施工必须紧跟掌子面,清除危岩;B、泡沫板挂设,进行聚苯乙烯泡沫板挂设施工;C、仰拱开挖及U型钢架设,衬砌成环,对钢架间隙进行喷射混凝土复喷;D、仰拱回填,U型钢架设完成后,进行仰拱回填施工,对混凝土进行养护;E、防水隔离层施工,在隧道收敛速率趋于稳定后,进行防水隔离层施工:F、二次衬砌施工,在防水隔离层施工完成后,进行二次衬砌施工;G,预应力锚索施工,通过现场放样,确定锚索孔位以及钻孔方向,对孔位位置进行清理。但上述专利的实际使用效果欠佳,具体如下所述:
首先,在其步骤B和C的实施过程中,围岩及初期支护均在持续的变形,当变形较大且变形释放空间较小时,可能侵入U型钢架的安装空间,进而限制U型钢架的安装;当变形较大且变形释放空间也较大时,初期支护可能已经产生破坏。
其次,泡沫板的挂设,为变形提供了一个缓冲,但其并不能使得围岩及初期支护的变形绝对均匀,而U型钢架间隔设置,并不能对变形释放空间进行完整的限制,当变形较大时,同样存在洞壁位移后由U型钢架间间隙侵入二次衬砌净空的风险、也存在不均匀变形导致的U型钢架背后脱空的风险。
其三,由于大变形理论研究的不尽成熟,加之现场地质岩体状况复杂性,导致在生产实践中,难以预测围岩大变形的发生,也即勘察设计阶段曾预测将会出现大变形的地段,并进行了相应的支护设计,而在实际施工过程却未出现大变形,相反在设计中预测没有大变形的地段却出现了大变形。而泡沫板的挂设,会阻碍对初期支护变形的测量,而将上述用于大变形地段的支护用于非大变形地段的支护时,由于泡沫板的存在,使得围岩自承能力在到达最佳状态后仍然存在一定的变形空间,进而可能导致围岩的松动以及自承能力的降低,降低隧道支护后期的稳定性,其类似于隧道的脱空病害。
其四,在初期支护和二次衬砌之间增加了步骤,无法保证二次衬砌的及时施作,不利于对围岩自承能力的利用。
因此,综上所述,上述在二次衬砌和初期支护之间填充一层高分子弹性材料的工法,在实际施工中并不能有效解决大变形地段的支护问题,同时会在隧道施工阶段造成安全隐患并影响隧道运营期间的稳定性和安全性。
发明内容
本发明所要解决的技术问题是提供一种用于大变形地层的隧道支护结构及其施工工法,其能有效解决大变形地段的支护问题,并保证隧道运营期间的稳定性和安全性。
本发明解决其技术问题所采用的技术方案是:用于大变形地层的隧道支护结构,沿隧道环向包括顶部的拱顶、底部的仰拱及两侧边墙,沿隧道径向包括外层的初期支护、内层的二次衬砌以及位于初期支护和二次衬砌之间的防水层,所述初期支护采用含有钢筋网和钢拱架的喷锚结构构成;在所述初期支护和二次衬砌之间设置有内层初期支护,所述防水层位于内层初期支护和二次衬砌之间,所述内层初期支护采用含有钢筋网和钢拱架的喷射混凝土结构构成。
进一步的,所述初期支护和内层初期支护的钢拱架沿隧道纵向间隔设置。
进一步的,所述初期支护的锚固结构包括锚杆和注浆小导管。
进一步的,所述内层初期支护的横断面呈倒U形并由一侧边墙底部经拱顶延伸至另一侧边墙底部;在仰拱处,由初期支护、二次衬砌及内层初期支护两端封闭构成的间隙内设置有回填层。作为一种优选,所述回填层采用喷射混凝土结构构成。
优选的,采用上述用于大变形地层的隧道支护结构的施工工法,包括如下步骤:
A、施作超前支护;
B、开挖隧道洞身;
C、紧跟掌子面施作初期支护;
D、监控围岩的变形情况,根据监控数据确定围岩的变形收敛趋势,并根据监控情况进行下述施作;
E1、当围岩变形呈收敛趋势时,在初期支护表面铺设防水层,并在初期支护变形稳定后,根据实际的断面轮廓施作二次衬砌,完成该段隧道支护结构的施工;
E2、当围岩变形无收敛趋势时,则根据如下步骤施工:
a、根据初期支护的理论强度及围岩的变形速率,确定初期支护的可控变形量,在初期支护变形量达到可控变形量时,施作内层初期支护;
b、监控围岩的变形情况,根据监控数据确定围岩的变形收敛趋势,再根据监控情况进行下述施作;
c1、当围岩变形呈收敛趋势时,在内层初期支护表面铺设防水层,并在内层初期支护变形稳定后,根据实际的断面轮廓施作二次衬砌,完成该段隧道支护结构的施工;
c2、当围岩变形无收敛趋势时,根据监控数据对二次衬砌进行强化处理,并在内层初期支护变形侵入二次衬砌的净空前,在内层初期支护表面铺设防水层,并根据实际的断面轮廓施作二次衬砌,完成该段隧道支护结构的施工。
进一步的,在所述步骤B中,开挖循环进尺与初期支护钢拱架的设置间距相适应。
本发明的有益效果是:本发明用于大变形地层的隧道支护结构及其施工工法,通过初期支护和内层初期支护的配合,使得对围岩的支护先柔后刚、先放后抗,实现对围岩变形的主动适应,并通过由初期支护、内层初期支护和二次衬砌构成的强支撑实现对围岩的永久支护,因此,能够有效解决大变形地段的支护问题,能够保证隧道运营期间的稳定性和安全性。
附图说明
图1是本发明支护结构的横断面设计图。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
用于大变形地层的隧道支护结构,沿隧道环向包括顶部的拱顶11、底部的仰拱12及两侧边墙13,沿隧道径向包括外层的初期支护21、内层的二次衬砌23以及位于初期支护21和二次衬砌23之间的防水层22,所述初期支护21采用含有钢筋网和钢拱架的喷锚结构构成;在所述初期支护21和二次衬砌23之间设置有内层初期支护22,所述防水层24位于内层初期支护22和二次衬砌23之间,所述内层初期支护22采用含有钢筋网和钢拱架的喷射混凝土结构构成。
如图1所示,本发明用于大变形地层的隧道支护结构的设计图中,在所述拱顶11及两侧边墙13处,设置有用于适应于围岩变形的预留变形空间,且预留变形空间包括位于内层初期支护22和初期支护21之间的外侧预留变形空间25以及位于内层初期支护22和二次衬砌23之间的内侧预留变形空间26,分别为不同阶段的围岩变形提供退让空间,从空间上保证围岩允许最大变形量的实现。但如后所述,实际施工过程中,内层初期支护22按初期支护21变形后的实际内轮廓进行施工,防水层24及二次衬砌23按内层初期支护22变形后的实际内轮廓进行施工,围岩、初期支护21、内层初期支护22、二次衬砌23之间均无间隙和空隙。
通过初期支护21和内层初期支护22,能够在不同的阶段获得不同的支护力。具体的讲,在围岩变形初期,围岩在初期支护21控制下变形;在围岩变形后期,在初期支护21和内层初期支护22的共同控制下,允许围岩以一较慢的速度变形。因此,通过支护力的阶段性控制,能够有效控制围岩的变形,降低围岩变形后期的变形速率,在保证围岩自承能力的同时增大围岩的允许变形量,提高释放的变形能。
其次,初期支护21和内层初期支护22内均设置有钢筋网和钢拱架,通过钢筋网和钢拱架的设置,提高支护的早期强度和刚度,缩短其自稳时间,能够尽早、尽快的对围岩变形实现控制;同时提高支护的强度和刚度,控制围岩局部出现的异常变形,使支护承受均匀荷载。
其三,通过对围岩及初期支护21变形收敛情况的监控,能方便的通过对内层初期支护22钢筋网和钢拱架的调整,实现对内层初期支护22强度和刚度的调整,进而保障围岩的变形在内侧预留变形空间26内收敛,实现对总变形量的控制。
其四,通过对内层初期支护22变形的监控,能够保证二次衬砌的及时施作,有利于对围岩自承能力的利用。
综上所述,本发明用于大变形地层的隧道支护结构,通过初期支护21和内层初期支护22的配合,使得对围岩的支护先柔后刚、先放后抗,实现对围岩变形的主动适应,并通过由初期支护21、内层初期支护22和二次衬砌23构成的强支撑实现对围岩的永久支护,因此,能够有效解决大变形地段的支护问题,能够保证隧道运营期间的稳定性和安全性。
进一步的,所述初期支护21和内层初期支护22的钢拱架沿隧道纵向间隔设置,该方式能够在不提高钢拱架用量的前提下,提高钢拱架的设置密度,进而强化对围岩局部出现异常变形的控制。
进一步的,所述初期支护21的锚固结构包括锚杆27和注浆小导管28。注浆小导管252,常用于超期支护,因此也被称为超前小导管,其属于高压喷射注浆工艺的一种,但管径较小,通常在38~50mm。在初期支护21的锚固结构中采用注浆小导管28,通过高压喷射流使浆液与围岩土体以半置换或全置换凝固为固结体,实现对围岩土体的加固,在起到锚固作用的同时能够提高围岩自身的自承能力。
由于大变形主要集中于拱顶和两侧边墙,因此,进一步的,所述内层初期支护22的横断面呈倒U形并由一侧边墙13底部经拱顶11延伸至另一侧边墙13底部;在仰拱12处,由初期支护21、二次衬砌23及内层初期支护22两端封闭构成的间隙内设置有回填层29。回填层29的设置,则是为了在设置了内层初期支护22后,保证二次衬砌23的形状,尤其是二次衬砌23仰拱部分的形状。回填层29可以是任意的承载结构,但为了使得回填层29与内层初期支护22能够构成封闭的环状结构,最好的,如图1所示,所述回填层29采用喷射混凝土结构构成。
本发明用于大变形地层的隧道支护结构,可以在整个隧道纵向上实施,但该方式成本较高。因此,最优的,采用上述用于大变形地层的隧道支护结构的施工工法,包括如下步骤:
A、施作超前支护;
B、开挖隧道洞身;
C、紧跟掌子面施作初期支护21;
D、监控围岩的变形情况,根据监控数据确定围岩的变形收敛趋势,并根据监控情况进行下述施作;
E1、当围岩变形呈收敛趋势时,在初期支护21表面铺设防水层24,并在初期支护21变形稳定后,根据实际的断面轮廓施作二次衬砌23,完成该段隧道支护结构的施工;
E2、当围岩变形无收敛趋势时,则根据如下步骤施工:
a、根据初期支护21的理论强度及围岩的变形速率,确定初期支护21的可控变形量,在初期支护21变形量达到可控变形量时,施作内层初期支护22;
b、监控围岩的变形情况,根据监控数据确定围岩的变形收敛趋势,再根据监控情况进行下述施作;
c1、当围岩变形呈收敛趋势时,在内层初期支护22表面铺设防水层24,并在内层初期支护22变形稳定后,根据实际的断面轮廓施作二次衬砌23,完成该段隧道支护结构的施工;
c2、当围岩变形无收敛趋势时,根据监控数据对二次衬砌23进行强化处理,并在内层初期支护21变形侵入二次衬砌23的净空前,在内层初期支护22表面铺设防水层24,并根据实际的断面轮廓施作二次衬砌23,完成该段隧道支护结构的施工。
上述施工工法,通过对围岩变形收敛情况的监控,及时、准确的判断该地段是否存在围岩大变形,并根据判断结果进行施作,无大变形时,依次按步骤A、步骤B、步骤C、步骤D和步骤E1进行施工;存在大变形时,依次按步骤A、步骤B、步骤C、步骤D和步骤E2进行施工。而根据大变形的烈度不同,在大变形烈度不高时,步骤E2按步骤a、步骤b、步骤c1进行施工;在大变形烈度较高时,步骤E2按步骤a、步骤b、步骤c2进行施工。因此,能够在保证施工安全的同时强化施工的灵活性。而掘进方式、初期支护21、内层初期支护22、防水层24和二次衬砌23的具体施工规范均与现有相同,而对围岩也即初期支护21、内层初期支护22变形量及收敛情况的监控方便,因此本工法能够方便的用于现有隧道的施工,实现成本低。
上述初期支护21的可控变形量,根据初期支护21的塑形变形极限即初期支护21在失效破坏前的最大变形量在扣除一定的安全余量后确定,以确保初期支护21的内层初期支护22的施工过程中不会被破坏。进一步的讲,在设计阶段,根据勘测数据,确定初期支护21和内层初期支护22的理论强度和变形极限,然后确定外侧预留变形空间25和内侧预留变形空间26的尺寸。在施工阶段,大致按外侧预留变形空间25和内侧预留变形空间26的尺寸对初期支护21和内层初期支护22的变形量进行控制,但应当根据围岩的实际变形速率进行调整,变形速率越大,则可控变形量越小。
按上述施工方法施工,无大变形时,由于洞身断面相同、隧道净空断面相同,因此,在非大变形地段,支护结构仅由初期支护21和二次衬砌23构成,二次衬砌23根据初期支护21的实际内轮廓施作,也即二次衬砌23的实际厚度远大于其设计厚度,能够有效提高支护结构的安全储备,保障隧道运营期间的稳定性和安全性。大变形烈度不高时,围岩变形呈收敛趋势,围岩变性能的释放最大化,同时二次衬砌23同样根据内层初期支护22的实际内轮廓施作,其实际厚度也大于其设计厚度,能够有效提高支护结构的安全储备,保障隧道运营期间的稳定性和安全性。大变形烈度较高时,虽然无法保证围岩变形的收敛,但通过内层初期支护22能极大的提高支护强度和刚度,极大的减缓变形,能够确保施工的安全,并确保围岩自承能力的最大化利用,同时为二次衬砌23的强化处理提供了时间,因此,同样能够有效提高支护结构的安全储备,保障隧道运营期间的稳定性和安全性。二次衬砌23强化处理可以采用任意的现有技术,如增加二次衬砌23厚度、提高二次衬砌23标号等。
由于围岩的软化可以在开挖之初、也可以开挖一段时间后,因此,内层初期支护22的施作仅同初期支护21和围岩的变形有关,而同初期支护21是否封闭成环无关;同时,内层初期支护22针对大变形地段进行设置,而非局部。为了进一步保证施工的安全性,在所述步骤B中,开挖循环进尺与初期支护21钢拱架的设置间距相适应。

Claims (7)

1.用于大变形地层的隧道支护结构,沿隧道环向包括顶部的拱顶(11)、底部的仰拱(12)及两侧边墙(13),沿隧道径向包括外层的初期支护(21)、内层的二次衬砌(23)以及位于初期支护(21)和二次衬砌(23)之间的防水层(22),所述初期支护(21)采用含有钢筋网和钢拱架的喷锚结构构成;其特征在于:
在所述初期支护(21)和二次衬砌(23)之间设置有内层初期支护(22),所述防水层(24)位于内层初期支护(22)和二次衬砌(23)之间,所述内层初期支护(22)采用含有钢筋网和钢拱架的喷射混凝土结构构成。
2.如权利要求1所述的用于大变形地层的隧道支护结构,其特征在于:所述初期支护(21)和内层初期支护(22)的钢拱架沿隧道纵向间隔设置。
3.如权利要求1所述的用于大变形地层的隧道支护结构,其特征在于:所述初期支护(21)的锚固结构包括锚杆(27)和注浆小导管(28)。
4.如权利要求1、2或3所述的用于大变形地层的隧道支护结构,其特征在于:所述内层初期支护(22)的横断面呈倒U形并由一侧边墙(13)底部经拱顶(11)延伸至另一侧边墙(13)底部;在仰拱(12)处,由初期支护(21)、二次衬砌(23)及内层初期支护(22)两端封闭构成的间隙内设置有回填层(29)。
5.如权利要求4所述的用于大变形地层的隧道支护结构,其特征在于:所述回填层(29)采用喷射混凝土结构构成。
6.采用如权利要求1所述用于大变形地层的隧道支护结构的施工工法,包括如下步骤:
A、施作超前支护;
B、开挖隧道洞身;
C、紧跟掌子面施作初期支护(21);
D、监控围岩的变形情况,根据监控数据确定围岩的变形收敛趋势,并根据监控情况进行下述施作;
E1、当围岩变形呈收敛趋势时,在初期支护(21)表面铺设防水层(24),并在初期支护(21)变形稳定后,根据实际的断面轮廓施作二次衬砌(23),完成该段隧道支护结构的施工;
E2、当围岩变形无收敛趋势时,则根据如下步骤施工:
a、根据初期支护(21)的理论强度及围岩的变形速率,确定初期支护(21)的可控变形量,在初期支护(21)变形量达到可控变形量时,施作内层初期支护(22);
b、监控围岩的变形情况,根据监控数据确定围岩的变形收敛趋势,再根据监控情况进行下述施作;
c1、当围岩变形呈收敛趋势时,在内层初期支护(22)表面铺设防水层(24),并在内层初期支护(22)变形稳定后,根据实际的断面轮廓施作二次衬砌(23),完成该段隧道支护结构的施工;
c2、当围岩变形无收敛趋势时,根据监控数据对二次衬砌(23)进行强化处理,并在内层初期支护(21)变形侵入二次衬砌(23)的净空前,在内层初期支护(22)表面铺设防水层(24),并根据实际的断面轮廓施作二次衬砌(23),完成该段隧道支护结构的施工。
7.如权利要求6所述的用于大变形地层的隧道支护结构的施工工法,其特征在于:在所述步骤B中,开挖循环进尺与初期支护(21)钢拱架的设置间距相适应。
CN201310491598.4A 2013-10-18 2013-10-18 用于大变形地层的隧道支护结构的施工工法 Active CN103527219B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310491598.4A CN103527219B (zh) 2013-10-18 2013-10-18 用于大变形地层的隧道支护结构的施工工法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310491598.4A CN103527219B (zh) 2013-10-18 2013-10-18 用于大变形地层的隧道支护结构的施工工法

Publications (2)

Publication Number Publication Date
CN103527219A true CN103527219A (zh) 2014-01-22
CN103527219B CN103527219B (zh) 2016-03-16

Family

ID=49929527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310491598.4A Active CN103527219B (zh) 2013-10-18 2013-10-18 用于大变形地层的隧道支护结构的施工工法

Country Status (1)

Country Link
CN (1) CN103527219B (zh)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047614A (zh) * 2014-07-15 2014-09-17 山东科技大学 一种强膨胀泥化软岩巷道置换支护方法
CN104329103A (zh) * 2014-10-20 2015-02-04 长安大学 一种寒区隧道保温复合支护***及其支护方法
CN104632249A (zh) * 2014-12-05 2015-05-20 中国电建集团成都勘测设计研究院有限公司 在松散软弱破碎围岩中的隧道***支护技术
CN104727828A (zh) * 2015-01-30 2015-06-24 北京交通大学 基于变形控制的隧道超前支护管理方法
CN104847374A (zh) * 2015-04-24 2015-08-19 长安大学 软岩大变形隧道支护体系及其施工方法
CN104895587A (zh) * 2015-05-28 2015-09-09 广西建工集团第五建筑工程有限责任公司 一种隧道二次衬砌压力灌注混凝土施工工法
CN105888697A (zh) * 2016-04-08 2016-08-24 江西博慧工程技术服务有限公司 一种跨断层隧道变形协调式支护结构及其施工方法
CN106401602A (zh) * 2016-11-15 2017-02-15 西南交通大学 富水未固结地层抗浮抗沉抗水压减震隧道结构
CN106499405A (zh) * 2016-11-02 2017-03-15 中国电建集团成都勘测设计研究院有限公司 隧洞衬砌结构
CN106522982A (zh) * 2016-11-15 2017-03-22 成都天佑智隧科技有限公司 富水未固结地层抗浮抗沉抗水压减震隧道施工方法
CN106593467A (zh) * 2016-11-09 2017-04-26 大唐陇东能源有限公司 一种煤矿井下软岩巷道支护方法
CN107387114A (zh) * 2017-09-05 2017-11-24 湖南科技大学 一种基于巷旁钻孔的煤矿巷道连续卸压方法
CN107503779A (zh) * 2017-08-01 2017-12-22 中铁十局集团有限公司 一种挤压型软弱围岩隧道预应力锚索群支护结构及施工工艺
CN107609241A (zh) * 2017-09-01 2018-01-19 宁波市交通规划设计研究院有限公司 软弱流变围岩隧道二次衬砌结构刚度及其施作时机的优选设计方法
CN108222969A (zh) * 2017-12-29 2018-06-29 中铁第四勘察设计院集团有限公司 一种基于安全系数法的隧道初期支护设计方法
CN109322680A (zh) * 2018-11-08 2019-02-12 杭州图强工程材料有限公司 支护衬砌与防治方法
CN109404019A (zh) * 2018-12-25 2019-03-01 中国电建集团成都勘测设计研究院有限公司 洞室围岩预支护***以及洞室结构
CN109681231A (zh) * 2019-01-24 2019-04-26 中铁第四勘察设计院集团有限公司 一种活动断层区段矿山法隧道位移自适应结构与安装方法
CN109989768A (zh) * 2019-04-26 2019-07-09 山东大学 一种适用于隧道穿越活断层的衬砌结构及其施工方法
CN110130948A (zh) * 2019-06-19 2019-08-16 中铁十九局集团第六工程有限公司 一种两台阶带仰拱快速封闭隧道支护结构及其施工方法
CN110173276A (zh) * 2019-05-28 2019-08-27 西南交通大学 一种隧道恒值限阻缓冲结构及其施工方法
CN112196581A (zh) * 2020-10-15 2021-01-08 中铁二局第二工程有限公司 一种软岩隧道施工支护时机确定方法
CN112253142A (zh) * 2020-11-27 2021-01-22 鲁东大学 一种深长隧道联络风道近净距上跨主洞施工方法
CN112343660A (zh) * 2020-11-17 2021-02-09 中国铁路经济规划研究院有限公司 一种隧道双层初期支护动态生成方法及装置
CN112963169A (zh) * 2021-02-25 2021-06-15 西华大学 一种隧道开挖大变形强支护装置
CN114086990A (zh) * 2021-11-25 2022-02-25 中山大学 一种软岩隧道韧性支护结构
CN114135318A (zh) * 2021-12-06 2022-03-04 江西丰强科技发展有限公司 一种密贴下穿隧道衬砌结构及其施工方法

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3381479A (en) * 1964-03-06 1968-05-07 Silver S P A Method of forming a line in a gallery
DE19807036C1 (de) * 1998-02-19 1999-12-02 Schoendorfer Bau Und Umwelttec Verfahren zur vollflächigen Abdichtung eines mit Tübbingen ausgekleideten Tunnels sowie danach hergestellte Abdichtung
JP2005179891A (ja) * 2003-12-16 2005-07-07 Kfc Ltd トンネル覆工コンクリートの施工方法
JP4250050B2 (ja) * 2003-10-03 2009-04-08 前田建設工業株式会社 トンネルの施工方法
CN201241712Y (zh) * 2008-08-22 2009-05-20 中铁第一勘察设计院集团有限公司 大变形地层隧道初期支护结构
CN101598028A (zh) * 2009-06-29 2009-12-09 中铁二院工程集团有限责任公司 高速铁路超大断面富水黄土隧道衬砌构造
CN201771517U (zh) * 2010-08-30 2011-03-23 中铁第四勘察设计院集团有限公司 一种隧道支护结构
CN102182474A (zh) * 2011-05-10 2011-09-14 湖南省交通规划勘察设计院 处理隧道施工初期支护变形过大的加固方法
CN202132053U (zh) * 2011-06-22 2012-02-01 中铁二院工程集团有限责任公司 Ⅵ级围岩双线隧道衬砌支护结构
CN202300419U (zh) * 2011-10-26 2012-07-04 中铁二十四局集团福建铁路建设有限公司 超浅埋下穿铁路长管棚隧道支护结构
CN102587924A (zh) * 2012-03-26 2012-07-18 中铁十三局集团第四工程有限公司 浅埋高含水量粘性土隧道施工方法
CN102996148A (zh) * 2012-11-22 2013-03-27 中交第二公路勘察设计研究院有限公司 一种高地应力软岩公路隧道支护方法
CN203515604U (zh) * 2013-10-18 2014-04-02 四川省交通运输厅公路规划勘察设计研究院 用于大变形地层的隧道支护结构

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3381479A (en) * 1964-03-06 1968-05-07 Silver S P A Method of forming a line in a gallery
DE19807036C1 (de) * 1998-02-19 1999-12-02 Schoendorfer Bau Und Umwelttec Verfahren zur vollflächigen Abdichtung eines mit Tübbingen ausgekleideten Tunnels sowie danach hergestellte Abdichtung
JP4250050B2 (ja) * 2003-10-03 2009-04-08 前田建設工業株式会社 トンネルの施工方法
JP2005179891A (ja) * 2003-12-16 2005-07-07 Kfc Ltd トンネル覆工コンクリートの施工方法
CN201241712Y (zh) * 2008-08-22 2009-05-20 中铁第一勘察设计院集团有限公司 大变形地层隧道初期支护结构
CN101598028A (zh) * 2009-06-29 2009-12-09 中铁二院工程集团有限责任公司 高速铁路超大断面富水黄土隧道衬砌构造
CN201771517U (zh) * 2010-08-30 2011-03-23 中铁第四勘察设计院集团有限公司 一种隧道支护结构
CN102182474A (zh) * 2011-05-10 2011-09-14 湖南省交通规划勘察设计院 处理隧道施工初期支护变形过大的加固方法
CN202132053U (zh) * 2011-06-22 2012-02-01 中铁二院工程集团有限责任公司 Ⅵ级围岩双线隧道衬砌支护结构
CN202300419U (zh) * 2011-10-26 2012-07-04 中铁二十四局集团福建铁路建设有限公司 超浅埋下穿铁路长管棚隧道支护结构
CN102587924A (zh) * 2012-03-26 2012-07-18 中铁十三局集团第四工程有限公司 浅埋高含水量粘性土隧道施工方法
CN102996148A (zh) * 2012-11-22 2013-03-27 中交第二公路勘察设计研究院有限公司 一种高地应力软岩公路隧道支护方法
CN203515604U (zh) * 2013-10-18 2014-04-02 四川省交通运输厅公路规划勘察设计研究院 用于大变形地层的隧道支护结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钟彬: "凉风垭隧道初期支护大变形的整治", 《施工技术》 *

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047614B (zh) * 2014-07-15 2016-01-13 山东科技大学 一种强膨胀泥化软岩巷道置换支护方法
CN104047614A (zh) * 2014-07-15 2014-09-17 山东科技大学 一种强膨胀泥化软岩巷道置换支护方法
CN104329103A (zh) * 2014-10-20 2015-02-04 长安大学 一种寒区隧道保温复合支护***及其支护方法
CN104632249A (zh) * 2014-12-05 2015-05-20 中国电建集团成都勘测设计研究院有限公司 在松散软弱破碎围岩中的隧道***支护技术
CN104727828A (zh) * 2015-01-30 2015-06-24 北京交通大学 基于变形控制的隧道超前支护管理方法
CN104847374A (zh) * 2015-04-24 2015-08-19 长安大学 软岩大变形隧道支护体系及其施工方法
CN104895587A (zh) * 2015-05-28 2015-09-09 广西建工集团第五建筑工程有限责任公司 一种隧道二次衬砌压力灌注混凝土施工工法
CN105888697B (zh) * 2016-04-08 2018-05-29 江西省路桥工程集团有限公司 一种跨断层隧道变形协调式支护结构及其施工方法
CN105888697A (zh) * 2016-04-08 2016-08-24 江西博慧工程技术服务有限公司 一种跨断层隧道变形协调式支护结构及其施工方法
CN106499405B (zh) * 2016-11-02 2019-02-19 中国电建集团成都勘测设计研究院有限公司 隧洞衬砌结构
CN106499405A (zh) * 2016-11-02 2017-03-15 中国电建集团成都勘测设计研究院有限公司 隧洞衬砌结构
CN106593467A (zh) * 2016-11-09 2017-04-26 大唐陇东能源有限公司 一种煤矿井下软岩巷道支护方法
CN106522982A (zh) * 2016-11-15 2017-03-22 成都天佑智隧科技有限公司 富水未固结地层抗浮抗沉抗水压减震隧道施工方法
CN106522982B (zh) * 2016-11-15 2019-02-15 成都天佑智隧科技有限公司 富水未固结地层抗浮抗沉抗水压减震隧道施工方法
CN106401602B (zh) * 2016-11-15 2019-02-15 西南交通大学 富水未固结地层抗浮抗沉抗水压减震隧道结构
CN106401602A (zh) * 2016-11-15 2017-02-15 西南交通大学 富水未固结地层抗浮抗沉抗水压减震隧道结构
CN107503779B (zh) * 2017-08-01 2024-04-02 中铁十一局集团有限公司 一种挤压型软弱围岩隧道预应力锚索群支护结构及施工工艺
CN107503779A (zh) * 2017-08-01 2017-12-22 中铁十局集团有限公司 一种挤压型软弱围岩隧道预应力锚索群支护结构及施工工艺
CN107609241A (zh) * 2017-09-01 2018-01-19 宁波市交通规划设计研究院有限公司 软弱流变围岩隧道二次衬砌结构刚度及其施作时机的优选设计方法
CN107609241B (zh) * 2017-09-01 2021-04-06 宁波市交通规划设计研究院有限公司 软弱流变围岩隧道二次衬砌结构刚度及其施作时机的优选设计方法
CN107387114A (zh) * 2017-09-05 2017-11-24 湖南科技大学 一种基于巷旁钻孔的煤矿巷道连续卸压方法
CN108222969A (zh) * 2017-12-29 2018-06-29 中铁第四勘察设计院集团有限公司 一种基于安全系数法的隧道初期支护设计方法
CN109322680A (zh) * 2018-11-08 2019-02-12 杭州图强工程材料有限公司 支护衬砌与防治方法
CN109404019A (zh) * 2018-12-25 2019-03-01 中国电建集团成都勘测设计研究院有限公司 洞室围岩预支护***以及洞室结构
CN109404019B (zh) * 2018-12-25 2024-02-27 中国电建集团成都勘测设计研究院有限公司 洞室围岩预支护***以及洞室结构
CN109681231A (zh) * 2019-01-24 2019-04-26 中铁第四勘察设计院集团有限公司 一种活动断层区段矿山法隧道位移自适应结构与安装方法
CN109681231B (zh) * 2019-01-24 2024-01-19 中铁第四勘察设计院集团有限公司 一种活动断层区段矿山法隧道位移自适应结构与安装方法
CN109989768A (zh) * 2019-04-26 2019-07-09 山东大学 一种适用于隧道穿越活断层的衬砌结构及其施工方法
CN110173276A (zh) * 2019-05-28 2019-08-27 西南交通大学 一种隧道恒值限阻缓冲结构及其施工方法
WO2020253001A1 (zh) * 2019-06-19 2020-12-24 中铁十九局集团第六工程有限公司 一种两台阶带仰拱快速封闭隧道支护结构及其施工方法
CN110130948A (zh) * 2019-06-19 2019-08-16 中铁十九局集团第六工程有限公司 一种两台阶带仰拱快速封闭隧道支护结构及其施工方法
CN112196581B (zh) * 2020-10-15 2022-10-28 中铁二局第二工程有限公司 一种软岩隧道施工支护时机确定方法
CN112196581A (zh) * 2020-10-15 2021-01-08 中铁二局第二工程有限公司 一种软岩隧道施工支护时机确定方法
CN112343660A (zh) * 2020-11-17 2021-02-09 中国铁路经济规划研究院有限公司 一种隧道双层初期支护动态生成方法及装置
CN112343660B (zh) * 2020-11-17 2023-01-20 中国铁路经济规划研究院有限公司 一种隧道双层初期支护动态生成方法及装置
CN112253142A (zh) * 2020-11-27 2021-01-22 鲁东大学 一种深长隧道联络风道近净距上跨主洞施工方法
CN112253142B (zh) * 2020-11-27 2022-05-24 鲁东大学 一种深长隧道联络风道近净距上跨主洞施工方法
CN112963169A (zh) * 2021-02-25 2021-06-15 西华大学 一种隧道开挖大变形强支护装置
CN114086990A (zh) * 2021-11-25 2022-02-25 中山大学 一种软岩隧道韧性支护结构
CN114135318A (zh) * 2021-12-06 2022-03-04 江西丰强科技发展有限公司 一种密贴下穿隧道衬砌结构及其施工方法

Also Published As

Publication number Publication date
CN103527219B (zh) 2016-03-16

Similar Documents

Publication Publication Date Title
CN103527219B (zh) 用于大变形地层的隧道支护结构的施工工法
CN203515604U (zh) 用于大变形地层的隧道支护结构
JP7125550B2 (ja) 逆アーチを備えた2段階高速閉鎖トンネルの支持構造及びその施工方法
CN107255035B (zh) 一种挤压型软弱围岩超大断面隧道支护体系及其施工方法
CN108204240B (zh) 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法
CN102937030B (zh) 深部巷道围岩分区破裂的锚注一体化支护方法
CN101614125B (zh) V级围岩隧道施工方法
CN111119935B (zh) 一种巷道松软破碎构造围岩多层次注浆加固方法
CN102493821B (zh) 一种高应力巷道煤岩体的支护方法
CN104533453A (zh) 巷道穿断层破碎带分步动态耦合支护方法
CN105350973A (zh) 一种大跨断面黄土隧道下穿高速公路的施工方法
CN101769154A (zh) 一种隧道施工的开挖支护方法
CN201241712Y (zh) 大变形地层隧道初期支护结构
CN109404005A (zh) 暗挖隧道小洞进大洞预加固体系及施工方法
CN103953366B (zh) 单洞隧道改为连拱时中隔墙顶部原衬砌空腔回填施工方法
CN101899837A (zh) 加固岩质边坡深部滑裂面的混凝土抗剪主动支护结构
CN104405411A (zh) 超大变断面隧道支护结构
CN110761811A (zh) 一种层状软岩隧道非对称支护结构及施工方法
CN103590834A (zh) 非对称挤压型变形隧道的开挖支护方法
CN103628886A (zh) 富水高地应力条件下软弱围岩隧道的开挖方法
CN109057801B (zh) 双侧墙导坑复合台阶式大断面隧道开挖支护的施工方法
CN106522248A (zh) 加固土质边坡方法及边坡加固装置
CN110230497A (zh) 一种线隧道正洞身双侧壁导坑施工方法
CN205117376U (zh) 一种用于浅埋偏压隧道的新型锚杆支护结构
CN104989419B (zh) 一种隧道初期支护侵限的处理方法及其施工配套设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 610000 7-10 Floor, Block B, Building No. 4, 200 Tianfu Fifth Street, Chengdu High-tech Zone, Sichuan Province

Patentee after: Sichuan Highway Planning, Survey and Design Research Institute Co., Ltd.

Address before: 610041 Wuhou District, Chengdu Wuhou Temple street, No. 1, No.

Patentee before: Sichuan Department of Transportation Highway Planning, Prospecting and Design Research Institute

CP03 Change of name, title or address