CN103395688B - Method for hoisting self-release vertical upright rod and special lifting tool - Google Patents

Method for hoisting self-release vertical upright rod and special lifting tool Download PDF

Info

Publication number
CN103395688B
CN103395688B CN201310365217.8A CN201310365217A CN103395688B CN 103395688 B CN103395688 B CN 103395688B CN 201310365217 A CN201310365217 A CN 201310365217A CN 103395688 B CN103395688 B CN 103395688B
Authority
CN
China
Prior art keywords
steady arm
pulley
special
suspension hook
snap close
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310365217.8A
Other languages
Chinese (zh)
Other versions
CN103395688A (en
Inventor
李建海
冯玉普
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEJIAN ELECTRIC POWER SUPPLY Co OF STATE GRID HEBEI ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
HEJIAN ELECTRIC POWER SUPPLY Co OF STATE GRID HEBEI ELECTRIC POWER Co
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEJIAN ELECTRIC POWER SUPPLY Co OF STATE GRID HEBEI ELECTRIC POWER Co, State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical HEJIAN ELECTRIC POWER SUPPLY Co OF STATE GRID HEBEI ELECTRIC POWER Co
Priority to CN201310365217.8A priority Critical patent/CN103395688B/en
Publication of CN103395688A publication Critical patent/CN103395688A/en
Application granted granted Critical
Publication of CN103395688B publication Critical patent/CN103395688B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention relates to a method for hoisting a self-release vertical upright rod and a special lifting tool, and belongs to the technical field of electrical network construction. The special lifting tool comprises a positioner (6), a special suspension cable (1), a suspension hook, a pulley release (5), a release rope (3) and a lock catch (4); the pulley release consists of a pulley and a suspension ring connected together; each of the two ends of the special suspension cable is provided with a cable sleeve (8); the two ends of the suspension cable are put together to form a double suspension cable; the double suspension cable is connected with the cable sleeve via the lock catch; one end of the release rope is connected with the lock catch, and the other end of the release rope traverses the pulley of the pulley release; and the suspension ring of the pulley release is hung on the suspension hook. The hoisting method and the special lifting tool have the benefits of being low in risk, without need for manual rod-climbing release, safe, reliable, fast in rod erecting, reduced in processes of rod-climbing release, rod erecting, rod-position recalibration and the like, reduced by at least half time, high in quality, vertical in rod positioning, convenient to measure and calibrate, and improved in construction quality.

Description

Automatic trip vertical posts hanging method and special hanger
Technical field
The present invention relates to a kind of automatic trip vertical posts hanging method and special hanger, belong to technical field of electrical network construction.
Background technology
In electrical network construction, vertical posts adopts individual wire rope sling, and during pole erecting, electric pole can not vertically erect, and must enter bar hole at a slant, and electric pole stands well also to be needed longitudinally, laterally to calibrate centering by manpower, and steel wire loop also needs manually to step on bar and trips.There is following problem in background technology: security risk is large, separates sling and need manually step on bar operation, the dangerous point such as there is falling from high altitude, the bar that falls is hurted sb.'s feelings; Vertical rod length consuming time, exist step on that bar is triped, shaft vertically, recalibrate time-consuming link such as 3, bar position etc.; Construction quality is low, and shaft tilts in the vertical again process in position, and shaft can be made camber line along bar base and roll, and unavoidably cross travel occurs, bar position easily occurs relatively large deviation.
Summary of the invention
The object of the invention is to provide a kind of automatic trip vertical posts hanging method and special hanger, replaces individual wire rope sling, suspension rod vertical rod, vertical suspension rod can be realized, accurately enter position, not step on bar and trip, and safe and reliable, simple to operate, of many uses, solve the problems referred to above existed in background technology.
The technical scheme of invention is: automatic trip vertical posts special hanger for hoisting, comprise steady arm, Special sling, suspension hook, pulley buckle release, thread off and restrict and snap close, link together pulley and suspension ring of pulley buckle release are formed, steady arm is cylindric, flexible internal diameter and head of the mast external diameter match, on the excircle of steady arm, 60 degree, interval is provided with two grommets, Special sling is first through a grommet on steady arm, hang over again on suspension hook, and then through another grommet on steady arm, the two ends of Special sling are provided with noose, the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable and noose are linked together by snap close, one end of dropout rope connects snap close, the other end is through the pulley of pulley buckle release, the suspension ring of pulley buckle release also hang on suspension hook.
Described steady arm is circumferentially provided with multiple dowel bolt, positions the head of the mast; Steady arm is also provided with baffle plate, prevents electric pole from passing steady arm.
Automatic trip vertical posts hanging method, above-mentioned special hanger is used to carry out, comprise following steps: 1. steady arm is arranged on the head of the mast, by Special sling through two grommets on steady arm, and the hoist cable between two grommets is hung on suspension hook, the two ends of Special sling are provided with noose, and the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable is linked together by snap close with noose after not walking around electric pole; 2. hang on suspension hook by the suspension ring of pulley buckle release, the one end of rope of threading off connects snap close, and the other end is through the pulley of pulley buckle release; 3. lift by crane suspension hook, Special sling becomes the triangle of change, pull-up electric pole, and leg-of-mutton three summits are steady arm, snap close and suspension hook respectively, and along with standing up of electric pole, the extended line of leg-of-mutton suspension hook summit gradually to steady arm, snap close two summit is close; When electric pole is to vertical position, steady arm, snap close and suspension hook are point-blank; 4. after electric pole location, back fill, rope of threading off is pulled on ground, snap close and Special sling are moved along electric pole to the head of the mast, rise suspension hook simultaneously, snap close, Special sling depart from from the head of the mast together with steady arm, steady arm, snap close, Special sling put back to ground with pulley buckle release with suspension hook, do not need to step on bar and trip, and realize separating rope on ground and thread off.
Described steady arm is circumferentially provided with multiple dowel bolt, positions the head of the mast; Steady arm is also provided with baffle plate, and whole steady arm is cap sequence, is buckled in the head of the mast.
Steady arm of the present invention is arranged on the head of the mast when using, and for the angle of fixing Special sling and electric pole, keeps plumbness after electric pole is sling; Special sling is not that isometrical rod-type or taper rod-type limit by electric pole, can live shaft by lock ring safely and reliably, ensures, in suspension rod process, slippage pole collapse accident does not occur.Pulley buckle release and steady arm, Special sling is ingenious coordinates, and realizes separating rope on ground and threads off.
Beneficial effect of the present invention is: risk is low, does not need manually to step on bar and trips, safe and reliable; Vertical rod is fast, reduces links such as stepping on bar is triped, shaft vertical, recalibration bar position, at least saves the time of half; Quality is high, and shaft vertically enters position, is convenient to Measurement and calibration, improves construction quality.
The each parts of the present invention are all by more than 10 tons force design, and rural power grids 15 meters and following electric pole weight are all less than 3 tons, and safety factor is high.Special sling adopts duplex type to overlap the design of single claim-reduction, adds the contact surface of Special sling and shaft, can banding electric pole more firmly.Dropout rope nylon rope, is carried out on ground by pulley buckle release, at utmost reduces the risk of operating personal.Steady arm uses the round steel welding of 8mm plate iron and φ 16, and pot galvanize process, has good durability.Steady arm of the present invention has dowel bolt, can adapt to the cement pole of different-diameter, can be used for the electric pole Overhaul site of most of rural power grids engineering concrete bar camp site and rural area distribution, Applicable scope is very large.
Accompanying drawing explanation
Fig. 1 is embodiment of the present invention special hanger schematic diagram;
Fig. 2 is embodiment of the present invention steady arm schematic diagram;
Fig. 3 is embodiment of the present invention steady arm, snap close, Special sling, suspension hook, pulley buckle release, dropout rope are interconnected schematic diagram;
Fig. 4 is that the embodiment of the present invention threads off rope through pulley buckle release schematic diagram;
Fig. 5 is that embodiment of the present invention hoisting electric pole is to vertical schematic diagram;
Fig. 6 is that the embodiment of the present invention pulls rear, steady arm disengaging electric pole schematic diagram of restricting of threading off;
In figure: Special sling 1, baffle plate 2, dropout rope 3, snap close 4, pulley buckle release 5, steady arm 6, grommet 7, noose 8, dowel bolt 9, suspension hook 10, electric pole 11.
Detailed description of the invention
The present invention will be further described by the following examples.
Automatic trip vertical posts special hanger for hoisting, comprise steady arm 6, Special sling 1, suspension hook, pulley buckle release 5, dropout rope 3 and snap close 4, link together pulley and suspension ring of pulley buckle release are formed, steady arm is cylindric, flexible internal diameter and head of the mast external diameter match, on the excircle of steady arm, 60 degree, interval is provided with two grommets 7, Special sling is first through a grommet on steady arm, hang over again on suspension hook, and then through another grommet on steady arm, the two ends of Special sling are provided with noose 8, the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable and noose are linked together by snap close, one end of dropout rope connects snap close, the other end is through the pulley of pulley buckle release, the suspension ring of pulley buckle release also hang on suspension hook.
Described steady arm is circumferentially provided with multiple dowel bolt 9, positions the head of the mast; Steady arm is also provided with baffle plate 2, prevents electric pole from passing steady arm.
Automatic trip vertical posts hanging method, above-mentioned special hanger is used to carry out, comprise following steps: 1. steady arm is arranged on the head of the mast, by Special sling through two grommets on steady arm, and the hoist cable between two grommets is hung on suspension hook, the two ends of Special sling are provided with noose, and the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable is linked together by snap close with noose after not walking around electric pole; 2. hang on suspension hook by the suspension ring of pulley buckle release, the one end of rope of threading off connects snap close, and the other end is through the pulley of pulley buckle release; 3. lift by crane suspension hook, Special sling becomes the triangle of change, pull-up electric pole, and leg-of-mutton three summits are steady arm, snap close and suspension hook respectively, and along with standing up of electric pole, the extended line of leg-of-mutton suspension hook summit gradually to steady arm, snap close two summit is close; When electric pole is to vertical position, steady arm, snap close and suspension hook are point-blank; 4. after electric pole location, back fill, rope of threading off is pulled on ground, snap close and Special sling are moved along electric pole to the head of the mast, rise suspension hook simultaneously, snap close, Special sling depart from from the head of the mast together with steady arm, steady arm, snap close, Special sling put back to ground with pulley buckle release with suspension hook, do not need to step on bar and trip, and realize separating rope on ground and thread off.
Described steady arm is circumferentially provided with multiple dowel bolt, positions the head of the mast; Steady arm is also provided with baffle plate, and whole steady arm is cap sequence, is buckled in the head of the mast.
Steady arm of the present invention is arranged on the head of the mast when using, and for the angle of fixing Special sling and electric pole, keeps plumbness after electric pole is sling; Special sling is not that isometrical rod-type or taper rod-type limit by electric pole, can live shaft by lock ring safely and reliably, ensures, in suspension rod process, slippage pole collapse accident does not occur.Pulley buckle release and steady arm, Special sling is ingenious coordinates, and realizes separating rope on ground and threads off.
Beneficial effect of the present invention is: risk is low, does not need manually to step on bar and trips, safe and reliable; Vertical rod is fast, reduces links such as stepping on bar is triped, shaft vertical, recalibration bar position, at least saves the time of half; Quality is high, and shaft vertically enters position, is convenient to Measurement and calibration, improves construction quality.

Claims (4)

1. an automatic trip vertical posts special hanger for hoisting, it is characterized in that comprising steady arm (6), Special sling (1), suspension hook, pulley buckle release (5), dropout rope (3) and snap close (4), pulley buckle release is made up of link together pulley and suspension ring, steady arm is cylindric, internal diameter and the head of the mast external diameter of cylinder match, on the excircle of steady arm, 60 degree, interval is provided with two grommets (7), Special sling is first through a grommet on steady arm, hang over again on suspension hook, and then through another grommet on steady arm, the two ends of Special sling are provided with noose (8), the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable and noose are linked together by snap close, one end of dropout rope connects snap close, the other end is through the pulley of pulley buckle release, the suspension ring of pulley buckle release also hang on suspension hook.
2. automatic trip vertical posts special hanger for hoisting according to claim 1, is characterized in that: described steady arm is circumferentially provided with multiple dowel bolt (9), positions the head of the mast; Steady arm is also provided with baffle plate (2), prevents electric pole from passing steady arm.
3. an automatic trip vertical posts hanging method, the special hanger using claim 1 to limit carries out, it is characterized in that comprising following steps: 1. steady arm is arranged on the head of the mast, by Special sling through two grommets on steady arm, and the hoist cable between two grommets is hung on suspension hook, the two ends of Special sling are provided with noose, and the two ends of Special sling are combined becomes bifilar hoist cable, bifilar hoist cable is linked together by snap close with noose after not walking around electric pole; 2. hang on suspension hook by the suspension ring of pulley buckle release, the one end of rope of threading off connects snap close, and the other end is through the pulley of pulley buckle release; 3. lift by crane suspension hook, Special sling becomes the triangle of change, pull-up electric pole, and leg-of-mutton three summits are steady arm, snap close and suspension hook respectively, and along with standing up of electric pole, the extended line of leg-of-mutton suspension hook summit gradually to steady arm, snap close two summit is close; When electric pole is to vertical position, steady arm, snap close and suspension hook are point-blank; 4. after electric pole location, back fill, rope of threading off is pulled on ground, snap close and Special sling are moved along electric pole to the head of the mast, rise suspension hook simultaneously, snap close, Special sling depart from from the head of the mast together with steady arm, steady arm, snap close, Special sling put back to ground with pulley buckle release with suspension hook, do not need to step on bar and trip, and realize separating rope on ground and thread off.
4. automatic trip vertical posts hanging method according to claim 3, is characterized in that: described steady arm is circumferentially provided with multiple dowel bolt, positions the head of the mast; Steady arm is also provided with baffle plate, and whole steady arm is cap sequence, is buckled in the head of the mast.
CN201310365217.8A 2013-08-21 2013-08-21 Method for hoisting self-release vertical upright rod and special lifting tool Expired - Fee Related CN103395688B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310365217.8A CN103395688B (en) 2013-08-21 2013-08-21 Method for hoisting self-release vertical upright rod and special lifting tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310365217.8A CN103395688B (en) 2013-08-21 2013-08-21 Method for hoisting self-release vertical upright rod and special lifting tool

Publications (2)

Publication Number Publication Date
CN103395688A CN103395688A (en) 2013-11-20
CN103395688B true CN103395688B (en) 2015-04-01

Family

ID=49559489

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310365217.8A Expired - Fee Related CN103395688B (en) 2013-08-21 2013-08-21 Method for hoisting self-release vertical upright rod and special lifting tool

Country Status (1)

Country Link
CN (1) CN103395688B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105401778B (en) * 2015-11-20 2018-11-23 国网河北省电力有限公司沧州供电分公司 A kind of electric pole vertical posts construction suspender
CN105565145B (en) * 2016-02-25 2017-12-01 安徽科创智慧知识产权服务有限公司 The big part fast removal equipment of cylinder
CN107352381A (en) * 2017-09-05 2017-11-17 安徽晋煤中能化工股份有限公司 High-altitude solves rope device
CN107740630B (en) * 2017-10-17 2022-11-22 国网江苏省电力公司仪征市供电公司 Pole fixing base
CN113896088B (en) * 2021-09-01 2023-08-04 中国化学工程第三建设有限公司 Device and method for lifting spherical shell plate with column legs by single machine without ascending and unhooking

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2284193A (en) * 1993-11-24 1995-05-31 Peter Campbell Device for holding scaffolding poles
US6648570B2 (en) * 2001-06-15 2003-11-18 Progress Energy Carolinas, Inc. Lifting and installing streetlight poles
JP2008081305A (en) * 2006-09-29 2008-04-10 Takashi Fujimoto Long material vertically hanging apparatus
ES2396436T3 (en) * 2010-06-29 2013-02-21 Siemens Aktiengesellschaft Arrangement for raising a tower wall part of a wind turbine and method for raising a tower wall part of a wind turbine
JP5669645B2 (en) * 2011-03-29 2015-02-12 三機工業株式会社 Lightning rod removal method and lightning rod removal jig
CN203419672U (en) * 2013-08-21 2014-02-05 河间市电力局 Self-tripping-type sling special for lifting vertical standing rod

Also Published As

Publication number Publication date
CN103395688A (en) 2013-11-20

Similar Documents

Publication Publication Date Title
CN103395688B (en) Method for hoisting self-release vertical upright rod and special lifting tool
CN202346637U (en) Holding rod of double-flat-arm spinning self-lifting seat
CN103545751B (en) Overhead transmission line ground wire optical fiber cable fitting changes support
CN102359303A (en) Extra-high voltage common circuit iron tower assembling method
CN104480930B (en) A kind of filling pile cage of reinforcement hangs fixing construction method
CN207339088U (en) Transmission line of electricity straight line pole aerial earth wire overhauls stent
CN104261246A (en) Hoisting tool of rectangular pipe-jacking section and use method of hoisting tool
CN109095343A (en) Assembled hanger
CN204848091U (en) Steel sheet cross arm hoisting accessory
CN203461680U (en) Self-balancing hanger for nuclear power plant steel containment module
CN201334306Y (en) Hoisting machine for upright post member
CN202936092U (en) Lifting tool of wind power tower barrel
CN203419672U (en) Self-tripping-type sling special for lifting vertical standing rod
CN203998604U (en) The be threaded vertical reinforcement erecting equipment of form of employing
CN104037658B (en) Pendency glass insulator strings promotes system
CN104410009A (en) Climbing type steel wire rope ladder
CN204737645U (en) Hoisting accessory
CN204167793U (en) Straight line steel tube tower side, double loop cross-arm jig
CN201722053U (en) Hoisting mechanism used for upright column hoisting
CN204569140U (en) A kind of blower fan tower barrel erect Current Collector Sleave
CN210182910U (en) Simple insulator lifting device for concrete pole
CN204416900U (en) A kind of transformer bushing lifting device
CN210490268U (en) Line pole pylon air ground line hooking device
CN208916602U (en) Cement electric pole boom hoisting
CN201536236U (en) Bracket for hoisting heavy objects on object like an electrical pole

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CANGZHOU POWER SUPPLY BRANCH COMPANY, STATE GRID H

Effective date: 20141217

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: HEJIAN ELECTRICITY BOARD

Effective date: 20141217

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 062450 CANGZHOU, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20141217

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Cangzhou Power Supply Branch Company, State Grid Hebei Electric Power Company

Applicant after: State Grid Hebei Electric Power Company

Applicant after: HEJIAN ELECTRIC POWER SUPPLY COMPANY OF STATE GRID HEBEI ELECTRIC POWER COMPANY

Address before: 062450 No. 8 Shuguang Road, Hejian City, Hebei, Cangzhou

Applicant before: Hejian Power Electric Bureau

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150401

Termination date: 20160821