CN103374884A - Reinforcement cage producing device and reinforcement cage producing method - Google Patents
Reinforcement cage producing device and reinforcement cage producing method Download PDFInfo
- Publication number
- CN103374884A CN103374884A CN2012101168443A CN201210116844A CN103374884A CN 103374884 A CN103374884 A CN 103374884A CN 2012101168443 A CN2012101168443 A CN 2012101168443A CN 201210116844 A CN201210116844 A CN 201210116844A CN 103374884 A CN103374884 A CN 103374884A
- Authority
- CN
- China
- Prior art keywords
- reinforcing cage
- half support
- support
- lower half
- fabrication
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Reinforcement Elements For Buildings (AREA)
- Wire Processing (AREA)
Abstract
The invention provides a reinforcement cage producing device. The reinforcement cage producing device comprises a support consisting of an upper half and a lower half, the upper half is movably mounted on the lower half, the size of the outer peripheral surface of the upper half is equal to that of the inner peripheral surface of the lower half, and clamping positions used for supporting main reinforcements of a reinforcement cage are arranged on the support and located on the outer peripheral surface of the upper half and the inner peripheral surface of the lower half. The reinforcement cage producing device is simple in structure, the reinforcement cage can be produced only by two-three persons, the main reinforcements can be well ensured to be straight and evenly spaced, and accordingly the reinforcement cage is less prone to deformation, and working efficiency is improved. The invention further provides a reinforcement cage producing method applying the reinforcement cage producing device.
Description
Technical field
The present invention relates to a kind of fabrication of reinforcing cage device and fabrication of reinforcing cage method.
Background technology
At present, in the work progress of the engineerings such as highway, railway, bridge, need to use the reinforcing cage of a large amount of different sizes and shape.Existing fabrication of reinforcing cage method is difficult to guarantee that the spacing of main reinforcement is even, and while main reinforcement difficulty reaches straight, thereby causes the reinforcing cage distortion.In addition, these methods need more personnel operation usually, and labour intensity is large, and production efficiency is low.
Summary of the invention
The object of the present invention is to provide a kind of fabrication of reinforcing cage device, this apparatus structure is simple, only needs 2-3 people just can carry out fabrication of steel reinforcement cage, and can guarantee well that main muscle is straight and spacing is even, thereby so that reinforcing cage is not yielding, improved operating efficiency.
To achieve these goals, fabrication of reinforcing cage device of the present invention comprises support, described support comprises first half support and Lower Half support, described first half support is movably arranged on the described Lower Half support, the size of the size of described first half support outer peripheral face and described Lower Half support inner peripheral surface equates, be useful on the screens of rest reinforcing cage master muscle on the described support, described screens is positioned at the outer peripheral face of described first half support and the inner peripheral surface of described Lower Half support.
Described support can be circle or rectangle, also can be other shape.
Described screens for rest reinforcing cage master muscle can be projection, also can be groove.
The present invention also provides a kind of method that said apparatus is made reinforcing cage of using.At first lay said apparatus according to required length of reinforcing cage interval, make each Lower Half support vertical plate face and reinforcing cage longitudinal centre line keep vertical, and institute standoff vertical plate face center point-blank.Place the Lower Half support of device by above-mentioned requirements after, part reinforcing cage master muscle is placed in the screens of described Lower Half support, makes all main muscle all parallel with support vertical plate face center line.Next, reinforcing rib vertically is placed on the main muscle that has placed firm welding.Then, first half support is installed on the Lower Half support.The main muscle of residue is placed in the screens of first half support, with them and reinforcing rib firm welding.After all contact point welding firmly between main muscle and the reinforcing rib, fabrication of steel reinforcement cage has just been finished.
By above technical scheme as can be known, fabrication of reinforcing cage device provided by the invention and fabrication of reinforcing cage method can be rapidly and accurately fixedly main muscle and the reinforcing rib of reinforcing cage, guaranteed that reinforcing cage master muscle is straight and spacing is even, therefore the reinforcing cage of making is not yielding, and only need 2-3 people just can carry out fabrication of steel reinforcement cage, improved operating efficiency.
Description of drawings
Fig. 1 is fabrication of reinforcing cage apparatus structure schematic diagram of the present invention;
The fabrication of reinforcing cage device of Fig. 2 first embodiment of the invention and reinforcing cage master muscle, reinforcing rib position relationship schematic diagram;
Fig. 3 is the fabrication of reinforcing cage device sectional drawing of first embodiment of the invention, first half support is shown is installed on the Lower Half support in the mode that overlaps;
Fig. 4 is the fabrication of reinforcing cage device front elevation drawing of second embodiment of the invention, and the state that first half support separates with the Lower Half support is shown.
The specific embodiment
The invention will be further described below in conjunction with the drawings and specific embodiments.
The first embodiment
As an example of circular support example first embodiment of the invention is described.As shown in Figure 1, the support of fabrication of reinforcing cage device 1 comprises Lower Half support 2 and first half support 3, and wherein Lower Half support 2 is supported on operating location by base 1 or miscellaneous part.As shown in Figure 3, first half support 3 is installed on the Lower Half support 2 in the mode of overlap joint, there is respectively a card division 7 at the two ends at first half support 3 maximum open places, the two ends at Lower Half support 2 maximum open places are respectively equipped with a draw-in groove 8 corresponding with the card division at two ends, first half support 3 maximum open place, draw-in groove 8 seals away from that side of carriage center, can prevent that like this card division 7 from moving to left and right directions in that draw-in groove 8 is interior, simultaneously former and later two sidewalls of draw-in groove 8 can prevent the movement of card division 7 on fore-and-aft direction, thereby so that first half support 3 firmly be installed on the Lower Half support 2.Be provided with the screens 4 for rest reinforcing cage master muscle 5 on the inner peripheral surface of Lower Half support 2, be useful on the screens 4 of rest reinforcing cage master muscle 5 on the outer peripheral face of first half support 3, the size of the size of each first half support 3 outer peripheral face and Lower Half support 2 inner peripheral surfaces equals the size of reinforcing cage.Distance between the screens 4 equates that the spacing between the screens 4 can arrange enough littlely, when the reinforcing cage master muscle spacing of making during greater than the spacing of two screens 4, places main muscle every 1 or several screens and gets final product.
The screens that is used for rest reinforcing cage master muscle can be projection, for example is welded on the bar dowel on first half support 3 outer peripheral faces and Lower Half support 2 inner peripheral surfaces, also can be groove.
The lower semi-circular support 2 of fabrication of reinforcing cage device can be made by steel plate or by concrete.For the convenience that mounts and dismounts, upper semi-circle support 3 is made by steel plate usually.
When making reinforcing cage, at first lay Lower Half support 2 according to the length of required reinforcing cage, make the vertical plate face of each Lower Half support 2 keep vertical with the reinforcing cage longitudinal centre line, and institute standoff vertical plate face center point-blank.Next, place reinforcing cage master muscle 5 in the screens 4 of Lower Half support 2, make every main muscle all parallel with the vertical plate face line of centres of support.Then, vertically be placed on reinforcing cage reinforcing rib 6 on the main muscle 5 that has placed and firm welding.Afterwards, upper semi-circle support 3 is installed on the lower semi-circular support 2, and places reinforcing cage master muscle in the screens 4 of upper semi-circle support 3, with these main muscle and reinforcing rib firm welding.
After fabrication of reinforcing cage is finished, at first with 3 dismountings of first half support, then the reinforcing cage of making can be unloaded down from device and be transported to the job location.
The second embodiment
The structure of the fabrication of reinforcing cage device 1 of second embodiment of the invention is substantially identical with the first embodiment, and difference is that first half support 3 is installed on the Lower Half support 2 in the bolt mode.As shown in Figure 4, on the card division 7 at the two ends, maximum open place of first half support 3 keyhole 9 is arranged respectively, on the draw-in groove 8 front and back sidewalls at the two ends, maximum open place of Lower Half support 2 keyhole 9 is arranged also accordingly, when card division 7 was positioned at draw-in groove 8, the keyhole on the keyhole on the card division 7 and the draw-in groove 8 front and back sidewalls overlapped.During mounting bracket, at first the card division 7 with first half support 3 places in the draw-in groove 8 of Lower Half support 2, passes keyhole with bolt or other likes again and moves to prevent first half support 3, thereby first half support 3 firmly is installed on the Lower Half support 2.
Fabrication of reinforcing cage apparatus and method provided by the invention can be used for making difform reinforcing cage.
Claims (8)
1. fabrication of reinforcing cage device, it is characterized in that, comprise support, described support comprises first half support and Lower Half support, described first half support is movably arranged on the described Lower Half support, the size of the size of described first half support outer peripheral face and described Lower Half support inner peripheral surface equates that be useful on the screens of rest reinforcing cage master muscle on the described support, described screens is positioned at the outer peripheral face of described first half support and the inner peripheral surface of described Lower Half support.
2. fabrication of reinforcing cage device according to claim 1, it is characterized in that, the two ends, maximum open place of described first half support are provided with the card division, the two ends, maximum open place of described Lower Half support are provided with the draw-in groove corresponding with described card division, and described draw-in groove seals away from that side of described carriage center.
3. fabrication of reinforcing cage device according to claim 1, it is characterized in that, the two ends, maximum open place of described first half support are provided with the card division, the two ends, maximum open place of described Lower Half support are provided with draw-in groove, be respectively equipped with keyhole on the front and back sidewall of described card division and described draw-in groove, described keyhole overlapped when described card division was positioned at described draw-in groove.
4. fabrication of reinforcing cage device according to claim 1 is characterized in that, described support is circular.
5. fabrication of reinforcing cage device according to claim 1 is characterized in that, described support is rectangle.
6. each described fabrication of reinforcing cage device is characterized in that described screens is projection according to claim 1-3.
7. each described fabrication of reinforcing cage device is characterized in that described screens is groove according to claim 1-3.
8. the method that application rights requires each described fabrication of reinforcing cage device of 1-5 to make reinforcing cage is characterized in that, comprises the following steps:
Lay described Lower Half support according to the length interval of required reinforcing cage, make the vertical plate face of each described Lower Half support keep vertical with described reinforcing cage longitudinal centre line, and the vertical plate face center of all described supports point-blank;
The described reinforcing cage master of part muscle is placed in the described screens of described Lower Half support, and described reinforcing cage master muscle is parallel with the line of centres of the vertical plate face of each described support;
Reinforcing rib vertically is placed on the main muscle that has placed firm welding;
Described first half support is installed on the described Lower Half support, the described reinforcing cage master muscle of residue is placed in the described screens of described first half support, with described residue described reinforcing cage master muscle and described reinforcing rib firm welding.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210116844.3A CN103374884B (en) | 2012-04-19 | 2012-04-19 | Reinforcement cage producing device and reinforcement cage producing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210116844.3A CN103374884B (en) | 2012-04-19 | 2012-04-19 | Reinforcement cage producing device and reinforcement cage producing method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103374884A true CN103374884A (en) | 2013-10-30 |
CN103374884B CN103374884B (en) | 2015-06-24 |
Family
ID=49460687
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210116844.3A Expired - Fee Related CN103374884B (en) | 2012-04-19 | 2012-04-19 | Reinforcement cage producing device and reinforcement cage producing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103374884B (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09316826A (en) * | 1996-05-31 | 1997-12-09 | Fujisen Kyoryo Doboku Kk | Supporting member for reinforcing bar assembling |
KR20060004145A (en) * | 2004-07-08 | 2006-01-12 | 동방엔지니어링 주식회사 | A steel processing machinery |
CN101200874A (en) * | 2007-12-19 | 2008-06-18 | 中铁二局股份有限公司 | Box-beam steel bar centralized tying and integral hoisting construction method |
CN101343948A (en) * | 2008-08-26 | 2009-01-14 | 天津市高速公路投资建设发展公司 | Prefabricated casket beam reinforced bar binding stand and reinforced bar binding method using the same |
CN201268846Y (en) * | 2008-09-22 | 2009-07-08 | 中冶天工建设有限公司 | Clamping fixture for manufacturing reinforced concrete filling pile major diameter reinforcement cage |
CN201722627U (en) * | 2010-07-07 | 2011-01-26 | 中铁四局集团第一工程有限公司 | Assembled adjustable support for reinforcing bar binding fixture |
CN201873988U (en) * | 2010-12-13 | 2011-06-22 | 中铁九局集团第二工程有限公司 | Drilled pile reinforcing cage mould |
CN201998323U (en) * | 2011-03-11 | 2011-10-05 | 中铁二十五局集团建筑安装工程有限公司 | Reinforcing steel bar binding jig for precast box beam bottom web plates |
CN202194126U (en) * | 2011-09-02 | 2012-04-18 | 中铁上海工程局第一工程有限公司 | Fixture for reinforcement cages of bored piles |
CN202509485U (en) * | 2012-04-19 | 2012-10-31 | 北京鑫畅路桥建设有限公司 | Reinforcement cage production device |
-
2012
- 2012-04-19 CN CN201210116844.3A patent/CN103374884B/en not_active Expired - Fee Related
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09316826A (en) * | 1996-05-31 | 1997-12-09 | Fujisen Kyoryo Doboku Kk | Supporting member for reinforcing bar assembling |
KR20060004145A (en) * | 2004-07-08 | 2006-01-12 | 동방엔지니어링 주식회사 | A steel processing machinery |
CN101200874A (en) * | 2007-12-19 | 2008-06-18 | 中铁二局股份有限公司 | Box-beam steel bar centralized tying and integral hoisting construction method |
CN101343948A (en) * | 2008-08-26 | 2009-01-14 | 天津市高速公路投资建设发展公司 | Prefabricated casket beam reinforced bar binding stand and reinforced bar binding method using the same |
CN201268846Y (en) * | 2008-09-22 | 2009-07-08 | 中冶天工建设有限公司 | Clamping fixture for manufacturing reinforced concrete filling pile major diameter reinforcement cage |
CN201722627U (en) * | 2010-07-07 | 2011-01-26 | 中铁四局集团第一工程有限公司 | Assembled adjustable support for reinforcing bar binding fixture |
CN201873988U (en) * | 2010-12-13 | 2011-06-22 | 中铁九局集团第二工程有限公司 | Drilled pile reinforcing cage mould |
CN201998323U (en) * | 2011-03-11 | 2011-10-05 | 中铁二十五局集团建筑安装工程有限公司 | Reinforcing steel bar binding jig for precast box beam bottom web plates |
CN202194126U (en) * | 2011-09-02 | 2012-04-18 | 中铁上海工程局第一工程有限公司 | Fixture for reinforcement cages of bored piles |
CN202509485U (en) * | 2012-04-19 | 2012-10-31 | 北京鑫畅路桥建设有限公司 | Reinforcement cage production device |
Also Published As
Publication number | Publication date |
---|---|
CN103374884B (en) | 2015-06-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201324922Y (en) | Adjustable box-girder welding and assembling device | |
CN202509485U (en) | Reinforcement cage production device | |
CN104908149A (en) | Template system of magnetic-levitation linear track beam and application method | |
CN104493020B (en) | The shaping stirrup thrust unit of square steel reinforcement cage forming machine | |
CN103331540A (en) | Clamping tool for welding rectangular guardrail tubes and suspension loops of medical bed | |
CN202861693U (en) | H section steel assembled machine | |
CN203292751U (en) | Clamping tool for welding guard rail rectangular tubes and hanging lugs on medical bed | |
CN109317911A (en) | A kind of cross column welding production line | |
CN207888146U (en) | A kind of universal evaporator fin turnover device | |
CN104723459A (en) | Die assembling and disassembling device for concrete prefabricated panel production line | |
CN103612051B (en) | Weighbridge gantry welding robot system | |
CN103374884A (en) | Reinforcement cage producing device and reinforcement cage producing method | |
CN203738289U (en) | Welding fixture for lower plate of bogie side beam | |
CN202499382U (en) | Vehicle door assembly station appliance | |
CN206812425U (en) | A kind of multifunctional composite bending forming machine | |
CN104550574A (en) | Supporting and adjusting device for main rib of stirrup box of reinforcement framework machine | |
CN204276755U (en) | The shaping stirrup pushing mechanism of square steel reinforcement cage forming machine | |
CN209850217U (en) | Grid steel frame processor | |
CN203448920U (en) | Welding fixture for accumulation chain straight rail | |
CN104646573A (en) | Adjustable fixing and locking device for end longitudinal bars of reinforcing bar framework machine | |
CN204470896U (en) | Silo support welding tooling | |
CN104308219B (en) | A kind of drilling equipment of rail | |
CN104646572B (en) | Automatic support device for formed framework of reinforcing bar framework machine | |
CN203237762U (en) | Four-layer slab preassemblinga for fiberboard production line | |
CN205086151U (en) | Vertical beam mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150624 Termination date: 20210419 |
|
CF01 | Termination of patent right due to non-payment of annual fee |