CN103437304B - A kind of method increasing pier section replacing pot bearing - Google Patents

A kind of method increasing pier section replacing pot bearing Download PDF

Info

Publication number
CN103437304B
CN103437304B CN201310398029.5A CN201310398029A CN103437304B CN 103437304 B CN103437304 B CN 103437304B CN 201310398029 A CN201310398029 A CN 201310398029A CN 103437304 B CN103437304 B CN 103437304B
Authority
CN
China
Prior art keywords
jack
pier
beam body
bearing
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310398029.5A
Other languages
Chinese (zh)
Other versions
CN103437304A (en
Inventor
张锐
周明珲
周科文
芮宝东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING CCCC QIAOYU SCIENCE AND TECHNOLOGY Co Ltd
Original Assignee
BEIJING CCCC QIAOYU SCIENCE AND TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING CCCC QIAOYU SCIENCE AND TECHNOLOGY Co Ltd filed Critical BEIJING CCCC QIAOYU SCIENCE AND TECHNOLOGY Co Ltd
Priority to CN201310398029.5A priority Critical patent/CN103437304B/en
Publication of CN103437304A publication Critical patent/CN103437304A/en
Application granted granted Critical
Publication of CN103437304B publication Critical patent/CN103437304B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to technical field of bridge engineering, particularly relate to a kind of method increasing pier section replacing pot bearing, comprise the following steps: step one, within the scope of the certain altitude of pier top, increase pier top section; Step 2, Dun Ding after increasing section places jack jack up girder, then takes out jack with steel cushion block temporary support beam body; Step 3, remove the pot bearing of Dun Ding, the bottom surface of leveling beam body, with concrete in conjunction with glue wedge-shaped steel plate, and fixes spacing around with angle steel; Step 4, builds pinner in pier top casting; Step 5, is set up in parallel two laminated rubber bearings at Dun Ding, and jack holds up beam body, and remove the steel cushion block of temporary support, fall beam, removes jack, completes replacing.The present invention does not need to set up temporary support girder, again changes simply very convenient after replacing, constructing without the need to suspending traffic, greatly reducing social influence, good economy performance, minimum to the injury of original structure, further increases the supporting capacity of respective members.

Description

A kind of method increasing pier section replacing pot bearing
Technical field
The present invention relates to technical field of bridge engineering, particularly relate to a kind of method increasing pier section replacing pot bearing.
Background technology
The Main Function of bearing is the bearing reaction transmitting superstructure, comprises vertical force and horizontal force, ensures the Free Transform of structure under the factor effects such as mobile load, variations in temperature, concrete shrinkage and creep simultaneously.On existing many bridges, due to product quality, design select, the factor of the aspect such as construction and installation and maintenance, there is serious problem and hidden danger in a large amount of pot bearing, and pot bearing all needs to be connected with concrete by reinforcing bar or crab-bolt due to upper and lower steel plate, change relative sheet-type support comparatively difficulty.
Existing conventional replacing options:
Method one: directly jacking is replaced by new pot bearing.
According to the construction technology changing pot bearing, more than jacking 5cm is needed just to have construction operation space with changing, and the independent jack-up of general bridge Dun Ding highly only allows that jacking is no more than 1.5cm, cannot change by carrying out the independent jack-up of Dun Ding, this just needs to be changed by synchronization of jacking up one, such construction is got up very difficult, and this method replacing cost is high.
Method two: replace with steel plate
Bearing lower steel plate is motionless, is laid down after beam body jack-up 0.5-1.0cm by upper steel plate, and by levelling for beam body, then by upper steel plate by concrete in conjunction with glue at Liang Tishang.The method is intact to bearing, just because the pot bearing of leveling non-at the bottom of beam is applicable, but the bearing of a lot of bridge is not because construction and installation error causes, but can not use completely due to problems such as quality, must change, so the method scope of application is quite limited, not be suitable for the pot bearing that disease is serious, and due to steel plate be by being combined with concrete in conjunction with this organic material of glue, whether its durability can support carriers also need to be proved service life.
Summary of the invention
It is low that technical problem to be solved by this invention is to provide a kind of operating expenses, and be suitable for the method that wide increase pier section changes pot bearing.
The technical scheme that the present invention solves the problems of the technologies described above is as follows: a kind of method increasing pier section replacing pot bearing, comprises the following steps:
Step one, pier top section is increased by the method for bar planting, concreting within the scope of the certain altitude of pier top, the pre-buried spacer bars of pier stud augmenting portion of Dun Ding, a described spacer bars part is inserted in described pier stud augmenting portion, and a part stretches out the upper surface of described pier stud augmenting portion;
Step 2, the pier top plane after increasing section places jack jack up girder, then takes out jack with steel cushion block temporary support beam body;
Step 3, removes the pot bearing of Dun Ding, the bottom surface of leveling beam body, at the bottom surface concrete of beam body in conjunction with glue wedge-shaped steel plate, and fixes spacing around with angle steel;
Step 4, builds the pinner of laminated rubber bearing in pier top casting;
Step 5, the position being provided with pot rubber bearing at Dun Dingyuan is set up in parallel two laminated rubber bearings, and jack holds up beam body, and remove the steel cushion block of temporary support, fall beam, removes jack, completes replacing.
The invention has the beneficial effects as follows: do not need newly to set up temporary support girder, after being replaced by laminated rubber bearing, next time is changed simply very convenient again, Dun Ding after direct utilization increases does supporting surface jack-up beam body and easily can replace laminated rubber bearing, without the need to suspending traffic, facilitates vehicle to occur, greatly reduce social influence and indirectly add economic benefit, better economy, minimum to the injury of original structure, whole construction technology further increases the supporting capacity of respective members.
The beneficial effect that in described step one, the cross section of Dun Ding is increased by the method for bar planting, concreting is: bar planting, concreting are the technology of comparative maturity in construction work, effectively can ensure the quality of constructing.
At the pre-buried spacer bars of pier stud augmenting portion of Dun Ding in described step one, a described spacer bars part is inserted in described pier stud augmenting portion, the beneficial effect that a part stretches out the upper surface of described pier stud augmenting portion is: embedded bar on the cross section increased, and the pinner of the pouring in subsequent step can be avoided to be moved.
On the basis of technique scheme, the present invention can also do following improvement.
Further, in described step 2, the height of jack jack up girder is 0.5cm-1.0cm.
The beneficial effect of above-mentioned further scheme is adopted to be: beam body jacking 0.5cm-1.0cm is avoided the too high secondary injury to beam body of jack-up.
Further, the angle steel in described step 3 can be connected with beam body by crab-bolt having the position of construction space.
Adopt the beneficial effect of above-mentioned further scheme to be: the position of stationary wedge steel plate, be moved in the process avoiding wedge-shaped steel plate to operate in construction and later stage bridge.
Further, in described step 4, the height of the pinner of laminated rubber bearing deducts rear plan by the height of former pot bearing and adopts the height of laminated rubber bearing and the height of wedge shape leveling bloom to determine.
The beneficial effect of above-mentioned further scheme is adopted to be: to ensure to change pot bearing and complete the height of back rest body and collimation does not change on original basis.
Further, the pinner of described laminated rubber bearing adopts epoxy concrete pouring to form.
Adopt the beneficial effect of above-mentioned further scheme to be: epoxy concrete hardness is large, and wear-resisting, cost performance is high, use epoxy concrete effectively can improve the application life of pinner.
Accompanying drawing explanation
Fig. 1 is a kind of flow chart increasing the method for pier section replacing pot bearing of the present invention;
The schematic diagram of the spacing angle steel of leveling wedge shape bloom that Fig. 2 increases pier section replacing pot bearing method for the present invention is a kind of uses;
Fig. 3 is that a kind of pier section that increases of the present invention is changed the method for pot bearing and to have been constructed the superstructure schematic diagram of rear abutment.
In accompanying drawing, the list of parts representated by each label is as follows:
1, former pier stud, 2, pier stud augmenting portion, 3, angle steel, 4, wedge-shaped steel plate, 5, crab-bolt, 6, pinner, 7, laminated rubber bearing, 8, spacer bars, 9, steel form.
Detailed description of the invention
Be described principle of the present invention and feature below in conjunction with accompanying drawing, example, only for explaining the present invention, is not intended to limit scope of the present invention.
As shown in Figure 1, a kind of method increasing pier section replacing pot bearing of the present invention, comprises the following steps:
Step one S01, pier top section is increased within the scope of the pier top certain altitude of original pier stud 1, the pier stud augmenting portion 2 of Dun Ding is increased by the method for bar planting, concreting, pre-buried spacer bars 8 in pier stud augmenting portion, described spacer bars 8 part is inserted in described pier stud augmenting portion, a part stretches out the upper surface of described pier stud augmenting portion, is moved for avoiding the pinner 6 of the pouring in subsequent step;
Step 2 S02, the pier top plane of the pier stud augmenting portion 2 after increasing section places jack, by beam body jacking 0.5cm-1.0cm, then takes out jack with steel cushion block temporary support beam body;
Step 3 S03, removes the pot bearing of Dun Ding, the bottom surface of leveling beam body, and at the bottom surface concrete of beam body in conjunction with glue wedge-shaped steel plate 4, and fix spacing with angle steel 3 around, angle steel 3 can be connected with beam body by crab-bolt 5 having the position of construction space;
Step 4 S04, deducting rear plan by the height of former pot bearing adopts the height of laminated rubber bearing and the height of wedge shape leveling bloom to determine the height of the pinner 6 of laminated rubber bearing 7, utilize steel form 9 pairs of pinner 6 limit types, and adopt epoxy concrete to build pinner 6;
Step 5 S05, the position being provided with pot rubber bearing at Dun Dingyuan is set up in parallel two laminated rubber bearings 7, described two laminated rubber bearings 7 lay respectively at the both sides of the center line of former pot bearing, and the center line of two former pot bearings of laminated rubber bearing 7 is symmetrical, hold up beam body about jack, remove the steel cushion block of temporary support, fall beam, remove jack, complete replacing.
The present invention has following advantage compared to prior art:
(1) do not need newly to set up temporary support girder, save economical and construct simple.
(2) beam body only needs jack-up about 0.5cm to take out former pot bearing, avoids the too high secondary injury to beam body of jack-up.
(3) bearing all has certain service life, and after being replaced by laminated rubber bearing, next time is changed simply very convenient again, directly utilizes the Dun Ding after increasing to be supporting surface jack-up beam body 0.5cm and easily can replace laminated rubber bearing.
(4) without the need to suspending traffic, facilitating vehicle to occur, greatly reducing social influence and indirectly adding economic benefit; Owing to being to bridge pier but not beam body carries out increasing section reinforcing, on bridge, vehicle is current negligible to newly-increased concrete disturbance; The top lifting height of beam body also only 0.5cm own, can construct completely under the prerequisite be open to traffic.
(5) better economy, and the more economy of the longer number of bridge and benefit better.
(6) minimum to the injury of original structure, whole construction technology further increases the supporting capacity of respective members.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (4)

1. increase the method that pier section changes pot bearing, it is characterized in that, comprise the following steps:
Step one, pier top section is increased by the method for bar planting, concreting within the scope of the certain altitude of pier top, the pre-buried spacer bars of pier stud augmenting portion of Dun Ding, a described spacer bars part is inserted in described pier stud augmenting portion, and a part stretches out the upper surface of described pier stud augmenting portion;
Step 2, the pier top plane after increasing section places jack jack up girder, then takes out jack with steel cushion block temporary support beam body;
Step 3, removes the pot bearing of Dun Ding, the bottom surface of leveling beam body, at the bottom surface concrete of beam body in conjunction with glue wedge-shaped steel plate, and fixes spacing around with angle steel;
Step 4, builds the pinner of laminated rubber bearing in pier top casting;
Step 5, the position being provided with pot rubber bearing at Dun Dingyuan is set up in parallel two laminated rubber bearings, and jack holds up beam body, and remove the steel cushion block of temporary support, fall beam, removes jack, completes replacing.
2. a kind of method increasing pier section replacing pot bearing according to claim 1, it is characterized in that, in described step 2, the height of jack jack up girder is 0.5cm-1.0cm.
3. a kind of pier section that increases according to claim 1 changes the method for pot bearing, it is characterized in that, the angle steel in described step 3 is connected with beam body by crab-bolt there being the position of construction space.
4. a kind of method increasing pier section replacing pot bearing according to claim 1, is characterized in that, the pinner of described laminated rubber bearing adopts epoxy concrete pouring to form.
CN201310398029.5A 2013-09-04 2013-09-04 A kind of method increasing pier section replacing pot bearing Active CN103437304B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310398029.5A CN103437304B (en) 2013-09-04 2013-09-04 A kind of method increasing pier section replacing pot bearing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310398029.5A CN103437304B (en) 2013-09-04 2013-09-04 A kind of method increasing pier section replacing pot bearing

Publications (2)

Publication Number Publication Date
CN103437304A CN103437304A (en) 2013-12-11
CN103437304B true CN103437304B (en) 2016-04-13

Family

ID=49691013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310398029.5A Active CN103437304B (en) 2013-09-04 2013-09-04 A kind of method increasing pier section replacing pot bearing

Country Status (1)

Country Link
CN (1) CN103437304B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677687A (en) * 2018-07-02 2018-10-19 中铁工程设计咨询集团有限公司 Bent cap, bridge pier, bridge and the bridge assembling constructing method of prefabrication and assembly construction bridge pier
CN109629461A (en) * 2019-01-14 2019-04-16 中交公局第六工程有限公司 A method of it does not break off a friendship and carries out cast-in-situ box girder reset and bearing replacement
CN110158490A (en) * 2019-06-04 2019-08-23 中铁九局集团第七工程有限公司 Continuous beam synchronization of jacking up construction
CN110468725B (en) * 2019-08-30 2021-05-07 中铁六局集团太原铁路建设有限公司 Rear mounting construction method for side pier support of swivel bridge
CN114086485B (en) * 2021-12-30 2024-04-23 中铁大桥局武汉桥梁特种技术有限公司 Construction method for replacing large-span high-speed rail continuous beam support

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10252016A (en) * 1997-03-14 1998-09-22 Oriental Constr Co Ltd Method for replacing bearing device
CN201553992U (en) * 2009-12-17 2010-08-18 杭州市市政工程集团有限公司 Device for jacking whole body of box girder
CN101906754A (en) * 2010-07-09 2010-12-08 清华大学 Rigid connection method for steel beam and concrete pier
CN102518050A (en) * 2011-12-29 2012-06-27 江苏华通工程检测有限公司 Operation platform for replacing support saddle of bridge
CN102605722A (en) * 2012-03-23 2012-07-25 陈兴冲 Method for seismic reinforcement of pier by the aid of reinforced concrete cover
KR101214531B1 (en) * 2012-11-12 2013-01-09 (주)우암건설 A lifting apparatus of upper structure of bridge and lifting method of upper structure of bridge by using

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10252016A (en) * 1997-03-14 1998-09-22 Oriental Constr Co Ltd Method for replacing bearing device
CN201553992U (en) * 2009-12-17 2010-08-18 杭州市市政工程集团有限公司 Device for jacking whole body of box girder
CN101906754A (en) * 2010-07-09 2010-12-08 清华大学 Rigid connection method for steel beam and concrete pier
CN102518050A (en) * 2011-12-29 2012-06-27 江苏华通工程检测有限公司 Operation platform for replacing support saddle of bridge
CN102605722A (en) * 2012-03-23 2012-07-25 陈兴冲 Method for seismic reinforcement of pier by the aid of reinforced concrete cover
KR101214531B1 (en) * 2012-11-12 2013-01-09 (주)우암건설 A lifting apparatus of upper structure of bridge and lifting method of upper structure of bridge by using

Also Published As

Publication number Publication date
CN103437304A (en) 2013-12-11

Similar Documents

Publication Publication Date Title
CN103437304B (en) A kind of method increasing pier section replacing pot bearing
CN204125899U (en) A kind of long piled wharf super large framed bent cast-in-situ pile cap bed die support system
CN108678417B (en) Steel construction floor reforms transform node
CN106894346B (en) A kind of the continuous beam bridge construction method
CN104153284A (en) Partial filling type steel box concrete continuous composite girder bridge and construction method thereof
CN202954299U (en) Template support structure for large-angle V-shaped pier and No.0 block of continuous rigid framework bridge
CN103966947B (en) A kind of anti-fall girder apparatus based on bridge beam body damping
CN107988924B (en) Steel-concrete composite girder bridge system conversion system and conversion method based on old bridge reconstruction
CN201722615U (en) Spanning type construction system with large-span box girder
CN205242238U (en) Be applied to self anchored suspension bridge's main girder structure
CN105568786A (en) Suspended monorail transit bottom plate overhung combined box type rail beam suspending system
CN108221711A (en) Across existing railway Business Line freely-supported tied arch pushing tow flat turn and high-order fall girder apparatus
CN105369745A (en) Bridge support exchanging and lifting reaction frame
CN106988228A (en) Prestressed concrete continuous beam girder construction process
CN106978783B (en) Hanging basket for pouring inclined web type continuous beam cantilever
CN203096603U (en) Support structure for bridge with cross slope
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN112030755A (en) Method for installing combined section of inward-inclined arch rib and arch center of steel arch bridge
CN104612031A (en) Reinforced concrete continuous rigid frame arch bridge and construction method
CN109056438B (en) Construction method for transformation of urban elevated ramp
CN103835238A (en) High-pier cable-stayed bridge zero-number block non-bracket construction method and structure in construction process
CN104294752A (en) Hollow slab bridge structure with end floor beams and construction method thereof
CN103410104B (en) The bearing replacement method and apparatus of overhead road of city
CN104131514B (en) A kind of plate girder bracket and construction method
CN204139066U (en) A kind of plate girder bracket, construction bracket and construction Hanging Basket

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Rui

Inventor after: Zhou Minghui

Inventor after: Zhou Kewen

Inventor after: Rui Baodong

Inventor before: Zhou Minghui

Inventor before: Zhang Rui

Inventor before: Zhou Kewen

Inventor before: Rui Baodong

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant