Background technology
Pumped storage power plant upper storage reservoir is usually placed in depression, mountain top, and can run into need to be in the problem on dam of more than two building on cheuch ground of steeper longitudinal gradient.Existing dam zoning is divided into bed course district, transition region, rockfill area, top, rockfill area, downstream (dry section), bottom of trench drainage blanket according to building excavated material characteristic by dam, and adopts and directly on ground, fill during dam embankment.But adopt, at cross section, be that W shape (W intermediate representation ridge, W bottom represents two gullys), longitudinal grade are greater than on 17 ° of grounds and build a dam in this way, all totally unfavorable to dam body stabilization and deformation.Prior art adopts conventionally excavates middle part ridge, avoid is laterally the impact along the inhomogeneous deformation of axis of dam direction on dam body of " W " shape, then carry out dam embankment, during dam embankment, regardless of Zeng Mo district, top and Zeng Mo district, bottom, the shortcoming of the method is that excavation fills investment greatly.In addition, in prior art, also by build gravity dam at downstream side slope correct position, reduce earth and rockfill dam downstream slope height, reduce longitudinal ground gradient and be greater than the height of building a dam on 17 ° of grounds, its shortcoming is that this dam type is that gravity dam and earth and rockfill dam mix dam type, be out of shape stressed inharmoniously, and gravity dam investment is large.On the backfill rock ballast layer of above-mentioned two kinds of dam and reservoir sides, do not lay junction plate, dam body panel and reservoir bottom geomembrane are directly joined, the middle joining section not playing a transition role, can not form stable impervious barrier well.
Summary of the invention
The present invention is intended to overcome the deficiencies in the prior art, and a kind of damming method of reservoir dam is provided.
In order to achieve the above object, technical scheme provided by the invention is:
A damming method, described dam ground cross section is W shape, W intermediate representation ridge, W bottom represents two gullys; Ground longitudinal grade is greater than 17 °.In building a dam, other steps of not launching explanation are the routine techniques means of building a dam this area, and its dam structure is also the conventional dam structure in this area.
Described method comprises the steps:
(1) ridge boss is whittled into platform; Along longitudinal several horizontal bench of domatic excavation of ground;
(2) on the dam ground of processing through step (1), carry out dam embankment, in the process of building a dam, in loose rock dam bottom and top, roll the Zeng Mo district, bottom of formation respectively and Zeng Mo district, top; While rolling, control Zeng Mo district compacting bed thickness 0.6
+0.05m, porosity < 18%, osmotic coefficient k > 1 * 10
-2cm/s, watering amount>=10%, controls Zeng Mo district enrockment maximum particle diameter and is no more than compacted lift thickness, and the enrockment content that particle diameter is less than 5mm is not more than 20% of Zeng Mo district enrockment quality, and the enrockment content that control particle diameter is less than 0.075mm is not more than 5% of Zeng Mo district enrockment quality;
(3) at dam embankment simultaneously, at the base of dam place of dam body, construct back-pressure platform; On the backfill rock ballast of dam body reservoir side, junction plate is set, reservoir bottom geomembrane is covered to junction plate and stretch in dam week side seam;
(4) wait the dam body having filled, through sedimentation at least 6 months and the rate of settling, be not more than 5mm/ and carry out building of dam body panel after the month, dam body panel joins by junction plate and reservoir bottom geomembrane.
Wherein, the described platform of step (1) is wide is 110
+5m, preferably 110m; Described horizontal bench is wide is 10
+0.5m, preferably 10m.Zeng Mo district enrockment maximum particle diameter described in step (2) is 0.6m ,Zeng Mo district's compacting bed thickness 0.6m.While rolling Zeng Mo district in step (2), be to adopt 27t self-propelled vibrating roller to roll 6-10 times, preferably 8 times.
Below in conjunction with beneficial effect, the inventive method is further elaborated:
The damming method of described reservoir dam comprises the steps:
(1) ridge boss is whittled into platform; Along longitudinal several horizontal bench of domatic excavation of ground.This step is two ditch one beam " W " landform for the dam foundation, and ditch and beam are greater than 17
otendency downstream, stable and the very unfavorable feature of dam body inhomogeneous deformation to dam, dam foundation landform is transformed: 1. middle part ridge boss is cut to slope excavation, form wide about 110m platform, reduce dam body at the differential settlement of parallel axis of dam direction, both reduced the inhomogeneous deformation of dam foundation cheuch, again because local excavation has only saved construction investment; 2. in conjunction with dam foundation excavation, to the domatic bench excavation that carries out of the steep basement rock of middle part ridge, form wide about 10m platform, increase rockfill along the skid resistance of bedrock surface.
(2) on the dam ground of processing through step (1), carry out dam embankment, in the process of building a dam, in loose rock dam bottom and top, roll the Zeng Mo district, bottom of formation respectively and Zeng Mo district, top; While rolling, control Zeng Mo district compacting bed thickness 0.6
+0.05m, porosity < 18%, osmotic coefficient k > 1 * 10
-2cm/s, watering amount>=10%, controls Zeng Mo district enrockment maximum particle diameter and is no more than compacted lift thickness, and the enrockment content that particle diameter is less than 5mm is not more than 20% of Zeng Mo district enrockment quality, and the enrockment content that control particle diameter is less than 0.075mm is not more than 5% of Zeng Mo district enrockment quality.In this step, first this proposes Shuan Zengmo district, and Zeng Mo district, bottom is by improving number of rolling and dam material quality to increase the following rockfill area of 185m elevation platform modulus of compressibility, can reducing the impact on dam body inhomogeneous deformation of " W " landform and clinoform.Zeng Mo district, top is by improving number of rolling and dam material quality to increase the above rockfill area of 265.8m elevation platform modulus of compressibility, guaranteeing dam stability of slope.Zeng Mo district adopts the weak weathering of lower storage reservoir storehouse basin excavation, fresh tuff, andesite to fill.That is to say, this step has changed the subregion of traditional dam, has increased Zeng Mo district, bottom and Zeng Mo district, top in each subregion, has improved the stability of dam under W shape foundation condition.
(3) at dam embankment simultaneously, at the base of dam place of dam body, construct back-pressure platform, back-pressure platform can be in conjunction with layout of spoil area behind dam, and it is stable that the constructing of this back-pressure platform is conducive to dam; On the backfill rock ballast layer of dam body reservoir side, lay junction plate, reservoir bottom geomembrane is covered to junction plate and stretch in dam week side seam.
(4) wait the dam body having filled, through sedimentation at least 6 months and the rate of settling, be not more than 5mm/ and carry out building of dam body panel after the month, dam body panel joins by junction plate and reservoir bottom geomembrane.Dam body panel, reservoir bottom geomembrane form seepage prevention system by junction plate, adopt above-mentioned dam body panel to build two standards of time and control (wait the dam body having filled, through sedimentation at least 6 months and the rate of settling, be not more than 5mm/ and after the month, carry out the laying of dam body panel) and can guarantee that seepage control of dam system is not because dam deformation damages.
The present invention fills out slag back-pressure platform, the rationally measure minimizing such as settlement reservation superelevation and sedimentation cycle dam inhomogeneous deformation by improvement dam foundation orographic condition, dam body rationalization partition, base of dam, has guaranteed that dam body is stable.
The specific embodiment
Below in conjunction with drawings and Examples, the present invention is further illustrated.
embodiment 1
Referring to Fig. 1 and Fig. 2.The present embodiment relies on Liyang pumped storage power plant upper storage reservoir key dam engineering.Upper storage reservoir key dam is reinforced concrete face rockfill dam, crest elevation 295.00m, and width at dam crest 10m, maximum height of dam 165.00m (axis of dam place), crest length 1113.20m, upstream face slope ratio is 1: 1.4, downstream face slope ratio is 1: 1.45.Described dam ground 8 cross sections are W shape, W intermediate representation ridge, and W bottom represents two gullys; Ground longitudinal grade is greater than 17 °.
(1) ridge boss is whittled into wide about 110m, the platform 1 of high about 30m; Horizontal bench 2 along the wide about 10m of the longitudinal domatic excavation of ground.
(2) on the dam ground of processing through step (1), carry out dam body 9 and fill, in the process of building a dam, roll bottom, rockfill area, dam and top, form respectively Zeng Mo district 3, bottom and Zeng Mo district, top 4; While rolling, control Zeng Mo district compacting bed thickness 0.6
+0.05m, porosity < 18%, osmotic coefficient k > 1 * 10
-2cm/s, watering amount>=10%, controls Zeng Mo district enrockment maximum particle diameter and is no more than compacted lift thickness, and the enrockment content that particle diameter is less than 5mm is not more than 20% of Zeng Mo district enrockment quality, and the enrockment content that control particle diameter is less than 0.075mm is not more than 5% of Zeng Mo district enrockment quality.Wherein, Zeng Mo district, bottom 3 is by improving number of rolling and dam material quality to increase the following rockfill area of 185m elevation platform modulus of compressibility, can reducing the impact on dam body inhomogeneous deformation of " W " landform and clinoform.Zeng Mo district, top 4 is by improving number of rolling and dam material quality to increase the above rockfill area of 265.8m elevation platform modulus of compressibility, guaranteeing dam stability of slope.Zeng Mo district adopts the weak weathering of lower storage reservoir storehouse basin excavation, fresh tuff, andesite to fill.
(3) at dam embankment simultaneously, locate to construct the back-pressure platform 10 of wide about 220m below the base of dam elevation 160m of dam body, back-pressure platform 10 can be in conjunction with layout of spoil area; On the backfill rock ballast layer of dam body reservoir side, lay junction plate 5, reservoir bottom geomembrane 6 is covered to junction plate and stretch in dam week side seam.
(4) wait the dam body having filled, through sedimentation at least 6 months and the rate of settling, be not more than 5mm/ and carry out building of dam body panel 7 after the month, dam body panel joins by junction plate 5 and reservoir bottom geomembrane 6.Dam body panel 7, reservoir bottom geomembrane 6 form seepage prevention system by junction plate 5.
The present embodiment is applied in the pumped storage power plant upper storage reservoir dam engineering of Liyang, and the about 70cm of dam maximum settlement, is 0.42% of height of dam at present, and the distortion of dam differential settlement is effectively controlled.Reduce middle part ridge excavated volume and the amount of filling approximately 500,000 m
3, reduce by 2,500 ten thousand yuan of engineering costs, save 4 months durations.