CN103485356A CN201310460216.1A CN201310460216A CN103485356A CN 103485356 A CN103485356 A CN 103485356A CN 201310460216 A CN201310460216 A CN 201310460216A CN 103485356 A CN103485356 A CN 103485356A
Authority
CN
China
Prior art keywords
frame
arranging
waterborne
filling bag
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310460216.1A
Other languages
Chinese (zh)
Other versions
CN103485356B (en
Inventor
卫启阳
熊书文
陈�峰
赵冬冬
许跃荣
宋健茂
邓奇群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Port and Channel Engineering Group Co Ltd
First Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd
Original Assignee
China Railway Port and Channel Engineering Group Co Ltd
First Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Port and Channel Engineering Group Co Ltd, First Engineering Co Ltd of China Railway Port and Channel Engineering Group Co Ltd filed Critical China Railway Port and Channel Engineering Group Co Ltd
Priority to CN201310460216.1A priority Critical patent/CN103485356B/en
Publication of CN103485356A publication Critical patent/CN103485356A/en
Application granted granted Critical
Publication of CN103485356B publication Critical patent/CN103485356B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses an overwater laying frame and a method for filling sand pockets with the overwater laying frame. The overwater laying frame is used for the field of hydraulic structures and comprises a main frame capable of floating on the water surface. When the overwater laying frame is utilized for filling the sand pockets to form a cofferdam, the filling pockets are spread and are fixed to a stand rod at the inner edge of the main frame, sand is filled into the filling pockets to ensure that the filling pockets sink into the water bottom along the stand rod, and therefore the filling pockets are continuously stacked to form the cofferdam. Being adopted to form the cofferdam, the overwater laying frame and the method for filling the sand pockets with the overwater laying frame prevent laying ships used in traditional methods from being used, save cost, and provide a new method for forming cofferdams under the working conditions in shallow water.

Description

A kind ofly waterbornely arrange frame and utilize this waterbornely to arrange the cofferdam method that frame is filled sand pocket
Technical field
The present invention is for the hydraulic architecture field, particularly relates to a kind ofly waterbornely arranging frame and utilizing this waterbornely to arrange the cofferdam method that frame is filled sand pocket.
Background technology
Cofferdam refers in hydraulic engineering construction, for building permanent water conservancy projects, and the provisional space enclosing structure of building.Its effect is to prevent that water and soil from entering the position of building of building, so that at the cofferdam internal drainage, excavation pit, build building.Generally be mainly used in hydraulic architecture, except the part as formal building, generally remove after being finished in cofferdam.
Cofferdam can be divided into polytype according to the difference of construction material, and wherein the cofferdam form of sand filling bag is comparatively applied wider in hydraulic architecture.Existing sand filling bag cofferdam technique adopts the mode of being constructed with Working Ships to carry out moulding mostly, but there is shortcomings in the use of Working Ships.At first, due to the Working Ships negligible amounts, make Working Ships dispatch expense and lease expenses is high; Secondly, Working Ships is had relatively high expectations to tide water level, and only, after meeting the tidal level that the depth of water is 4 meters left and right, construction could be carried out smoothly, and this engineering more shallow to tidal level is a Bottleneck Restrictions.
Summary of the invention
For addressing the above problem, the invention provides and a kind ofly meet that the shallow cofferdam moulding of depth of water needs are cost-saving again waterbornely to be arranged frame and utilize this waterbornely to arrange the cofferdam method that frame is filled sand pocket.
The technical solution adopted for the present invention to solve the technical problems is: a kind of frame of arranging waterborne, and comprise a floatability on the water surface and can strut the main frame of filling bag, be provided with some montants that insert in the water body of below along interior edge or the outside of main frame.
Be further used as the improvement of technical solution of the present invention, be provided with some main frames that make along main frame and swim in the flotation gear on the water surface, main frame is formed by connecting in turn by some unit frameworks first place, and unit framework comprises two parallel girders that arrange and the web member of two girders of some connections.
Be further used as the improvement of technical solution of the present invention, main frame is rectangular, and each unit framework forms rectangular frame by two girders and two web members that are positioned at two girder two ends, and each unit framework is equipped with connector in four angle points outsides of rectangular frame.
Be further used as the improvement of technical solution of the present invention, the corner angle of connector for being fixedly connected with rectangular frame, be equipped with some connecting bolts hole on each corner angle.
Be further used as the improvement of technical solution of the present invention, the steel pipe that girder is Φ 80mm, the steel pipe that web member is Φ 20mm.
The present invention also provides a kind of above-mentioned cofferdam method that frame is filled sand pocket of arranging waterborne that utilizes, and it is characterized in that, comprises the following steps:
A. preparation of construction: make frame and the filling bag of arranging waterborne;
B. the frame of arranging waterborne is located: station keeping ship casts anchor in place, the frame of arranging waterborne is fixed in to the location hull, more accurately locates;
C. lay filling bag: filling bag is arranged in frame and launched on the water, then each montant is passed to each filling bag edge, make filling bag keep deployed condition and be fixed in main frame;
D. the sand ship is in place;
E. filling bag filling, sinking: the sand material on the sand ship is filled in filling bag, and filling bag sinks under water along montant under the effect of sand material;
F. continuous-flow type construction: pack up the frame of arranging waterborne, the running fix ship is to next construction location, and repeating step B~E, until the stacking formation of filling bag cofferdam.
Be further used as the improvement of technical solution of the present invention, filling bag comprises bag, some by the emersed cuff of bag and some handles that is located at the filling bag edge.
Be further used as the improvement of technical solution of the present invention, after in step B, station keeping ship enters construction location, head and the tail all descend crossed anchor, commander's windlass hand control strand anchor, preliminary running fix ship makes the frame sideline of arranging waterborne near the filling bag embankment sideline, then utilizing RTK to carry out the line setting-out accurately locates, by slowly repeatedly regulating, determine exact position.
Be further used as the improvement of technical solution of the present invention, in step C, the top of montant tilts to the frame outside of arranging waterborne, and insert in water-bed mud face the montant bottom.
Be further used as the improvement of technical solution of the present invention, after step D medium sand ship is in place, be fixed in described station keeping ship.
Beneficial effect of the present invention: the invention provides a kind of frame of arranging waterborne, comprise the main frame of a floatability on the water surface, utilize this frame of arranging waterborne to be filled sand pocket while forming cofferdam, filling bag is launched and is fixed on the montant on edge in main frame, by back-up sand material in filling bag, filling bag is sunk under water along montant, thereby by the continuous stacking formation cofferdam of filling bag, of the present inventionly waterbornely arrange frame and utilize this frame of arranging waterborne to fill cofferdam method of sand pocket and carry out the cofferdam moulding by utilizing, avoid the use of Working Ships in conventional method, thereby cost-saving, also for cofferdam moulding under the more shallow operating mode of the depth of water, new approaches are provided simultaneously.
The accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described:
Fig. 1 is the present invention's frame example structure top view of arranging waterborne;
Fig. 2 is the present invention's frame example structure front view of arranging waterborne;
Fig. 3 is the present invention's frame embodiment unit frame structure schematic diagram of arranging waterborne;
To be that the present invention is waterborne arrange syndeton schematic diagram between frame embodiment unit framework to Fig. 4;
Fig. 5 is that the present invention frame embodiment that arranges waterborne lays and fills the sand pocket structural representation;
Fig. 6 is that the present invention utilizes the cofferdam method construction front view that frame is filled sand pocket of arranging waterborne;
Fig. 7 is that the present invention utilizes the process chart that frame is filled the cofferdam method of sand pocket of arranging waterborne;
Fig. 8 is that the present invention utilizes the cofferdam method construction front view that frame is filled sand pocket of arranging waterborne;
Fig. 9 is the cofferdam schematic cross-section obtained after construction.
The specific embodiment
With reference to Fig. 1~Fig. 4, the invention provides a kind of frame of arranging waterborne, comprise a floatability on the water surface and can strut the main frame 2 of filling bag 1, along interior edge or the outside of main frame 2, be provided with some montants 3 that insert in the water body of below, the position of montant 3 can be adjusted as required, disassembles conveniently.
Utilize this frame of arranging waterborne to be filled sand pocket while forming cofferdam, filling bag 1 is launched and is fixed on the montant 3 on main frame 2 interior edges, by to the interior back-up sand material of filling bag 1, filling bag is sunk under water along montant 3, thereby by the continuous stacking formation cofferdam of filling bag 1, by utilizing the frame of arranging waterborne of the present invention to carry out the cofferdam moulding, avoid the use of Working Ships in conventional method, thus cost-saving, also for cofferdam moulding under the more shallow operating mode of the depth of water, provide new approaches simultaneously.
As the preferred embodiment of the present invention, be provided with some main frames 2 that make along main frame 2 and swim in the flotation gear 21 on the water surface, flotation gear 21 is preferably the floating cylinder of lightweight, main frame 2 is formed by connecting in turn by some unit frameworks 4 first places, and unit framework 4 comprises two parallel girders 41 that arrange and the web member 42 of two girders 41 of some connections.
The length of unit framework 4 can be selected multiple according to specific needs, the unit framework 4 that adopts length not wait carries out first place and connects in turn to form main frame 2, purpose is for the ease of disassembling, be adapted to filling bag 1 construction of different size, when meeting the construction intensity needs, can to arranging frame, be reequiped easily again, be convenient to better control the expansion of filling bag 1, location and sinking, the structure setting of the web member 42 of two parallel girders 41 and two girders 41 of some connections, make whole main frame 2 can under the complicated active forces such as water wave, keep basicly stable, floating cylinder guarantees that this frame of arranging waterborne can bubble through the water column.
As the preferred embodiment of the present invention, main frame 2 is rectangular, and each unit framework 4 forms rectangular frame by two girders 41 and two web members 42 that are positioned at two girder 41 two ends, and each unit framework 4 is equipped with connector in four angle points outsides of rectangular frame.
The corner angle 43 of connector for being fixedly connected with rectangular frame, be equipped with some connecting bolts hole 44 on each corner angle 43.
Corner angle 43 welds with four angle points of rectangular frame, increases the contact area of 4 of each unit frameworks, increases active force, adopt the high strength shearing bolt through connecting bolt hole 44, two unit frameworks 4 to be connected, form bolt contact system, and strengthen protection with iron chains, increase the safety guarantee performance.
As the preferred embodiment of the present invention, the steel pipe that girder 41 is Φ 80mm, the steel pipe that web member 42 is Φ 20mm.
Concrete: adopt Φ 80mm steel pipe to do girder 41, Φ 20mm steel pipe is made web member 42 and is connected girders 41, and thickness and the material selection of girder 41 and web member 42, can be adjusted according to the effect size of wave, current certainly, allly meets the rigidity condition requirement and all can.For meeting easy-to-dismount needs, Φ 80mm steel pipe is made to three kinds of different length, be respectively 1m, 2m and 3m length.
Also provide a kind of above-mentioned cofferdam method that frame is filled sand pocket of arranging waterborne that utilizes with reference to Fig. 5~Fig. 9 the present invention, comprised the following steps:
A. preparation of construction: make frame and the filling bag 1 of arranging waterborne;
B. the frame of arranging waterborne is located: station keeping ship casts anchor in place, the described frame of arranging waterborne is fixed in to station keeping ship 5 bodies, more accurately locates;
C. lay filling bag 1: filling bag 1 is arranged in frame and launched on the water, and during expansion, direction is preferably along water (flow) direction, to save manpower, raise the efficiency, then each montant 3 is passed to each filling bag 1 edge, make filling bag 1 keep deployed condition and be fixed in main frame 2;
D. sand ship 6 is in place;
E. filling bag 1 filling, sinking: the sand material on sand ship 6 is filled in filling bag 1, and filling bag 1 sinks under water along montant 3 under the effect of sand material;
F. continuous-flow type construction: pack up the frame of arranging waterborne, running fix ship 5 is to next construction location, and repeating step B~E, until the stacking formation of filling bag 1 cofferdam.
By utilizing said method to carry out the cofferdam moulding, avoid the use of Working Ships in conventional method, thereby cost-saving, simultaneously also for cofferdam moulding under the more shallow operating mode of the depth of water provides new approaches, the present invention has overcome the more severe difficult problem of execution conditions.The selection of new technology, played vital effect to the saving of construction cost.The successful utilization of this technique shows, in the low water stage condition, in the general coastal waters construction of wave condition, has broad application prospects and market prospects.
As the preferred embodiment of the present invention, the filling bag 1 of making comprises bag, some by the emersed cuff 11 of bag and some handles that is located at filling bag 1 edge.
Concrete: according to the design drawing requirement, determine the pattern that sews up of filling bag 1 size and filling bag 1 geotextiles used.Filling bag 1 can be made into tubular, and size adds and moves back a grade size with the size of the different elevations of rib body section.In bag fill cross-sectional direction size, with elevation, change, and the longitudinal section size is beneficial to make and easy construction is advisable, generally at 20~50m.The layout of the cuff 11 of every filling bag 1 is blossom type, is convenient to even back-up sand, and the quantity of cuff 11 is definite according to filling bag 1 size, and general every 5m~10m establishes one, and the length of cuff 11 is advisable with the 20cm~30cm that can emerge.Using waterbornely while arranging the frame construction, for filling bag 1 is made handle, for fixing filling bag 1, making it along montant 3 sinkings, effectively guarantee the accuracy of construction location, handle is made according to stressed needs, generally every 1~3m, makes one, convenient fixedly filling bag 1.Be sewed with two kinds of methods, fourth seam and overseam, can determine according to design drawing.Also to make the Special-shaped bag that length is different, lay for adjacent two layers sand pocket end, avoid occurring straight joint.
As the preferred embodiment of the present invention, after in step B, station keeping ship 5 enters construction location, head and the tail all descend crossed anchor, commander's windlass hand control strand anchor, preliminary running fix ship 5 makes the frame sideline of arranging waterborne near filling bag 1 fill sideline, then utilizing RTK to carry out the line setting-out accurately locates, by slowly repeatedly regulating, determine exact position.
Station keeping ship 5 be used in conjunction with the construction control that is conducive to engineering, purpose is exactly for stable strand anchor, overcome wind wave action, be convenient for measuring location, utilize the hoist engine on station keeping ship 5 to sprawl filling bag 1 simultaneously, mechanical execution, save manpower, in addition, select lower crossed anchor mode, reduce anchorage desired zone scope, facilitating other ship also to prevent from the filling bag 1 of filling is caused damage near in operation.
As the preferred embodiment of the present invention, in step C, the frame outside is arranged to waterborne in the top of montant 3, to facilitate filling bag 1, along montant 3, glides, and insert in water-bed mud face montant 3 bottoms, thereby can bear the pulling force of filling bag 1 and can not be shifted.
As the preferred embodiment of the present invention, after step D medium sand ship 6 is in place, be fixed in station keeping ship 5.
As the preferred embodiment of the present invention, in step e during filling bag 1 filling, first selected 4 close 1 bag of angle cuffs 11 of filling bag and 4 filling bag 1 are than the cuff of center 11, selected cuff 11 is firm with the sand delivering pipeline socket of sand ship 6, carry out the filling construction, first open the sediment transport pipe control valve of bag position, angle, after filling bag 1 position is fixed substantially, then the sediment transport pipe control valve of open fill bag 1 center.During filling, keep other cuff 11 exits unobstructed, can carry out smoothly drainage exhaust.Simultaneously, note often adjusting sediment transport pipe sand export direction, prevent bag in stowing operation because of the unbalance stress distortion that is shifted, filling reach a certain amount of after, the bag position is basicly stable, adjusts and respectively remains the continuation filling of cuff position, and filling bag 1 filling thickness general control is at 40cm~50cm.The back-up sand amount substantially reach idealized after, the thickness that carries out filling bag 1 detects, if do not reach requirement, continues to select the cuff 11 of relevant position to carry out filling.Until reach idealized thickness.
As the preferred embodiment of the present invention, in step e, F, after sand ship 6 makes filling bag 1 stable to the interior back-up sand material of filling bag 1, can be by waterbornely arranging frame, sand ship 6 separates with station keeping ship 5, and station keeping ship 5 is moved to next construction location in advance.
Certainly, the invention is not limited to above-mentioned embodiment, those of ordinary skill in the art also can make equivalent variations or replacement under the prerequisite without prejudice to spirit of the present invention, and the modification that these are equal to or replacement all are included in the application's claim limited range.

Claims (10)

1. the frame of arranging waterborne is characterized in that: comprise a floatability on the water surface and can strut the main frame of filling bag, along interior edge or the outside of described main frame, be provided with some montants that insert in the water body of below.
2. the frame of arranging waterborne according to claim 1, it is characterized in that: along described main frame, be provided with and somely make described main frame swim in the flotation gear on the water surface, described main frame is formed by connecting in turn by some unit frameworks first place, and described unit framework comprises two parallel girders that arrange and the web member of two described girders of some connections.
3. the frame of arranging waterborne according to claim 2, it is characterized in that: described main frame is rectangular, each described unit framework forms rectangular frame by two girders and two web members that are positioned at two girder two ends, and each described unit framework is equipped with connector in four angle points outsides of rectangular frame.
4. the frame of arranging waterborne according to claim 3 is characterized in that: the corner angle of described connector for being fixedly connected with described rectangular frame is equipped with some connecting bolts hole on each described corner angle.
5. the frame of arranging waterborne according to claim 3, is characterized in that: the steel pipe that described girder is Φ 80mm, the steel pipe that described web member is Φ 20mm.
6. one kind is utilized the described cofferdam method that frame is filled sand pocket of arranging waterborne of claim 1~5 any one, it is characterized in that, comprises the following steps:
A. preparation of construction: make frame and the filling bag of arranging waterborne;
B. the frame of arranging waterborne is located: station keeping ship casts anchor in place, the described frame of arranging waterborne is fixed in to the location hull, more accurately locates;
C. lay filling bag: described filling bag is arranged in frame and launched on the water, then each described montant is passed to each filling bag edge, make filling bag keep deployed condition and be fixed in described main frame;
D. the sand ship is in place;
E. filling bag filling, sinking: the sand material on described sand ship is filled in filling bag, and described filling bag sinks under water along described montant under the effect of sand material;
F. continuous-flow type construction: pack up the described frame of arranging waterborne, mobile described station keeping ship is to next construction location, and repeating step B~E, until the stacking formation of filling bag cofferdam.
7. according to claim 6ly utilize the cofferdam method that frame is filled sand pocket of arranging waterborne, it is characterized in that: described filling bag comprises bag, some by the emersed cuff of described bag and some handles that is located at described filling bag edge.
8. according to claim 6ly utilize the cofferdam method that frame is filled sand pocket of arranging waterborne, it is characterized in that: after station keeping ship described in described step B enters construction location, head and the tail all descend crossed anchor, commander's windlass hand control strand anchor, preliminary running fix ship makes the described frame sideline of arranging waterborne near the filling bag embankment sideline, then utilizing RTK to carry out the line setting-out accurately locates, by slowly repeatedly regulating, determine exact position.
9. according to claim 6ly utilize the cofferdam method that frame is filled sand pocket of arranging waterborne, it is characterized in that: the top of montant described in described step C tilts to the frame outside of arranging waterborne, and insert in water-bed mud face described montant bottom.
10. according to claim 6ly utilize the cofferdam method that frame is filled sand pocket of arranging waterborne, it is characterized in that: after described step D medium sand ship is in place, be fixed in described station keeping ship.
CN201310460216.1A 2013-09-29 2013-09-29 Overwater laying frame and method for filling sand pockets with same Active CN103485356B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310460216.1A CN103485356B (en) 2013-09-29 2013-09-29 Overwater laying frame and method for filling sand pockets with same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310460216.1A CN103485356B (en) 2013-09-29 2013-09-29 Overwater laying frame and method for filling sand pockets with same

Publications (2)

Publication Number Publication Date
CN103485356A true CN103485356A (en) 2014-01-01
CN103485356B CN103485356B (en) 2015-06-17

Family

ID=49825911

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310460216.1A Active CN103485356B (en) 2013-09-29 2013-09-29 Overwater laying frame and method for filling sand pockets with same

Country Status (1)

Country Link
CN (1) CN103485356B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120727A (en) * 2014-07-04 2014-10-29 上海交通建设总承包有限公司 Construction method for hoisting and installing prefabricated bagged sand
CN104878792A (en) * 2015-05-28 2015-09-02 中交一航局第二工程有限公司 Rigid frame-type geotextile covering silt prevention system and method of immersed tunnel foundation bed
CN107100174A (en) * 2017-04-26 2017-08-29 中国水利水电科学研究院 A kind of design method of earthwork fabric-filled sand pocket
CN114750886A (en) * 2022-05-24 2022-07-15 安徽省交通航务工程有限公司 Building method of self-floating assembly type filling operation platform for soil engineering pipe bags

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR779516A (en) * 1934-10-10 1935-04-08 Process for the rapid and economical execution of maritime constructions in deep waters
CN88203862U (en) * 1988-02-29 1988-11-30 钟金龙 Water combined bent
CN1811068A (en) * 2005-10-14 2006-08-02 张雪松 New cofferdam construction process for building pier in deep water river
US20080008530A1 (en) * 2005-03-18 2008-01-10 Francesco Sposito Method for the Realization of Artificial Islands, Embankments, Piers, Breakwaters, Platforms, or Similar Structures in Bodies of Water and Structures Obtained
CN201990952U (en) * 2011-04-27 2011-09-28 中铁二十局集团第二工程有限公司 Assembled floating body used for construction of underwater pile cap double-walled steel cofferdam
CN202007379U (en) * 2011-04-14 2011-10-12 四川川交路桥有限责任公司 Movable floating bridge convenient for deepwater bridge construction
CN202644551U (en) * 2012-05-24 2013-01-02 浙江省第一水电建设集团股份有限公司 Steel pipe pile cofferdam structure
CN203530995U (en) * 2013-09-29 2014-04-09 中铁港航局集团有限公司 Overwater mattress-laying frame

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR779516A (en) * 1934-10-10 1935-04-08 Process for the rapid and economical execution of maritime constructions in deep waters
CN88203862U (en) * 1988-02-29 1988-11-30 钟金龙 Water combined bent
US20080008530A1 (en) * 2005-03-18 2008-01-10 Francesco Sposito Method for the Realization of Artificial Islands, Embankments, Piers, Breakwaters, Platforms, or Similar Structures in Bodies of Water and Structures Obtained
CN1811068A (en) * 2005-10-14 2006-08-02 张雪松 New cofferdam construction process for building pier in deep water river
CN202007379U (en) * 2011-04-14 2011-10-12 四川川交路桥有限责任公司 Movable floating bridge convenient for deepwater bridge construction
CN201990952U (en) * 2011-04-27 2011-09-28 中铁二十局集团第二工程有限公司 Assembled floating body used for construction of underwater pile cap double-walled steel cofferdam
CN202644551U (en) * 2012-05-24 2013-01-02 浙江省第一水电建设集团股份有限公司 Steel pipe pile cofferdam structure
CN203530995U (en) * 2013-09-29 2014-04-09 中铁港航局集团有限公司 Overwater mattress-laying frame

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘利: "围堰土工膜袋水下灌砂的应用及总结", 《城市建设理论研究(电子版)》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104120727A (en) * 2014-07-04 2014-10-29 上海交通建设总承包有限公司 Construction method for hoisting and installing prefabricated bagged sand
CN104878792A (en) * 2015-05-28 2015-09-02 中交一航局第二工程有限公司 Rigid frame-type geotextile covering silt prevention system and method of immersed tunnel foundation bed
CN104878792B (en) * 2015-05-28 2018-01-16 中交一航局第二工程有限公司 Immersed tube tunnel bedding rigid frame posture geotextiles cover anti-silting system and method
CN107100174A (en) * 2017-04-26 2017-08-29 中国水利水电科学研究院 A kind of design method of earthwork fabric-filled sand pocket
CN114750886A (en) * 2022-05-24 2022-07-15 安徽省交通航务工程有限公司 Building method of self-floating assembly type filling operation platform for soil engineering pipe bags
CN114750886B (en) * 2022-05-24 2023-01-10 安徽省交通航务工程有限公司 Method for constructing self-floating assembly type filling operation platform for soil engineering pipe bags

Also Published As

Publication number Publication date
CN103485356B (en) 2015-06-17

Similar Documents

Publication Publication Date Title
CN108661081B (en) A kind of inverted tension type anchor cable system support suspension tunnel structure
CN103046553B (en) Method for carrying out deepwater laying on large-volume reinforced mud-filling tubular bags by using geotextiles-laying vessels
CN205399220U (en) Whole system of erectting of large -scale arched bridge over strait
CN102322069B (en) Underwater combination base of open caisson and steel pipe piles and construction method
CN105603881A (en) Integral erecting system for large sea-crossing arch bridge and construction method thereof
CN103485356B (en) Overwater laying frame and method for filling sand pockets with same
CN102953341A (en) Overhead trestle structure built on non-covering steep bare rocks in deep rapids
CN103866817B (en) Water intake pumping station
CN106522275B (en) Self-propulsion type semi-submerged ship goes out the large-scale Immersed tunnel technique of fortune
CN107700366A (en) Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method
CN107620316B (en) Rock riverbed large-volume deepwater foundation construction method
CN207452738U (en) The deep water high-block bridge degree bridge construction naked rock river bed trestle of hard stone
CN202247972U (en) Amphibious excavator capable of working in deep water areas
CN202170512U (en) Underwater combined base for open caisson and steel pipe piles
CN202247719U (en) Corresponding corrugated pre-stressed anti-sedimentation culvert pipe for bridge
CN104594291B (en) A kind of soft raft mattress sinking construction method that can improve mattress sinking smooth degree
CN202359565U (en) Steel sheet pile cofferdam structure
CN214656751U (en) Ground of taking pile foundation basis is wall wharf structure even
CN205171386U (en) Interim mound in aquatic suitable for bridge erection
CN206681016U (en) Water retaining and soil retaining building structure
CN210555475U (en) Floating type drilling platform
CN109056762A (en) A kind of construction method of island beach embankment
CN203530995U (en) Overwater mattress-laying frame
CN204401555U (en) Gate dam crest wave wall structure
CN207143998U (en) A kind of underwater bridge structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant