CN103486330B - Either inside high-altitude pipeline mounting construction method - Google Patents
Either inside high-altitude pipeline mounting construction method Download PDFInfo
- Publication number
- CN103486330B CN103486330B CN201310458447.9A CN201310458447A CN103486330B CN 103486330 B CN103486330 B CN 103486330B CN 201310458447 A CN201310458447 A CN 201310458447A CN 103486330 B CN103486330 B CN 103486330B
- Authority
- CN
- China
- Prior art keywords
- pipeline
- frock
- overhead traveling
- traveling crane
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L1/00—Laying or reclaiming pipes; Repairing or joining pipes on or under water
- F16L1/024—Laying or reclaiming pipes on land, e.g. above the ground
- F16L1/0243—Laying or reclaiming pipes on land, e.g. above the ground above ground
- F16L1/0246—Laying or reclaiming pipes on land, e.g. above the ground above ground at a certain height off the ground
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D3/00—Portable or mobile lifting or hauling appliances
- B66D3/18—Power-operated hoists
- B66D3/20—Power-operated hoists with driving motor, e.g. electric motor, and drum or barrel contained in a common housing
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of metallurgical steel-making plant floor inner high-altitude pipeline mounting construction method, the steps include: to set up frock on crown block trolley, comprise the bracket of support pipeline and be used for lifting the pole of pipeline; Tube groove processing and rust cleaning, painting process construction are carried out in ground; Utilize sky vehicle overhauling electric hoist lifting pipeline in factory building, hoisting height exceedes a day height; Run below overhead traveling crane to sky vehicle overhauling electric hoist; Running trolley, is put in pipeline above frock, suitably fixes; Run overhead traveling crane, pipeline is transported to mounting point; The lifting chain block that in frock, bolt is hung is utilized to be sling by pipeline; Running trolley, transports to the pipeline sling above Pipe installing position, then pipeline is dropped on installation in position on pipe support.Present invention utilizes a day vehicle overhauling electric hoist installation position and set high the feature with overhead traveling crane mobility, using overhead traveling crane as a transition vector, in handling safety reliably and under greatly cost-saving prerequisite, complete the installation of pipeline.
Description
Technical field
The present invention relates to the high-altitude pipe installation method of pipeline location above overhead traveling crane orbit, specifically a kind of metallurgical steel-making plant floor inner high-altitude pipeline mounting construction method.
Background technique
At present, for saving space and need of production and security reason, the process pipe in metallurgical steel-making plant floor, as gas pipe line, lpg pipeline, propane gas pipeline, oxygen channel etc., is generally all arranged on workshop overhead traveling crane and walks on stage above.Process pipe is placed on high empty position, adds installation difficulty.Pipeline mounting construction in the past adopts mobile crane to carry out lifting pipeline, and installation process is comparatively large by the restriction of ground field condition, and high-lift operation needs to set up safety scaffold, and cost is higher.
Summary of the invention
The present invention is intended to the problems referred to above solving the pipe installation method existence of existing high-altitude, and provide a kind of day vehicle overhauling electric hoist mounting point that utilizes higher than the mobility feature of overhead traveling crane, using overhead traveling crane as a transition vector, in handling safety reliably and under greatly cost-saving prerequisite, complete the either inside high-altitude pipeline mounting construction method of Pipe installing.
The technological scheme that the present invention solves the employing of its technical problem is:
A kind of either inside high-altitude pipeline mounting construction method, carry out in the steps below:
(1) on overhead traveling crane running trolley, set up frock: described frock comprises two supports be fixed on overhead traveling crane running trolley machine supporting beams, described two supports be fixed with respectively the bracket of support pipeline and be used for lifting the pole of pipeline;
(2) surface duct is prefabricated: according to Pipe installing size, carries out retaining wall on slope and rust cleaning, painting process construction on ground;
(3) lifting pipeline is put in above frock: utilize vehicle overhauling electric hoist in sky in factory building to carry out lifting pipeline, hoisting height exceedes a day height; Run below overhead traveling crane to sky vehicle overhauling electric hoist; Running trolley, is put in pipeline above frock, suitably fixes;
(4) utilize frock that Pipe installing is in place: to run overhead traveling crane, pipeline is transported to mounting point; The lifting chain block that on frock pole, bolt is hung is utilized to be sling by pipeline; Running trolley, transports to the pipeline sling above Pipe installing position, then pipeline is dropped on installation in position on pipe support.
Further, described frock by be positioned at overhead traveling crane running trolley machine supporting beams two ends and with machine supporting beams be welded and fixed two portal trestles, the saddle bracket matched with mounted pipe diameter be weldingly fixed on described portal trestle, be weldingly fixed on described portal trestle and add the pole that oblique pull is used for lifting pipeline and form, two portal trestle upper surface level heights are higher than device height on dolly, and pole top bolt hangs with lifting chain block.
Compared with prior art, adopt the present invention of technique scheme, make use of a day vehicle overhauling electric hoist installation position and set high the feature with overhead traveling crane mobility, using overhead traveling crane as a transition vector, in handling safety reliably and under greatly cost-saving prerequisite, complete the installation of pipeline, its invention effect is:
Pipe installation process does not limit by any ground field condition, and personnel's operation, on crown platform, improves the Security of personnel's work surface; Utilize factory building existing resource to construct, decrease construction plant lifting cost use, reduce construction cost, shorten the construction period, improve efficiency of construction; Frock making is simple, and material can utilize on-the-spot residue waste-material-preparing, cost-saving.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention tool structure schematic diagram.
Fig. 2 is sky vehicle overhauling electric hoist lifting piping schematic.
Fig. 3 is that overhead traveling crane runs to schematic diagram below day vehicle overhauling electric hoist.
Fig. 4 is that trolley travelling arrives schematic diagram below day vehicle overhauling electric hoist.
Fig. 5 is that pipeline is put in schematic diagram above frock.
Fig. 6 is that schematic diagram above Pipe installing position transported to by the pipeline that jack is sling.
Fig. 7 is that pipeline drops on installation in position schematic diagram on pipe support.
In figure: crown block trolley 1, portal trestle 2, saddle bracket 3, pole 4, lifting chain block 5, overhead traveling crane 6, sky vehicle overhauling electric hoist 7, pipeline 8, pipe support 9.
Embodiment
Below in conjunction with embodiment, the invention will be further described, and object is only to understand content of the present invention better.Therefore, the cited case does not limit the scope of the invention.
The present embodiment is the construction of 120 tons of pneumatic steelmaking workshop gas pipelines.Concrete pipe installation process is as follows:
1., see Fig. 1, overhead traveling crane running trolley sets up frock:
(1) first according to the pipeline saddle bracket 3 of the corresponding pipe diameter size of designing institute's drawing making;
(2) at upper welding two portal trestles 2 of the machine supporting beams (crossbeam) of crown block trolley 1, to ensure the stability of portal trestle 2 entirety, portal trestle 2 upper surface level height should higher than device height on crown block trolley 1, so that pipeline is put into pipeline energy horizontal positioned on portal trestle 2, do not affect by little vehicle device.
(3) be welded on portal trestle 2 by saddle bracket 3, surface of contact answers firm welding.
(4) pole 4 of welding lifting on portal trestle 2, be used for lifting pipeline, pole 4 adds oblique pull, and to ensure the stability of pole 4, pole 4 top bolt hangs with lifting chain block 5.
2. surface duct is prefabricated:
According to Pipe installing size, carry out retaining wall on slope and the construction of the operation such as rust cleaning, japanning on ground.
3. lifting pipeline is put in above frock:
See Fig. 2, utilize sky vehicle overhauling electric hoist 7 in factory building to carry out the lifting of pipeline 8, hoisting height exceedes the height of overhead traveling crane 6;
See Fig. 3, overhead traveling crane 6 is run to below day vehicle overhauling electric hoist 7;
See Fig. 4, crown block trolley 1 is run to below day vehicle overhauling electric hoist 7, above the saddle bracket 3 by sky vehicle overhauling electric hoist 7 pipeline 8 being put in frock, and suitably fix.
4. utilize frock that pipeline is in place:
See Fig. 5, run overhead traveling crane 6, the crown block trolley 1 of carrying pipeline 8 is delivered to the side, mounting point of pipeline 8;
See Fig. 6, utilize the lifting chain block 5 that in frock, bolt is hung to be sling by pipeline 8, be promoted to pipeline 8 installed height mark, then crown block trolley 1 run to above pipeline 8 mounting point;
See Fig. 7, by lifting chain block 5, pipeline 8 is dropped on installation in position on pipe support 9.
Claims (2)
1. an either inside high-altitude pipeline mounting construction method, is characterized in that, carries out in the steps below:
(1) on overhead traveling crane running trolley, set up frock: described frock comprises two portal trestles be fixed on overhead traveling crane running trolley machine supporting beams, described two portal trestles be fixed with respectively the bracket of support pipeline and be used for lifting the pole of pipeline;
(2) surface duct is prefabricated: according to Pipe installing size, carries out retaining wall on slope and rust cleaning, painting process construction on ground;
(3) lifting pipeline is put in above frock: utilize vehicle overhauling electric hoist in sky in factory building to carry out lifting pipeline, hoisting height exceedes a day height; Run below overhead traveling crane to sky vehicle overhauling electric hoist; Running trolley, is put in pipeline above frock, suitably fixes;
(4) utilize frock that Pipe installing is in place: to run overhead traveling crane, pipeline is transported to mounting point; The lifting chain block that on frock pole, bolt is hung is utilized to be sling by pipeline; Running trolley, transports to the pipeline sling above Pipe installing position, then pipeline is dropped on installation in position on pipe support.
2. either inside high-altitude according to claim 1 pipeline mounting construction method, it is characterized in that, described frock is by being positioned at overhead traveling crane running trolley machine supporting beams two ends and two portal trestles be welded and fixed with machine supporting beams, the saddle bracket matched with mounted pipe diameter be weldingly fixed on described portal trestle, being weldingly fixed on described portal trestle and adding the pole that oblique pull is used for lifting pipeline and form, two portal trestle upper surface level heights are higher than device height on dolly, and pole top bolt hangs with lifting chain block.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310458447.9A CN103486330B (en) | 2013-10-02 | 2013-10-02 | Either inside high-altitude pipeline mounting construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310458447.9A CN103486330B (en) | 2013-10-02 | 2013-10-02 | Either inside high-altitude pipeline mounting construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103486330A CN103486330A (en) | 2014-01-01 |
CN103486330B true CN103486330B (en) | 2015-11-11 |
Family
ID=49826800
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310458447.9A Active CN103486330B (en) | 2013-10-02 | 2013-10-02 | Either inside high-altitude pipeline mounting construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103486330B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107416685B (en) * | 2017-08-29 | 2019-11-05 | 株洲新奥燃气有限公司 | Installation of gas pipeline construction method and its supporting structure on the downside of a kind of bridge |
CN108706503B (en) * | 2018-05-31 | 2020-03-27 | 广船国际有限公司 | Hanging weight installation method |
CN110282557A (en) * | 2019-05-28 | 2019-09-27 | 中国华冶科工集团有限公司 | Assist mounting platform and the method with high vacant duct in bridge crane installation workshop |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6179523B1 (en) * | 1995-12-29 | 2001-01-30 | Shell Oil Company | Method for pipeline installation |
CN101264845A (en) * | 2008-05-06 | 2008-09-17 | 首钢总公司 | Crown block high altitude integrated suspension transposition construction method |
CN201793331U (en) * | 2010-07-30 | 2011-04-13 | 合肥紫金制管有限公司 | Translational crane for steel pipes |
CN201980883U (en) * | 2011-03-01 | 2011-09-21 | 四川华英化工有限责任公司 | Hoisting tool |
CN202186848U (en) * | 2011-07-21 | 2012-04-11 | 舟山蓝天气体有限公司 | Universal movable maintenance gantry crane |
CN202946764U (en) * | 2012-12-20 | 2013-05-22 | 甬港现代工程有限公司 | Pipe installation machine |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1121086A (en) * | 1997-07-07 | 1999-01-26 | Yukiya Iimura | Traveling hoist mechanism |
-
2013
- 2013-10-02 CN CN201310458447.9A patent/CN103486330B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6179523B1 (en) * | 1995-12-29 | 2001-01-30 | Shell Oil Company | Method for pipeline installation |
CN101264845A (en) * | 2008-05-06 | 2008-09-17 | 首钢总公司 | Crown block high altitude integrated suspension transposition construction method |
CN201793331U (en) * | 2010-07-30 | 2011-04-13 | 合肥紫金制管有限公司 | Translational crane for steel pipes |
CN201980883U (en) * | 2011-03-01 | 2011-09-21 | 四川华英化工有限责任公司 | Hoisting tool |
CN202186848U (en) * | 2011-07-21 | 2012-04-11 | 舟山蓝天气体有限公司 | Universal movable maintenance gantry crane |
CN202946764U (en) * | 2012-12-20 | 2013-05-22 | 甬港现代工程有限公司 | Pipe installation machine |
Also Published As
Publication number | Publication date |
---|---|
CN103486330A (en) | 2014-01-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201990402U (en) | Device for integral hanging of shield machine | |
CN202358849U (en) | Small-size suspension crane | |
CN201660380U (en) | Novel hoisting transportation vehicle | |
CN201417657Y (en) | Installation device of indoor transformer | |
CN103437563B (en) | A kind of mounting method for large steel-strctrue building steel frame | |
CN102363512B (en) | Portable heavy electrical equipment carrier | |
CN202322177U (en) | Portable carrier for heavy electrical equipment | |
CN104195948A (en) | Bridge hanging pipeline pushing installation and construction method | |
CN103486330B (en) | Either inside high-altitude pipeline mounting construction method | |
CN201980880U (en) | Hoisting device | |
CN108343783B (en) | The installation method and hanging apparatus of high-altitude large-diameter pipeline under complex environment | |
CN104016260B (en) | Little lattice funnel slide installation method and slippage installing mechanism | |
CN203187333U (en) | Light carrying device for building block installment | |
CN203247031U (en) | Hoisting device for curtain board transporting | |
CN202193564U (en) | Simple and convenient bridge crane | |
CN201999638U (en) | Hoisting device for ascending pipe and bridge pipe of coke oven | |
CN103791156A (en) | Superaltitude quick installation method of large-diameter glass fiber reinforced plastic pipes | |
CN203246780U (en) | Gas tank centralized storage and transportation device | |
CN202785542U (en) | Reactor dome hanging basket | |
CN204751999U (en) | A remove portal frame that is used for CNG air entrainment three jars of relief valve dismouting at female station to detect | |
CN203402879U (en) | Rotatable and portable elevator | |
CN103803397A (en) | Hanger for mounting universal shaft of vertical mill and application method of hanger | |
CN103498418B (en) | Device for shifting hanging basket assembly pieces and construction method | |
CN202001022U (en) | Movable lining arch center formwork | |
CN204624982U (en) | The vertical overhead hoist of a kind of tubing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |