CN103454684A - Deep-sea simulation acoustic experiment table and using method thereof - Google Patents

Deep-sea simulation acoustic experiment table and using method thereof Download PDF

Info

Publication number
CN103454684A
CN103454684A CN2013103922478A CN201310392247A CN103454684A CN 103454684 A CN103454684 A CN 103454684A CN 2013103922478 A CN2013103922478 A CN 2013103922478A CN 201310392247 A CN201310392247 A CN 201310392247A CN 103454684 A CN103454684 A CN 103454684A
Authority
CN
China
Prior art keywords
pressure
valve
water tank
pressure regulation
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103922478A
Other languages
Chinese (zh)
Other versions
CN103454684B (en
Inventor
秦华伟
胡杭民
袁惠得
韩冀皖
陈鹰
邱文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Dianzi University
Original Assignee
Hangzhou Dianzi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Dianzi University filed Critical Hangzhou Dianzi University
Priority to CN201310392247.8A priority Critical patent/CN103454684B/en
Publication of CN103454684A publication Critical patent/CN103454684A/en
Application granted granted Critical
Publication of CN103454684B publication Critical patent/CN103454684B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)

Abstract

The invention relates to a deep-sea simulation acoustic experiment table and a using method thereof. The deep-sea simulation acoustic experiment table comprises a water tank system, a pressure adjusting and maintaining system, a bubble generating system, a water tank pressure protection system and an acoustic system. The pressure adjusting and maintaining system, the bubble generating system, the water tank pressure protection system and the acoustic system are independent and are all connected with the water tank system. The pressure adjusting and maintaining system adjusts pressure intensity in a water tank to a designated value, adjusts in real time and maintains pressure for a long time. The bubble generating system generates controllable bubbles. The water tank pressure protection system controls pressure of the water tank in a specific range to perform a protective function. An acoustic detection system serves as the most important component on the experiment table and is used for generating and receiving ultrasonic waves and analyzing and processing signals. The deep-sea simulation acoustic experiment table can adjust and maintain the pressure in a simulated deep-sea environment, and can simulate pressure intensity of deep-sea places with any depth in the specific range. The generated bubbles can simulate real bubbles discharged from the bottom of a deep sea.

Description

A kind of deep-sea simulation acoustics experiment table and using method thereof
Technical field
The invention belongs to the seafari equipment technical field, relate to a kind of deep-sea simulation acoustics experiment table and using method thereof.
Background technology
Seabed has abundant mining deposits, and the exploitation that the various mining depositses of depositing are composed in the exploitation of ocean resources, particularly deep-sea floor is a brand-new technical field.The resources such as deep-sea hydrothermal, cold spring, oil and natural gas will become one of main energy sources of the 21 century mankind.Under the effect of earth's crust inside, their often can discharge the gas that is rich in various chemical substances outward with the form of bubble, detectable and locate corresponding deep sea deposits by surveying these bubbles.But, due to environmental baselines such as the geology of deep-sea floor complexity, ocean current, pressure, temperature, research deep-sea detecting method is the front line science of the world today.Acoustic sounding is up to now, a kind of widely used method aspect hydrospace detection, but all be confined to the close contact formula or generally investigate formula on a large scale.For studying the mechanism of the accurate detection method of remote acoustics, and carry out simulated experiment in laboratory, exploitation related experiment platform is extremely urgent.At present, the comparatively perfect deep-sea simulation acoustics experiment table for scientific research has no popularization on a large scale.
Summary of the invention
The present invention seeks to overcome the deficiencies in the prior art, a kind of deep-sea simulation acoustics experiment table and using method thereof are provided, can realize carrying out the acoustic sounding experiment under the simulated high-pressure environment of deep-sea.
A kind of deep-sea simulation acoustics experiment table, comprise cistern system, pressure regulation pressure-retaining system, bubble generation systems, tank pressure protection system and sound system.
Described cistern system comprises airtight tank shell, O-ring seal, locking hoop, support stand, automatic open device, thermometer, pressure compensator and some interface channels, wherein tank shell is made framework by ferrous material, five faces except bottom surface all are furnished with the windowpane that high temperature resistant, high pressure resistant, corrosion resistant organic glass or quartz glass are made, tank shell is comprised of tank lid and water tank, and by the locking hoop of tank lid both sides, both are locked, zero-clearance is guaranteed to seal by O-ring seal in junction; Support stand is positioned at the water tank bottom; Automatic open device is installed on the tank lid center upper portion; Thermometer is installed on the tank lid left side; Pressure compensator is installed on the water tank right side central; Lay respectively at two interface channels of two interface channels in water tank left side and right side, bottom as the interface between pressure regulation pressure-retaining system, bubble generation systems, tank pressure protection system, sound system and cistern system.
Described pressure regulation pressure-retaining system comprises the first gas compressor, front pressure regulation two-port valve, simulated seawater case, voltage-regulation voltage-stabilization valve, pressure regulation flowmeter, liquid booster pump, liquid booster pump two-port valve, pressure regulation tensimeter, pressure regulation T-valve, rear pressure regulation two-port valve, pressurize T-valve, dwell pressure table, backflow two-port valve, the first controller and blowdown valve; Described the first gas compressor has two outlets, and one of them outlet is connected with an end of front pressure regulation two-port valve, and another outlet is connected with an end of the backflow two-port valve that is positioned at tank top, and the other end of backflow two-port valve is connected with water tank; Before described pressure regulation, the other end of two-port valve is connected with an interface of simulated seawater case, an interface in two other interface of simulated seawater case is connected to the import of voltage-regulation voltage-stabilization valve by pipeline, another interface is connected to the outlet of blowdown valve by pipeline, the blowdown valve import is connected with the pipeline between pressure regulation T-valve, rear pressure regulation two-port valve; Described voltage-regulation voltage-stabilization valve outlet port is connected with an end of pressure regulation flowmeter, and the pressure regulation flowmeter other end is connected with the left side import of pressure regulation T-valve; The right side outlet of pressure regulation T-valve is connected with an end of rear pressure regulation two-port valve, and upper side outlet is connected with the pressure regulation tensimeter; The other end of rear pressure regulation two-port valve is connected with water tank; One end of liquid booster pump two-port valve is connected with liquid booster pump, the other end with pressure regulation flowmeter and pressure regulation T-valve between pipeline be connected; External the first controller of liquid booster pump; The pressurize T-valve that is positioned at tank top is furnished with the dwell pressure table.
Described bubble generation systems comprises tensimeter, flowmeter, pressure maintaining valve, throttling valve, aerator and the second gas compressor; Wherein aerator is positioned at the water tank lower right side; The second gas compressor outlet is connected with the throttling valve import; The outlet of throttling valve is connected with the import of pressure maintaining valve; The outlet of pressure maintaining valve is connected with an end of flowmeter; The other end of flowmeter is connected with a manometric end; The manometric other end is connected with aerator.
Described tank pressure protection system comprises second controller, solenoid valve, pneumatic valve, explosion-proof valve, water container and the 3rd gas compressor; Wherein the solenoid valve import is connected with water tank, and outlet is connected with the import of pneumatic valve, simultaneously external second controller, the 3rd air compressor; The outlet of pneumatic valve is connected with water container; Wherein the import of explosion-proof valve is connected in the pipeline between water tank and solenoid valve, and outlet is connected in water container; Second controller is furnished with pressure transducer.
Described sound system comprises signal generator, power amplifier, ultrasonic probe and data acquisition system (DAS), and wherein ultrasonic probe collection ultrasound wave occurs and is received in one, is laid on the left side of water tank; Data acquisition system (DAS) comprises data collecting card and computing machine, with the signal output part of ultrasonic probe, is connected; The output terminal of power amplifier is connected with the signal input part of ultrasonic probe, and the input end of power amplifier is connected with the signal output part of signal generator.
The using method of above-mentioned deep-sea simulation acoustics experiment table comprises that water tank assembling, pressure regulation pressurize, bubble occur, four parts of acoustic sounding, and concrete steps are as follows:
A, water tank assembling process:
Before A-1 starts assembling, according to requirement of experiment, at the good related experiment equipment of water tank internal placement; Again the aerator in the bubble generation systems and sound system are installed, the interface between pressure regulation pressure-retaining system, tank pressure protection system and cistern system is installed simultaneously; Then by automatic open device, tank lid is closed, between tank lid and water tank, by O-ring seal, guarantees to seal zero-clearance, and by locking hoop by both bandings, guarantee under the water tank high pressure conditions all the time in sealing state; Wherein thermometer is as the embedded parts of tank lid, and pressure compensator, as the embedded parts of water tank, when both close in tank lid, is started working; Whole assembling process completes on support stand.
A-2, after experimental implementation, after reducing to normal pressure in water tank, can open water tank by automatic open device automatically.
B, pressure regulation pressure maintaining period:
Before the B-1 pressure regulation, air abrim in cistern system, pressure is atmospheric pressure, and the valve of pressurize T-valve is in open mode, and other all valves are all in closure state.
During the B-2 pressurization, the spool of opening between front pressure regulation two-port valve, voltage-regulation voltage-stabilization valve, rear pressure regulation two-port valve and the left side import of pressure regulation T-valve and right side outlet (opens left side import and right side outlet, the upside port closing), produce source of the gas by the first gas compressor, liquid in the simulated seawater case is clamp-oned in cistern system, when the pressurize T-valve just has solid stream of water to flow out, close front pressure regulation two-port valve, the first gas compressor quits work simultaneously, all valves in the pressure regulation pressure-retaining system are all closed, now, keep the left side import of pressure regulation T-valve and right side outlet to open, upper side outlet is still closed, set the pressure values that water tank will reach at pressure regulation tensimeter place according to requirement of experiment, and open liquid booster pump two-port valve and rear pressure regulation two-port valve, controlling liquid booster pump by the first controller starts working, constantly feed-tank supercharging, when reaching requirement of experiment pressure, the left side import of pressure regulation T-valve is closed immediately, upper side outlet is opened, the first controller is given an order simultaneously, liquid booster pump quits work, pressure regulation tensimeter place Real-Time Monitoring show the pressure of water tank now, if change, the upper side outlet of pressure regulation T-valve is closed immediately, the left side import is opened, the start liquid supercharge pump feed-tank supercharging immediately of the first controller, when water tank reaches designated value, quit work, the pressure regulation T-valve also recovers the left side import and closes, the state that right side and upper side outlet are opened, so go round and begin again, thereby reach the function of pressurize, the data that dwell pressure table place shows are the pressure of tank top, as the standby parameter of experiment.
During the B-3 pressure release, when the experiment link in certain pressure finishes, need pressure release, now make liquid booster pump and the first controller quit work, close all valves, only rear pressure regulation two-port valve and blowdown valve are opened, liquid in water tank enters the simulated seawater case, recovers normal pressure in water tank; And then open the backflow two-port valve, and produce source of the gas by the first gas compressor, remaining liquid in water tank is all entered in the simulated seawater case.
During the B-4 pressure regulation, in the B-2 step, after pressurization, if will realize, the pressure in water tank is larger than existing pressure, by the first controller and liquid booster pump, on the basis of B-2 step, is continued to be pressurized to and specifies pressure to get final product; If realize, the pressure in water tank is less than existing pressure, and with reference to the B-3 step, each valve all is arranged on the state of B-3 step, and sets one at blowdown valve and specify pressure values, starts pressure release; In water tank, reach while specifying pressure, each valve returns to the state of B-2 step, and, by the first controller and liquid booster pump acting in conjunction, realizes pressurize.
In the B-5 experimentation, in water tank, pressure is very large, exists certain danger, and for guaranteeing experiment safety, the tank pressure protection system plays very important effect; When in water tank, pressure surpasses certain safety value, second controller is given an order, and under the action of gas source of the 3rd gas compressor, pneumatic valve is opened, and is the water tank pressure release, thereby reaches the effect of protection; , when the explosion-proof valve water tank reaches capacity pressure, automatically open, be the water tank pressure release simultaneously;
C, bubble generating process:
After above-mentioned steps is equal, water tank in simulation deep-sea state, is pressed into gas by the second gas compressor, and under the acting in conjunction of throttling valve, pressure maintaining valve, flowmeter, tensimeter and aerator, the bubble that generation physics, chemistry can arrange; Wherein by the second gas compressor, be pressed into the chemical composition difference of gas, can control the chemical composition of produced bubble; By adjusting the size of aeration board small aperture in aerator, can control the size of bubble; By the quantity of aeration board aperture and the flow of gas in the adjustment aerator, can control quantity and the speed of Bubble formation.
D, acoustic sounding process:
Bubble to be generated, after the requirement of experiment state, is sent the signal of experiment predeterminated frequency by signal generator, after adjusting by power amplifier, signal is inputted to ultrasonic probe, sends ultrasound wave; After ultrasound wave runs into the object such as bubble, sound wave will be reflected, and to return in certain path, by ultrasonic probe, be received, and finally by data acquisition system (DAS), carry out the data analysis processing, draw the mechanism of acoustic sounding deep sea deposits.
The invention has the beneficial effects as follows:
1,, in specialized range, simulate the deep-marine-environment of any degree of depth.By artificial calculating, can obtain the pressure values of certain degree of depth in ocean, the present invention can be pressurized to designated value by hydraulic system, and the pressure differential that experiment table water tank height produces is compared to this designated value, can ignore, simulate truly the pressure environment of this degree of depth.
2, realize real-time pressurize, the present invention can maintain invariablenes pressure of liquid in water tank, and realizes real-time monitoring.
3,, according to requirement of experiment, can produce size, movement velocity, the controlled bubble of quantity.
4, according to requirement of experiment, can produce and include the bubble of specifying chemical composition, thereby simulate veritably the bubble that deep sea deposits produce, realize deep-sea analog detection experiment.
5, according to requirement of experiment, can produce the sound wave of various forms, meet various requirement of experiment, finally realize the research of acoustic sounding deep sea deposits mechanism.
6, on system-based of the present invention, other necessarieses can be installed, carry out all kinds of deep-seas simulated experiment except acoustics on experiment table.
The accompanying drawing explanation
Fig. 1 is experiment table overall design layout of the present invention;
Fig. 2 is cistern system structural representation of the present invention;
Fig. 3 is pressure regulation pressure-retaining system structural representation of the present invention;
Fig. 4 is bubble generation systems structural representation of the present invention;
Fig. 5 is tank pressure protection system structural representation of the present invention;
Fig. 6 is acoustic sounding structural representation of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the invention will be further described.
As shown in Figure 1, deep-sea simulation acoustics experiment table, comprise cistern system 01, pressure regulation pressure-retaining system 02, bubble generation systems 03, tank pressure protection system 04 and sound system 05.
As shown in Figure 2, cistern system 01 comprises airtight tank shell 101, O-ring seal 102, locking hoop 103, support stand 104, automatic open device 105, thermometer 106, pressure compensator 107 and some interface channels, wherein tank shell 101 is made framework by ferrous material, five faces except bottom surface all are furnished with high temperature resistant, high pressure resistant, the windowpane 110 that corrosion resistant organic glass or quartz glass are made, facilitate the experimenter to observe, the shooting record, tank shell 101 is comprised of tank lid 108 and water tank 109, and by the locking hoop 103 of tank lid 108 both sides, both are locked, zero-clearance is guaranteed to seal by O-ring seal 102 in junction, support stand 104 with incabloc function is positioned at water tank 109 bottoms, automatic open device 105 is installed on tank lid 108 center upper portion, can automatically open, close locking hoop 103 and tank lid 108, thermometer 106 is installed on tank lid 108 left sides, in order to the temperature of real-time measurement water tank inside, pressure compensator 107 is installed on water tank 109 right side central, in order to Compensation Regulation, lay respectively at two interface channels of two interface channels in water tank 109 left sides and right side, bottom as the interface between pressure regulation pressure-retaining system 02, bubble generation systems 03, tank pressure protection system 04, sound system 05 and cistern system 01.
As shown in Figure 3, pressure regulation pressure-retaining system 02 comprises the first gas compressor 201, front pressure regulation two-port valve 202, simulated seawater case 203, voltage-regulation voltage-stabilization valve 204, pressure regulation flowmeter 205, liquid booster pump 206, liquid booster pump two-port valve 207, pressure regulation tensimeter 208, pressure regulation T-valve 209, rear pressure regulation two-port valve 210, pressurize T-valve 211, pressurize 212, backflow two-port valve 213, the first controller 214 and blowdown valve 215; Described the first gas compressor 201 has two outlets, one of them outlet is connected with an end of front pressure regulation two-port valve 202, be mainly used in before experiment starts, producing source of the gas is pressed into the liquid in simulated seawater case 203 in water tank 01, another outlet is connected with the backflow two-port valve 213 that is positioned at water tank 01 top, be mainly used in after experiment finishes, produce source of the gas remaining liquid in water tank 01 is pressed in simulated seawater case 203; Before described pressure regulation, the other end of two-port valve 202 is connected with simulated seawater case 203, simulated seawater case 203 has three interfaces, two other interface, one of them interface is connected to an end import of voltage-regulation voltage-stabilization valve 204 by pipeline, another interface is connected to the outlet of blowdown valve 215 by pipeline, blowdown valve 215 imports are connected with the pipeline between pressure regulation T-valve 208, rear pressure regulation two-port valve 210, for pressure release; Described voltage-regulation voltage-stabilization valve 204 outlets are connected with an end of pressure regulation flowmeter 205, and pressure regulation flowmeter 205 other ends are connected with the left side import of pressure regulation T-valve 209; The right side outlet of pressure regulation T-valve 208 is connected with an end of rear pressure regulation two-port valve 210, on pressure regulation T-valve 208, side outlet is connected with the pressure regulation tensimeter and 208 is connected, while toward water tank 01, adding water, and the upside port closing, left side import and right side outlet are opened, and the liquid in simulated seawater case 203 passes through; During toward water tank 01 pressurization, pressure regulation tensimeter 208 arranges a pressure values, after pressure reaches this value, on pressure regulation T-valve 209, side outlet is opened, the left side import is closed, thereby by the first controller 214, liquid booster pump 206 is quit work, pressure regulation tensimeter 208 detects the pressure in water tank in real time, if occur change, on pressure regulation T-valve 209, side outlet is closed immediately, and left side import is simultaneously opened, and the first controller 214 is controlled liquid booster pump 206 work, make the pressure in water tank 01 return to designated value, go round and begin again like this to realize the pressurize of water tank 01; Rear pressure regulation two-port valve 210 other ends are connected with water tank 01; Liquid booster pump 206 is connected with the pipeline between pressure regulation flowmeter 205 and pressure regulation T-valve 209 by liquid booster pump two-port valve 207, and external the first controller 214 of while, in order to the duty of real-time control liquid booster pump 206; The pressurize T-valve 211 that is positioned at tank top is furnished with dwell pressure table 212, for the pressure of the real time measure tank top.
As shown in Figure 4, bubble generation systems 03 comprises tensimeter 301, flowmeter 302, pressure maintaining valve 303, throttling valve 304, aerator 305 and the second gas compressor 306; The aerator 305 that wherein is positioned at water tank 01 lower right side can, by regulating aeration board venthole pore size, produce the different bubble of size; Required various gas with various are tested in the second gas compressor 306 inputs, thereby include the bubble of different chemical composition in 01 li generation of water tank; Be followed successively by throttling valve 304, pressure maintaining valve 303, flowmeter 302, tensimeter 301 between the second gas compressor 306 and aerator 305, adjusting by these parts, can realize gas velocity, size control, thereby can, according to requirement of experiment, produce specific dimensions, quantity, movement velocity, include the bubble of specifying chemical composition.
As shown in Figure 5, described tank pressure protection system 04 comprises second controller 401, solenoid valve 402, pneumatic valve 403, explosion-proof valve 404, water container 405 and the 3rd gas compressor 406; Wherein solenoid valve 402 imports are connected with water tank 01, and outlet is connected with the import of pneumatic valve 403, simultaneously external second controller 401, the 3rd air compressor 406; The outlet of pneumatic valve 403 is connected with water container 405; Wherein the import of explosion-proof valve 404 is connected in the pipeline between water tank 01 and solenoid valve 402, and outlet is connected in water container 405; Second controller 401 is furnished with pressure transducer, and the pressure of the real time measure water tank 01 inside also shows the pressure that this pressure is water tank 01 bottom in real time; Second controller 401 is controlled the duty of whole water tank 01 pressure protective system simultaneously, if the interior pressure of water tank 01 surpasses preset value, second controller 401 will send order, the 3rd gas compressor 406 work, produce action of gas source in pneumatic valve 403, pneumatic valve 403 is opened, and is water tank 01 pressure release; Simultaneously, wherein explosion-proof valve 404 plays double protective effect, causes danger after avoiding water tank 01 pressure to overstep the extreme limit.
As shown in Figure 6, described sound system 05 comprises signal generator 503, power amplifier 502, ultrasonic probe 501 and data acquisition system (DAS) 504, and wherein ultrasonic probe 501 collection ultrasound waves occur and are received in one, are laid on the left side of water tank 01; Data acquisition system (DAS) 504 comprises data collecting card and computing machine, with the signal output part of ultrasonic probe 501, is connected; The output terminal of power amplifier 502 is connected with the signal input part of ultrasonic probe 501, and the input end of power amplifier 502 is connected with the signal output part of signal generator 503.
Use the method for deep-sea simulation acoustics experiment table to comprise that water tank assembling, pressure regulation pressurize, bubble occur, four parts of acoustic sounding, concrete steps are as follows:
A, water tank assembling process:
Before A-1 starts assembling, according to requirement of experiment, at the good related experiment equipment of water tank internal placement; Again the aerator 205 in bubble generation systems 02 and sound system 05 are installed, the interface between pressure regulation pressure-retaining system 03, tank pressure protection system 04 and cistern system 01 is installed simultaneously; Then by automatic open device 105, tank lid 108 is closed, between tank lid 108 and water tank 109, by O-ring seal 102, guarantees to seal zero-clearance, and by locking hoop 103 by both bandings, guarantee under the water tank high pressure conditions all the time in sealing state; Wherein thermometer 106 is as the embedded parts of tank lid 108, and pressure compensator 107, as the embedded parts of water tank 109, when both close in tank lid 108, is started working; Whole assembling process completes on support stand 104.
A-2, after experimental implementation, after reducing to normal pressure in water tank 01, can open water tank 01 by automatic open device 105 automatically.
B, pressure regulation pressure maintaining period:
Before the B-1 pressure regulation, air abrim in cistern system 01, pressure is atmospheric pressure, and the valve of pressurize T-valve 211 is in open mode, and other all valves are all in closure state.
During the B-2 pressurization, the spool of opening between front pressure regulation two-port valve 202, surplus valve 203, voltage-regulation voltage-stabilization valve 204, rear pressure regulation two-port valve 210 and the 209 left side imports of pressure regulation T-valve and right side outlet (opens left side import and right side outlet, the upside port closing), produce source of the gas by the first gas compressor 201, liquid in simulated seawater case 203 is clamp-oned in cistern system 01, when pressurize T-valve 211 just has solid stream of water to flow out, close front pressure regulation two-port valve 202, the first gas compressor 201 quits work simultaneously, all valves in pressure regulation pressure-retaining system 02 are all closed, now, keep pressure regulation T-valve 209 left side imports and right side outlet to open, upper side outlet is still closed, set at pressure regulation tensimeter 208 places the pressure values that water tank 01 will reach according to requirement of experiment, and open liquid booster pump two-port valve 207 and rear pressure regulation two-port valve 210, controlling liquid booster pump 206 by the first controller 214 starts working, constantly feed-tank 01 supercharging, when reaching requirement of experiment pressure, the left side import of pressure regulation T-valve 209 is closed immediately, upper side outlet is opened, the first controller 214 is given an order simultaneously, liquid booster pump 206 quits work, pressure regulation tensimeter 208 place's Real-Time Monitorings show the pressure of water tank 01 now, if change, the upper side outlet of pressure regulation T-valve 209 is closed immediately, the left side import is opened, start liquid supercharge pump 206 feed-tank 01 superchargings immediately of the first controller 214, when water tank reaches designated value, quit work, pressure regulation T-valve 209 also recovers the left side import and closes, the state that right side and upper side outlet are opened, so go round and begin again, thereby reach the function of pressurize, the data that dwell pressure table 212 place shows are the pressure at water tank 01 top, as the standby parameter of experiment.
During the B-3 pressure release, when the experiment link in certain pressure finishes, need pressure release, now make liquid booster pump 206 and the first controller 214 quit work, close all valves, only rear pressure regulation two-port valve 210 and blowdown valve 215 are opened, the liquid in water tank 01 enters simulated seawater case 203, in water tank 01, recovers normal pressure; And then open backflow two-port valve 213, and produce source of the gas by the first gas compressor 201, remaining liquid in water tank 01 is all entered in simulated seawater case 203.
During the B-4 pressure regulation, in the B-2 step, after pressurization, if will realize, the pressure in water tank 01 is larger than existing pressure, by the first controller 214 and liquid booster pump 206, on the basis of B-2 step, is continued to be pressurized to and specifies pressure to get final product; If realize, the pressure in water tank 01 is less than existing pressure, and with reference to the B-3 step, each valve all is arranged on the state of B-3 step, and sets one at blowdown valve 215 and specify pressure values, starts pressure release; In water tank 01, reach while specifying pressure, each valve returns to the state of B-2 step, and, by the first controller 214 and liquid booster pump 206 actings in conjunction, realizes pressurize.
In the B-5 experimentation, in water tank 01, pressure is very large, exists certain danger, and for guaranteeing experiment safety, tank pressure protection system 04 plays very important effect; When in water tank 01, pressure surpasses certain safety value, second controller 401 is given an order, and under the action of gas source of the 3rd gas compressor 406, pneumatic valve 403 is opened, and is water tank 01 pressure release, thereby reaches the effect of protection; , when explosion-proof valve 404 water tanks 01 reach capacity pressure, automatically open, be water tank 01 pressure release simultaneously.
C, bubble generating process:
After above-mentioned steps is equal, water tank 01 is in simulation deep-sea state, be pressed into gas by the second gas compressor 306, and under the acting in conjunction of throttling valve 304, pressure maintaining valve 303, flowmeter 302, tensimeter 301 and aerator 305, the bubble that generation physics, chemistry can arrange; Wherein by the second gas compressor 306, be pressed into the chemical composition difference of gas, can control the chemical composition of produced bubble; By adjusting the size of aeration board small aperture in aerator, can control the size of bubble; By the quantity of aeration board aperture and the flow of gas in the adjustment aerator, can control quantity and the speed of Bubble formation.
D, acoustic sounding process:
Bubble to be generated, after the requirement of experiment state, is sent the signal of experiment predeterminated frequency by signal generator 503, after adjusting by power amplifier 502, signal is inputted to ultrasonic probe 501, sends ultrasound wave; After ultrasound wave runs into the object such as bubble, sound wave will be reflected, and to return in certain path, by ultrasonic probe 501, be received, and finally by data acquisition system (DAS) 504, carry out the data analysis processing, draw the mechanism of acoustic sounding deep sea deposits.
Above patent of the present invention is provided a cover system be described in detail, for one of ordinary skill in the art, according to design of the present invention, all will change in specific embodiments and applications.In sum, this description should not be construed as the restriction to this cover system, all according to the present invention relates to any change that thought makes all within the protection domain of patent of the present invention.

Claims (2)

1. a deep-sea simulation acoustics experiment table, comprise cistern system (01), pressure regulation pressure-retaining system (02), bubble generation systems (03), tank pressure protection system (04) and sound system (05), it is characterized in that:
Described cistern system (01) comprises airtight tank shell (101), O-ring seal (102), locking hoop (103), support stand (104), automatic open device (105), thermometer (106), pressure compensator (107) and some interface channels, wherein tank shell (101) is made framework by ferrous material, five faces except bottom surface all are furnished with high temperature resistant, high pressure resistant, the windowpane that corrosion resistant organic glass or quartz glass are made (110), tank shell (101) is comprised of tank lid (108) and water tank (109), and by the locking hoop (103) of tank lid (108) both sides, both are locked, zero-clearance is guaranteed to seal by O-ring seal (102) in junction, support stand (104) is positioned at water tank (109) bottom, automatic open device (105) is installed on tank lid (108) center upper portion, thermometer (106) is installed on tank lid (108) left side, pressure compensator (107) is installed on water tank (109) right side central, lay respectively at two interface channels of two interface channels in water tank (109) left side and right side, bottom as the interface between pressure regulation pressure-retaining system (02), bubble generation systems (03), tank pressure protection system (04), sound system (05) and cistern system (01),
Described pressure regulation pressure-retaining system (02) comprises the first gas compressor (201), front pressure regulation two-port valve (202), simulated seawater case (203), voltage-regulation voltage-stabilization valve (204), pressure regulation flowmeter (205), liquid booster pump (206), liquid booster pump two-port valve (207), pressure regulation tensimeter (208), pressure regulation T-valve (209), rear pressure regulation two-port valve (210), pressurize T-valve (211), dwell pressure table (212), backflow two-port valve (213), the first controller (214) and blowdown valve (215), described the first gas compressor (201) has two outlets, one of them outlet is connected with an end of front pressure regulation two-port valve (202), another outlet is connected with an end of the backflow two-port valve (213) that is positioned at water tank (01) top, and the other end of backflow two-port valve (213) is connected with water tank (01), before described pressure regulation, the other end of two-port valve (202) is connected with an interface of simulated seawater case (203), an interface in two other interface of simulated seawater case (203) is connected to the import of voltage-regulation voltage-stabilization valve (204) by pipeline, another interface is connected to the outlet of blowdown valve (215) by pipeline, blowdown valve (215) import is connected with the pipeline between pressure regulation T-valve (208), rear pressure regulation two-port valve (210), described voltage-regulation voltage-stabilization valve (204) outlet is connected with an end of pressure regulation flowmeter (205), and pressure regulation flowmeter (205) other end is connected with the left side import of pressure regulation T-valve (209), the outlet of the right side of pressure regulation T-valve (208) is connected with an end of rear pressure regulation two-port valve (210), upper side outlet with the pressure regulation tensimeter, be connected (208) connected, the other end of rear pressure regulation two-port valve (210) is connected with water tank (01), one end of liquid booster pump two-port valve (207) is connected with liquid booster pump (206), the other end with pressure regulation flowmeter (205) and pressure regulation T-valve (209) between pipeline be connected, external the first controller of liquid booster pump (206) (214), the pressurize T-valve (211) that is positioned at tank top is furnished with dwell pressure table (212),
Described bubble generation systems (03) comprises tensimeter (301), flowmeter (302), pressure maintaining valve (303), throttling valve (304), aerator (305) and the second gas compressor (306); Wherein aerator (305) is positioned at water tank (01) lower right side; The second gas compressor (306) outlet is connected with throttling valve (304) import; The outlet of throttling valve (304) is connected with the import of pressure maintaining valve (303); The outlet of pressure maintaining valve (303) is connected with an end of flowmeter (302); The other end of flowmeter (302) is connected with an end of tensimeter (301); The other end of tensimeter (301) is connected with aerator (305);
Described tank pressure protection system (04) comprises second controller (401), solenoid valve (402), pneumatic valve (403), explosion-proof valve (404), water container (405) and the 3rd gas compressor (406); Wherein solenoid valve (402) import is connected with water tank (01), and outlet is connected with the import of pneumatic valve (403), simultaneously external second controller (401), the 3rd air compressor (406); The outlet of pneumatic valve (403) is connected with water container (405); Wherein the import of explosion-proof valve (404) is connected in the pipeline between water tank (01) and solenoid valve (402), and outlet is connected in water container (405); Second controller (401) is furnished with pressure transducer;
Described sound system (05) comprises signal generator (503), power amplifier (502), ultrasonic probe (501) and data acquisition system (DAS) (504), wherein ultrasonic probe (501) collection ultrasound wave occurs and is received in one, is laid on the left side of water tank (01); Data acquisition system (DAS) (504) comprises data collecting card and computing machine, with the signal output part of ultrasonic probe (501), is connected; The output terminal of power amplifier (502) is connected with the signal input part of ultrasonic probe (501), and the input end of power amplifier (502) is connected with the signal output part of signal generator (503).
2. use the method for deep-sea simulation acoustics experiment table as described as right 1, it is characterized in that the method comprises that water tank assembling, pressure regulation pressurize, bubble occur, four parts of acoustic sounding, concrete steps are as follows:
A, water tank assembling process:
Before A-1 starts assembling, according to requirement of experiment, at the good related experiment equipment of water tank internal placement; Again the aerator (205) in bubble generation systems (02) and sound system (05) are installed, the interface between pressure regulation pressure-retaining system (03), tank pressure protection system (04) and cistern system (01) is installed simultaneously; Then by automatic open device (105), tank lid (108) is closed, guarantee to seal zero-clearance by O-ring seal (102) between tank lid (108) and water tank (109), and by locking hoop (103) by both bandings, guarantee under water tank (01) high pressure conditions all the time in sealing state; Wherein thermometer (106) is as the embedded parts of tank lid (108), and pressure compensator (107) is as the embedded parts of water tank (109), and both, start working while closing in tank lid (108); Whole assembling process completes on support stand (104);
A-2, after experimental implementation, after reducing to normal pressure in water tank (01), can open water tank (01) by automatic open device (105) automatically;
B, pressure regulation pressure maintaining period:
Before the B-1 pressure regulation, air abrim in cistern system (01), pressure is atmospheric pressure, and the valve of pressurize T-valve (211) is in open mode, and other all valves are all in closure state;
During the B-2 pressurization, the spool of opening between front pressure regulation two-port valve (202), voltage-regulation voltage-stabilization valve (204), rear pressure regulation two-port valve (210) and pressure regulation T-valve (209) left side import and right side outlet (opens left side import and right side outlet, the upside port closing), produce source of the gas by the first gas compressor (201), liquid in simulated seawater case (203) is clamp-oned in cistern system (01), when pressurize T-valve (211) just has solid stream of water to flow out, close front pressure regulation two-port valve (202), the first gas compressor (201) quits work simultaneously, all valves in pressure regulation pressure-retaining system (02) are all closed, now, keep pressure regulation T-valve (209) left side import and right side outlet to open, upper side outlet is still closed, locate to set at pressure regulation tensimeter (208) pressure values that water tank (01) will reach according to requirement of experiment, and open liquid booster pump two-port valve (207) and rear pressure regulation two-port valve (210), controlling liquid booster pump (206) by the first controller (214) starts working, constantly feed-tank (01) supercharging, when reaching requirement of experiment pressure, the left side import of pressure regulation T-valve (209) is closed immediately, upper side outlet is opened, the first controller (214) is given an order simultaneously, liquid booster pump (206) quits work, now pressure regulation tensimeter (208) is located Real-Time Monitoring and is shown the pressure of water tank (01), if change, the upper side outlet of pressure regulation T-valve (209) is closed immediately, the left side import is opened, the first controller (214) start liquid supercharge pump (206) feed-tank (01) supercharging immediately, when water tank reaches designated value, quit work, pressure regulation T-valve (209) also recovers the left side import and closes, the state that right side and upper side outlet are opened, so go round and begin again, thereby reach the function of pressurize, the data that dwell pressure table (212) is located to show are the pressure at water tank (01) top, as the standby parameter of experiment,
During the B-3 pressure release, when the experiment link in certain pressure finishes, need pressure release, now make liquid booster pump (206) and the first controller (214) quit work, close all valves, only rear pressure regulation two-port valve (210) and blowdown valve (215) are opened, the liquid in water tank (01) enters simulated seawater case (203), recovers normal pressure in water tank (01); And then open backflow two-port valve (213), and produce source of the gas by the first gas compressor (201), remaining liquid in water tank (01) is all entered in simulated seawater case (203);
During the B-4 pressure regulation, in the B-2 step, after pressurization, if will realize, the pressure in water tank (01) is larger than existing pressure, by the first controller (214) and liquid booster pump (206), on the basis of B-2 step, is continued to be pressurized to and specifies pressure to get final product; If realize, the pressure in water tank (01) is less than existing pressure, and with reference to the B-3 step, each valve all is arranged on the state of B-3 step, and sets one at blowdown valve (215) and specify pressure values, starts pressure release; In water tank (01), reach while specifying pressure, each valve returns to the state of B-2 step, and, by the first controller (214) and liquid booster pump (206) acting in conjunction, realizes pressurize;
In the B-5 experimentation, in water tank (01), pressure is very large, exists certain danger, and for guaranteeing experiment safety, tank pressure protection system (04) plays very important effect; When in water tank (01), pressure surpasses certain safety value, second controller (401) is given an order, and under the action of gas source of the 3rd gas compressor (406), pneumatic valve (403) is opened, and is water tank (01) pressure release, thereby reaches the effect of protection; , when explosion-proof valve (404) water tank (01) reaches capacity pressure, automatically open, be water tank (01) pressure release simultaneously;
C, bubble generating process:
After above-mentioned steps is equal, water tank (01) is in simulation deep-sea state, be pressed into gas by the second gas compressor (306), and under the acting in conjunction of throttling valve (304), pressure maintaining valve (303), flowmeter (302), tensimeter (301) and aerator (305), the bubble that generation physics, chemistry can arrange; Wherein by the second gas compressor (306), be pressed into the chemical composition difference of gas, can control the chemical composition of produced bubble; By adjusting the size of aeration board small aperture in aerator, can control the size of bubble; By the quantity of aeration board aperture and the flow of gas in the adjustment aerator, can control quantity and the speed of Bubble formation;
D, acoustic sounding process:
Bubble to be generated, after the requirement of experiment state, is sent the signal of experiment predeterminated frequency by signal generator (503), after adjusting by power amplifier (502), signal is inputted to ultrasonic probe (501), sends ultrasound wave; After ultrasound wave runs into the object such as bubble, sound wave will be reflected, and to return in certain path, by ultrasonic probe (501), be received, and finally by data acquisition system (DAS) (504), carry out the data analysis processing, draw the mechanism of acoustic sounding deep sea deposits.
CN201310392247.8A 2013-09-02 2013-09-02 A kind of deep-sea simulation acoustic experiment table and using method thereof Expired - Fee Related CN103454684B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310392247.8A CN103454684B (en) 2013-09-02 2013-09-02 A kind of deep-sea simulation acoustic experiment table and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310392247.8A CN103454684B (en) 2013-09-02 2013-09-02 A kind of deep-sea simulation acoustic experiment table and using method thereof

Publications (2)

Publication Number Publication Date
CN103454684A true CN103454684A (en) 2013-12-18
CN103454684B CN103454684B (en) 2016-03-09

Family

ID=49737252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310392247.8A Expired - Fee Related CN103454684B (en) 2013-09-02 2013-09-02 A kind of deep-sea simulation acoustic experiment table and using method thereof

Country Status (1)

Country Link
CN (1) CN103454684B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103776500A (en) * 2014-02-07 2014-05-07 广东工业大学 Sound wave splitter for measuring floating speed of bubbles of leaked natural gas of cold spring on seabed
CN103776499A (en) * 2014-02-07 2014-05-07 中国科学院南海海洋研究所 In-situ ultrasonic measurement system for seepage flow of seafloor cold spring natural gas
CN104368248A (en) * 2014-11-17 2015-02-25 杭州电子科技大学 Bubble generator and using method thereof
CN104437151A (en) * 2014-11-17 2015-03-25 杭州电子科技大学 Multifunctional bubble generator and using method thereof
CN108346360A (en) * 2017-01-23 2018-07-31 天津开发区兴衡石油机械配件有限公司 A kind of seabed air curtain generator
CN109100777A (en) * 2018-10-18 2018-12-28 国家***第二海洋研究所 Frequency conversion type oceanic high air gun
CN111322253A (en) * 2020-01-30 2020-06-23 浙江理工大学 Deep-sea mining onshore slurry lifting experiment platform
CN114062487A (en) * 2021-11-19 2022-02-18 自然资源部第二海洋研究所 Submarine hydrothermal plume acoustic detection simulation device and method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07248727A (en) * 1994-03-14 1995-09-26 Sanyo Electric Co Ltd Chart information processor and chart information processing method
CN101975698A (en) * 2010-10-28 2011-02-16 浙江大学 Test container for imitating deep-sea high-pressure environment
CN103115862A (en) * 2013-01-22 2013-05-22 江苏大学 Simulated corrosion test device and method for abyssal environment
CN202971047U (en) * 2012-12-22 2013-06-05 中国科学院工程热物理研究所 Deep-sea energy comprehensive utilization system
CN203465428U (en) * 2013-09-02 2014-03-05 杭州电子科技大学 Deep sea simulation acoustic experiment platform

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07248727A (en) * 1994-03-14 1995-09-26 Sanyo Electric Co Ltd Chart information processor and chart information processing method
CN101975698A (en) * 2010-10-28 2011-02-16 浙江大学 Test container for imitating deep-sea high-pressure environment
CN202971047U (en) * 2012-12-22 2013-06-05 中国科学院工程热物理研究所 Deep-sea energy comprehensive utilization system
CN103115862A (en) * 2013-01-22 2013-05-22 江苏大学 Simulated corrosion test device and method for abyssal environment
CN203465428U (en) * 2013-09-02 2014-03-05 杭州电子科技大学 Deep sea simulation acoustic experiment platform

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103776499B (en) * 2014-02-07 2017-01-04 中国科学院南海海洋研究所 Cold seepage gas seepage flow ultrasonic measurement system in situ
CN103776499A (en) * 2014-02-07 2014-05-07 中国科学院南海海洋研究所 In-situ ultrasonic measurement system for seepage flow of seafloor cold spring natural gas
US9845672B2 (en) 2014-02-07 2017-12-19 South China Sea Institute Of Oceanology, Chinese Academy Of Sciences In-situ ultrasonic measuring system for natural gas flux at the hydrocarbon seeps at the seafloor
WO2015117562A1 (en) * 2014-02-07 2015-08-13 中国科学院南海海洋研究所 In-situ ultrasonic measurement system for seepage flow of seafloor cold spring natural gas
CN103776500A (en) * 2014-02-07 2014-05-07 广东工业大学 Sound wave splitter for measuring floating speed of bubbles of leaked natural gas of cold spring on seabed
CN103776500B (en) * 2014-02-07 2016-08-24 广东工业大学 Measure the sound wave shunt of cold seepage gas seepage gas bubble light soil
CN104368248B (en) * 2014-11-17 2016-05-18 杭州电子科技大学 Bubble generator and using method thereof
CN104437151B (en) * 2014-11-17 2016-05-18 杭州电子科技大学 Multi-functional bubble generator and using method thereof
CN104437151A (en) * 2014-11-17 2015-03-25 杭州电子科技大学 Multifunctional bubble generator and using method thereof
CN104368248A (en) * 2014-11-17 2015-02-25 杭州电子科技大学 Bubble generator and using method thereof
CN108346360A (en) * 2017-01-23 2018-07-31 天津开发区兴衡石油机械配件有限公司 A kind of seabed air curtain generator
CN109100777A (en) * 2018-10-18 2018-12-28 国家***第二海洋研究所 Frequency conversion type oceanic high air gun
CN111322253A (en) * 2020-01-30 2020-06-23 浙江理工大学 Deep-sea mining onshore slurry lifting experiment platform
CN111322253B (en) * 2020-01-30 2021-11-05 浙江理工大学 Deep-sea mining onshore slurry lifting experiment platform
CN114062487A (en) * 2021-11-19 2022-02-18 自然资源部第二海洋研究所 Submarine hydrothermal plume acoustic detection simulation device and method
CN114062487B (en) * 2021-11-19 2023-12-12 自然资源部第二海洋研究所 Submarine hydrothermal plume acoustic detection simulation device and method

Also Published As

Publication number Publication date
CN103454684B (en) 2016-03-09

Similar Documents

Publication Publication Date Title
CN103454684B (en) A kind of deep-sea simulation acoustic experiment table and using method thereof
CN103440813B (en) Simulated deep sea comprehensive experiment table provided with bubble generator and use method thereof
CN106556687B (en) Weak cementing non-diagenesis hydrate acoustics and saturation degree synchronous testing device and method
CN110847873B (en) Low-permeability natural gas hydrate reservoir in-situ hydraulic jet mining device and method
CN106935120B (en) Biogeochemistry experimental system for simulating under methane seepage condition
CN101451985B (en) Detection device for synthesizing and decomposing gas hydrate
CN101936833B (en) Device and method for simulating generation of gas hydrate and measuring physical property parameters thereof
CN102125815A (en) High-pressure experimental system for simulating leakage type natural gas hydrate formation/decomposition
CN107930537A (en) A kind of simulated sea bottom methane leakage causes the reaction unit and method of early diagenesis
CN208098019U (en) A kind of simulated sea bottom methane leakage leads to the reaction unit of early diagenesis
CN111551672B (en) Natural gas hydrate exploitation methane leakage simulation system and method
CN101718730A (en) Method and device for measuring the resistivity of gas hydrate and hydrate-containing sediment in situ
CN203465428U (en) Deep sea simulation acoustic experiment platform
CN103235107A (en) Pressure plate testing device capable of controlling suction force by negative pore water pressure
CN110630229B (en) Device and method for evaluating hydrate production based on ultrasonic waves and sand control screen
CN107063921B (en) Device and method for rapidly measuring hydrate saturation in hydrate deposit
CN106226139A (en) The synthesis of hydrate and monitoring method in a kind of permafrost region consolidated rock sample
CN203465889U (en) Deep sea simulation integrated experiment platform equipped with bubble generator
CN209148485U (en) A kind of natural gas hydrate permeability measurement device
CN108587712A (en) A kind of synthetic method of high saturation hydrate
CN110374556B (en) Natural gas hydrate exploitation device with reservoir stratum multi-level pressure compensation function
CN115452505B (en) Simulation observation device and method for hydrate reaction process under seabed stress condition
CN203216681U (en) Pressurizing simulation water depth test apparatus for sealed water tank
CN206906120U (en) A kind of degasser
CN116148250A (en) Visual CO based on hydraulic fracturing and in-situ sampling 2 Sealing and storing simulation experiment device and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160309

Termination date: 20160902