CN103388370A - Hanger stabilizing structure with oversized space in ceiling - Google Patents
Hanger stabilizing structure with oversized space in ceiling Download PDFInfo
- Publication number
- CN103388370A CN103388370A CN2013103148078A CN201310314807A CN103388370A CN 103388370 A CN103388370 A CN 103388370A CN 2013103148078 A CN2013103148078 A CN 2013103148078A CN 201310314807 A CN201310314807 A CN 201310314807A CN 103388370 A CN103388370 A CN 103388370A
- Authority
- CN
- China
- Prior art keywords
- kbg
- pipes
- screw mandrel
- furred ceiling
- hung
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a hanger stabilizing structure with oversized space in a ceiling. The hanger stabilizing structure comprises a screw rod (2) and a sheathing and buckling type thin-wall steel guide pipe (4), wherein the upper end of the screw rod (2) is fixedly arranged at the top surface of a slab, the screw rod (2) is sheathed with the sheathing and buckling type thin-wall steel guide pipe (4), and the two ends of the sheathing and buckling type thin-wall steel guide pipe (4) are fixedly arranged on the screw rod (2) through screw caps (3). The sheathing and buckling type thin-wall steel guide pipe (4) sheathed on the screw rod (2) is formed by connecting two or more than two sheathing and buckling type thin-wall steel guide pipe units, and the adjacent sheathing and buckling type thin-wall steel guide pipe units are butted through a joint (5) of the sheathing and buckling type thin-wall steel guide pipe. The hanger stabilizing structure has the advantages that the structure is stable; the component parts are cut by a numerical-control machine tool, and the welding is omitted, so the factory production of products is realized, the integration processing of the factory products is met, the convenience is realized during installation on site, and a large amount of time is saved during installation on site.
Description
Technical field
The present invention relates to space over dimensioning in a kind of furred ceiling and hang robust structure.
Background technology
The conventional anti-verticality that supports way can not be guaranteed, and sealing-off easily occurs in welding on zinc-plating material, take a lot of work and be unfavorable for the developing direction of decorative product, original technology can produce increases furred ceiling weight, the drawbacks such as the pollution while strengthening the stressed degree of expansion bolt and electric welding construction and potential safety hazard, also need the professional and technical personnel to construct in addition.
Summary of the invention
The objective of the invention is: provide space over dimensioning in a kind of furred ceiling to hang robust structure, its stabilized structure, and exempt welding, and can realize product batch production production, meet the integrated processing of factory products, convenient on-the-spot the installation, save field installation time.
Technical scheme of the present invention is: in a kind of furred ceiling, the space over dimensioning is hung robust structure, it comprises screw mandrel, KBG Pipes, the floor end face is fixed in described screw mandrel upper end, screw rod bushing is provided with KBG Pipes, and the two ends of KBG Pipes is fixed on screw mandrel by nut.
Below technique scheme is further expalined:
The sheathed KBG Pipes of described screw mandrel is connected and composed by two or more KBG Pipes unit, and adjacent KBG Pipes unit docks by the new joint of KBG Pipes.
The new joint of described KBG Pipes includes transverse joint section, dock by the KBG Pipes unit between the transverse joint section of the transverse joint section of a new joint of KBG Pipes and the adjacent new joint of another KBG Pipes, form firm network structure.
The new joint of described KBG Pipes is cross, and the four direction upper joint sleeve connects pressing type Steel Thin-Wall duct unit up and down.
The new joint of described KBG Pipes is " T " font, and left or up bottom right three direction upper joint sleeves in up and down connect pressing type Steel Thin-Wall duct unit.
The floor end face is fixed in by expansion bolt in described screw mandrel upper end.
Described screw mandrel is the solid screw mandrel of full tooth.
Advantage of the present invention is:
1, in furred ceiling of the present invention, the space over dimensioning is hung robust structure, and it utilizes the Digit Control Machine Tool cutting, exempts welding, can realize product batch production production, also meet the integrated processing of factory products, bring great convenience for on-the-spot the installation, for scene, install and save a large amount of time.
2, in furred ceiling of the present invention, the space over dimensioning is hung robust structure, the construction of use physical property, reduce the pollution to air to a certain extent, reaches the effect that environment-friendly and green is decorated, because element structure is simple, material price is lower, and difficulty of construction is low, and is applied widely, save the lost labors such as cutting steel, welding, save artificial, material, save thus cost, but spread uses.Simultaneously, reduce construction sequence, jointly construct in the time of can hanging muscle with making, accelerating construction progress.
3, in furred ceiling of the present invention, the space over dimensioning is hung robust structure, adopt joint style to efficiently solve space over dimensioning in furred ceiling and hang the firmness of firm technology and the problem of stability, guarantee simultaneously the perfect verticality of screw mandrel, meet design requirement, promoted the impression degree of decorative effect.
Description of drawings
The invention will be further described below in conjunction with drawings and Examples:
Fig. 1 is the structural representation of the embodiment of the present invention;
Fig. 2 is the schematic diagram of the new joint of cross KBG Pipes of the embodiment of the present invention;
Fig. 3 is the schematic diagram of the new joint of T font KBG Pipes of the embodiment of the present invention;
Fig. 4 is the fixing structural representation of the horizontal sleeve pipe of not establishing of the embodiment of the present invention;
Fig. 5 is the local detail structural representation of the embodiment of the present invention;
Wherein: 1 expansion bolt; 2 screw mandrels; 3 nuts; 4 KBG Pipes; The 5 new joints of KBG Pipes.
The specific embodiment
Embodiment: as shown in Figure 1, shown in Figure 5, in a kind of furred ceiling, the space over dimensioning is hung robust structure, it comprises screw mandrel 2, KBG Pipes 4, screw mandrel 2 is the solid screw mandrel of full tooth, the floor end face is fixed in by expansion bolt 1 in upper end, screw mandrel 2 is arranged with KBG Pipes 4, and the two ends of KBG Pipes 4 is fixed on screw mandrel 2 by nut 3.
The sheathed KBG Pipes 4 of screw mandrel 2 is connected and composed by two or more KBG Pipes unit, and adjacent KBG Pipes unit docks by the new joint 5 of KBG Pipes.
The new joint 5 of KBG Pipes has two kinds of forms as required.
As shown in Figure 2, the new joint 5 of a kind of KBG Pipes of form includes transverse joint section, dock by the KBG Pipes unit between the transverse joint section of the transverse joint section of a new joint 5 of KBG Pipes and the adjacent new joint 5 of another KBG Pipes, form firm network structure, the new joint 5 of KBG Pipes is cross, and the four direction upper joint sleeve connects pressing type Steel Thin-Wall duct unit up and down.
As shown in Figure 3, the new joint 5 of the KBG Pipes of another kind of form is " T " font, and three direction upper joint sleeves of left or up, up and down bottom right connect pressing type Steel Thin-Wall duct unit.This form can be exclusively used in the edge of hanging robust structure.
The processing of the present embodiment and installation comprise following main points:
1, make the length of screw mandrel 2 and KBG Pipes 4 according to furred ceiling absolute altitude back court.
2, be arranged on the end face floor and punch according to a position.
3, expansion bolt 1 and screw mandrel 2 assemblings are screwed in a nut 3, squeeze in floor opening and fixation.
4, adopt KBG Pipes 4 to be inserted in screw mandrel 2 from bottom to top, then be inserted in the new joint 5 of KBG Pipes, fixing of two ends, first up and down, transverse joint are docked fixing again with KBG Pipes 4, the networking stabilisation system is overlapped in formation one.
5, according to furred ceiling screw mandrel 2 length requirements (between 1.5~2m), can not set up horizontal sleeve pipe and fix, directly use a KBG Pipes with screw mandrel 2 length 4 fixing (nut 3 is used at the two ends, up and down).With reference to shown in Figure 4.
Should be pointed out that and also can have the embodiment of multiple conversion and remodeling for the present invention through proving absolutely, be not limited to above-mentioned specific embodiment.Above-described embodiment is as just explanation of the present invention, rather than limitation of the present invention.In a word, protection scope of the present invention should comprise those apparent conversion or alternative and remodeling to those skilled in the art.
Claims (7)
1. the interior space of a furred ceiling over dimensioning is hung robust structure, it is characterized in that: it comprises screw mandrel (2), KBG Pipes (4), the floor end face is fixed in described screw mandrel (2) upper end, screw mandrel (2) is arranged with KBG Pipes (4), and the two ends of KBG Pipes (4) is fixed on screw mandrel (2) by nut (3).
2. in furred ceiling according to claim 1, the space over dimensioning is hung robust structure, it is characterized in that: the sheathed KBG Pipes (4) of described screw mandrel (2) is connected and composed by two or more KBG Pipes unit, and adjacent KBG Pipes unit docks by the new joint of KBG Pipes (5).
3. in furred ceiling according to claim 2, the space over dimensioning is hung robust structure, it is characterized in that: the new joint of described KBG Pipes (5) includes transverse joint section, dock by the KBG Pipes unit between the transverse joint section of the transverse joint section of a new joint of KBG Pipes (5) and the adjacent new joint of another KBG Pipes (5), form firm network structure.
4. in furred ceiling according to claim 2, the space over dimensioning is hung robust structure, and it is characterized in that: the new joint of described KBG Pipes (5) is cross, and the four direction upper joint sleeve connects pressing type Steel Thin-Wall duct unit up and down.
5. in furred ceiling according to claim 2, the space over dimensioning is hung robust structure, it is characterized in that: the new joint of described KBG Pipes (5) is " T " font, and left or up bottom right three direction upper joint sleeves in up and down connect pressing type Steel Thin-Wall duct unit.
6. in furred ceiling according to claim 1, the space over dimensioning is hung robust structure, and it is characterized in that: the floor end face is fixed in by expansion bolt (1) in described screw mandrel (2) upper end.
7. in furred ceiling according to claim 1, the space over dimensioning is hung robust structure, and it is characterized in that: described screw mandrel (2) is the solid screw mandrel of full tooth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310314807.8A CN103388370B (en) | 2013-07-25 | 2013-07-25 | Space over dimensioning hanging robust structure in furred ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310314807.8A CN103388370B (en) | 2013-07-25 | 2013-07-25 | Space over dimensioning hanging robust structure in furred ceiling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103388370A true CN103388370A (en) | 2013-11-13 |
CN103388370B CN103388370B (en) | 2015-10-21 |
Family
ID=49532783
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310314807.8A Active CN103388370B (en) | 2013-07-25 | 2013-07-25 | Space over dimensioning hanging robust structure in furred ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103388370B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115233891A (en) * | 2022-07-28 | 2022-10-25 | 中建科工集团有限公司 | Support device and ceiling mounting method thereof |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1241863A (en) * | 1967-05-16 | 1971-08-04 | B Urzadzen Techniki Jadrowej | Improvements in or relating to suspended ceilings |
KR20090010031U (en) * | 2008-03-31 | 2009-10-06 | 주식회사 유 창 | structure of celing |
CN202611077U (en) * | 2012-06-11 | 2012-12-19 | 魏志鹏 | Light steel keel boom back supporting member |
CN202767323U (en) * | 2012-08-23 | 2013-03-06 | 南通市建筑装饰装璜有限公司 | Combined type back strut boom of decorative ceiling |
CN202936930U (en) * | 2012-12-07 | 2013-05-15 | 中建五局装饰幕墙有限公司 | Novel large-area suspended ceiling reverse supporting suspended ceiling |
CN203393887U (en) * | 2013-07-25 | 2014-01-15 | 苏州金螳螂建筑装饰股份有限公司 | Stable structure of interior spatial super-sized hanger in suspended ceiling |
-
2013
- 2013-07-25 CN CN201310314807.8A patent/CN103388370B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1241863A (en) * | 1967-05-16 | 1971-08-04 | B Urzadzen Techniki Jadrowej | Improvements in or relating to suspended ceilings |
KR20090010031U (en) * | 2008-03-31 | 2009-10-06 | 주식회사 유 창 | structure of celing |
CN202611077U (en) * | 2012-06-11 | 2012-12-19 | 魏志鹏 | Light steel keel boom back supporting member |
CN202767323U (en) * | 2012-08-23 | 2013-03-06 | 南通市建筑装饰装璜有限公司 | Combined type back strut boom of decorative ceiling |
CN202936930U (en) * | 2012-12-07 | 2013-05-15 | 中建五局装饰幕墙有限公司 | Novel large-area suspended ceiling reverse supporting suspended ceiling |
CN203393887U (en) * | 2013-07-25 | 2014-01-15 | 苏州金螳螂建筑装饰股份有限公司 | Stable structure of interior spatial super-sized hanger in suspended ceiling |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115233891A (en) * | 2022-07-28 | 2022-10-25 | 中建科工集团有限公司 | Support device and ceiling mounting method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103388370B (en) | 2015-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204602932U (en) | Multi-radian bending machine | |
MY188627A (en) | Trench box and method of assembly | |
CN204112715U (en) | A kind of U-shaped adjustable holder support and template support frame body | |
CN209195005U (en) | Aluminium frame wooden formwork structure at beam slab and column joint | |
CN103806650B (en) | A kind of steel column mould form of construction work | |
CN103388370A (en) | Hanger stabilizing structure with oversized space in ceiling | |
CN203741724U (en) | Anti-collision wall formwork system | |
CN203393887U (en) | Stable structure of interior spatial super-sized hanger in suspended ceiling | |
CN204899108U (en) | Node structure is hung futilely to marble | |
CN204402014U (en) | A kind of aluminum alloy mould plate system back cord | |
CN103835425A (en) | Suspended ceiling board installation adjustable device | |
CN203081321U (en) | Mechanical device capable of being used for carrying out ceiling drilling operations on ground | |
CN204623801U (en) | A kind of scaffold clamp | |
CN204475813U (en) | A kind of building operations height adjustable scaffold | |
CN203905254U (en) | Prefabricated installation structure for special-shaped sculpture modelling hung ceiling | |
CN205134635U (en) | Permanent stone that is full of fire prevention heat insulation structure | |
CN204676757U (en) | Suspended-ceiling suspension device | |
CN204487047U (en) | T profile group founds sectional fixture | |
CN103967188A (en) | Special-shaped sculpture modeling ceiling assembled type installation structure | |
CN202787964U (en) | Concrete structure drop plate angle steel tool type combined template | |
CN204343517U (en) | Aluminium sheet furred ceiling shrinkage joint node | |
CN204940770U (en) | A kind of dry-hang stone being applicable to low carrying metope | |
CN204160110U (en) | Stand and cut conduit jacking | |
CN205654084U (en) | Gypsum wall body mould | |
CN204081196U (en) | A kind of large discrepancy in elevation on-plane surface moulding ceiling structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |