CN103363259B - Mounting base, installation foundation system and spiral bin machine make unit - Google Patents

Mounting base, installation foundation system and spiral bin machine make unit Download PDF

Info

Publication number
CN103363259B
CN103363259B CN201310281954.XA CN201310281954A CN103363259B CN 103363259 B CN103363259 B CN 103363259B CN 201310281954 A CN201310281954 A CN 201310281954A CN 103363259 B CN103363259 B CN 103363259B
Authority
CN
China
Prior art keywords
base unit
base
support post
mounting
mounting base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310281954.XA
Other languages
Chinese (zh)
Other versions
CN103363259A (en
Inventor
周翔
叶哲阳
邓侃
吴友勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA POWER INDUSTRY INTERNET Co.,Ltd.
Original Assignee
CHONGQING SANYI HIGH INTELLIGENT ROBOT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING SANYI HIGH INTELLIGENT ROBOT Co Ltd filed Critical CHONGQING SANYI HIGH INTELLIGENT ROBOT Co Ltd
Priority to CN201310281954.XA priority Critical patent/CN103363259B/en
Publication of CN103363259A publication Critical patent/CN103363259A/en
Application granted granted Critical
Publication of CN103363259B publication Critical patent/CN103363259B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C37/00Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape
    • B21C37/06Manufacture of metal sheets, bars, wire, tubes or like semi-manufactured products, not otherwise provided for; Manufacture of tubes of special shape of tubes or metal hoses; Combined procedures for making tubes, e.g. for making multi-wall tubes
    • B21C37/12Making tubes or metal hoses with helically arranged seams

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)
  • Foundations (AREA)

Abstract

The present invention discloses a kind of mounting base, installation foundation system and spiral bin machine and makes unit.Disclosed mounting base for the manufacture of spiral bin body, the multiple base units comprising multiple pressing plate and be disposed in order along loop wire; Two adjacent base units are hinged and connected by the vertical hinging shaft extended; Two adjacent base units are removably fixedly linked by pressing plate described at least one.Like this, during erection support, the lower end of support post and corresponding base unit are fixed multiple base unit just can be made to keep fixing; And then it is crooked or move position to reduce the support post be fixed on base unit; Reduce the degreeof tortuosity of the mounting bracket that sinking of ground causes; Avoid or reduce the displacement of support post, and then good prerequisite can be provided for the non-deformability improving mounting bracket, ensure mounting bracket non-deformability and adaptive while, avoid the installation period of mounting bracket long and manufacture the high cost of spiral bin body.

Description

Mounting base, installation foundation system and spiral bin machine make unit
Technical field
The present invention relates to the manufacturing equipment of spiral silo, in particular to a kind of mounting base for the manufacture of spiral bin body, also relate to a kind of installation foundation system comprising the manufacture spiral bin body of this mounting base and the spiral bin machine comprising this installation foundation system makes unit.
Background technique
Spiral silo comprises the storehouse body of tubular, and storehouse body can be rotated along predetermined helix and be engaged by roll bending and be formed.Please refer to Fig. 1, this figure is the principle schematic that roll bending forms storehouse body.Roll bending 110 rotates in a spiral manner, forms neighbouring multiple spirals.In figure, spiral 111 and spiral 112 neighbouring, and the lower side of spiral 111 is engaged with the upper side edge of spiral 112 and is connected, and forms the limit that is connected.More spiral order is connected and can forms the storehouse body of the cylindrical shape with predetermined altitude, and this storehouse body can be called spiral bin body, and this spiral bin body forms a longitudinal center line.In the fabrication process, the height of spiral bin body can reach tens meters.
Current, spiral bin body generally can utilize spiral bin machine to make unit manufacture.Please refer to Fig. 2, this figure is the principle schematic that spiral bin machine makes that unit manufactures spiral bin body.Spiral bin machine makes unit can comprise uncoiler 210, forming machine 220 and bar folder 230.Roll bending 110 launches by uncoiler 210, and extends in a predetermined direction.Forming machine 220 can bend the upper side edge of roll bending 110 and lower side, makes the upper side edge of roll bending 110 and lower side form corresponding flanging.Bar folder 230 can bend the top flanging of downside of spiral 111 and the flanging of the upside of below spiral 112; Make the top flanging of downside of spiral 111 and the fold occlusal of the upside of below spiral 112 form the limit that is connected, make roll bending 110 be rolled into the spiral bin body of tubular.In order to guide roll bending 110 along predetermined route spiral motion, also arrange mounting bracket, mounting bracket forms the movable basis parts of roll bending 110.
Please refer to Fig. 3, this figure is the structural representation of known a kind of mounting bracket; For the ease of public understanding, in figure, also show bar folder and the linkage structure between bar folder and mounting bracket.This mounting bracket comprises multiple support post 310 and multiple connecting frame 320.The distance layout that multiple support post 310 is predetermined around predetermined circle interval.Two support posts 310, between adjacent two support posts 310, couple together by connecting frame 320; Bar folder 230 is also between two support posts 310 simultaneously, and is connected with the support post 310 of both sides by suitable connecting rod; Like this, multiple support post 310, multiple connecting frame 320 and bar folder 230 just surround an annulus.Support post 310 comprises vertical rod and support roller, and vertical rod supports on the ground, and support roller is arranged in vertical rod, can support and guide roll bending 110 along predetermined spiral motion.
In manufacture spiral bin body process, heavier and keep motion state based on spiral bin body, and then cause the stressed more complicated of mounting bracket, and then cause mounting bracket easily to produce distortion.The first, the crooked meeting of support post 310 causes mounting bracket crooked; The second, the sinking of ground at the support post 310 place annulus distortion that mounting bracket can be caused to be formed; Three, the annulus circularity that support post 310 displacement can cause mounting bracket to be formed reduces.Mounting bracket produces distortion directly affects the shaping and formed precision of spiral bin body, reduces the stability of strutting system of spiral bin body simultaneously, and then causes adverse effect to the perpendicularity of spiral bin body.
In order to reduce the distortion of mounting bracket, can support post 310 be fixed on concrete foundation, to reduce or to avoid support post 310 crooked or sagging; But the installation period that concrete foundation can extend mounting bracket is set, improves spiral bin body manufacture cost.
In addition, multiple connecting rod can also be passed through, make multiple support post 310 all be positioned at above-mentioned annulus land and fix, form a radial bindiny mechanism, multiple support post 310 is made to keep relatively fixing, to avoid or to reduce the displacement of support post 310, but can not ensure that support post 310 is not crooked, mounting bracket still easily produces distortion; Importantly: when arranging above-mentioned radial bindiny mechanism, the length of connecting rod needs corresponding with the diameter of spiral bin body, and then when manufacturing the spiral bin body of different-diameter, needs to manufacture different radial bindiny mechanisms; Like this, the mounting bracket comprising this radial bindiny mechanism is just difficult to the spiral bin body adapting to manufacture different-diameter, and adaptability is poor.
For this reason, how ensure mounting bracket non-deformability and adaptive while, avoid the installation period of mounting bracket high cost that is long and that manufacture spiral bin body to be the technical barrier that current those skilled in the art need to solve.
Summary of the invention
Based on above-mentioned technical barrier, the invention provides a kind of mounting base for the manufacture of spiral bin body, utilize this mounting base, can ensure mounting bracket non-deformability and adaptive while, avoid the installation period of mounting bracket long and manufacture the high cost of spiral bin body.
On the basis providing above-mentioned mounting base, the present invention also provides a kind of installation foundation system comprising this mounting base.This installation foundation system not only has good non-deformability and stronger adaptability, can also shorten the installation period of installation foundation system, reduces the manufacture cost of spiral bin body.
The present invention also provides a kind of spiral bin machine comprising this installation foundation system to make unit.This spiral bin machine makes the quality that unit can ensure spiral bin body.
Mounting base provided by the invention is for the manufacture of spiral bin body, and the multiple base units comprising multiple pressing plate and be disposed in order along a loop wire;
Described base unit forms the bearing of trend microscler regulating tank vertical with described loop wire; Two adjacent base units are hinged and connected by the vertical hinging shaft extended;
Two adjacent base units are removably fixedly linked by pressing plate described at least one.
Optionally, two adjacent base units are connected respectively by the two ends of detachable mechanism with described pressing plate.
Optionally, two adjacent base units are connected respectively by the two ends of threaded piece with described pressing plate.
Optionally, the two ends of described pressing plate arrange microscler mounting hole respectively; Described threaded piece coordinates with the tapped hole of described base unit through described microscler mounting hole.
Optionally, in two adjacent base units, the circumferential fillet of a base unit is corresponding with the circumferential fillet of another base unit; In described circumferential fillet, near the one end at described loop wire center, there is hinged seat;
In two adjacent base units, a hinged seat of first base unit is hinged and connected by a hinged seat of described hinging shaft and second base unit.
Optionally, in described circumferential fillet, the one end away from described loop wire center also has hinged seat.
Optionally, described mounting base also comprises multiple levelling bolt; Each described base unit arranges the threaded adjusting through hole that multiple center line vertically extends; Described levelling bolt coordinates with described threaded adjusting through hole.
Installation foundation system provided by the invention, for the manufacture of spiral bin body, and comprises multiple support post and multiple connecting frame, also comprises any one mounting base above-mentioned; Described support post lower end supports and is fixed on a described base unit.
Optionally, the lower end of each described support post is fixed by detachable mechanism and a described base unit; Described support post is provided with buffer rail, and described buffer rail and described microscler regulating tank are slidably matched.
Optionally, described installation foundation system comprises multiple fastening adjustment mechanism, and each described fastening adjustment mechanism comprises fastening adjustment bar and locking fixed block; Described fastening adjustment bar is through described microscler regulating tank;
The lower end of described fastening adjustment bar is connected to form first with described locking fixed block and is connected, and described locking fixed block is connected on described base unit, and the upper end of described fastening adjustment bar is connected with the lower end of described support post, forms second and connects;
Among described first connection is connected with second, at least one is for being threaded.
Spiral bin machine provided by the invention makes unit and comprises bar folder, also comprise any one installation foundation system above-mentioned, described bar folder is fixedly linked by least two support posts of connecting rod and described installation foundation system, or is fixedly linked by the mounting base of connecting rod and described installation foundation system.
Provided by the invention for the manufacture of in the mounting base of spiral bin body, the multiple base units comprising multiple pressing plate and be disposed in order along loop wire (the large I of loop wire is determined according to the size of the spiral bin body manufactured); Two adjacent base units are hinged and connected by the vertical hinging shaft extended; Two adjacent base units are removably fixedly linked by pressing plate described at least one.Like this, during erection support, the lower end of support post and corresponding base unit are fixed multiple support post just can be made to keep fixing; Because adjacent two base units are fixedly linked by described pressing plate, the support post be fixed on base unit can be reduced crooked or move position; Keep fixing by pressing plate between multiple base unit, when a base unit has the trend moved down because supporting surface sink, other base unit can provide support power to this base unit, and then can reduce the degreeof tortuosity of the mounting bracket that sinking of ground causes; Equally, because multiple base unit forms the entirety that one has predetermined stiffness, can avoid or reduce the displacement of support post better, and then good prerequisite can be provided for the non-deformability improving mounting bracket.In addition, two adjacent base units are hinged and connected by the vertical hinging shaft extended, and two adjacent base units are removably fixedly linked by pressing plate; When mounted, according to manufacturing the needs of spiral bin body, the relative angle between base unit can be changed easily, and utilizes pressing plate to be fixed by adjacent two base units easily, then based on this mounting base erection support; Like this, do not need to arrange mattess specially again, and then the installation period of mounting bracket can be avoided long, and the high cost manufacturing spiral bin body can be avoided.Due to the relative angle by adjusting between base unit, mounting base just can be made to be applicable to manufacture the spiral bin body of different size, this mounting base may be used for manufacturing different spiral bin body, so also can provide prerequisite for the manufacture cost reducing spiral bin body.
In further technological scheme, the two ends of described pressing plate arrange microscler mounting hole respectively; Described threaded piece coordinates with the tapped hole of described base unit through described microscler mounting hole.Like this, relative angle between adjustment base unit, when making mounting base be applicable to the spiral bin body manufacturing different size, can by changing the relative position between threaded piece and microscler mounting hole, make pressing plate go for the needs of more kinds of situation, and then versatility and the adaptability of mounting base can be improved.
Further technological scheme is like this, and two adjacent base units are removably fixedly linked by least two described pressing plates.The join strength between base unit can be improved like this, improve mounting base integral rigidity, and then provide more stable installation foundation for mounting bracket.
In further technological scheme, in two adjacent base units, the circumferential fillet of a base unit is corresponding with the circumferential fillet of another base unit; In described circumferential fillet, near the one end at described loop wire center, there is hinged seat; In two adjacent base units, a hinged seat of first base unit is hinged and connected by a hinged seat of described hinging shaft and first base unit.Corresponding hinged seat is set, the installation of hinging shaft can be facilitated, and can provide convenient for the relative angle between adjustment base unit.In further technological scheme, in the circumferential fillet of described base unit, the one end away from described loop wire center has hinged seat.The two ends of circumference fillet all arrange hinged seat, and base unit can be made to have more kinds of mounting point, reduce in assembling process and select demand, facilitate the assembling of mounting base.
In further technological scheme, mounting base also comprises multiple levelling bolt; Each described base unit arranges the threaded adjusting through hole that multiple center line vertically extends; Described levelling bolt coordinates with described threaded adjusting through hole.By rotating levelling bolt, the contact position between mounting base and ground can be adjusted, and then make mounting base when Different Ground, mounting base be supported on the ground better, and then improve the adaptability of mounting base.
The installation foundation system provided, owing to comprising above-mentioned mounting base, not only has good non-deformability and stronger adaptability, can also shorten the assembling cycle of installation foundation system, reduces the manufacture cost of spiral bin body.
The spiral bin machine comprising above-mentioned installation foundation system provided makes the quality that unit can ensure spiral bin body.
Accompanying drawing explanation
Fig. 1 is the principle schematic that roll bending forms storehouse body;
Fig. 2 is the principle schematic that spiral bin machine makes that unit manufactures spiral bin body;
Fig. 3 is the structural representation of known a kind of mounting bracket; For the ease of public understanding, the bar folder also illustrated in figure and the linkage structure between bar folder and mounting bracket;
Fig. 4 provides mounting base overall structure schematic diagram for the embodiment of the present invention;
Fig. 5 illustrates the partially connected architecture that the embodiment of the present invention provides mounting base;
Fig. 6 illustrates the embodiment of the present invention to be provided in mounting base, the stereochemical structure of base unit;
Fig. 7 is I-I magnified partial view in Fig. 5;
The structural representation of the installation foundation system that Fig. 8 provides for the embodiment of the present invention;
The part-structure schematic diagram of the spiral bin machine making unit that Fig. 9 provides for the embodiment of the present invention.
In figure:
Roll bending 110, spiral 111, spiral 112;
Pressing plate 410, microscler mounting hole 411, base unit 420, microscler regulating tank 421, hinged seat 422, hinging shaft 401, threaded piece 402, levelling bolt 403;
Loop wire S, circumferential fillet SD;
Support post 310, connecting frame 320, connecting rod 301;
Uncoiler 210, forming machine 220, bar folder 230.
Embodiment
It should be noted that, when not conflicting, the embodiment in the present invention and the feature in embodiment can combine mutually.Below with reference to the accompanying drawings and describe technological scheme provided by the invention in detail in conjunction with the embodiments.
Please refer to Fig. 4, this figure is that the embodiment of the present invention provides mounting base overall structure schematic diagram.This mounting base may be used for manufacturing spiral bin body, for mounting bracket provides installation foundation.Multiple base units 420 that this mounting base comprises multiple pressing plate 410 and is disposed in order along loop wire S.The loop configuration body that multiple base units 420 shown in figure are formed is untight structure, according to actual needs, and the loop configuration body closed that multiple base unit 420 also can be formed.
In order to clear description and clear signal linkage structure, Fig. 5 illustrates the partially connected architecture that the embodiment of the present invention provides mounting base; Fig. 6 illustrates the stereochemical structure of base unit.Base unit 420 forms the bearing of trend microscler regulating tank 421 vertical with loop wire S; Adjacent two base units 420 are hinged and connected by the vertical hinging shaft 401 extended.In addition, two adjacent base units 420 are removably fixedly linked by least one pressing plate 410.
During erection support, the lower end of support post 310 can be made to be fixed by detachable mechanism and corresponding base unit 420.Because adjacent two base units 420 are removably fixedly linked by pressing plate 410, multiple base unit 420 keeps relatively fixing, and then it is crooked or move position to reduce the support post 310 be fixed on base unit 420; Keep fixing by pressing plate 410 between multiple base unit 420, when a base unit 420 has the trend moved down because supporting surface sink, other base unit 420 can provide support power to this base unit, and then can reduce the degreeof tortuosity of the mounting bracket that sinking of ground causes; Equally, because multiple base unit 420 forms the entirety that one has predetermined stiffness, can avoid or reduce the displacement of support post 310 better, and then good prerequisite can be provided for the non-deformability improving mounting bracket.In addition, adjacent two base units 420 are hinged and connected by the vertical hinging shaft 401 extended, and two adjacent base units 420 are removably fixedly linked by pressing plate 410; When mounted, according to manufacturing the needs of spiral bin body, the relative angle between base unit 420 can be changed easily, and utilizes pressing plate 410 to be fixed by adjacent two base units 420 easily, then based on this mounting base erection support; Like this, the adaptive capacity of mounting bracket to place can be improved, reduce the requirement to landing stiffness, not need to arrange mattess specially again, and then the installation period of mounting bracket can be avoided long, and the high cost manufacturing spiral bin body can be avoided.Due to the relative angle by adjusting between base unit 420, mounting base just can be made to be applicable to manufacture the spiral bin body of different size, this mounting base may be used for manufacturing different spiral bin body, so also can provide good prerequisite for the manufacture cost reducing spiral bin body.
In the present embodiment, the rectangle structure that base unit 420 adopts channel-section steel to surround; The material that base unit 420 adopts can be selected according to actual needs, can be round steel, angle steel, square steel or rod iron etc., and concrete formation is not limited to rectangular, also can be square, the structures such as arc.
Be appreciated that two adjacent base units 420 are removably fixing by pressing plate 410, have various ways, can make pressing plate 410 respectively with the clamping of two base units 420, snapping or frictional connection, etc.Pressing plate 410 unremovably can be connected with a base unit 420, is removably connected with another base unit 420, and two adjacent base units 420 can also be made to be connected respectively by the two ends of detachable mechanism with pressing plate 410.Detachable mechanism can be fixture or jig.
In the present embodiment, two adjacent base units 420 are connected respectively by the two ends of threaded piece 402 with pressing plate 410; By dismounting threaded piece, pressing plate 410 can be made to be separated with base unit 420, and then two base units 420 can be made to be separated.Please refer to Fig. 7, this figure is I-I magnified partial view in Fig. 5, the figure shows adjacent two base unit 420 linkage structures.In this embodiment, the two ends of pressing plate 410 arrange microscler mounting hole 411 respectively; Threaded piece 402 coordinates with the tapped hole of base unit 420 through microscler mounting hole 411.Like this, relative angle between adjustment base unit 420, when making mounting base be applicable to the spiral bin body manufacturing different size, threaded piece 402 can be made to slide along microscler mounting hole 411, by changing the relative position between threaded piece 402 and microscler mounting hole 411, make pressing plate 410 go for the needs of more kinds of situation, and then versatility and the adaptability of mounting base can be improved.
As shown in Figure 7, in the present embodiment, adjacent two base units 420 are removably fixedly linked by least two pressing plates 410; Two pressing plates 410 lay respectively at base unit 420 inner side and outer side part.The join strength between base unit 420 can be improved like this, improve mounting base integral rigidity, and then provide more stable installation foundation for mounting bracket.
Refer again to Fig. 6, if base unit 420 two limits (minor face) are circumferential fillet SD.In two adjacent base units 420, the circumferential fillet SD of a base unit 420 is corresponding with the circumferential fillet SD of another base unit 420.The invention provides in a kind of embodiment, in the circumferential fillet SD of base unit 420, near the one end at loop wire S center, there is hinged seat 422.Referring again to Fig. 7, in two adjacent base units 420, a hinged seat 422 of first base unit 420 is hinged and connected by a hinged seat 422 of hinging shaft 401 and first base unit 420.Corresponding hinged seat is set, the installation of hinging shaft 401 can be facilitated, and can provide convenient for the relative angle between adjustment base unit 420.In embodiment, hinging shaft 401 can also arrange draw ring, can the insertion of more convenient hinging shaft 401 and dial-out by draw ring.
Be appreciated that, in the circumferential fillet SD of base unit 420, the one end away from loop wire S center also can have hinged seat 422.Like this, the two ends of circumferential fillet SD all arrange hinged seat 422; When any long limit of base unit 420 is relative with the center of loop wire S, all can base unit 420 be hinged coordinates with other; Base unit 422 so just can be made to have more kinds of mounting point, reduce in mounting base assembling process and select demand, facilitate the assembling of mounting base.
Refer again to Fig. 6, in the mounting base that embodiment provides, also comprise multiple levelling bolt 403; Each base unit 420 arranges the threaded adjusting through hole that multiple center line vertically extends; Levelling bolt 403 coordinates with threaded adjusting through hole.In figure, base unit 420 arranges 6 threaded adjusting through holes, and is distributed on two long limits.When mounting base is arranged on predetermined ground, by rotating levelling bolt 403, the contact position between mounting base and ground can be adjusted, and then make mounting base can when Different Ground, mounting base is supported on the ground better, and then improves the adaptability of mounting base.
Please refer to Fig. 8, this figure is the structural representation of the installation foundation system that the embodiment of the present invention provides.The installation foundation system that this embodiment provides for the manufacture of spiral bin body, and can comprise known mounting bracket, namely comprises multiple support post 310 and multiple connecting frame 320; Connecting frame 320 can be connected between two adjacent support posts 310.Also comprise any one mounting base above-mentioned; Multiple support post 310 and base unit 420 one_to_one corresponding.Like this, the lower end of each support post 310 can be fixed by detachable mechanism and a base unit 420; And support post 310 is provided with buffer rail, and buffer rail and microscler regulating tank 421 are slidably matched; Detachable mechanism can be existing threaded piece, fixture or jig etc.Manufacturing the spiral bin body of different-diameter, when needing the position adjusting support post 310, detachable mechanism can be unclamped, buffer rail is slided along microscler regulating tank 421, change support post 310 relative to base unit 420(or mounting base) position be applicable to after, with detachable mechanism fixed support column 310 and base unit 420.Owing to comprising above-mentioned mounting base, installation foundation system not only has good non-deformability and stronger adaptability, can also shorten the assembling cycle of installation foundation system, reduces the manufacture cost of spiral bin body; Its principle repeats no more.In installation foundation system shown in Fig. 8, the ring structure surrounded has breach, and this breach may be used for installing known bar folder 230; In situation permission situation, installation foundation system can surround a closed ring structure.
In addition, support post 310 lower end supports and is fixed on a base unit 420 and is not limited in the above described manner.Installation foundation system also can comprise multiple fastening adjustment mechanism, and each described fastening adjustment mechanism can comprise fastening adjustment bar and locking fixed block.Fastening adjustment bar can be made through microscler regulating tank 421.Meanwhile, the lower end of fastening adjustment bar can be made to be connected to form first with locking fixed block and to be connected, and make locking fixed block be connected on base unit 420; Meanwhile, the upper end of fastening adjustment bar can be made to be connected with the lower end of support post 310, form second and connect.Wherein, first connect to be connected with second among can at least one for being threaded.Fastening adjustment mechanism can be bolt, and the screw rod of bolt forms fastening adjustment bar, and bolt head forms locking fixed block; One end of screw rod can with the lower end threaded engagement of support post 310.Fastening adjustment mechanism can be stud and nut, and stud forms fastening adjustment bar, and nut forms locking fixed block; Stud one end coordinates with nut screw, the lower end threaded engagement of the other end and support post 310; Now, fastening adjustment bar (screw rod or stud) plays the effect of being fastenedly connected on the one hand, is slidably matched on the other hand, plays the effect of buffer rail with microscler regulating tank 421).
Utilize above-mentioned fastening adjustment mechanism, when needing the position adjusting support post 310, can rotational fastener adjustable lever (screw rod or stud) or locking fixed block (nut), unclamp the clamping between locking fixed block and base unit 420, fastening adjustment bar is slided along microscler regulating tank 421, change support post 310 relative to base unit 420(or mounting base) position be applicable to after, the bar of counterrotating fastening adjustment again (screw rod or stud) or locking fixed block (nut), locking fixed block is made to be clamped on base unit 420, support post 310 and base unit 420 is kept to be fixedly linked.
Please refer to Fig. 9, this figure is the part-structure schematic diagram of the spiral bin machine making unit that the embodiment of the present invention provides.Spiral bin machine makes unit and comprises bar folder 230, also comprises above-mentioned installation foundation system, and bar folder 230 is fixedly linked by least two support posts 310 of connecting rod 301 with installation foundation system (being specially mounting bracket); Like this, installation foundation system and bar folder 230 form a rigid construction body; Certainly, bar folder 230 is also fixedly linked by the mounting base of connecting rod 301 with installation foundation system, specifically can be connected with two or more base units 420 of mounting base.Based on the specification and analysis of above-mentioned mounting base, the spiral bin machine comprising this mounting base makes the quality that unit can ensure spiral bin body.Be appreciated that in Fig. 9, mounting base also can be connected by suitable connecting rod with bar folder 230, to ensure that spiral bin machine makes the integral rigidity of unit.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (10)

1. a mounting base, for the manufacture of spiral bin body, it is characterized in that, the multiple base units (420) comprising multiple pressing plate (410) and be disposed in order along a loop wire (S), described multiple base unit (420) forms loop configuration body;
Described base unit (420) forms the bearing of trend microscler regulating tank (421) vertical with described loop wire (S); Two adjacent base units (420) are hinged and connected by the vertical hinging shaft (401) extended;
Two adjacent base units (420) are removably fixedly linked by pressing plate described at least one (410);
In two adjacent base units (420), the circumferential fillet (SD) of a base unit (420) and the circumferential fillet (SD) of another base unit (420) corresponding; In described circumferential fillet (SD), near the one end at described loop wire (S) center, there is hinged seat (422);
In two adjacent base units (420), a hinged seat (422) of first base unit (420) is hinged and connected by the hinged seat (422) of described hinging shaft (401) with second base unit (420).
2. mounting base according to claim 1, is characterized in that, two adjacent base units (420) are connected respectively by the two ends of detachable mechanism with described pressing plate (410).
3. mounting base according to claim 2, is characterized in that, two adjacent base units (420) are connected respectively by the two ends of threaded piece (402) with described pressing plate (410).
4. mounting base according to claim 3, is characterized in that, the two ends of described pressing plate (410) arrange microscler mounting hole (411) respectively; Described threaded piece (402) coordinates with the tapped hole of described base unit (420) through described microscler mounting hole (411).
5. mounting base according to claim 1, is characterized in that, in described circumferential fillet (SD), the one end away from described loop wire (S) center also has hinged seat (422).
6. mounting base according to claim 1, is characterized in that, also comprises multiple levelling bolt (403); Each described base unit (420) arranges the threaded adjusting through hole that multiple center line vertically extends; Described levelling bolt (403) coordinates with described threaded adjusting through hole.
7. an installation foundation system, for the manufacture of spiral bin body, comprises multiple support post (310) and multiple connecting frame (320), it is characterized in that, also comprises the mounting base of claim 1 to 6 described in any one; Described support post (310) lower end supports and is fixed on a described base unit (420).
8. installation foundation system according to claim 7, is characterized in that, the lower end of each described support post (310) is fixed by detachable mechanism and a described base unit (420); Described support post (310) is provided with buffer rail, and described buffer rail and described microscler regulating tank (421) are slidably matched.
9. installation foundation system according to claim 7, is characterized in that, comprises multiple fastening adjustment mechanism, and each described fastening adjustment mechanism comprises fastening adjustment bar and locking fixed block; Described fastening adjustment bar is through described microscler regulating tank (421);
The lower end of described fastening adjustment bar is connected to form first with described locking fixed block and is connected, described locking fixed block is connected on described base unit (420), the upper end of described fastening adjustment bar is connected with the lower end of described support post (310), forms second and connects;
Among described first connection is connected with second, at least one is for being threaded.
10. a spiral bin machine makes unit, comprise bar folder (230), it is characterized in that, also comprise the installation foundation system described in claim 7,8 or 9, described bar folder (230) is fixedly linked by least two support posts (310) of connecting rod (301) with described installation foundation system, or is fixedly linked by the mounting base of connecting rod (301) with described installation foundation system.
CN201310281954.XA 2013-07-05 2013-07-05 Mounting base, installation foundation system and spiral bin machine make unit Active CN103363259B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310281954.XA CN103363259B (en) 2013-07-05 2013-07-05 Mounting base, installation foundation system and spiral bin machine make unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310281954.XA CN103363259B (en) 2013-07-05 2013-07-05 Mounting base, installation foundation system and spiral bin machine make unit

Publications (2)

Publication Number Publication Date
CN103363259A CN103363259A (en) 2013-10-23
CN103363259B true CN103363259B (en) 2016-01-20

Family

ID=49365229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310281954.XA Active CN103363259B (en) 2013-07-05 2013-07-05 Mounting base, installation foundation system and spiral bin machine make unit

Country Status (1)

Country Link
CN (1) CN103363259B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3380147A (en) * 1966-03-25 1968-04-30 Eldon O. Mcdonald Method of making a circular building structure
DE1959500A1 (en) * 1969-11-27 1971-06-03 Xaver Lipp Machine for producing a pipe with a large diameter, in particular a silo
US3863479A (en) * 1972-10-13 1975-02-04 Silo Verfahrens Ag Apparatus for the production of a tube
DE2529925B1 (en) * 1975-07-04 1976-12-02 Xaver Lipp Large diameter tube production - has machining stations suitable for different diameter tubes by means of swivelling roller pair
US4821501A (en) * 1986-08-08 1989-04-18 Xaver Lipp Suspension cable casing system
CN201625745U (en) * 2010-03-25 2010-11-10 吴新锋 Novel spiral type steel plate bin processing equipment
CN102330875A (en) * 2011-07-18 2012-01-25 无锡市中惠橡胶科技有限公司 Structure for installing base of rubber belt fatigue testing machine
AU2012205243A1 (en) * 2011-07-15 2013-01-31 Mr And Kl Jaeschke Pty Ltd A System for Manufacturing a Container

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3380147A (en) * 1966-03-25 1968-04-30 Eldon O. Mcdonald Method of making a circular building structure
DE1959500A1 (en) * 1969-11-27 1971-06-03 Xaver Lipp Machine for producing a pipe with a large diameter, in particular a silo
US3863479A (en) * 1972-10-13 1975-02-04 Silo Verfahrens Ag Apparatus for the production of a tube
DE2529925B1 (en) * 1975-07-04 1976-12-02 Xaver Lipp Large diameter tube production - has machining stations suitable for different diameter tubes by means of swivelling roller pair
US4821501A (en) * 1986-08-08 1989-04-18 Xaver Lipp Suspension cable casing system
CN201625745U (en) * 2010-03-25 2010-11-10 吴新锋 Novel spiral type steel plate bin processing equipment
AU2012205243A1 (en) * 2011-07-15 2013-01-31 Mr And Kl Jaeschke Pty Ltd A System for Manufacturing a Container
CN102330875A (en) * 2011-07-18 2012-01-25 无锡市中惠橡胶科技有限公司 Structure for installing base of rubber belt fatigue testing machine

Also Published As

Publication number Publication date
CN103363259A (en) 2013-10-23

Similar Documents

Publication Publication Date Title
CN111545962B (en) Welding auxiliary support of cold welding machine
CN202580510U (en) Mounting bracket of wireless scanning device
CN106584009A (en) Roller assembly auxiliary tool
CN102593765A (en) Cable head producing support
CN103363259B (en) Mounting base, installation foundation system and spiral bin machine make unit
CN109616965B (en) High-voltage cable support structure of cable tunnel
CN104806852A (en) Laser installing support frame
CN215484876U (en) Auxiliary frame for replacing connecting rod of bolt ball net rack
CN108612915A (en) A kind of tube support arrangement based on beam support
CN212301098U (en) Bending degree test structure of reinforcing bar bender for building
CN205496306U (en) Steel pipe roller straightening machine
CN211579467U (en) Electrodeless rotary high-voltage cable support
CN107516548A (en) A kind of micromotion platform with isolation cushion
CN209837464U (en) Large-area roof truss stress conversion layer
CN207735360U (en) A kind of Roller of Forming Unit of SSAW Pipe
CN105568416B (en) A kind of chemical fibre product drafting frame
CN103495948B (en) Conducting rod correcting and positioning mould
CN219521009U (en) Arch control device for solid-web superposed beams
CN208067633U (en) Temporary support system when arc column segmented is welded
CN215038747U (en) Embedded bolt positioning device for base of assembled wallboard
CN221321825U (en) Adjustable jig frame for manufacturing bending box body
CN221363465U (en) Clamp
CN219365481U (en) Elevation and verticality adjusting device for steel structure upright post
CN219654266U (en) T roof beam template with adjustable
CN219900757U (en) Welding frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20150923

Address after: 404100 Chongqing Yubei District City Longxing Zhen Ying Long Road No. 19

Applicant after: Chongqing Sanyi High Intelligent Robot Co., Ltd.

Address before: 410100 Changsha economic and Technological Development Zone, Hunan City, the 31 industrial city

Applicant before: Hunan Sany Intelligent Control Equipment Co., Ltd.

Applicant before: Chongqing Sanyi High Intelligent Robot Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20161013

Address after: 410205, Hunan Province, Yuelu District, Changsha Province, No. 39, Hill Road, China Central Power Software Park, room 1606-1607

Patentee after: Hunan auspicious Intelligent Machine Co.

Address before: 404100 Chongqing Yubei District City Longxing Zhen Ying Long Road No. 19

Patentee before: Chongqing Sanyi High Intelligent Robot Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210203

Address after: Room 802, building 10, phase I, Changsha Zhongdian Software Park, 39 Jianshan Road, Changsha hi tech Development Zone, Changsha City, Hunan Province, 410000

Patentee after: CHINA POWER INDUSTRY INTERNET Co.,Ltd.

Address before: Room 1606-1607, CLP Software Park, 39 Jianshan Road, Yuelu District, Changsha City, Hunan Province, 410205

Patentee before: HUNAN SHARING INTELLIGENT MACHINES Co.,Ltd.