CN103465961A - Power steering gear tie rod - Google Patents

Power steering gear tie rod Download PDF

Info

Publication number
CN103465961A
CN103465961A CN2013101213049A CN201310121304A CN103465961A CN 103465961 A CN103465961 A CN 103465961A CN 2013101213049 A CN2013101213049 A CN 2013101213049A CN 201310121304 A CN201310121304 A CN 201310121304A CN 103465961 A CN103465961 A CN 103465961A
Authority
CN
China
Prior art keywords
intermediate rod
annular
projection
power steering
interior
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101213049A
Other languages
Chinese (zh)
Other versions
CN103465961B (en
Inventor
陈党文
马芳武
杨国斌
赵福全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Geely Holding Group Co Ltd
Zhejiang Geely Automobile Research Institute Co Ltd
Zhejiang Geely Automobile Research Institute Co Ltd Hangzhou Branch
Original Assignee
Zhejiang Geely Holding Group Co Ltd
Zhejiang Geely Automobile Research Institute Co Ltd
Zhejiang Geely Automobile Research Institute Co Ltd Hangzhou Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Geely Holding Group Co Ltd, Zhejiang Geely Automobile Research Institute Co Ltd, Zhejiang Geely Automobile Research Institute Co Ltd Hangzhou Branch filed Critical Zhejiang Geely Holding Group Co Ltd
Priority to CN201310121304.9A priority Critical patent/CN103465961B/en
Publication of CN103465961A publication Critical patent/CN103465961A/en
Application granted granted Critical
Publication of CN103465961B publication Critical patent/CN103465961B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steering-Linkage Mechanisms And Four-Wheel Steering (AREA)

Abstract

The invention discloses a power steering gear tie rod, which can prolong the failure time of the power steering gear tie rod when a splicing position between an inner tie rod and an outer tie rod has a fatigue crack, and can prompt the fatigue crack to a driver through reducing the sensitivity of the steering gear. The power steering gear tie rod is formed by splicing the inner tie rod and the outer tie rod, wherein one of the inner tie rod and the outer tie rod is provided with a circular blocking lug, and the other of the inner tie rod and the outer tie rod is provided with a pair of supporting arms which are distributed at the two opposite sides of the tie rod and extend towards the direction of the other tie rod; the supporting arms are distributed at the two opposite sides of the circular blocking lug, the positions at the two ends of the circular blocking lug between the two supporting arms and are respectively provided with a blocking frame, the positions positioned at the inner side of the end surface of the circular blocking lug on the two blocking frames are respectively provided with a blocking rod, the two blocking rods at the same blocking frame are distributed at two the opposite sides of the tie rod of the circular blocking lug, and a gap is formed between each blocking rod and the end surface of the circular blocking lug.

Description

A kind of power steering intermediate rod
Technical field
The present invention relates to a kind of automobile component, be specifically related to a kind ofly by the splicing of interior intermediate rod and outer intermediate rod, form the power steering intermediate rod.
Background technology
The power steering intermediate rod is the vital parts of the steering swivel system of automobile, and under the automobile normal operating condition, the power steering intermediate rod mainly is subject to pressure.Current power steering intermediate rod mainly contains following two kinds of structures, a kind of power steering intermediate rod structure that is formed in one wherein, and another kind of power steering intermediate rod is comprised of interior intermediate rod and the splicing of outer intermediate rod.The power steering intermediate rod formed by the splicing of interior intermediate rod and outer intermediate rod run into interior intermediate rod or outside intermediate rod when damaged (being generally that interior intermediate rod is damaged), can change separately interior intermediate rod or outer intermediate rod gets final product, in especially splicing by screw thread, intermediate rod and outer intermediate rod can also be finely tuned the total length of this power steering intermediate rod; But the power steering intermediate rod that this class is comprised of interior intermediate rod and the splicing of outer intermediate rod, the structural strength at the splicing position in it between intermediate rod and outer intermediate rod a little less than, when power steering, when being subject to from wheel greater impact power, the splicing position between interior intermediate rod and outer intermediate rod easily produces stress and concentrates and flexural deformation; Distortion during due to initial deformation is little less on the motor turning impact, and chaufeur is difficult for discovering; But, in During Process of Long-term Operation subsequently, fracture by fatigue easily occurs in this deformation position; Once the fracture of power steering intermediate rod, cause the power steering intermediate rod to lose efficacy and can produce great potential safety hazard.
Summary of the invention
The objective of the invention is existingly by the splicing of interior intermediate rod and outer intermediate rod, to form the power steering intermediate rod in order to overcome, fracture by fatigue easily occurs in the splicing position in it between intermediate rod and outer intermediate rod in During Process of Long-term Operation, cause the power steering intermediate rod to lose efficacy, produce the problem of great potential safety hazard, a kind of power steering intermediate rod is provided, can extend the out-of-service time of power steering intermediate rod after fracture by fatigue occurs the splicing position between interior intermediate rod and outer intermediate rod, and by reduce the deflector steering sensitivity to chaufeur with prompting, thereby actv. improves the potential safety hazard caused after the fracture of power steering intermediate rod.
Technical scheme of the present invention is:
A kind of power steering intermediate rod, by interior intermediate rod and the splicing of outer intermediate rod, formed, on an intermediate rod in described interior intermediate rod and outer intermediate rod, be provided with annular near the splicing position of interior intermediate rod and outer intermediate rod and stop projection, another intermediate rod is provided with and a pair ofly is distributed in the relative both sides of intermediate rod, and toward the supporting arm of another intermediate rod direction extension; Described two supporting arms are distributed in the relative both sides that annular stops projection, between two supporting arms, be positioned at annular and stop that the projection two ends are respectively equipped with divider, on two dividers, be positioned at annular and stop that projection end face inboard has respectively a pair of pin, and two pins on same divider are distributed in the relative both sides that annular stops projection place intermediate rod, each pin and annular stop between the projection end face and are provided with gap.
Stop projection because the intermediate rod in interior intermediate rod and outer intermediate rod is provided with annular, another intermediate rod is provided with a pair of supporting arm, and between two supporting arms, be positioned at annular and stop that the projection two ends are respectively equipped with divider; After fracture by fatigue occurs in the splicing position between interior intermediate rod and outer intermediate rod, can by annular stop two pins, divider and supporting arm on projection, divider between interior intermediate rod and outer intermediate rod, set up a temporary transient connection structure make steering procedure in the suffered pressure of intermediate rod can continue to transmit, actv. extends the out-of-service time of power steering intermediate rod, for chaufeur provides time of enough processing accidents; Simultaneously because the pin on divider and annular stop between the projection end face, be provided with gap, it has reduced the deflector steering sensitivity, makes chaufeur can discover steering swivel system and breaks down.The power steering intermediate rod of this programme is after fracture by fatigue occurs in the splicing position between interior intermediate rod and outer intermediate rod, not only can give chaufeur with prompting, simultaneously all right actv. extends the out-of-service time of power steering intermediate rod, for chaufeur provides time of enough processing accidents, but thereby actv. improve the potential safety hazard caused after the fracture of power steering intermediate rod.
As preferably, on interior intermediate rod, in annular, stop between projection and supporting arm root and be provided with the weakening strength structure, the structural strength of the interior intermediate rod at this weakening strength structure place is less than the interior intermediate rod of annular beyond stopping between projection and supporting arm root and the structural strength of outer intermediate rod.
This programme structure, when guaranteeing power steering intermediate rod overall construction intensity, stops on the interior intermediate rod between projection and supporting arm root the weakening strength structure is set in annular; Make the deformation of intermediate rod in During Process of Long-term Operation and the position of fracture by fatigue at first occur in weakening strength structure place; So further actv. guarantees after fracture by fatigue is occurring the power steering intermediate rod, not only can give chaufeur with prompting, simultaneously all right actv. extends the out-of-service time of power steering intermediate rod, for chaufeur provides time of enough processing accidents, and then actv. improves the potential safety hazard caused after the fracture of power steering intermediate rod.
As preferably, the weakening strength structure is circular groove or breach or ledge structure.
As preferably, two pins on same divider stop that with annular the spacing between the projection end face is identical, and this spacing is set between 1 to 3.5 millimeter.Pin and annular stop that the spacing between the projection end face can not be excessive or too small, after fracture by fatigue occurs in the splicing position between interior intermediate rod and outer intermediate rod, if pin and annular stop that the spacing between the projection end face is too small, deflector steering sensitivity changes not obvious being difficult to chaufeur with prompting; If pin and annular stop that the spacing between the projection end face is excessive, the suffered pressure of intermediate rod is difficult to transmit; Thereby the pin of this programme and the annular stop that the spacing between the projection end face is set between 1 to 3.5 millimeter, after fracture by fatigue occurs in the splicing position between interior intermediate rod and outer intermediate rod, when giving chaufeur with prompting, guarantee that the suffered pressure of intermediate rod transmits smoothly, actv. extends the out-of-service time of power steering intermediate rod, for chaufeur provides time of enough processing accidents.
As preferably, splicing construction between interior intermediate rod and outer intermediate rod comprises the threaded connection hole be arranged on outer intermediate rod end face, be arranged on the outside thread of interior intermediate rod one end and be arranged on the pretension captive nut on this outside thread, the threaded connection hole of interior intermediate rod and outer intermediate rod is threaded connection, and described pretension captive nut is pressed on outer intermediate rod end face.Due to interior intermediate rod, by being threaded of screw thread and outer intermediate rod, thereby the total length of the power steering intermediate rod of this programme can be regulated; Simultaneously due to arranging of pretension captive nut, the structural strength of the power steering intermediate rod after can guaranteeing to regulate is stable, reliable.
As preferably, annular stops that projection is the nut that stops be arranged on the outside thread of interior intermediate rod, and this stops that nut and outer intermediate rod are positioned at the both sides of pretension captive nut.This programme annular stops that projection is set to the nut that stops on interior intermediate rod, and it is easy to make, quick for installation.
As preferably, stop that near annular two supporting arms of projection stop that with annular the intermediate rod at projection place parallels, described divider stops that with annular the projection end face parallels.
The invention has the beneficial effects as follows: after power steering intermediate rod generation fracture by fatigue, not only can give chaufeur with prompting, simultaneously all right actv. extends the out-of-service time of power steering intermediate rod, for chaufeur provides time of enough processing accidents, but actv. improves the potential safety hazard caused after the fracture of power steering intermediate rod.
The accompanying drawing explanation
Fig. 1 is a kind of structural representation of the embodiment of the present invention 1.
Fig. 2 is a kind of local structure schematic diagram of the embodiment of the present invention 1.
Fig. 3 be in Fig. 2 A to a kind of structural representation.
Fig. 4 is a kind of structural representation of the embodiment of the present invention 3.
In figure: interior intermediate rod 1, outer intermediate rod 2, supporting arm 3, pretension captive nut 4, annular stops projection 5, divider 6,61, pin 7, weakening strength structure 8.
The specific embodiment
Below in conjunction with accompanying drawing and the specific embodiment, the present invention is described in further detail:
Embodiment 1: as shown in Figure 1, Figure 2, Figure 3 shows, a kind of power steering intermediate rod, be comprised of interior intermediate rod 1 and 2 splicings of outer intermediate rod.Splicing construction between interior intermediate rod and outer intermediate rod comprises the threaded connection hole be arranged on outer intermediate rod 2 end faces, is arranged on the outside thread of interior intermediate rod 1 one ends and is arranged on the pretension captive nut 4 on this outside thread.Interior intermediate rod 1 is threaded connection with the threaded connection hole of outer intermediate rod 2.Pretension captive nut 4, by tightening, is pressed on outer intermediate rod 2 end faces its end.Splicing construction between above-mentioned interior intermediate rod and outer intermediate rod can also be by being welded to connect interior intermediate rod and outer intermediate rod.
On interior intermediate rod 1, be provided with annular near the splicing position of interior intermediate rod 1 and outer intermediate rod 2 and stop projection 5.This annular stops that projection 5 is for the nut that stops on the outside thread that is arranged on interior intermediate rod 1, and this stops that nut and outer intermediate rod 2 are positioned at the both sides of pretension captive nut 4.Be provided with on outer intermediate rod 2, near interior intermediate rod 1 and the splicing position of outer intermediate rod 2 and a pair ofly be distributed in the relative both sides of outer intermediate rod, and toward the supporting arm 3 of intermediate rod 1 direction extension in another.Two supporting arms 3 are distributed in the relative both sides that annular stops projection 5, and stop that near annular two supporting arms 3 of projection 5 parallel with interior intermediate rod 1.Between two supporting arms 3, be positioned at annular and stop that projection 5 rear and front ends are respectively equipped with divider 6,61, and divider stops that with annular the end face of projection 5 parallels.On two dividers 6,61, be positioned at annular and stop that projection 5 end face inboards have respectively a pair of pin 7, be specifically, two dividers 6,61 are comprised of the pin 7 of pair of parallel respectively, and stop that with annular the corresponding part pin of projection 5 end faces is positioned at the end face inboard that annular stops projection 5.Two pins 7 on same divider 6,61 are distributed in the relative both sides of interior intermediate rod 1.Each pin 7 and annular stop between projection 5 end faces and are provided with gap, and two pins on same divider stop that with annular the spacing between the projection end face is identical.Each pin 7 and annular stop that the spacing between projection 5 end faces is set to 2 millimeters.
As shown in Figure 2, on interior intermediate rod 1, in annular, stop between projection 5 and supporting arm 3 roots and be provided with weakening strength structure 8.Weakening strength structure 8 is circular groove or breach or ledge structure.The structural strength of the interior intermediate rod 1 at these weakening strength structure 8 places is less than the interior intermediate rod of annular beyond stopping between projection 5 and supporting arm 3 roots and the structural strength of outer intermediate rod.
As Fig. 1, shown in Fig. 2, after the interior intermediate rod 1 and the splicing position between outer intermediate rod 2 or weakening strength structure 8 places' generation fracture by fatigues of power steering intermediate rod of the present invention, annular in steering procedure on intermediate rod 1 stops that projection 5 will be resisted against on the pin 7 on divider, and then stop projection 5 by annular, pin 7 on divider, divider 6, 61 and supporting arm 3 between interior intermediate rod 1 and outer intermediate rod 2, set up a temporary transient connection structure make steering procedure in the suffered pressure of intermediate rod can continue to transmit, actv. extends the out-of-service time of power steering intermediate rod, for chaufeur provides time of enough processing accidents.Simultaneously because the pin 7 on divider and annular stop between projection 5 end faces, be provided with gap, it has reduced the deflector steering sensitivity, makes chaufeur can discover steering swivel system and breaks down.
Embodiment 2: all the other structures of the present embodiment are with reference to embodiment 1, and its difference is:
On outer intermediate rod, be provided with annular near the splicing position of interior intermediate rod and outer intermediate rod and stop projection.Be provided with on interior intermediate rod, near interior intermediate rod and the splicing position of outer intermediate rod and a pair ofly relatively be distributed in the intermediate rod both sides, and toward the supporting arm of intermediate rod direction extension in addition.Two supporting arms are distributed in the relative both sides that annular stops projection, and stop that near annular two supporting arms of projection parallel with interior intermediate rod.
Embodiment 3: all the other structures of the present embodiment are with reference to embodiment 1, and its difference is:
As shown in Figure 4, between two supporting arms 3, being positioned at annular stops that the projection two ends are respectively equipped with divider 6,61.On two dividers 6,61, be positioned at annular and stop that projection end face inboard has respectively a pair of pin 7, be specifically, two dividers 6,61, for two baffle plates and the baffle plate be parallel to each other stops that with annular projection 5 end faces are parallel, are provided with through hole in the middle part of baffle plate, and interior intermediate rod 1 is plugged in this through hole; A pair of pin on above-mentioned divider is the baffle plate of through hole both sides.

Claims (7)

1. a power steering intermediate rod, by interior intermediate rod (1) and outer intermediate rod (2) splicing, formed, it is characterized in that, on an intermediate rod in described interior intermediate rod and outer intermediate rod, be provided with annular near the splicing position of interior intermediate rod and outer intermediate rod and stop projection (5), another intermediate rod is provided with and a pair ofly is distributed in the relative both sides of intermediate rod, and toward the supporting arm (3) of another intermediate rod direction extension; Described two supporting arms are distributed in the relative both sides that annular stops projection (5), between two supporting arms (3), be positioned at annular and stop that projection (5) two ends are respectively equipped with divider (6,61), on two dividers, be positioned at annular and stop that projection end face inboard has respectively a pair of pin (7), and two pins (7) on same divider are distributed in the relative both sides that annular stops projection place intermediate rod, each pin and annular stop between the projection end face and are provided with gap.
2. a kind of power steering intermediate rod according to claim 1, it is characterized in that, described interior intermediate rod (7) is upper, be positioned at annular stops between projection (5) and supporting arm (3) root and is provided with weakening strength structure (8), and the structural strength of the interior intermediate rod at this weakening strength structure place is less than annular and stops between projection and supporting arm root interior intermediate rod in addition and the structural strength of outer intermediate rod.
3. a kind of power steering intermediate rod according to claim 2, is characterized in that, described weakening strength structure is circular groove or breach or ledge structure.
4. a kind of power steering intermediate rod according to claim 1, is characterized in that, two pins (7) on same divider stop that with annular the spacing between projection (5) end face is identical, and this spacing is set between 1 to 3.5 millimeter.
5. according to claim 1 or 2 or 3 described a kind of power steering intermediate rods, it is characterized in that, splicing construction between described interior intermediate rod (1) and outer intermediate rod (2) comprises the threaded connection hole be arranged on outer intermediate rod (2) end face, be arranged on the outside thread of interior intermediate rod (1) one end and be arranged on the pretension captive nut (4) on this outside thread, the threaded connection hole of interior intermediate rod and outer intermediate rod is threaded connection, and described pretension captive nut is pressed on outer intermediate rod end face.
6. a kind of power steering intermediate rod according to claim 5, is characterized in that, annular stops that projection is the nut that stops be arranged on the outside thread of interior intermediate rod, and this stops that nut and outer intermediate rod are positioned at the both sides of pretension captive nut.
7. according to claim 1 or 2 or 3 described a kind of power steering intermediate rods, it is characterized in that, stop that near annular two supporting arms of projection stop that with annular the intermediate rod at projection place parallels, described divider stops that with annular the projection end face parallels.
CN201310121304.9A 2013-04-09 2013-04-09 A kind of power steering intermediate rod Active CN103465961B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310121304.9A CN103465961B (en) 2013-04-09 2013-04-09 A kind of power steering intermediate rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310121304.9A CN103465961B (en) 2013-04-09 2013-04-09 A kind of power steering intermediate rod

Publications (2)

Publication Number Publication Date
CN103465961A true CN103465961A (en) 2013-12-25
CN103465961B CN103465961B (en) 2015-11-18

Family

ID=49791070

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310121304.9A Active CN103465961B (en) 2013-04-09 2013-04-09 A kind of power steering intermediate rod

Country Status (1)

Country Link
CN (1) CN103465961B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107914769A (en) * 2017-12-25 2018-04-17 上海龙创汽车设计股份有限公司 A kind of novel carbon fiber track rod mechanism and preparation method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1982915A (en) * 1932-10-29 1934-12-04 Abbott B Jenks Safety joint
US2757028A (en) * 1948-12-30 1956-07-31 Ehrenreich & Cie A Steering rods for motor vehicles
GB1275207A (en) * 1970-04-21 1972-05-24 Automative Products Company Lt Improvements in or relating to flexible connecting devices
US5044808A (en) * 1988-08-17 1991-09-03 Trw Ehrenreich Gmbh & Co. Kg Steering rod for motor vehicles
CN202243647U (en) * 2011-08-29 2012-05-30 比亚迪股份有限公司 Steering cross pull rod

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1982915A (en) * 1932-10-29 1934-12-04 Abbott B Jenks Safety joint
US2757028A (en) * 1948-12-30 1956-07-31 Ehrenreich & Cie A Steering rods for motor vehicles
GB1275207A (en) * 1970-04-21 1972-05-24 Automative Products Company Lt Improvements in or relating to flexible connecting devices
US5044808A (en) * 1988-08-17 1991-09-03 Trw Ehrenreich Gmbh & Co. Kg Steering rod for motor vehicles
CN202243647U (en) * 2011-08-29 2012-05-30 比亚迪股份有限公司 Steering cross pull rod

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107914769A (en) * 2017-12-25 2018-04-17 上海龙创汽车设计股份有限公司 A kind of novel carbon fiber track rod mechanism and preparation method thereof

Also Published As

Publication number Publication date
CN103465961B (en) 2015-11-18

Similar Documents

Publication Publication Date Title
WO2008036327A3 (en) Operator alerting system using a vehicle fault condition prioritization method
CN105008732A (en) Pin joint assembly
CN103465961A (en) Power steering gear tie rod
CN102991693B (en) A kind of Double-chain driver of boarding bridge joint
CN104671085A (en) Locking clamping track instrument
CN204937467U (en) A kind of bourdon's tube mounting flange
CN203356875U (en) Wagon side beam technical support
CN205076644U (en) Switch bracket of forward position board
CN204592217U (en) A kind of durable type combination gear ring support saddle
CN203918853U (en) The assembly tooling of heavy-duty car transmission shaft
CN204037672U (en) Subframe locking device
CN104595314A (en) Anti-cracking projection welding nut structure
CN205148134U (en) Thrust washer's four -wheel positioning fixture
CN204935547U (en) A kind of hydraulic controlled sleeve separator
CN202955014U (en) Pump shaft of high pressure pump capable of removing phosphorous with water
CN203958299U (en) A kind of U-shaped pull bar
CN202863146U (en) Interior and exterior frames mounting and fixing structure of shifter
CN203157592U (en) Bicycle hub
CN104140032B (en) A kind of Tank-supporting device for shaft cage guide
CN206202425U (en) A kind of attachment structure of lorry girder and auxiliary girder
CN104989206A (en) Novel car door hinge reinforcing plate
CN205709544U (en) A kind of easy-to-dismount crane hook assembly preventer
CN204895838U (en) A back arc frame for aircraft portable cabin skeleton
CN205219150U (en) Fixed lock of arm mark of break
CN205034930U (en) Hauler for villa

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant