CN103469939A - Flexible connection anti-seismic structure for masonry infilled wall and main body, and construction method for flexible connection anti-seismic structure - Google Patents

Flexible connection anti-seismic structure for masonry infilled wall and main body, and construction method for flexible connection anti-seismic structure Download PDF

Info

Publication number
CN103469939A
CN103469939A CN2013104373016A CN201310437301A CN103469939A CN 103469939 A CN103469939 A CN 103469939A CN 2013104373016 A CN2013104373016 A CN 2013104373016A CN 201310437301 A CN201310437301 A CN 201310437301A CN 103469939 A CN103469939 A CN 103469939A
Authority
CN
China
Prior art keywords
wall
stem
building block
masonry
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013104373016A
Other languages
Chinese (zh)
Other versions
CN103469939B (en
Inventor
刘治国
张际永
孙茜
安凤杰
***
方鹏
王蓉
石伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201310437301.6A priority Critical patent/CN103469939B/en
Publication of CN103469939A publication Critical patent/CN103469939A/en
Application granted granted Critical
Publication of CN103469939B publication Critical patent/CN103469939B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a flexible connection anti-seismic structure for a masonry infilled wall and a main body, and construction method for the flexible connection anti-seismic structure. Core columns or structural column reinforcing steel bars are connected with an upper floor slab and a lower floor slab in a steel bar planting way; reinforcing steel bars of a horizontal lintel or a horizontal tie beam on the upper part of a door opening are anchored into the core columns on the two sides or are connected with the main body structure by adopting the steel bar planting way. U-shaped building blocks serve as beam templates at the lintel or the horizontal tie beam; bound beam steel bars are placed in the U-shaped building blocks and are formed by pouring concrete; extruded polystyrene boards are arranged at the gaps of the two sides of the masonry infilled wall, the top part and the main body structure to serve as flexible connection. The conventional rigid connection of adding Rachel steel bars among the infilled wall, a frame column and a load-bearing wall is changed into the flexible connection of filling the extruded polystyrene boards, so that the infilled wall body cannot be damaged out of a plane under a seismic action and cannot cause adverse impact on the main body structure.

Description

A kind of masonry filler wall and main body flexibly connect earthquake resistant structure and job practices thereof
Technical field
The present invention relates to building field, particularly relate to masonry filler wall and agent structure connected mode.
Background technology
At present, along with infilled wall in the past and the frame column of ceramic tile technology, the General Requirements that is connected of load bearing wall are established steel tie along post or wall, infilled wall and frame column, load bearing wall are combined closely, and are the way that is rigidly connected.What in the Wenchuan County in Sichuan earthquake, the infilled wall of this class formation destroyed, collapses is more, for drawing the earthquake calamity lesson, to flexibly connect as the Novel connection connection technology and be applied between infilled wall and agent structure, guaranteed that filled wall does not destroy outside out-of-plane when geological process, and unlikely agent structure has been caused to adverse effect.
Summary of the invention
The objective of the invention is: provide a kind of masonry filler wall and main body to flexibly connect earthquake resistant structure and job practices thereof, change into and fill flexibly connecting of extruded polystyrene board adding being rigidly connected of tension rib between traditional infilled wall and frame column, load bearing wall, guaranteed that filled wall does not destroy outside out-of-plane when geological process, and unlikely agent structure has been caused to adverse effect.
To achieve these goals, technical scheme of the present invention is to provide a kind of masonry filler wall and main body flexibly connects earthquake resistant structure, comprise vertical stem stem or constructional column, horizontal direction lintel or horizontal binder, masonry reaches the extruded polystyrene board that flexibly connects with agent structure, stem stem or constructional column reinforcing bar adopt the bar planting mode to be connected with upper and lower floor, the door opening upper level to lintel or horizontal binder reinforcing bar anchors in the stem stem of both sides or adopt the bar planting mode to be connected with agent structure, at lintel or horizontal binder place, adopt U-shaped building block as beam forms, place the good beam muscle of colligation in U-shaped building block, build again the concrete moulding, the masonry filler wall both sides, the gap of top and agent structure arranges extruded polystyrene board as flexibly connecting.
This masonry filler wall and main body flexibly connect the job practices of earthquake resistant structure, comprise following construction sequence:
Step 1: the body of wall unwrapping wire, before masonry is built by laying bricks or stones, the floor structure face is pressed to the absolute altitude levelling, emit axis, masonry sideline and the hole line of a skin building block according to working drawing;
Step 2: building block is arranged, piecemeal scale, line in body of wall line scope;
Step 3: bar planting, according to infilled wall length, corresponding stem stem position is set, by the bar planting of being holed of concrete stem stem reinforcement location, bore diameter and the degree of depth are according to the difference of adopted anchoring adhesive and difference, verifying after qualified and carry out the injecting glue bar planting in scene, after bar planting, keeps 24h to solidify and starts to build by laying bricks or stones again;
Step 4: put down the end, by bullet is good building block piecemeal scale line, that bottom concrete block masonry is good after, build and fill with real C20 concrete toward the building block hollow position, arrange brick as bottom and put down the end;
Step 5: build by laying bricks or stones, adopt " to hole, the fissure of displacement " masonry method, while building by laying bricks or stones, by the hole of one deck under the aligned of last layer building block, perpends staggers mutually, does not stay straight joint;
Step 6: the construction stem stem, when wall length surpasses 5m, the wall stage casing arranges stem stem, and the answer≤2.4m of distance between stem stem and stem stem; Stem stem is established in the door and window hole both sides; Stem stem is established at corner, J-shaped wall, cross wall handing-over position; When infilled wall length is less than 2.5m, door opening limit stem stem reinforcing bar is connected with reinforcing bar in door upper level binder, stops to binder, no longer extends upward; Wall is grown up when 2.5m, at the bottom of door opening limit stem stem reinforcing bar extends beam or at the bottom of plate; The long 5.0m that surpasses of wall, the high infilled wall that surpasses 4.2m of wall, the middle part long at wall arranges the cast-in-situ reinforced concrete post by spacing 5.0m, and column cross-section size is 240mm * 200mm, and arrangement of reinforcement is 4 grade III steels 12, and stirrup is that grade III steel 8 spacings are 250, builds the C20 concrete;
Step 7: horizontal binder, wall higher primary school is when 4.2m, and middle part that should be high at wall, on door opening, arrange horizontal binder together when door opening is arranged; Wall is high between 4.2m~5.0m the time, sets up the 2 horizontal binders in road, spacing≤1.6m; Wall is high>during 5.0m, the horizontal binder of multiple tracks is set, and first is located on door opening, and all the other horizontal binders are by arranging apart from being not more than 1.6m in vertical, horizontal binder and two ends shear wall or post anchoring, the horizontal binder of the wide body of wall of 200mm is built the concrete moulding with the double template inside of doing of U-shaped brick; When the door opening width is not more than 1.5m, support is carried out with flitch in the lintel bottom, and the U-shaped brick template of holding concurrently is built by laying bricks or stones, inside joins 3 grade III steels 10, and stirrup is that grade III steel 8 spacings are 200mm; When the door opening width is greater than 1.5m, lintel installs the cast-in-place moulding of template, and lintel is of a size of 200mm * 200mm, inside joins 4 Φ 12 grade III steels, and stirrup is grade III steel 8 200, crosses beam steel and extends through each 300mm of both sides, hole;
Step 8: while building to beam, position, plate bottom, at least interval 7d, can carry out top and build by laying bricks or stones;
Step 9: top way; According to 8 degree seismic fortification intensity requirements, when wall length>5.0m, the wall top is except should building tightly with Vierendeel girder, plate, should add anchor point, adopt the bar planting mode that grade III steel 10 reinforcing bars are implanted in beam, plate, implantation depth is 120mm, protruded length is 150mm, and spacing is not more than 1.0m, and filling C20 concrete is closely knit, known according to the stem stem spacing, 2 road anchor points are set between two stem stems and get final product, when wall length≤5.0m, anchor point is not set, after the thick extruded polystyrene board of filling 20mm, that the filling of last space is closely knit;
Step 10: filleting, the extruded polystyrene board width is filled at infilled wall both sides and top should be than the few 20mm in the every limit of building block width, after having built 7 days by laying bricks or stones, can carry out the gap processing, first with polyurethane foams, gap is full of, with scraper, redundance is hung, outermost is twisted with the fingers real again with sealing cement, finally between the unlike material body of wall, pastes the wide alkaline-resisting grid cloth of 200mm floating with polymer mortar.
Wherein, according to described last space difference, implement different ways, while going up most a skin building block apart from beam or the not enough 30mm of plate, twist with the fingers flat with the dry masonry mortar; Go up most a skin building block and between 30mm~50mm the time, with the C20 concrete, fill with real apart from the space of beam or plate; Go up most a skin building block apart from the space of beam or plate when the 100mm left and right, with solid brick is flat, build, mortar is twisted with the fingers real.
Calculating from the 20mm of wall column limit, distance both sides during row's brick, after in stem stem bottom reinforcement bars implantation floor, reaching solidification intensity, then build building block closely knit with the C20 fine-stone concrete.
Fill extruded polystyrene board in the wide space of 20mm between blockwork and agent structure, the polyphenyl plate width should be than the few 20mm in the every limit of blockwork width, to guarantee the space of polyphenyl plate outside spray polyurethane foams and sealing cement.
Beneficial effect of the present invention:
Change into and fill flexibly connecting of extruded polystyrene board adding being rigidly connected of tension rib between traditional infilled wall and frame column, load bearing wall, detailed job practices and step is provided, be convenient to guarantee the construction effect flexibly connected, guaranteed that filled wall does not destroy outside out-of-plane when geological process, and unlikely agent structure has been caused to adverse effect.
The accompanying drawing explanation
Fig. 1: build the partition wall elevational schematic view by laying bricks or stones;
In figure: 1, stem stem; 2, horizontal binder; 3, row's brick is put down the end; 4, bar planting; 5, extruded polystyrene board; 6, build by laying bricks or stones; 7, auxiliary block of concrete.
The specific embodiment
Masonry filler wall of the present invention is except constructional column, stem stem, horizontal binder, lintel adopt the bar planting mode and agent structure is connected, and other positions all adopt extruded polystyrene board to spray the flexible connection mode that polyurethane foams seals with sealing cement more outward to be connected with agent structure.Adopt " connection of upper and lower, left and right point ", add constructional column or stem stem between the upper and lower and beam of infilled wall, plate, between infilled wall both sides and wall column with horizontal binder or lintel point drawknot, fill with extruded polystyrene board in the space of infilled wall and agent structure, when alleviating earthquake to the destruction of wall column, beam slab.Body of wall inside arranges stem stem and horizontal binder, guarantees outer the stablizing of body of wall out-of-plane.Door and window hole arranges stem stem and horizontal binder, guarantees that body of wall has globality preferably, and body of wall unlikely disintegration when reaching destruction is collapsed.
Specifically as shown in Figure 1: a kind of masonry filler wall and main body flexibly connect earthquake resistant structure, comprise vertical stem stem or constructional column, horizontal direction lintel or horizontal binder, masonry reaches the extruded polystyrene board that flexibly connects with agent structure, stem stem or constructional column reinforcing bar adopt the bar planting mode to be connected with upper and lower floor, the door opening upper level to lintel or horizontal binder reinforcing bar anchors in the stem stem of both sides or adopt the bar planting mode to be connected with agent structure, at lintel or horizontal binder place, adopt U-shaped building block as beam forms, place the good beam muscle of colligation in U-shaped building block, build again the concrete moulding, the masonry filler wall both sides, the gap of top and agent structure arranges extruded polystyrene board as flexibly connecting.
Above-mentioned masonry filler wall and agent structure flexibly connect technology, and construction sequence is as follows:
Step 1: body of wall unwrapping wire.Before masonry is built by laying bricks or stones, the floor structure face is pressed to the absolute altitude levelling, emit axis, masonry sideline and the hole line of a skin building block according to working drawing.
Step 2: building block is arranged.Piecemeal scale, line in body of wall line scope, adopt the building block of master ga(u)ge lattice as far as possible.
Step 3: bar planting.According to infilled wall length, corresponding stem stem position is set, by the bar planting of being holed of concrete stem stem reinforcement location.Bore diameter and the degree of depth are according to the difference of adopted anchoring adhesive and difference.Verify after qualified and carry out the injecting glue bar planting through the supervising engineer scene, after bar planting, keep 24h to solidify and starts again to build by laying bricks or stones.
Step 4: put down the end.After by bullet is good building block piecemeal scale line, that bottom concrete block masonry is good, toward the building block hollow position, build and fill with real C20 concrete, arrange brick as bottom and put down the end.
Step 5: build by laying bricks or stones.Adopt " to hole, the fissure of displacement " masonry method.While building by laying bricks or stones, by the hole of one deck under the aligned of last layer building block, perpends staggers mutually, does not stay straight joint.
Step 6: stem stem.When wall length surpasses 5m, the wall stage casing arranges stem stem, and the answer≤2.4m of distance between stem stem and stem stem; Stem stem is established in the door and window hole both sides; Stem stem is established at corner, J-shaped wall, cross wall handing-over position; While as infilled wall length, being less than 2.5m, door opening limit stem stem reinforcing bar is connected with reinforcing bar in door upper level binder, stops to binder, no longer extends upward; Wall is grown up when 2.5m, at the bottom of door opening limit stem stem reinforcing bar extends beam or at the bottom of plate; The long 5.0m that surpasses of wall, the high infilled wall that surpasses 4.2m of wall, the middle part long at wall arranges the cast-in-situ reinforced concrete post by spacing 5.0m, and column cross-section size is 240mm * 200mm, and arrangement of reinforcement is 4 grade III steels 12, and stirrup is that grade III steel 8 spacings are 250, builds the C20 concrete.The thick wall of stem stem arrangement of reinforcement: 200mm, 2 12 are placed in a core pole hole and fill with real C20 concrete.
Step 7: horizontal binder.Wall higher primary school is when 4.2m, and middle part that should be high at wall (when door opening is arranged on door opening) arranges horizontal binder together; Wall is high between 4.2m~5.0m the time, sets up the 2 horizontal binders in road, spacing≤1.6m; Wall is high>during 5.0m, the horizontal binder of multiple tracks should be set, and first is located on door opening, and all the other horizontal binders are by arranging apart from being not more than 1.6m in vertical.Horizontal binder and two ends shear wall or post anchoring.The horizontal binder of the wide body of wall of 200mm can be built the concrete moulding with the double template inside of doing of U-shaped brick; When the door opening width is not more than 1.5m, support is carried out with flitch in the lintel bottom, and the U-shaped brick template of holding concurrently is built by laying bricks or stones, inside joins 3 grade III steels 10, and stirrup is that grade III steel 8 spacings are 200mm; When the door opening width is greater than 1.5m, lintel installs the cast-in-place moulding of template, and lintel is of a size of 200mm * 200mm, inside joins 4 Φ 12(grade III steels), stirrup is grade III steel [email protected] beam steel and extend through each 300mm of both sides, hole.
Step 8: while building to beam, position, plate bottom, at least, after the 7d of interval, can carry out top and build by laying bricks or stones.
Step 9: top way.According to 8 degree seismic fortification intensity requirements, when wall length>5.0m, the wall top, except should building tightly with Vierendeel girder, plate, should add anchor point, adopts the bar planting mode that grade III steel 10 reinforcing bars are implanted in beams, plate, implantation depth is 120mm, protruded length is 150mm, and spacing is not more than 1.0m, and filling C20 concrete is closely knit, known according to the stem stem spacing, 2 road anchor points are set between two stem stems and get final product.When wall length≤5.0m, anchor point is not set, after the thick extruded polystyrene board of filling 20mm, according to last pore size, take the different modes filling closely knit.
While 1) going up a skin building block apart from the not enough 30mm of beam (plate) most, with the dry masonry mortar, twist with the fingers flat;
2) go up a skin building block most and between 30mm~50mm the time, with the C20 concrete, fill with real apart from the space of beam (plate);
3) go up most a skin building block apart from the space of beam (plate) when the 100mm left and right, with solid brick is flat, build, mortar is twisted with the fingers real.
Step 10: filleting.The extruded polystyrene board width is filled at infilled wall both sides and top should, than the few 20mm in the every limit of building block width, after having built 7 days by laying bricks or stones, can carry out the gap processing.First with polyurethane foams, gap is full of, with scraper, redundance is hung, outermost is twisted with the fingers real again with sealing cement.Finally between the unlike material body of wall, paste the wide alkaline-resisting grid cloth of 200mm floating with polymer mortar.

Claims (5)

1. a masonry filler wall and main body flexibly connect earthquake resistant structure, it is characterized in that: comprise vertical stem stem or constructional column, horizontal direction lintel or horizontal binder, masonry reaches the extruded polystyrene board that flexibly connects with agent structure, stem stem or constructional column reinforcing bar adopt the bar planting mode to be connected with upper and lower floor, the door opening upper level to lintel or horizontal binder reinforcing bar anchors in the stem stem of both sides or adopt the bar planting mode to be connected with agent structure, at lintel or horizontal binder place, adopt U-shaped building block as beam forms, place the good beam muscle of colligation in U-shaped building block, build again the concrete moulding, the masonry filler wall both sides, the gap of top and agent structure arranges extruded polystyrene board as flexibly connecting.
2. a kind of masonry filler wall according to claim 1 and main body flexibly connect the job practices of earthquake resistant structure, it is characterized in that: comprise following construction sequence:
Step 1: the body of wall unwrapping wire, before masonry is built by laying bricks or stones, the floor structure face is pressed to the absolute altitude levelling, emit axis, masonry sideline and the hole line of a skin building block according to working drawing;
Step 2: building block is arranged, piecemeal scale, line in body of wall line scope;
Step 3: bar planting, according to infilled wall length, corresponding stem stem position is set, by the bar planting of being holed of concrete stem stem reinforcement location, bore diameter and the degree of depth are according to the difference of adopted anchoring adhesive and difference, verifying after qualified and carry out the injecting glue bar planting in scene, after bar planting, keeps 24h to solidify and starts to build by laying bricks or stones again;
Step 4: put down the end, by bullet is good building block piecemeal scale line, that bottom concrete block masonry is good after, build and fill with real C20 concrete toward the building block hollow position, arrange brick as bottom and put down the end;
Step 5: build by laying bricks or stones, adopt " to hole, the fissure of displacement " masonry method, while building by laying bricks or stones, by the hole of one deck under the aligned of last layer building block, perpends staggers mutually, does not stay straight joint;
Step 6: the construction stem stem, when wall length surpasses 5m, the wall stage casing arranges stem stem, and the answer≤2.4m of distance between stem stem and stem stem; Stem stem is established in the door and window hole both sides; Stem stem is established at corner, J-shaped wall, cross wall handing-over position; When infilled wall length is less than 2.5m, door opening limit stem stem reinforcing bar is connected with reinforcing bar in door upper level binder, stops to binder, no longer extends upward; Wall is grown up when 2.5m, at the bottom of door opening limit stem stem reinforcing bar extends beam or at the bottom of plate; The long 5.0m that surpasses of wall, the high infilled wall that surpasses 4.2m of wall, the middle part long at wall arranges the cast-in-situ reinforced concrete post by spacing 5.0m, and column cross-section size is 240mm * 200mm, and arrangement of reinforcement is 4 grade III steels 12, and stirrup is that grade III steel 8 spacings are 250, builds the C20 concrete;
Step 7: horizontal binder, wall higher primary school is when 4.2m, and middle part that should be high at wall, on door opening, arrange horizontal binder together when door opening is arranged; Wall is high between 4.2m~5.0m the time, sets up the 2 horizontal binders in road, spacing≤1.6m; Wall is high>during 5.0m, the horizontal binder of multiple tracks is set, and first is located on door opening, and all the other horizontal binders are by arranging apart from being not more than 1.6m in vertical, horizontal binder and two ends shear wall or post anchoring, the horizontal binder of the wide body of wall of 200mm is built the concrete moulding with the double template inside of doing of U-shaped brick; When the door opening width is not more than 1.5m, support is carried out with flitch in the lintel bottom, and the U-shaped brick template of holding concurrently is built by laying bricks or stones, inside joins 3 grade III steels 10, and stirrup is that grade III steel 8 spacings are 200mm; When the door opening width is greater than 1.5m, lintel installs the cast-in-place moulding of template, and lintel is of a size of 200mm * 200mm, inside joins 4 Φ 12 grade III steels, and stirrup is grade III steel 8 200, crosses beam steel and extends through each 300mm of both sides, hole;
Step 8: while building to beam, position, plate bottom, at least interval 7d, can carry out top and build by laying bricks or stones;
Step 9: top way; According to 8 degree seismic fortification intensity requirements, when wall length>5.0m, the wall top is except should building tightly with Vierendeel girder, plate, should add anchor point, adopt the bar planting mode that grade III steel 10 reinforcing bars are implanted in beam, plate, implantation depth is 120mm, protruded length is 150mm, and spacing is not more than 1.0m, and filling C20 concrete is closely knit, known according to the stem stem spacing, 2 road anchor points are set between two stem stems and get final product, when wall length≤5.0m, anchor point is not set, after the thick extruded polystyrene board of filling 20mm, that the filling of last space is closely knit;
Step 10: filleting, the extruded polystyrene board width is filled at infilled wall both sides and top should be than the few 20mm in the every limit of building block width, after having built 7 days by laying bricks or stones, can carry out the gap processing, first with polyurethane foams, gap is full of, with scraper, redundance is hung, outermost is twisted with the fingers real again with sealing cement, finally between the unlike material body of wall, pastes the wide alkaline-resisting grid cloth of 200mm floating with polymer mortar.
3. job practices according to claim 2, is characterized in that: according to described last space difference, implement different ways, while going up most a skin building block apart from beam or the not enough 30mm of plate, twist with the fingers flat with the dry masonry mortar; Go up most a skin building block and between 30mm~50mm the time, with the C20 concrete, fill with real apart from the space of beam or plate; Go up most a skin building block apart from the space of beam or plate when the 100mm left and right, with solid brick is flat, build, mortar is twisted with the fingers real.
4. job practices according to claim 2 is characterized in that: calculating from the 20mm of wall column limit, distance both sides during row's brick, after the stem stem bottom reinforcement bars is implanted in floor and reached solidification intensity, then building block is built closely knit with the C20 fine-stone concrete.
5. according to the described job practices of one of claim 2-4, it is characterized in that: fill extruded polystyrene board in the wide space of the 20mm between blockwork and agent structure, the polyphenyl plate width should be than the few 20mm in the every limit of blockwork width, to guarantee the space of polyphenyl plate outside spray polyurethane foams and sealing cement.
CN201310437301.6A 2013-09-24 2013-09-24 A kind of masonry filler wall and main body flexibly connect earthquake resistant structure and construction method thereof Expired - Fee Related CN103469939B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310437301.6A CN103469939B (en) 2013-09-24 2013-09-24 A kind of masonry filler wall and main body flexibly connect earthquake resistant structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310437301.6A CN103469939B (en) 2013-09-24 2013-09-24 A kind of masonry filler wall and main body flexibly connect earthquake resistant structure and construction method thereof

Publications (2)

Publication Number Publication Date
CN103469939A true CN103469939A (en) 2013-12-25
CN103469939B CN103469939B (en) 2015-09-09

Family

ID=49794967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310437301.6A Expired - Fee Related CN103469939B (en) 2013-09-24 2013-09-24 A kind of masonry filler wall and main body flexibly connect earthquake resistant structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN103469939B (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883022A (en) * 2014-03-20 2014-06-25 中国建筑第二工程局有限公司 Building envelope inner and outer wall anti-seismic and sound insulation anti-cracking integrated structure and construction method thereof
CN103967163A (en) * 2014-03-31 2014-08-06 太原理工大学 Swing masonry wall with inwards-concave wall side ends
CN104179273A (en) * 2014-09-15 2014-12-03 中国建筑股份有限公司 Precast assembled integrated type concrete shear wall panel with bottom hole containing multiple coupling beams
CN104179262A (en) * 2014-08-21 2014-12-03 山西一建集团有限公司 Thermal bridge treatment method for exterior-wall external-insulation outside door windows
CN104389361A (en) * 2014-11-04 2015-03-04 华南理工大学 Damping filling wallboard for frame structure
CN104775544A (en) * 2015-03-04 2015-07-15 安徽新华学院 Energy dissipation type coupled anti-seismic wall with reinforcing bars, grouting holes, building blocks and combined coupling beam and manufacturing method
CN104989100A (en) * 2015-05-25 2015-10-21 中国十七冶集团有限公司 Construction method for crack prevention on connecting portion of masonry wall and concrete wall column
CN105421775A (en) * 2015-11-06 2016-03-23 北京崇建工程有限公司 Construction method for lintel of brick-concrete structure
CN105507454A (en) * 2016-02-27 2016-04-20 中国地震局工程力学研究所 Deformation-controllable frame filling wall and construction method thereof
CN105569214A (en) * 2015-12-31 2016-05-11 青建集团股份公司 Dense thin-wall filled building block construction technology
CN105604344A (en) * 2016-02-28 2016-05-25 叶香竹 Reinforcing method of cracked interior wall
CN105649235A (en) * 2015-12-31 2016-06-08 青建集团股份公司 Construction technique for MS dense thin-wall building block filling
CN105908864A (en) * 2016-05-25 2016-08-31 杭州江润科技有限公司 Interface crack preventing structure for filling brickwork and framework shear wall and construction method
CN105937278A (en) * 2016-06-06 2016-09-14 河北建筑工程学院 Prefabricated concrete frame infill wall system and construction method thereof
CN106049665A (en) * 2016-07-28 2016-10-26 杭州江润科技有限公司 Lightweight blockwork cast-in-place core and construction method
CN106088603A (en) * 2016-07-27 2016-11-09 张晶廷 A kind of construction method of cast-in-place concrete building structure
CN106760063A (en) * 2017-01-13 2017-05-31 郑州大学 Wooden frame antidetonation windowing adobe wall and its construction technology
CN106948600A (en) * 2017-03-03 2017-07-14 重庆大学 Core column type is without the slurry accurate block masonry of air entrained concrete and its construction method
CN108019077A (en) * 2017-12-13 2018-05-11 成都思纳誉联建筑设计有限公司 A kind of construction method with flexible connecting structure masonry filler wall
CN108457402A (en) * 2017-02-21 2018-08-28 黄靓 A kind of concrete structure construction method with assembled masonry filler wall
CN109057066A (en) * 2018-08-20 2018-12-21 中国冶集团有限公司 A kind of flexible connection anti-seismic structure and construction method
CN109653382A (en) * 2018-11-27 2019-04-19 上海宝冶集团有限公司 Gap construction technology at the top of masonry wall between main structure
CN110206309A (en) * 2019-07-03 2019-09-06 河南西艾尔墙体科技有限公司 A kind of CL cast-in-place shear wall and filled-in panel flexible connecting method
CN110593442A (en) * 2019-08-19 2019-12-20 西南交通大学 Building method of masonry infilled wall adaptive to deformation of external frame
CN111231075A (en) * 2020-01-20 2020-06-05 江苏博森建筑设计有限公司 Forming die of anti-seismic prefabricated wall beam structure and construction method thereof
CN113250461A (en) * 2021-06-22 2021-08-13 四川农业大学 Construction method for improving seismic resistance of wall with Tibetan Qiang stone wood structure
CN114197703A (en) * 2021-11-23 2022-03-18 桁立建设集团有限公司 Masonry infilled wall and main body flexible connection anti-seismic structure and construction method thereof
CN115506488A (en) * 2022-10-09 2022-12-23 中建中原建筑设计院有限公司 Method for connecting prefabricated sandwich heat-insulation peripheral retaining wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007136233A1 (en) * 2006-05-24 2007-11-29 Yan Sup Lee Fix holder, steel wire, bricks, and bricks wall reinforcement method thereby
CN102116061A (en) * 2009-12-30 2011-07-06 中铁建工集团有限公司 Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN201924486U (en) * 2010-12-30 2011-08-10 苏州市建筑设计研究院有限责任公司 Semi-flexible connection device for frame structure
CN103266767A (en) * 2013-05-27 2013-08-28 中国航天建设集团有限公司 Construction method for preventing and treating cracks between concrete structure and filler wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007136233A1 (en) * 2006-05-24 2007-11-29 Yan Sup Lee Fix holder, steel wire, bricks, and bricks wall reinforcement method thereby
CN102116061A (en) * 2009-12-30 2011-07-06 中铁建工集团有限公司 Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN201924486U (en) * 2010-12-30 2011-08-10 苏州市建筑设计研究院有限责任公司 Semi-flexible connection device for frame structure
CN103266767A (en) * 2013-05-27 2013-08-28 中国航天建设集团有限公司 Construction method for preventing and treating cracks between concrete structure and filler wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄兰兰: "砌块填充墙抗震性能试验研究", 《工程抗震与加固改造》, 28 February 2011 (2011-02-28) *

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103883022A (en) * 2014-03-20 2014-06-25 中国建筑第二工程局有限公司 Building envelope inner and outer wall anti-seismic and sound insulation anti-cracking integrated structure and construction method thereof
CN103967163A (en) * 2014-03-31 2014-08-06 太原理工大学 Swing masonry wall with inwards-concave wall side ends
CN103967163B (en) * 2014-03-31 2016-04-27 太原理工大学 End, wall limit concave waves masonry wall
CN104179262A (en) * 2014-08-21 2014-12-03 山西一建集团有限公司 Thermal bridge treatment method for exterior-wall external-insulation outside door windows
CN104179273B (en) * 2014-09-15 2016-08-24 中国建筑股份有限公司 A kind of bottom punches the fabricated assembly overall concrete shear wallboard containing many coupling beams
CN104179273A (en) * 2014-09-15 2014-12-03 中国建筑股份有限公司 Precast assembled integrated type concrete shear wall panel with bottom hole containing multiple coupling beams
CN104389361A (en) * 2014-11-04 2015-03-04 华南理工大学 Damping filling wallboard for frame structure
CN104775544A (en) * 2015-03-04 2015-07-15 安徽新华学院 Energy dissipation type coupled anti-seismic wall with reinforcing bars, grouting holes, building blocks and combined coupling beam and manufacturing method
CN104989100A (en) * 2015-05-25 2015-10-21 中国十七冶集团有限公司 Construction method for crack prevention on connecting portion of masonry wall and concrete wall column
CN105421775A (en) * 2015-11-06 2016-03-23 北京崇建工程有限公司 Construction method for lintel of brick-concrete structure
CN105569214A (en) * 2015-12-31 2016-05-11 青建集团股份公司 Dense thin-wall filled building block construction technology
CN105649235A (en) * 2015-12-31 2016-06-08 青建集团股份公司 Construction technique for MS dense thin-wall building block filling
CN105507454A (en) * 2016-02-27 2016-04-20 中国地震局工程力学研究所 Deformation-controllable frame filling wall and construction method thereof
CN105604344A (en) * 2016-02-28 2016-05-25 叶香竹 Reinforcing method of cracked interior wall
CN105604344B (en) * 2016-02-28 2018-01-30 叶香竹 A kind of reinforcement means for having crack interior wall
CN105908864A (en) * 2016-05-25 2016-08-31 杭州江润科技有限公司 Interface crack preventing structure for filling brickwork and framework shear wall and construction method
CN105908864B (en) * 2016-05-25 2018-02-27 新宇建设有限公司 Fill masonry and the construction method of frame-shear wall prevention Interface Crack structure
CN105937278A (en) * 2016-06-06 2016-09-14 河北建筑工程学院 Prefabricated concrete frame infill wall system and construction method thereof
CN105937278B (en) * 2016-06-06 2019-06-07 河北建筑工程学院 A kind of assembly concrete frame wall filled with masonry system and its construction method
CN106088603A (en) * 2016-07-27 2016-11-09 张晶廷 A kind of construction method of cast-in-place concrete building structure
CN106049665A (en) * 2016-07-28 2016-10-26 杭州江润科技有限公司 Lightweight blockwork cast-in-place core and construction method
CN106049665B (en) * 2016-07-28 2018-05-04 中信国安建工集团有限公司 The construction method of the cast-in-place core of light block wall
CN106760063A (en) * 2017-01-13 2017-05-31 郑州大学 Wooden frame antidetonation windowing adobe wall and its construction technology
CN108457402A (en) * 2017-02-21 2018-08-28 黄靓 A kind of concrete structure construction method with assembled masonry filler wall
CN106948600A (en) * 2017-03-03 2017-07-14 重庆大学 Core column type is without the slurry accurate block masonry of air entrained concrete and its construction method
CN108019077A (en) * 2017-12-13 2018-05-11 成都思纳誉联建筑设计有限公司 A kind of construction method with flexible connecting structure masonry filler wall
CN109057066A (en) * 2018-08-20 2018-12-21 中国冶集团有限公司 A kind of flexible connection anti-seismic structure and construction method
CN109653382A (en) * 2018-11-27 2019-04-19 上海宝冶集团有限公司 Gap construction technology at the top of masonry wall between main structure
CN110206309A (en) * 2019-07-03 2019-09-06 河南西艾尔墙体科技有限公司 A kind of CL cast-in-place shear wall and filled-in panel flexible connecting method
CN110593442A (en) * 2019-08-19 2019-12-20 西南交通大学 Building method of masonry infilled wall adaptive to deformation of external frame
CN111231075A (en) * 2020-01-20 2020-06-05 江苏博森建筑设计有限公司 Forming die of anti-seismic prefabricated wall beam structure and construction method thereof
CN113250461A (en) * 2021-06-22 2021-08-13 四川农业大学 Construction method for improving seismic resistance of wall with Tibetan Qiang stone wood structure
CN114197703A (en) * 2021-11-23 2022-03-18 桁立建设集团有限公司 Masonry infilled wall and main body flexible connection anti-seismic structure and construction method thereof
CN115506488A (en) * 2022-10-09 2022-12-23 中建中原建筑设计院有限公司 Method for connecting prefabricated sandwich heat-insulation peripheral retaining wall
CN115506488B (en) * 2022-10-09 2024-03-22 中建中原建筑设计院有限公司 Method for connecting prefabricated sandwich heat-insulating peripheral retaining wall

Also Published As

Publication number Publication date
CN103469939B (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN103469939B (en) A kind of masonry filler wall and main body flexibly connect earthquake resistant structure and construction method thereof
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN103556749A (en) Hanging flexible connection of precast concrete infill wall
CN103953114B (en) Steel frame-reinforced masonry shear wall combinative structure and construction method thereof
CN203701334U (en) Reinforced and prefabricated type shear wall structure
CN105155724A (en) Construction method of structural column for simultaneous construction with frame-structured filled wall
CN103790267A (en) Reinforcement type prefabricated assembly type shear wall structure and construction method thereof
CN107447901A (en) Anti-seismic prefabricated floor and floor antidetonation splicing construction
CN104929278A (en) Assembly type dense column hollow shear wall structure
CN103526781A (en) Integrated-tray, shock-insulation and reinforcing structure for historic building foundation and construction method thereof
CN203487664U (en) Prefabricated concrete filled wall suspension type flexible connection
CN108104284B (en) Wallboard connecting structure of shear wall steel arm embedded floor slab and assembly method
CN114592688A (en) Construction method of oblique reinforced concrete shear wall based on equivalent rod piece model
KR100304861B1 (en) Insulation Precast Concrete Panel
KR101038945B1 (en) A filling structure of upper part of a tunnel and its procedure
CN104631658B (en) The construction method and sun-dried mud brick of a kind of adobe wall suitable for highly seismic region of providing fortification against earthquakes
CN106917358B (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN213268513U (en) Outer wall structure
CN105113663A (en) Assembly type constructional column constructed simultaneously with framework structure infill wall
CN109057066A (en) A kind of flexible connection anti-seismic structure and construction method
CN105888282B (en) A kind of seismic reinforcing structure and method that big hole is opened for transformer station's masonry wall
CN108625491A (en) Assembled H profile steel column-isolated footing-concrete collar tie beam L-shaped connecting node
CN205063155U (en) Assembled constructional column building block of being under construction simultaneously with frame construction infilled wall
CN108019077A (en) A kind of construction method with flexible connecting structure masonry filler wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20170924

CF01 Termination of patent right due to non-payment of annual fee