CN103526763A - 一种灌注桩、树根桩与旋喷桩复合式基坑围护方法 - Google Patents

一种灌注桩、树根桩与旋喷桩复合式基坑围护方法 Download PDF

Info

Publication number
CN103526763A
CN103526763A CN201310437161.2A CN201310437161A CN103526763A CN 103526763 A CN103526763 A CN 103526763A CN 201310437161 A CN201310437161 A CN 201310437161A CN 103526763 A CN103526763 A CN 103526763A
Authority
CN
China
Prior art keywords
pile
root
foundation ditch
foundation pit
sandstone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310437161.2A
Other languages
English (en)
Inventor
吴�民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201310437161.2A priority Critical patent/CN103526763A/zh
Publication of CN103526763A publication Critical patent/CN103526763A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

本发明涉及一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,在检验了整个施工场地的现场情况后,在基坑不能封闭的部位采取多排树根桩代替钻孔灌注桩的围护方法,并加筑高压旋喷桩作为止水帷幕,实现对基坑周边的整体灌桩加固。本发明能够对不能完全封闭的深基坑围护可实现有效、安全可靠支护效果,适用于解决工业厂房内技改项目由于空间受限常规支护方式无法实施的难题。

Description

一种灌注桩、树根桩与旋喷桩复合式基坑围护方法
技术领域
本发明属工程施工技术领域,特别是涉及一种灌注桩、树根桩与旋喷桩复合式基坑围护方法。
背景技术
随着工业技术改造中因生产任务增加或节约能耗等目的,需要加强资源综合利用,而原有厂房建筑、设备、生产方式、工艺顺序等往往不能满足上述要求,故需在原有厂房内进行施工改造,以使其适应新的生产要求。特别在冶金、有色等工业厂商为增加产量常常需在原有厂房内增设生产线,需在多跨厂房内进行深基坑开挖。常用的支护方法有制作地下连续墙、制作SMW工法桩、制作钻孔灌注桩+水泥土搅拌桩等围护结构等。
根据基坑深度及地基情况常常采用钻孔灌注桩支护、高压旋喷桩止水的围护方式,但由于基坑位于两跨厂房内,中间柱列管道及行车梁下方,钻孔灌注桩无法施工,导致基坑不能完全封闭。
发明内容
本发明所要解决的技术问题是提供一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,能对。
本发明解决其技术问题所采用的技术方案是:提供一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,包括:
1)厂房内开挖有基坑,基坑内靠北边一侧沿B轴方向布置有沙石回填区域,沙石回填区域内安装有若干已施工承台,且在沙石回填区域内沿B轴方向布置有厂房内管,沿基坑周线打有加固桩,加固桩包括钻孔灌注桩、高压旋喷桩和小桩径树根桩,其中在厂房内管与基坑周线相交处采用3排桩直径为300mm、桩与桩的中心距为500mm的小桩径树根桩进行打桩,在基坑周线其余部分采用单排直径为950mm、桩与桩的中心距为1150mm的钻孔灌注桩进行打桩。
2)在钻孔灌注桩外侧加筑桩直径为800mm、桩与桩的中心距为1150mm的高压旋喷桩作为止水帷幕;在小桩径树根桩外侧加筑桩直径为800mm、桩与桩的中心距为500mm的高压旋喷桩作为止水帷幕。
所述的基坑总面积900㎡,基坑总边长120m。
所述的钻孔灌注桩桩长15.25m,小桩径树根桩桩长15.25m,高压旋喷桩桩长16.8m。
所述的基坑普遍区底板厚度1400mm,其下有100mm厚垫层,挖深8.20m;局部落深区挖深8.70m;局部范围区挖深6.40m。
所述的基坑外部靠东边一侧为已施工完毕的原轧机区域。
所述的基坑外部靠南边一侧沿A轴线建有外墙,外墙底部的底面安装有已施工承台。
所述的基坑内靠南边一侧沿1/A轴方向布置有一沙石回填区域,沙石回填区域内安装有若干已施工承台,沙石回填区域内填充有沙石。
有益效果
本发明能够对不能完全封闭的深基坑围护可实现有效、安全可靠支护效果。适用于解决工业厂房内技改项目由于空间受限常规支护方式无法实施的难题。
附图说明
图1为本发明示意图。
图2为本发明C处放大图。
图3为本发明基坑普遍区、局部落深区、局部范围区分布图。
具体实施方式
下面结合具体实施例,进一步阐述本发明。应理解,这些实施例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
实施例1
如图1~图3所示,一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,包括已施工承台1,沙石回填区域2,厂房内管3,外墙4,已施工完毕的原轧机区域5,止水帷幕6,树根桩7,钻孔灌注桩8,基坑9,精轧机设备基础围护工程中,某公司铝箔车间轧制跨及辅跨A-C/6-13线内,厂房内净高约13.0m。基坑总面积约900㎡,基坑9总延长120m。局部范围区J位于基坑9一侧的两个角上,局部落深区L位于局部范围区J之间的基坑9位置,与局部范围区J相对的另一侧基坑9位置为基坑普遍区P;基坑开挖深度:基坑普遍区P底板厚度1400mm,其下有100mm厚垫层,挖深8.20m;局部落深区L挖深8.70m;局部范围区J挖深6.40m。
需安装的精轧机设备周边环境如下:
精轧机设备基础基坑周围有已建厂房内部柱、桩、承台、外墙,基坑内边线东侧、西侧距离已建厂房承台结构距离较近,距离分别约为1.90m、1.70m,局部施工作业空间狭小。
在基坑靠近B轴线两边吊车梁以下有两排东西走向的工艺管线与基坑围护边线交叉,在深基坑施工中且不能拆除,在实际施工中会对管线下部的钻孔灌注桩施工带来不利影响。
本基坑工程已建厂房内部,周边环境复杂,环境保护要求高。对于基坑工程而言,东侧相邻运行中的原有轧机设备、南侧已建厂房结构外墙对变形极为敏感,是须重点的保护对象。
基于上述环境条件,对本基坑工程采用如下围护方案:钻孔灌注桩+树根桩+高压旋喷桩复合式基坑围护方法。
钻孔灌注桩施工区域:基坑围护结构采用Φ9501150钻孔灌注桩(桩长15.25m)加Φ8001150高压旋喷桩(桩长16.8m)止水帷幕。
树根桩施工区域(B轴线附近):基坑围护结构采用3排Φ300500小桩径树根桩(桩长15.25m)加Φ800500高压旋喷桩(桩长16.8m)止水帷幕。
需安装的精轧机设备基础围护工程全部施工完成,柱墙体沉降最大值8.71mm,围护桩顶沉降最大值4.62mm,桩体测斜最大值6.78mm,邻近原有轧机基础沉降0.65mm,基础倾斜值0.09mm/m,各项指标均满足控制指标要求,需安装的精轧机基坑采用灌注桩—树根桩与高压旋喷桩基坑支护设计施工的成功,积累了此类方法的设计施工的经验,达到的预期的目的。

Claims (7)

1.一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,包括:
1)厂房内开挖有基坑(9),基坑(9)内靠北边一侧沿B轴方向布置有沙石回填区域(2),沙石回填区域(2)内安装有若干已施工承台(1),且在沙石回填区域(2)内沿B轴方向布置有厂房内管(3),沿基坑(9)周线打有加固桩,加固桩包括钻孔灌注桩、高压旋喷桩和小桩径树根桩,其中在厂房内管(3)与基坑(9)周线相交处采用3排桩直径为300mm、桩与桩的中心距为500mm的小桩径树根桩进行打桩,在基坑(9)周线其余部分采用单排直径为950mm、桩与桩的中心距为1150mm的钻孔灌注桩进行打桩;
2)在钻孔灌注桩外侧加筑桩直径为800mm、桩与桩的中心距为1150mm的高压旋喷桩作为止水帷幕;在小桩径树根桩外侧加筑桩直径为800mm、桩与桩的中心距为500mm的高压旋喷桩作为止水帷幕。
2.根据权利要求1所述的一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,其特征是:所述的基坑(9)总面积900㎡,基坑总边长120m。
3.根据权利要求1所述的一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,其特征是:所述的钻孔灌注桩桩长15.25m,小桩径树根桩桩长15.25m,高压旋喷桩桩长16.8m。
4.根据权利要求1所述的一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,其特征是:所述的基坑普遍区(P)底板厚度1400mm,其下有100mm厚垫层,挖深8.20m;局部落深区(L)挖深8.70m;局部范围区(J)挖深6.40m。
5.根据权利要求1所述的一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,其特征是:所述的基坑(9)外部靠东边一侧为已施工完毕的原轧机区域(5)。
6.根据权利要求1所述的一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,其特征是:所述的基坑(9)外部靠南边一侧沿A轴线建有外墙(4),外墙(4)底部的底面安装有已施工承台(1)。
7.根据权利要求1所述的一种灌注桩、树根桩与旋喷桩复合式基坑围护方法,其特征是:所述的基坑(9)内靠南边一侧沿1/A轴方向布置有一沙石回填区域(2),沙石回填区域(2)内安装有若干已施工承台(1),沙石回填区域(2)内填充有沙石。
CN201310437161.2A 2013-09-22 2013-09-22 一种灌注桩、树根桩与旋喷桩复合式基坑围护方法 Pending CN103526763A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310437161.2A CN103526763A (zh) 2013-09-22 2013-09-22 一种灌注桩、树根桩与旋喷桩复合式基坑围护方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310437161.2A CN103526763A (zh) 2013-09-22 2013-09-22 一种灌注桩、树根桩与旋喷桩复合式基坑围护方法

Publications (1)

Publication Number Publication Date
CN103526763A true CN103526763A (zh) 2014-01-22

Family

ID=49929083

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310437161.2A Pending CN103526763A (zh) 2013-09-22 2013-09-22 一种灌注桩、树根桩与旋喷桩复合式基坑围护方法

Country Status (1)

Country Link
CN (1) CN103526763A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111324983A (zh) * 2020-03-26 2020-06-23 武汉大学 基于有限元的桩直径不确定性对防渗效果影响的评估方法
CN114960687A (zh) * 2022-06-22 2022-08-30 南京历史城区保护建设集团有限责任公司 一种历史风貌区地下微型市政共同沟的施工工艺

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2627062Y (zh) * 2003-06-05 2004-07-21 徐昉 一种基坑支护构件
KR20090045626A (ko) * 2007-11-02 2009-05-08 쌍용건설 주식회사 매입 앵커 및 이를 이용한 지하외벽의 합성옹벽 시공방법
CN102433899A (zh) * 2011-12-31 2012-05-02 上海市机械施工有限公司 防止城市轨道交通的地下墙接缝漏水的结构
CN102635120A (zh) * 2012-05-04 2012-08-15 张全胜 圆形深基坑无支撑施工结构和施工方法
CN102644286A (zh) * 2012-04-10 2012-08-22 广东天竟建设有限公司 一种深基坑支护结构
CN202466594U (zh) * 2011-12-29 2012-10-03 标力建设集团有限公司 水平旋喷土锚和灌注桩复合基坑支护结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2627062Y (zh) * 2003-06-05 2004-07-21 徐昉 一种基坑支护构件
KR20090045626A (ko) * 2007-11-02 2009-05-08 쌍용건설 주식회사 매입 앵커 및 이를 이용한 지하외벽의 합성옹벽 시공방법
CN202466594U (zh) * 2011-12-29 2012-10-03 标力建设集团有限公司 水平旋喷土锚和灌注桩复合基坑支护结构
CN102433899A (zh) * 2011-12-31 2012-05-02 上海市机械施工有限公司 防止城市轨道交通的地下墙接缝漏水的结构
CN102644286A (zh) * 2012-04-10 2012-08-22 广东天竟建设有限公司 一种深基坑支护结构
CN102635120A (zh) * 2012-05-04 2012-08-15 张全胜 圆形深基坑无支撑施工结构和施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王春平等: "在周边环境复杂条件下的深基坑施工技术", 《建筑施工》, no. 08, 31 August 2011 (2011-08-31), pages 654 - 656 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111324983A (zh) * 2020-03-26 2020-06-23 武汉大学 基于有限元的桩直径不确定性对防渗效果影响的评估方法
CN111324983B (zh) * 2020-03-26 2022-02-15 武汉大学 基于有限元的桩直径不确定性对防渗效果影响的评估方法
CN114960687A (zh) * 2022-06-22 2022-08-30 南京历史城区保护建设集团有限责任公司 一种历史风貌区地下微型市政共同沟的施工工艺

Similar Documents

Publication Publication Date Title
CN201962688U (zh) 地下连续墙码头桩基础结构
CN103485790A (zh) 一种管幕-支护结构组合体系浅埋暗挖法
CN110374112B (zh) 软弱土场地深基坑支护体系及其施工方法
CN102943479A (zh) 分区卸荷控制深大基坑变形的***及方法
CN100510281C (zh) 超大直径、超埋深度调蓄池的半逆作施工方法
CN103103988A (zh) 利用中心岛楼板水平支撑结构的基坑施工方法
CN102425171A (zh) 深大基坑中心岛顺逆工法
CN104131565A (zh) 一种逆作土方正作开挖的施工方法
CN111139837A (zh) 一种软土地区十字交叉地铁处多基坑同时开挖方法
CN111501771B (zh) 多椭圆环形组合撑在深大淤泥基坑工程的应用方法
CN105350561A (zh) 一种用于软土地区输电塔的装配式微型沉井基础
CN109594574B (zh) 基于有限空间的大型顶管沉井逆作施工方法
CN104895079A (zh) 钢板桩打设的逆做施工方法
CN103526763A (zh) 一种灌注桩、树根桩与旋喷桩复合式基坑围护方法
CN101498133A (zh) 增大地下室逆作法土方开挖空间的方法和支护结构
CN209941754U (zh) 一种高压电力管涵原地保护结构
CN204212161U (zh) 基坑支护斜钢顶撑体系
CN111877365A (zh) 一种h型钢组合钢板桩连续墙组合支护体系及其施工方法
CN209179010U (zh) 一种市政管线横穿基坑的围护结构
CN115688518A (zh) 一种在深基坑施工中实现地下管廊位移控制的计算方法
CN205116181U (zh) 一种格形封闭式围护体系
CN109371979B (zh) 喷锚逆作与冲孔桩组合的深基坑围护结构
CN210141128U (zh) 模拟管幕暗挖的试验装置
CN208934101U (zh) 一种泵闸基坑围护结构
CN206941655U (zh) 适用于软弱富水砂性地层的连续墙接缝防水涌砂结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140122