CN103440892A - Digitization alarm optimization design method of nuclear power plant - Google Patents

Digitization alarm optimization design method of nuclear power plant Download PDF

Info

Publication number
CN103440892A
CN103440892A CN2013102966178A CN201310296617A CN103440892A CN 103440892 A CN103440892 A CN 103440892A CN 2013102966178 A CN2013102966178 A CN 2013102966178A CN 201310296617 A CN201310296617 A CN 201310296617A CN 103440892 A CN103440892 A CN 103440892A
Authority
CN
China
Prior art keywords
warning
power plant
suppress
police
nuclear power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102966178A
Other languages
Chinese (zh)
Inventor
张莉
杨庆明
李力
杨晓燕
孙涛
唐涛
尚臣
丁小川
贾玉强
刘勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Power Engineering Co Ltd
Original Assignee
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Power Engineering Co Ltd filed Critical China Nuclear Power Engineering Co Ltd
Priority to CN2013102966178A priority Critical patent/CN103440892A/en
Publication of CN103440892A publication Critical patent/CN103440892A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Landscapes

  • Testing And Monitoring For Control Systems (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

For digitization alarm of a main control room of a nuclear power plant, the invention provides the principles and design method of alarm optimization (how to restrain alarm on suitable occasions). The method comprehensively considers the design requirements of a technology system, safety operation requirements of the nuclear power plant, instrument control achieving modes and the like to achieve safe, reasonable and effective retraining of digitization alarm, lowers work burdens of operation workers, reduces possibility of human factor errors, and improves safety and economy of the nuclear power plant.

Description

A kind of nuclear power plant digital alarming Optimization Design
Technical field
The invention belongs to nuclear power plant's master-control room designing technique, be specifically related to a kind of nuclear power plant digital alarming Optimization Design.
Background technology
For the nuclear power plant that adopts digitizing instrument control system (DCS) and advanced master-control room, the warning system of the monitoring of digitizing man-machine interface and control system integration is more flexible, be not subject to the restriction of physical space, warning quantity also can be increased and refinement according to operation demand, make operator obtain more information and guidance, be conducive to power plant safety stable operation.But under some specific operation, if provide a large amount of irrelevant informations to operator, as increased with the irrelevant warning amount of current operation under at specific operation, increased on the contrary operator's working load, even likely disturb the judgement of operator to power plant's important state, therefore be necessary alerting signal is optimized to management, report to the police and suppress.If some report to the police be in some cases nonessential, operator is unconcerned, just can be necessary it is carried out to suitable " inhibition " processing.
Summary of the invention
The objective of the invention is the problem for nuclear power plant's master-control room digital alarming, a kind of warning Optimization Design is provided, digital alarming is rationally suppressed, reduce the probability that mhuman failure occurs.
Technical scheme of the present invention is as follows: a kind of nuclear power plant digital alarming Optimization Design comprises:
Step 1, for an alarm content, judge that whether this warning meets in following condition (a)~(e), if so, determines that this warning is for can not repressedly reporting to the police; Otherwise, enter step 2;
(a), under current operating condition, any warning relevant to nuclear power plant malfunction protocol guiding rules do not suppress;
(b), under current operating condition, the system of stipulating in nuclear power plant's running technology standard and the warning of equipment do not suppress;
(c), under current operating condition, with the warning of personal safety and device security related system, do not suppress;
(d), under current operating condition, the system relevant to the unit available rate and the warning of equipment do not suppress;
(e) do not belong to above several classes, need be with reference to operational experience feedback, if think untamed warning do not suppress in operational experience feedback; To the routine test under different operational modes, isolation, system and equipment again the warning under the design test state suppress, do special the analysis and checking, under the prerequisite that can't confirm, do not suppress;
Step 2, for the warning that does not meet any condition in step 1, be optimized design according to suppressing principle.
Further, nuclear power plant as above digital alarming Optimization Design, the inhibition principle described in step 2 comprises:
(1) power plant's operating condition suppresses, if report to the police under some operating conditions, be false, insignificant, operator is unconcerned, should suppress;
(2) the reason consequence suppresses, if report to the police, is other inevitable consequences of reporting to the police and triggering, and this warning can be suppressed;
(3) redundant warning suppresses, and for many Threshold Alerts or group alarm, can be suppressed.
In above-mentioned inhibition principle, (1) power plant operating condition suppresses further to comprise:
A. according to the inhibition of reporting to the police of operation standard pattern;
B. according to the inhibition of reporting to the police of special service condition;
C. according to the equipment state inhibition of reporting to the police.
Beneficial effect of the present invention is as follows: nuclear power plant provided by the present invention digital alarming Optimization Design, process system designing requirement, npp safety operation demand, instrument control system implementation etc. have been considered comprehensively, in the situation that do not affect the npp safety operation, alleviate to a great extent operations staff's work load, reduced the probability that mhuman failure occurs.
The accompanying drawing explanation
Fig. 1 is that digital alarming suppresses first step funnel principle schematic diagram;
Fig. 2 is that digital alarming suppresses second step inhibition principle schematic diagram.
Embodiment
Below in conjunction with drawings and Examples, the present invention is described in detail.
It is generally to realize in 2 layers of DCS systems (controlling display layer) that digital alarming suppresses.Digital alarming suppresses to suppress the generation of reporting to the police, but the logical process through designing in advance, the warning that process system is produced through the instrument control system, be presented on nuclear power plant's main control room workstation according to the result after suppressing.Concrete way of realization is: shows in real time the warning inventory of current generation on workstation, under current working or condition, if the warning produced belongs to repressed warning, can not show in this reports to the police inventory, and in " repressed warning inventory ".Operator can recall this inventory at any time, checks current repressed warning.
At nuclear power plant's main control room, the digital alarming shown on computer workstation for each, all will design according to process system, nuclear power plant's service requirement etc. analyzed.The design effort step that digital alarming suppresses is divided into two large steps, and the method for employing can be called " funnel principle " and " inhibition principle ".
Step 1: if the funnel principle---this warning meets one of following condition, and " step 2 " directly skipped in this warning, is defined as and can not repressedly reports to the police.As shown in Figure 1.
A: under current operating condition, any warning relevant to nuclear power plant malfunction protocol guiding rules do not suppress;
B: under current operating condition, in nuclear power plant's running technology standard (OTS), the system of regulation and the warning of equipment do not suppress;
C: under current operating condition, do not suppress with the warning of personal safety and device security related system;
D: under current operating condition, the system relevant to the unit available rate and the warning of equipment do not suppress;
E: do not belong to above several classes, also need to consider operational experience feedback, look at whether also to belong to untamed warning; To the routine test under different operational modes, isolation, system and equipment again the warning under the design test state suppress, do special the analysis and checking; Do not suppress (conservatism) under the prerequisite that can't be confirmed whether can suppress to report to the police in current cognitive situation.
Step 2: if suppress, principle---this warning is not filtered out by " step 1 ", thinks that this warning can suppressed principle suppress.The present invention has defined 5 and has suppressed principle, is divided into 3 steps.As shown in Figure 2.
The 1st step: power plant's operating condition suppresses (suppressing principle A, B, C), if certain warning is false, insignificant under some operating conditions, operator is unconcerned, should suppress.
Principle A---according to the inhibition of reporting to the police of operation standard pattern
According to the inhibition of reporting to the police of nuclear power plant's operating condition.According in OTS to the requirement of equipment availability, warning is analyzed.
Principle B---according to the inhibition of reporting to the police of special service condition
Some is reported to the police through the analysis of principle A, thinks and can be suppressed under some operating mode, and the while is bonding apparatus state (principle C) again.Also can think to suppress with the operating mode of equipment state, i.e. the situation of principle A and C stack.
Principle C---according to the equipment state inhibition of reporting to the police
According to the state of some particular devices (as the running status of a circuit cools agent pump, the open/close state of the gateway isolation valve of pump), as the ON/OFF of valve, pump/stopping state suppresses to report to the police.Common and principle A considers.
The 2nd step: reason-consequence suppresses (suppressing principle D), if certain warning is the inevitable consequence that other are reported to the police and trigger, this warning can be suppressed.
Principle D---according to the inhibition of reporting to the police of reason-consequence
It is in order to prevent the warning of avalanche type that reason-consequence warning suppresses.As while losing back-up system:
The ■ power supply is lost other relevant warning of reporting to the police and suppressing power supply disappearance thus and producing.
■ pressurized air is lost other relevant warning of reporting to the police and suppressing pressurized air forfeiture thus and producing.
Other relevant warning that the ■ loss of heat sink is reported to the police and to be suppressed loss of heat sink thus and to produce.
Reason-consequence that other technique of ■ is relevant.
The 3rd step: redundant warning suppresses (suppressing principle E), for many Threshold Alerts or group alarm, can be suppressed.
Principle E---according to the redundancy inhibition of reporting to the police
For a parameter, a plurality of definite values are set sometimes.As a liquid tank, usually according to liquid level, arrange from low to high and hang down 2 warnings, low warning, high warning, high 2 warnings.Here application " high 2 report to the police " inhibition " the high warning ", application " low 2 report to the police " inhibition " the low warning ".
Embodiment
The warning of nuclear power plant is varied, and different effect and importance of reporting to the police is not identical.For fear of by key or important or high-grade warning is suppressed, during warning optimum management design, strict application funnel principle is carried out the importance screening.
A is clear and definite for the funnel principle, and the warning associated with nuclear power plant accident guiding rules can not suppress.Therefore this type of warning has the characteristics of sign accident sign or phenomenon, is used directly to diagnosis and the guiding of accident, shows that unit is in urgent state simultaneously, applies this method and thinks and do not suppress this type of warning.
System and device-dependent warning that the clear and definite npp safety operating provisions of funnel principle b requires do not suppress.This method thinks, the generation explanation nuclear power plant operation of this type of warning has risk.
In addition, funnel principle c, d, e are clear and definite, and untamed other types are reported to the police, and comprise the warning of factors such as relating to personal safety/device security, unit available rate, operational experience feedback, and this method thinks that not suppressing to be conducive to response in time processes.
For the warning that is not subject to above-mentioned arbitrary funnel principle restriction, the warning of also having passed through the importance screening should further be optimized according to suppressing principle.
Suppressing principle A(operating condition suppresses) clear and definite, if certain warning is false, insignificant under some operating conditions, operator is unconcerned, should suppress.Such as during the operating modes such as reactor cold shut, steam generator is no longer produced steam, and the main steam line natural pressure is low, and " main steam pressure is low " reports to the police without demonstration, can suppress.The special service condition inhibition of inhibition principle B(), principle inhibition principle C(equipment state inhibition) is similar to suppressing principle A.
Suppressing principle D(reason consequence suppresses) clear and definite, if certain warning is the inevitable consequence that other are reported to the police and trigger, this warning can be suppressed.For example electric power system power supply forfeiture, can cause process system equipment to be stopped transport, and the low warning of supply voltage can suppress the relevant warning of plant equipment stoppage in transit.Such principle can effectively be optimized the management of alerting signal, allows operator grasp more targetedly the fault basic reason.
Suppressing principle E(redundancy suppresses) suppressor mode of clear and definite many Threshold Alerts or group alarm.For example, certain cistern water level continue to reduce, and has triggered low warning, and then triggers low the warning, obviously low report to the police be current more badly, more urgent effective warning, should pay close attention to emphatically.
Obviously, those skilled in the art can carry out various changes and modification and not break away from the spirit and scope of the present invention the present invention.Like this, if of the present invention these are revised and within modification belongs to the scope of the claims in the present invention and equivalent technology thereof, the present invention also is intended to comprise these changes and modification interior.

Claims (3)

1. nuclear power plant's digital alarming Optimization Design comprises:
Step 1, for an alarm content, judge that whether this warning meets in following condition (a)~(e), if so, determines that this warning is for can not repressedly reporting to the police; Otherwise, enter step 2;
(a), under current operating condition, any warning relevant to nuclear power plant malfunction protocol guiding rules do not suppress;
(b), under current operating condition, the system of stipulating in nuclear power plant's running technology standard and the warning of equipment do not suppress;
(c), under current operating condition, with the warning of personal safety and device security related system, do not suppress;
(d), under current operating condition, the system relevant to the unit available rate and the warning of equipment do not suppress;
(e) do not belong to above several classes, need be with reference to operational experience feedback, if think untamed warning do not suppress in operational experience feedback; To the routine test under different operational modes, isolation, system and equipment again the warning under the design test state suppress, do special the analysis and checking, under the prerequisite that can't confirm, do not suppress;
Step 2, for the warning that does not meet any condition in step 1, be optimized design according to suppressing principle.
2. nuclear power plant as claimed in claim 1 digital alarming Optimization Design, it is characterized in that: the inhibition principle described in step 2 comprises:
(1) power plant's operating condition suppresses, if report to the police under some operating conditions, be false, insignificant, operator is unconcerned, should suppress;
(2) the reason consequence suppresses, if report to the police, is other inevitable consequences of reporting to the police and triggering, and this warning can be suppressed;
(3) redundant warning suppresses, and for many Threshold Alerts or group alarm, can be suppressed.
3. nuclear power plant as claimed in claim 2 digital alarming Optimization Design is characterized in that: in described inhibition principle, (1) power plant operating condition suppresses further to comprise:
A. according to the inhibition of reporting to the police of operation standard pattern;
B. according to the inhibition of reporting to the police of special service condition;
C. according to the equipment state inhibition of reporting to the police.
CN2013102966178A 2013-07-16 2013-07-16 Digitization alarm optimization design method of nuclear power plant Pending CN103440892A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102966178A CN103440892A (en) 2013-07-16 2013-07-16 Digitization alarm optimization design method of nuclear power plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102966178A CN103440892A (en) 2013-07-16 2013-07-16 Digitization alarm optimization design method of nuclear power plant

Publications (1)

Publication Number Publication Date
CN103440892A true CN103440892A (en) 2013-12-11

Family

ID=49694580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102966178A Pending CN103440892A (en) 2013-07-16 2013-07-16 Digitization alarm optimization design method of nuclear power plant

Country Status (1)

Country Link
CN (1) CN103440892A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104051038A (en) * 2014-05-28 2014-09-17 中国核电工程有限公司 Method for quickly entering digital nuclear power plant accident procedure
CN104282350A (en) * 2014-08-05 2015-01-14 中国核电工程有限公司 Control method for reducing false alarm of nuclear power station charging pump
CN104700909A (en) * 2014-12-31 2015-06-10 大亚湾核电运营管理有限责任公司 Nuclear power plant group pile safety system
CN104809855A (en) * 2015-03-18 2015-07-29 中国核电工程有限公司 Nuclear power plant digital alarm procedure verification method
CN113299052A (en) * 2020-02-24 2021-08-24 北京国电智深控制技术有限公司 Method and device for suppressing nuisance alarm
CN113645073A (en) * 2021-08-11 2021-11-12 未鲲(上海)科技服务有限公司 Alarm mail processing method and device, electronic equipment and storage medium
CN117133109A (en) * 2023-10-26 2023-11-28 广州瑞港消防设备有限公司 Automatic alarm suppression system for energy storage container

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06201892A (en) * 1992-12-25 1994-07-22 Power Reactor & Nuclear Fuel Dev Corp Nuclear power plant accident management support system
CN101339817A (en) * 2007-07-05 2009-01-07 中广核工程有限公司 Alarm inhibiting method of nuclear plant digital alarming system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06201892A (en) * 1992-12-25 1994-07-22 Power Reactor & Nuclear Fuel Dev Corp Nuclear power plant accident management support system
CN101339817A (en) * 2007-07-05 2009-01-07 中广核工程有限公司 Alarm inhibiting method of nuclear plant digital alarming system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
崔瑶等: "核电站数字化报警抑制方法研究", 《电脑知识与技术》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104051038A (en) * 2014-05-28 2014-09-17 中国核电工程有限公司 Method for quickly entering digital nuclear power plant accident procedure
CN104282350A (en) * 2014-08-05 2015-01-14 中国核电工程有限公司 Control method for reducing false alarm of nuclear power station charging pump
CN104282350B (en) * 2014-08-05 2017-01-25 中国核电工程有限公司 Control method for reducing false alarm of nuclear power station charging pump
CN104700909A (en) * 2014-12-31 2015-06-10 大亚湾核电运营管理有限责任公司 Nuclear power plant group pile safety system
CN104809855A (en) * 2015-03-18 2015-07-29 中国核电工程有限公司 Nuclear power plant digital alarm procedure verification method
CN113299052A (en) * 2020-02-24 2021-08-24 北京国电智深控制技术有限公司 Method and device for suppressing nuisance alarm
CN113645073A (en) * 2021-08-11 2021-11-12 未鲲(上海)科技服务有限公司 Alarm mail processing method and device, electronic equipment and storage medium
CN117133109A (en) * 2023-10-26 2023-11-28 广州瑞港消防设备有限公司 Automatic alarm suppression system for energy storage container
CN117133109B (en) * 2023-10-26 2024-02-13 广州瑞港消防设备有限公司 Automatic alarm suppression system for energy storage container

Similar Documents

Publication Publication Date Title
CN103440892A (en) Digitization alarm optimization design method of nuclear power plant
Perrow The president's commission and the normal accident
JP5758692B2 (en) Nuclear power plant supervisory control system
CN106773979B (en) A kind of managing and control system and method suitable for shipping shore power system power supply and information
CN102298980B (en) Protection exit method for million-kilowatt digital nuclear power plant reactor
CN107861471A (en) A kind of control system of remote monitoring machine tool net safe operation
CN107944724A (en) Operation and maintenance decision method for offshore wind power equipment
CN105989427A (en) Equipment status trend analysis and early warning method based on data mining
KR20160003549A (en) Communication abnormality detecting apparatus, communication abnormality detecting method and program
CN108733191A (en) The detecting system and method for communication equipment power fail warning
CN202948734U (en) Reactor automatic track while scanning (ATWS) accident response system
CN103474115A (en) Function analysis method for auxiliary operation control display of nuclear plant with digital human machine interface
CN107681786A (en) A kind of substation equipment monitoring information alerts the secondary method being intelligently classified
CN100392419C (en) Compound whole-working order testing device control and protection system, and failure protection scheme
CN201392993Y (en) DCS control module for nuclear power engineering transformer
Hao et al. Modeling and simulation of loss of power in nuclear power plant
CN110162006A (en) The method for constructing PLC hardware fault diagnosis platform
CN201365140Y (en) Feeder line switch control module for nuclear power station electric power plant
CN107562011A (en) A kind of cast tube production line security protection control system and its control method
CN101819823B (en) Electronic hang tag system of nuclear power plant
CN201567181U (en) Crane hoisting brake system control protector
CN203299637U (en) Screen cabinet door monitoring early warning system
CN103543705A (en) Implementation method for switching operational state of mainframe
CN106776193A (en) The Virtual test equipment and method of testing of apparatus for monitoring power supply slave failure
CN104348133B (en) Reactor protection system internal electric source interlocking controller

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131211