CN103513573B - 一种300mw机组有效稳定主蒸汽温度的最佳控制方法 - Google Patents

一种300mw机组有效稳定主蒸汽温度的最佳控制方法 Download PDF

Info

Publication number
CN103513573B
CN103513573B CN201310313739.3A CN201310313739A CN103513573B CN 103513573 B CN103513573 B CN 103513573B CN 201310313739 A CN201310313739 A CN 201310313739A CN 103513573 B CN103513573 B CN 103513573B
Authority
CN
China
Prior art keywords
degree
difference
load
deviation
attemperation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310313739.3A
Other languages
English (en)
Other versions
CN103513573A (zh
Inventor
赵毅
张长志
***
张应田
刘卫平
秦俊海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310313739.3A priority Critical patent/CN103513573B/zh
Publication of CN103513573A publication Critical patent/CN103513573A/zh
Application granted granted Critical
Publication of CN103513573B publication Critical patent/CN103513573B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Abstract

本发明涉及一种300MW机组有效稳定主蒸汽温度的最佳控制方法,该方法包括步骤:⑴将主蒸汽温度与主蒸汽温度设定值作差值运算求出差值A:T1-T2=A,其中,T1为主蒸汽温度,T2为主蒸汽温度设定值;⑵确立差值A与减温水流量B之间的函数关系B=F(A),这种函数关系的确定方法为通过具体记录一定负荷下300MW机组所需减温水流量的累积量以及过渡时间得到;⑶确立减温水流量B与减温水调整门开度C之间的关系;⑷将差值A与减温水流量B、减温水压力与过热蒸汽压力之差P3以及调整门开度C一一对应,实现减温水的最佳控制,本发明方法提高了调节品质及能源利用率,效果明显,改方法可以应用到各种减温控制的工艺中,应用市场广泛。

Description

一种300MW机组有效稳定主蒸汽温度的最佳控制方法
技术领域
本发明属于热工自动控制技术领域,,尤其是一种300MW机组有效稳定主蒸汽温度的最佳控制方法。
背景技术
锅炉过热蒸汽温度是影响锅炉生产过程安全性和经济性的最重要的参数之一,过热汽温过高导致金属温度过高蠕胀增强,降低管道寿命,经常超温可导致过热器管道超温爆管。过热蒸汽温度过低将会降低全厂热效率,一般过热器汽温每降低5~10℃热效率减低1%。因此要求对过热蒸汽温度的控制不超过额定值(给定值)的-10~+5℃。控制对象的特性为惯性大、滞后大、非线性、强耦合的特点,另外影响过热汽温的因素很多例如锅炉负荷、燃料量、烟气扰动(启停制粉)、减温水量(给水压力)等。稳定、准确、快速的对过热汽温进行有效的控制是非常有必要的。经检索,中国专利文献CN101899996A是本发明最接近的现有技术。
减温水自动是锅炉最难投的自动之一,减温水自动的三个必要条件是:1、调节阀必须流量特性好,2、内漏量小,3、执行器稳定可靠。在三个必要条件的基础上,如果投入PID调节,则容易产生积分饱和、易超调等弊端,目前缺少一种特别行之有效的方法去控制主蒸汽温度。
发明内容
本发明的目的在于克服现有技术的不足,提供一种300MW机组有效稳定主蒸汽温度的最佳控制方法。
本发明解决其技术问题是采取以下技术方案实现的:
一种300MW机组有效稳定主蒸汽温度的最佳控制方法,包括以下步骤:
⑴将主蒸汽温度与主蒸汽温度设定值作差值运算求出差值A:T1-T2=A,其中,T1为主蒸汽温度,T2为主蒸汽温度设定值;
⑵确立差值A与减温水流量B之间的函数关系B=F(A),这种函数关系的确定方法为通过具体记录一定负荷下300MW机组所需减温水流量的累积量以及过渡时间得到;
⑶确立减温水流量B与减温水调整门开度C之间的关系;
⑷将差值A与减温水流量B、减温水压力与过热蒸汽压力之差P3以及调整门开度C一一对应,实现减温水的最佳控制,其具体步骤如下:
①确定机组当时负荷FH,以及当时机组主蒸汽温度与设定值之间的差值A;
②依据上述两个数据,确定要计算的函数B=F(A),计算出B值;
③根据P3的大小,确定插值计算的表格,根据B值计算出C值;
④最终实现缩小差值A到不超过额定值-5℃~+5℃的范围。
而且,所述步骤⑵中函数关系的具体确定方法为:
①针对300MW机组来试验,50%负荷即FH=150MW工况下,差值A在0度到15度再回到0度,记录所需减温水流量的累积量以及过渡时间为25t,0.4小时;50%负荷即FH=150MW工况下,差值A在0度到10度再回到0度,所需减温水流量的累积量及过渡时间为18t,0.3小时;
利用上述数据,进行如下分析:如果温度差值为15度,则采用快速喷水的办法,即将喷水量快速增加至整体累计流量的二分之一,而时间缩短为原来的二分之一,即水量为25t/2=12.5t,而原来一半时间即0.4h*0.5=0.2h,所以12.5t/0.2h=62.5t/h,这就是本次计算的瞬时流量,同样10度的瞬时流量计算为18t*2/(2*0.3h)=60t/h;
整理函数阶段,可以将50%负荷的喷水函数设置为四段:第一段偏差A为负数或者零,F51(A)=0,第二段偏差A为0-10度,函数为F52(A)=6A;偏差A在10.01-15.00之间采用函数为F53(A)=60+0.5*(A-10),偏差A在15度以上,则采用F54(A)=62.5t/h,其中下标51、52、53、54分别表示50%负荷的第1、2、3、4阶段函数;
②针对300MW机组来试验,75%负荷即FH=225MW工况下,差值A在0度到15度再回到0度,记录所需减温水流量的累积量以及过渡时间为24t,0.4小时;75%负荷即225MW工况下,差值在0度到10度再回到0度,所需减温水流量的累积量及过渡时间为17t,0.3小时;
利用上述数据,进行如下分析:如果温度差值为15度,则采用快速喷水的办法,即将喷水量快速增加至整体累计流量的二分之一,而时间缩短为原来的二分之一,即水量为24t/2=12t,而原来一半时间即0.4h*0.5=0.2h,所以12t/0.2h=60t/h,这就是本次计算的瞬时流量,同样10度的瞬时流量计算为17t*2/(2*0.3h)=56.67t/h,
整理函数阶段,可以将75%负荷的喷水函数设置为四段:第一段偏差A为负数或者零,F751(A)=0,第二段偏差A为0-10度,函数为F752(A)=5.7*A;偏差A在10.01-15.00之间采用函数为F753(A)=56.67+0.67*(A-10),偏差A在15度以上,则采用F754(A)=60t/h,其中下标751、752、753、754分别表示75%负荷的第1、2、3、4阶段函数;
③针对300MW机组来试验,100%负荷即FH=300MW工况下,差值A在0度到15度再回到0度,记录所需减温水流量的累积量以及过渡时间为23t,0.4小时;100%负荷即300MW工况下,差值在0度到10度再回到0度,所需减温水流量的累积量及过渡时间为16t,0.3小时;
利用上述数据,进行如下分析:如果温度差值为15度,则采用快速喷水的办法,即将喷水量快速增加至整体累计流量的二分之一,而时间缩短为原来的二分之一,即水量为23t/2=11.5t,而原来一半时间即0.4h*0.5=0.2h,所以11.5t/0.2h=57.5t/h,这就是本次计算的瞬时流量,同样10度的瞬时流量计算为16t*2/(2*0.3h)=53.33t/h;
整理函数阶段,可以将100%负荷的喷水函数设置为四段:第一段偏差A为负数或者零,F101(A)=0,第二段偏差A为0-10度,函数为F102(A)=5.33*A;偏差A在10.01-15.00之间采用函数为F103(A)=53.33+0.83*(A-10),偏差A在15度以上,则采用F104(A)=57.5t/h,其中下标101、102、103、104分别表示100%负荷的第1、2、3、4阶段函数;
④确定函数关系:函数关系为:B=F(A),
针对额定容量为300MW的发电机组,当机组发电负荷FH≤185MW,A≤0,F51(A)=0;0<A<10,F52(A)=6A;10≤A≤15,F53(A)=60+0.5*(A-10),A>15,F54(A)=62.5t/h;
机组发电负荷185MW<FH<260MW,A≤0,F751(A)=0;0<A<10,F752(A)=5.7*A;10≤A≤15,F753(A)=56.67+0.67*(A-10),A>15,F754(A)=60t/h;
机组发电负荷FH>260MW,A≤0,F101(A)=0;0<A<10,F102(A)=5.33*A;10≤A≤15,F103(A)=53.33+0.83*(A-10),A>15,F104(A)=57.5t/h。
而且,所述步骤⑶确立减温水流量B与减温水调整门开度C之间的关系的具体步骤如下:
①当机组减温水压力P1与过热器出口压力P2之差即P2-P1=P3为2.0MPa时,从历史记录中记录减温水流量与减温水门开度之间的关系,并总结为如下关系:
开度C 0 10 20 30 40 50 60 70 80 90 100
流量B 0 1.5 2.0 4.4 7.2 14.3 21.8 35.2 ..... .... .....
②当机组减温水压力P1与过热器出口压力P2之差即P2-P1=P3为1.6MPa时,从历史记录中记录减温水流量与减温水门开度之间的关系,并总结为如下关系:
③当机组减温水压力P1与过热器出口压力P2之差即P2-P1=P3为1.2MPa时,从历史记录中记录减温水流量与减温水门开度之间的关系,并总结为如下关系:
开度C 0 10 20 30 40 50 60 70 80 90 100
流量B 0 0.8 1.2 3.2 5.4 10.7 18.6 31.0 ...... ...... .....
④根据机组的P3实际值,选取下列计算方法:当压力差值P3≤1.4MPa,则根据流量B查表求出减温水阀开度的指令C,中间值采用线性差值方法求得:
流量 0 0.8 1.2 3.2 5.4 10.7 18.6 31.0 ...... ...... ......
开度 0 10 20 30 40 50 60 70 80 90 100
当压力差值1.4<P3≤1.8MPa,则根据流量B查表求出减温水阀开度的指令C,中间值采用线性差值方法求得:
流量 0 1.2 1.5 3.8 6.9 12.5 19.5 33.6 ..... ... .....
开度 0 10 20 30 40 50 60 70 80 90 100
当压力差值P3>1.8MPa,则根据流量B查表求出减温水阀开度的指令C,中间值采用线性差值方法求得:
流量 0 1.5 2.0 4.4 7.2 14.3 21.8 35.2 ...... ...... ......
开度 0 10 20 30 40 50 60 70 80 90 100
本发明的优点和积极效果是:
1、本发明方法可以应用到一级减温、二级减温、再热器减温等各种减温控制的工艺中,应用市场广泛。
2、本发明相对原来PID调节的方法,可以提高调节品质,提高能源利用率,效果明显。
附图说明
图1为本发明方法的工艺步骤流程示意图。
具体实施方式
以下结合附图对本发明实施例做进一步详述,
一种300MW机组有效稳定主蒸汽温度的自动控制方法,如图1所示,包括以下步骤:
⑴将主蒸汽温度与主蒸汽温度设定值作差值运算求出差值A:T1-T2=A,
其中,T1为主蒸汽温度,T2为主蒸汽温度设定值;
⑵确立差值A与减温水流量B之间的函数关系B=F(A),这种函数关系的确定方法为通过具体记录一定负荷下300MW机组所需减温水流量的累积量,以及过渡时间得到;
①针对300MW机组来试验,50%负荷即FH=150MW工况下,差值A在0度到15度再回到0度,记录所需减温水流量的累积量以及过渡时间为25t,0.4小时。50%负荷即FH=150MW工况下,差值A在0度到10度再回到0度,所需减温水流量的累积量及过渡时间为18t,0.3小时,
利用上述数据,进行如下分析:如果温度差值为15度,则采用快速喷水的办法,即将喷水量快速增加至整体累计流量的二分之一,而时间缩短为原来的二分之一,即水量为25t/2=12.5t,而原来一半时间即0.4h*0.5=0.2h,所以12.5t/0.2h=62.5t/h,这就是本次计算的瞬时流量,同样10度的瞬时流量计算为18t*2/(2*0.3h)=60t/h,
整理函数阶段,可以将50%负荷的喷水函数设置为四段:第一段偏差A为负数或者零,F51(A)=0,第二段偏差A为0-10度,函数为F52(A)=6A;偏差A在10.01-15.00之间采用函数为F53(A)=60+0.5*(A-10),偏差A在15度以上,则采用F54(A)=62.5t/h,其中下标51、52、53、54分别表示50%负荷的第1、2、3、4阶段函数;
②针对300MW机组来试验,75%负荷即FH=225MW工况下,差值A在0度到15度再回到0度,记录所需减温水流量的累积量以及过渡时间为24t,0.4小时,75%负荷即225MW工况下,差值在0度到10度再回到0度,所需减温水流量的累积量及过渡时间,比如17t,0.3小时;
利用上述数据,进行如下分析:如果温度差值为15度,则采用快速喷水的办法,即将喷水量快速增加至整体累计流量的二分之一,而时间缩短为原来的二分之一,即水量为24t/2=12t,而原来一半时间即0.4h*0.5=0.2h,所以12t/0.2h=60t/h,这就是本次计算的瞬时流量,同样10度的瞬时流量计算为17t*2/(2*0.3h)=56.67t/h;
整理函数阶段,可以将75%负荷的喷水函数设置为四段:第一段偏差A为负数或者零,F751(A)=0,第二段偏差A为0-10度,函数为F752(A)=5.7*A;偏差A在10.01-15.00之间采用函数为F753(A)=56.67+0.67*(A-10),偏差A在15度以上,则采用F754(A)=60t/h,其中下标751、752、753、754分别表示75%负荷的第1、2、3、4阶段函数;
③针对300MW机组来试验,100%负荷即FH=300MW工况下,差值A在0度到15度再回到0度,记录所需减温水流量的累积量以及过渡时间为23t,0.4小时,100%负荷即300MW工况下,差值在0度到10度再回到0度,所需减温水流量的累积量及过渡时间为16t,0.3小时;
利用上述数据,进行如下分析:如果温度差值为15度,则采用快速喷水的办法,即将喷水量快速增加至整体累计流量的二分之一,而时间缩短为原来的二分之一,即水量为23t/2=11.5t,而原来一半时间即0.4h*0.5=0.2h,所以11.5t/0.2h=57.5t/h,这就是本次计算的瞬时流量,同样10度的瞬时流量计算为16t*2/(2*0.3h)=53.33t/h;
整理函数阶段,可以将100%负荷的喷水函数设置为四段:第一段偏差A为负数或者零,F101(A)=0,第二段偏差A为0-10度,函数为F102(A)=5.33*A;偏差A在10.01-15.00之间采用函数为F103(A)=53.33+0.83*(A-10),偏差A在15度以上,则采用F104(A)=57.5t/h,其中下标101、102、103、104分别表示100%负荷的第1、2、3、4阶段函数;
④确定函数关系:函数关系为:B=F(A),
针对额定容量为300MW的发电机组,当机组发电负荷FH≤185MW,A≤0,F51(A)=0;0<A<10,F52(A)=6A;10≤A≤15,F53(A)=60+0.5*(A-10),A>15,F54(A)=62.5t/h;
机组发电负荷185MW<FH<260MW,A≤0,F751(A)=0;0<A<10,F752(A)=5.7*A;10≤A≤15,F753(A)=56.67+0.67*(A-10),A>15,F754(A)=60t/h;
机组发电负荷FH>260MW,A≤0,F101(A)=0;0<A<10,F102(A)=5.33*A;10≤A≤15,F103(A)=53.33+0.83*(A-10),A>15,F104(A)=57.5t/h。
⑶确立减温水流量B与减温水调整门开度C之间的关系;具体步骤如下:
①当机组减温水压力P1与过热器出口压力P2之差即P2-P1=P3为2.0MPa时,从历史记录中记录减温水流量与减温水门开度之间的关系,并总结为如下关系:
开度C 0 10 20 30 40 50 60 70 80 90 100
流量B 0 1.5 2.0 4.4 7.2 14.3 21.8 35.2 ...... ..... .....
②当机组减温水压力P1与过热器出口压力P2之差即P2-P1=P3为1.6MPa时,从历史记录中记录减温水流量与减温水门开度之间的关系,并总结为如下关系:
开度C 0 10 20 30 40 50 60 70 80 90 100
流量B 0 1.2 1.5 3.8 6.9 12.5 19.5 33.6 ..... ... .....
③当机组减温水压力P1与过热器出口压力P2之差即P2-P1=P3为1.2MPa时,从历史记录中记录减温水流量与减温水门开度之间的关系,并总结为如下关系:
开度C 0 10 20 30 40 50 60 70 80 90 100
流量B 0 0.8 1.2 3.2 5.4 10.7 18.6 31.0 ...... ...... .....
④根据机组的P3实际值,选取下列计算方法:当压力差值P3≤1.4MPa,则根据流量B查表求出减温水阀开度的指令C,中间值采用线性差值方法求得:
流量 0 0.8 1.2 3.2 5.4 10.7 18.6 31.0 ...... ...... .....
开度 0 10 20 30 40 50 60 70 80 90 100
当压力差值1.4<P3≤1.8MPa,则根据流量B查表求出减温水阀开度的指令C,中间值采用线性差值方法求得:
流量 0 1.2 1.5 3.8 6.9 12.5 19.5 33.6 ..... ... .....
开度 0 10 20 30 40 50 60 70 80 90 100
当压力差值P3>1.8MPa,则根据流量B查表求出减温水阀开度的指令C,中间值采用线性差值方法求得:
流量 0 1.5 2.0 4.4 7.2 14.3 21.8 35.2 ...... ...... .....
开度 0 10 20 30 40 50 60 70 80 90 100
⑷将差值A与减温水流量B、减温水压力与过热蒸汽压力之差P3以及调整门开度C一一对应,实现减温水的最佳控制;其具体步骤如下:
①确定机组当时负荷FH,以及当时机组主蒸汽温度与设定值之间的差值A;
②依据上述两个数据,确定要计算的函数B=F(A),计算出B值;
③根据P3的大小,确定插值计算的表格,根据B值计算出C值;
④最终实现缩小差值A到不超过额定值-5℃~+5℃的范围。
实例效果
在采用原来PID控制方法的情况下,对于型号为B&WB-1165/17.5-M锅炉,主蒸汽温度与主蒸汽温度设定值之间的偏差最佳可保持在±12℃范围之间。
通过改用本发明方法,对于B&WB-1165/17.5-M锅炉,主蒸汽温度与主蒸汽温度设定值之间的偏差范围缩减到±5℃范围之内,以一台额定容量为300MW的锅炉为例,减温效果可节约标准煤0.2g/kWh,按照每年发电19.7亿kWh,单台机组一年内可节省394吨标准煤。按照500元/吨计算,两台机组一年一共可节约人民币约40万元。对于目前国内使用的300MW锅炉来讲,如均采用本发明方法,预计每年至少可以为国家节省资金上亿元。
需要强调的是,本发明所述的实施例是说明性的,而不是限定性的,因此本发明并不限于具体实施方式中所述的实施例,凡是由本领域技术人员根据本发明的技术方案得出的其他实施方式,同样属于本发明保护的范围。

Claims (1)

1.一种300MW机组有效稳定主蒸汽温度的最佳控制方法,其特征在于:包括以下步骤:
⑴将主蒸汽温度与主蒸汽温度设定值作差值运算求出差值A:T1-T2=A,其中,T1为主蒸汽温度,T2为主蒸汽温度设定值;
⑵确立差值A与减温水流量B之间的函数关系B=F(A),这种函数关系的确定方法为通过具体记录一定负荷下300MW机组所需减温水流量的累积量以及过渡时间得到;函数关系的具体确定方法为:
①针对300MW机组来试验,50%负荷即FH=150MW工况下,差值A在0度到15度再回到0度,记录所需减温水流量的累积量以及过渡时间为25t,0.4小时;50%负荷即FH=150MW工况下,差值A在0度到10度再回到0度,所需减温水流量的累积量及过渡时间为18t,0.3小时;
利用上述数据,进行如下分析:如果温度差值为15度,则采用快速喷水的办法,即将喷水量快速增加至整体累计流量的二分之一,而时间缩短为原来的二分之一,即水量为25t/2=12.5t,而原来一半时间即0.4h*0.5=0.2h,所以12.5t/0.2h=62.5t/h,这就是本次计算的瞬时流量,同样10度的瞬时流量计算为18t*2/(2*0.3h)=60t/h;
整理函数阶段,将50%负荷的喷水函数设置为四段:第一段偏差A为负数或者零,F51(A)=0,第二段偏差A为0-10度,函数为F52(A)=6A;偏差A在10.01-15.00之间采用函数为F53(A)=60+0.5*(A-10),偏差A在15度以上,则采用F54(A)=62.5t/h,其中下标51、52、53、54分别表示50%负荷的第1、2、3、4阶段函数;
②针对300MW机组来试验,75%负荷即FH=225MW工况下,差值A在0度到15度再回到0度,记录所需减温水流量的累积量以及过渡时间为24t,0.4小时;75%负荷即225MW工况下,差值在0度到10度再回到0度,所需减温水流量的累积量及过渡时间为17t,0.3小时;
利用上述数据,进行如下分析:如果温度差值为15度,则采用快速喷水的办法,即将喷水量快速增加至整体累计流量的二分之一,而时间缩短为原来的二分之一,即水量为24t/2=12t,而原来一半时间即0.4h*0.5=0.2h,所以12t/0.2h=60t/h,这就是本次计算的瞬时流量,同样10度的瞬时流量计算为17t*2/(2*0.3h)=56.67t/h,
整理函数阶段,将75%负荷的喷水函数设置为四段:第一段偏差A为负数或者零,F751(A)=0,第二段偏差A为0-10度,函数为F752(A)=5.7*A;偏差A在10.01-15.00之间采用函数为F753(A)=56.67+0.67*(A-10),偏差A在15度以上,则采用F754(A)=60t/h,其中下标751、752、753、754分别表示75%负荷的第1、2、3、4阶段函数;
③针对300MW机组来试验,100%负荷即FH=300MW工况下,差值A在0度到15度再回到0度,记录所需减温水流量的累积量以及过渡时间为23t,0.4小时;100%负荷即300MW工况下,差值在0度到10度再回到0度,所需减温水流量的累积量及过渡时间为16t,0.3小时;
利用上述数据,进行如下分析:如果温度差值为15度,则采用快速喷水的办法,即将喷水量快速增加至整体累计流量的二分之一,而时间缩短为原来的二分之一,即水量为23t/2=11.5t,而原来一半时间即0.4h*0.5=0.2h,所以11.5t/0.2h=57.5t/h,这就是本次计算的瞬时流量,同样10度的瞬时流量计算为16t*2/(2*0.3h)=53.33t/h;
整理函数阶段,将100%负荷的喷水函数设置为四段:第一段偏差A为负数或者零,F101(A)=0,第二段偏差A为0-10度,函数为F102(A)=5.33*A;偏差A在10.01-15.00之间采用函数为F103(A)=53.33+0.83*(A-10),偏差A在15度以上,则采用F104(A)=57.5t/h,其中下标101、102、103、104分别表示100%负荷的第1、2、3、4阶段函数;
④确定函数关系:函数关系为:B=F(A),
针对额定容量为300MW的发电机组,当机组发电负荷FH≤185MW,A≤0,F51(A)=0;0<A<10,F52(A)=6A;10≤A≤15,F53(A)=60+0.5*(A-10),A>15,F54(A)=62.5t/h;
机组发电负荷185MW<FH<260MW,A≤0,F751(A)=0;0<A<10,F752(A)=5.7*A;10≤A≤15,F753(A)=56.67+0.67*(A-10),A>15,F754(A)=60t/h;
机组发电负荷FH>260MW,A≤0,F101(A)=0;0<A<10,F102(A)=5.33*A;10≤A≤15,F103(A)=53.33+0.83*(A-10),A>15,F104(A)=57.5t/h;
⑶确立减温水流量B与减温水调整门开度C之间的关系;
⑷将差值A与减温水流量B、减温水压力与过热蒸汽压力之差P3以及调整门开度C一一对应,实现减温水的最佳控制,其具体步骤如下:
①确定机组当时负荷FH,以及当时机组主蒸汽温度与设定值之间的差值A;
②依据上述负荷FH和差值A,确定要计算的函数B=F(A),计算出B值;
③根据P3的大小,确定差值计算的表格,根据B值计算出C值;
④最终实现缩小差值A到不超过额定值-5℃~+5℃的范围。
CN201310313739.3A 2013-07-24 2013-07-24 一种300mw机组有效稳定主蒸汽温度的最佳控制方法 Active CN103513573B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310313739.3A CN103513573B (zh) 2013-07-24 2013-07-24 一种300mw机组有效稳定主蒸汽温度的最佳控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310313739.3A CN103513573B (zh) 2013-07-24 2013-07-24 一种300mw机组有效稳定主蒸汽温度的最佳控制方法

Publications (2)

Publication Number Publication Date
CN103513573A CN103513573A (zh) 2014-01-15
CN103513573B true CN103513573B (zh) 2016-09-07

Family

ID=49896494

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310313739.3A Active CN103513573B (zh) 2013-07-24 2013-07-24 一种300mw机组有效稳定主蒸汽温度的最佳控制方法

Country Status (1)

Country Link
CN (1) CN103513573B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103900102B (zh) * 2014-04-11 2017-01-04 国家电网公司 采用自动方式的电网调频时快速稳定主蒸汽温度的方法
CN105114931A (zh) * 2015-06-23 2015-12-02 潘秀娟 一种改进锅炉过热汽温的控制方法
CN105180139A (zh) * 2015-09-17 2015-12-23 苏州市江远热电有限责任公司 锅炉主蒸汽温度控制***以及方法
CN105138041A (zh) * 2015-09-22 2015-12-09 河北省电力建设调整试验所 一种用于dcs实现的火电机组主汽温度的控制方法
CN107178778B (zh) * 2017-06-01 2019-02-19 中国神华能源股份有限公司 锅炉汽温控制装置、***和方法
CN108303888B (zh) * 2018-02-07 2020-11-03 广东电网有限责任公司电力科学研究院 一种电站锅炉主蒸汽温度减温喷水控制方法及***
CN112666828B (zh) * 2020-12-18 2023-03-14 华润电力(海丰)有限公司 一种自适应调节输出设备的方法、装置、设备及介质
CN114355996A (zh) * 2021-07-22 2022-04-15 杭州绿能环保发电有限公司 一种主蒸汽温度控制方法、***及电子设备
CN113721464A (zh) * 2021-08-27 2021-11-30 西安热工研究院有限公司 一种燃煤机组减温喷水阀门流量特性自适应修正控制方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5580119A (en) * 1978-12-13 1980-06-17 Nippon Sanso Kk Temperature control method
CN101598328A (zh) * 2008-09-28 2009-12-09 广州粤能电力科技开发有限公司 大负荷变化速率的锅炉汽温控制方法及专用装置
CN101893877A (zh) * 2009-05-20 2010-11-24 中国国电集团公司九江发电厂 一种发电厂基于能耗分析的优化运行方法及其***
CN101899996A (zh) * 2009-06-01 2010-12-01 上海捷控软件技术有限公司 用蒸汽温度预测控制提高火电机组汽轮机效率的方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101596408A (zh) * 2009-03-30 2009-12-09 深圳市英尼克电器有限公司 全天候节水型反渗透装置及其方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5580119A (en) * 1978-12-13 1980-06-17 Nippon Sanso Kk Temperature control method
CN101598328A (zh) * 2008-09-28 2009-12-09 广州粤能电力科技开发有限公司 大负荷变化速率的锅炉汽温控制方法及专用装置
CN101893877A (zh) * 2009-05-20 2010-11-24 中国国电集团公司九江发电厂 一种发电厂基于能耗分析的优化运行方法及其***
CN101899996A (zh) * 2009-06-01 2010-12-01 上海捷控软件技术有限公司 用蒸汽温度预测控制提高火电机组汽轮机效率的方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
300MW机组再热减温水流量的调整方法;韩伟等;《吉林电力》;20091031;第37卷(第5期);第48-49页 *
300MW锅炉过热器减温水***改造方案;杨春龙;《华北电力技术》;20060630(第6期);第43-44页 *

Also Published As

Publication number Publication date
CN103513573A (zh) 2014-01-15

Similar Documents

Publication Publication Date Title
CN103513573B (zh) 一种300mw机组有效稳定主蒸汽温度的最佳控制方法
CN105201564A (zh) 一种基于主蒸汽流量的汽轮机滑压优化的控制方法
CN108035777B (zh) 一种火电机组中低压缸联合零出力供热***及方法
CN105759864B (zh) 一种火电机组主蒸汽压力的补偿调节方法
CN106773681B (zh) 一种汽包锅炉火电机组一次调频控制优化方法
CN104632302B (zh) 一种凝汽式汽轮机滑压运行曲线测试/实施方法
CN104481598B (zh) 一种火电厂汽轮机在线滑压优化方法
CN102628378B (zh) 一种滑压曲线修正方法及装置
Wang et al. Modeling and flexible load control of combined heat and power units
CN104763485B (zh) 一种补热型超高压/亚临界背压供热机组热力***
CN106401660B (zh) 一种基于多维曲面的汽轮机滑压优化控制方法
CN109378833B (zh) 一种通过控制汽轮机抽汽量实现机组快速调频的方法
CN106958465B (zh) 一种用于汽轮发电机组甩负荷后快速稳定转速的方法
CN206972325U (zh) 一种小汽轮机汽源自动切换和调节***
CN105299612A (zh) 基于多模型切换的主蒸汽温度控制方法及控制***
CN109373347A (zh) 一种机组旁路供热的给煤量优化控制方法
CN109027685A (zh) 利用蒸汽压缩机实现大流量高参数的工业供汽***及方法
CN112039091B (zh) 一种基于零号高加的一次调频控制方法
CN105953207A (zh) 一种高品质的电站锅炉汽温控制***
CN112240231A (zh) 一种兼顾可靠性和经济性的多源稳定工业供汽***及方法
CN204987905U (zh) 一种烧结冷却机余热利用***
CN108278134B (zh) 一种母管制直流锅炉发电机组协调控制方法
CN106884689B (zh) 一种小型抽汽式供热汽轮机排汽降湿的方法
CN113623032B (zh) 一种燃煤锅炉烟气储热发电一体化***及运行方法
CN213450529U (zh) 一种兼顾可靠性和经济性的多源稳定工业供汽***

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant