CN103362508B - Mine development method - Google Patents

Mine development method Download PDF

Info

Publication number
CN103362508B
CN103362508B CN201310327667.8A CN201310327667A CN103362508B CN 103362508 B CN103362508 B CN 103362508B CN 201310327667 A CN201310327667 A CN 201310327667A CN 103362508 B CN103362508 B CN 103362508B
Authority
CN
China
Prior art keywords
work plane
track
haulage
roadway
eye
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310327667.8A
Other languages
Chinese (zh)
Other versions
CN103362508A (en
Inventor
艾德春
朱炳虎
郁钟铭
陈开学
刘永志
梁华杰
岳虎
杨军伟
陈才贤
汤铸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liupanshui Normal University
Original Assignee
Liupanshui Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liupanshui Normal University filed Critical Liupanshui Normal University
Priority to CN201310327667.8A priority Critical patent/CN103362508B/en
Publication of CN103362508A publication Critical patent/CN103362508A/en
Application granted granted Critical
Publication of CN103362508B publication Critical patent/CN103362508B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a min development method, and belongs to the field of mine roadway excavation technology. The method comprises the steps of developing an improved well transportation footrill and an improved well air-return footrill from the ground; then excavating an auxiliary cutting hole and a part of a cutting hole to form a ventilation circuit and a transportation system, preparing the cutting hole in advance; tunneling a work plane transportation roadway and a work plane rail roadway from the improved well transportation footrill and the improved well air-return footrill; tunneling the work plane transportation roadway and the work plane rail roadway after cross-measure cutting coal, wherein the work plane transportation roadway and the work plane rail roadway can be tunneled from two ends simultaneously so as to accelerate formation of a coal face circuit; and finally cutting through the cutting hole, the work plane transportation roadway and the work plane rail roadway. The mine development method can carry out recovery rapidly and realize production in advance.

Description

A kind of mine development method
Technical field
The present invention relates to a kind of mine development method, belong to extraction technique field, tunnel, ore deposit.
Background technology
Coal is one of important energy source of China, plays a part very important to the development of the national economy and development.At present in coal mine roadway developing, the mine laneway development method adopted is (for rice square-bottomed bamboo basket ore deposit, as Fig. 2), from ground driving transport, track and return air three inclined shafts, then dig haulage cross-cut, track crossdrift and track gallery, windstone gate respectively, after exposed coal three corresponding positions of inclined shaft, driving face haulage way and track gallery are to cutting eye place again, finally throughly cut eye, form coal-face, just can mine.But this traditional method is only after three corresponding positions of inclined shaft excavate haulage cross-cut, track crossdrift and track gallery, windstone gate, ability digging work face haulage way and track gallery, and work plane haulage way and track heading excessively slow, cause production time long for long i.e. investment cycle; And the resistance of ventilation and draining is large when operation, power supply and the distance supplied water, mining equiment is transported to the problems such as the time length of coal-face, causes the production efficiency in colliery and the reliability reduction of mine.
As from the foregoing, iff employing conventional well development method, then cause production time long, be therefore necessary to improve existing mine development method, realize going into operation in advance, to produce larger economic benefit.
Summary of the invention
For above-mentioned prior art Problems existing, the invention provides a kind of mine development method, there is the fireballing effect of developing, improve production efficiency and the reliability of mine.
To achieve these goals, the technical solution used in the present invention is: a kind of mine development method, digs haulage cross-cut, track crossdrift and track gallery, windstone gate respectively from return air inclined shaft, track inclined shaft and the corresponding position of transport inclined shaft; After exposed coal, driving face haulage way and work plane track gallery;
(1) from ground opening-up measure well haulage tunnel and service shaft return air footrill;
(2) excavate the auxiliary part of cutting eye and cutting eye, form ventilation circuit and transportation system;
(3) from service shaft haulage tunnel and service shaft return air drifting work plane haulage way and work plane track gallery;
(4) from driving face haulage way while of two ends, coal seam and work plane track gallery;
(5) through cut eye, work plane haulage way and work plane track gallery after, carry out back production.
Auxiliary cut eye and excavate when distance cuts eye 20 meters.
The invention has the beneficial effects as follows: (1) the inventive method also can not dig three corresponding positions of inclined shaft haulage cross-cut, track crossdrift and track gallery, windstone gate time, just can from service shaft haulage tunnel and service shaft return air footrill digging work face haulage way and track gallery; After excavating haulage cross-cut, track crossdrift and track gallery, windstone gate, two ends just can be tunneled simultaneously, this will greatly improve the driving speed of transport face gallery and track gallery, through work plane haulage way and track gallery can be shifted to an earlier date, realize going into operation in advance, going into operation for the former progress in rice square-bottomed bamboo basket colliery is 2 ~ 2.5 years, adopts development method of the present invention to realize just can going into operation for 1 ~ 1.5 year, be advanced by operation in 1 ~ 1.5 year, create huge economic benefit and social benefit.
(2) the service shaft haulage tunnel newly opened up and service shaft return air footrill are before operation, can be used for ventilating, assisting fortune coal, pedestrian, haulage device, auxiliary material transport, shorten equipment conveying and set-up time, travel time, alleviate the transport pressure of transport inclined shaft and track inclined shaft, can enhance productivity and namely add the economic benefit in colliery with mine reliability of operation.
(3) the service shaft haulage tunnel newly opened up and service shaft return air footrill can provide same function for the next one face of adopting, and preparing, realizing recycling for going into operation in advance; About there are 5 to adopt face for rice square-bottomed bamboo basket colliery, go into operation in advance, huge economic benefit can not only be produced, also save cost for 5 times that just can realize the face of adopting.
Accompanying drawing explanation
Fig. 1 is mining face arrangement figure of the present invention.
Fig. 2 is the mining face arrangement figure of conventional well roadway opening.
Wherein, 1, return air inclined shaft, 2, track inclined shaft, 3, transport inclined shaft, 4, windstone gate, 5, track crossdrift, 6 track gallerys, 7, haulage cross-cut, 8, air door, 9, work plane track gallery, 10, stop adopting line, 11, work plane haulage way, 12, eye is cut, 13, auxiliary cut eye, 14, service shaft haulage tunnel, 15, service shaft return air footrill, 16, coal seam.
Detailed description of the invention
Below in conjunction with accompanying drawing, the invention will be further described.
As shown in Figure 1, the present invention is first from ground developing return air inclined shaft 1, track inclined shaft 2 and transport inclined shaft 3, haulage cross-cut 7, track crossdrift 5 and track gallery 6, windstone gate 4 is dug respectively from the corresponding position of return air inclined shaft 1, track inclined shaft 2 and transport inclined shaft 3, after exposed coal, driving face haulage way 11 and work plane track gallery 9; Excavate service shaft haulage tunnel 14 and service shaft return air footrill 15 simultaneously, then excavate the auxiliary part of cutting eye 13 and cutting eye 12, form ventilation circuit and transportation system, prepare out in advance to cut eye 12; Now from service shaft haulage tunnel 14 and service shaft return air footrill 15 driving face haulage way 11 and work plane track gallery 9, so just can two ends simultaneously driving face haulage way 11 and work plane track gallery 9, accelerate the formation of adopting loop, face, finally through eye 12, work plane haulage way 11 and the work plane track gallery 9 cut just can carry out back production, realizes going into operation in advance.
Service shaft haulage tunnel 14 and service shaft return air footrill 15, before operation, can be used for ventilating, assisting fortune coal, pedestrian, haulage device, auxiliary material transport.Auxiliary cut the 20m place that eye 13 cuts eye 12 in distance and excavate.
Service shaft haulage tunnel 14 and service shaft return air footrill 15 can be gone into operation in advance for next one face of adopting and be provided same function.
Fig. 2 is the mining face arrangement figure of conventional well roadway opening, owing to tunneling transport, track and return air three inclined shafts from ground, then haulage cross-cut, track crossdrift and track gallery, windstone gate is dug respectively three corresponding positions of inclined shaft, after exposed coal, driving face haulage way and track gallery are to cutting eye place again, finally throughly cut eye, form coal-face, mine.But this traditional method is only after three corresponding positions of inclined shaft excavate haulage cross-cut, track crossdrift and track gallery, windstone gate, ability digging work face haulage way and track gallery, and work plane haulage way and track heading excessively slow, cause production time long for long i.e. investment cycle; And the resistance of ventilation and draining is large when operation, power supply and the distance supplied water, mining equiment is transported to the problems such as the time length of coal-face, causes the production efficiency in colliery and the reliability reduction of mine.

Claims (2)

1. a mine development method, digs haulage cross-cut, track crossdrift and track gallery, windstone gate respectively from return air inclined shaft, track inclined shaft and the corresponding position of transport inclined shaft; After exposed coal, driving face haulage way and work plane track gallery; It is characterized in that:
(1) from ground opening-up measure well haulage tunnel and service shaft return air footrill;
(2) excavate the auxiliary part of cutting eye and cutting eye, form ventilation circuit and transportation system;
(3) from service shaft haulage tunnel and service shaft return air drifting work plane haulage way and work plane track gallery;
(4) from crossdrift and service shaft driving face haulage way and work plane track gallery simultaneously;
(5) through cut eye, work plane haulage way and work plane track gallery after, carry out back production.
2. a kind of mine development method according to claim 1, is characterized in that, auxiliary cut eye and excavates when distance cuts eye 20 meters.
CN201310327667.8A 2013-07-31 2013-07-31 Mine development method Expired - Fee Related CN103362508B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310327667.8A CN103362508B (en) 2013-07-31 2013-07-31 Mine development method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310327667.8A CN103362508B (en) 2013-07-31 2013-07-31 Mine development method

Publications (2)

Publication Number Publication Date
CN103362508A CN103362508A (en) 2013-10-23
CN103362508B true CN103362508B (en) 2015-04-15

Family

ID=49364687

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310327667.8A Expired - Fee Related CN103362508B (en) 2013-07-31 2013-07-31 Mine development method

Country Status (1)

Country Link
CN (1) CN103362508B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594900A (en) * 2014-11-28 2015-05-06 贵州晨辉达矿业工程设计有限公司 Mining method with subsection tendency in moving direction
CN105156116B (en) * 2015-08-28 2017-09-12 贵州盘江精煤股份有限公司 A kind of stope of coal mines tunnel design and construction method
CN108843319B (en) * 2018-07-04 2019-11-05 长沙矿山研究院有限责任公司 The forming method of deep Development system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693668A (en) * 2005-06-17 2005-11-09 上海市隧道工程轨道交通设计研究院 Counter pulling method used in underground pipe culvert linear dark digging
CN101649741A (en) * 2009-05-27 2010-02-17 山西晋城无烟煤矿业集团有限责任公司 Laneway disposed by using large U to sleeve small u
CN101824997A (en) * 2010-03-25 2010-09-08 莫技 Arrangement method for double-uphill air return of mining areas of mine
CN102996131A (en) * 2012-12-10 2013-03-27 中国矿业大学 Solid-filling coal mining method with two pre-excavating tunnels for advancing

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU781313B2 (en) * 2000-05-19 2005-05-12 Eskom Mining method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1693668A (en) * 2005-06-17 2005-11-09 上海市隧道工程轨道交通设计研究院 Counter pulling method used in underground pipe culvert linear dark digging
CN101649741A (en) * 2009-05-27 2010-02-17 山西晋城无烟煤矿业集团有限责任公司 Laneway disposed by using large U to sleeve small u
CN101824997A (en) * 2010-03-25 2010-09-08 莫技 Arrangement method for double-uphill air return of mining areas of mine
CN102996131A (en) * 2012-12-10 2013-03-27 中国矿业大学 Solid-filling coal mining method with two pre-excavating tunnels for advancing

Also Published As

Publication number Publication date
CN103362508A (en) 2013-10-23

Similar Documents

Publication Publication Date Title
CN105240013B (en) Broadwall N00 engineering methods
CN105221179B (en) A kind of highly gassy mine Y type method of ventilations
CN104088643B (en) A kind of high-dipping point blank coal seam Sub-Level Caving coal-mining method
CN107882565B (en) A kind of adopt without driving without coal column stays integrated production practice
CN104481578B (en) A kind of high gas layer large-mining-height working surface mash gas harnessing method
CN103590830B (en) Open pit and underground space-time synchronous mining method for multiple-ore body
CN105089668A (en) Longwall working face coal-pillar-free mining method
CN109252860B (en) High-degree mechanical mining method for thin coal seam continuous mining machine
CN105736040A (en) Method for pumping and exhausting gas of coal beds in front of parallel adit and main cave by means of parallel adit drilling construction
CN103362508B (en) Mine development method
CN102086765A (en) High-sublevel multi-layer mining method of ultrathin copper ore body
CN204152537U (en) Retaining Roadways Along Goaf at Coal Face Z-type ventilation system
CN105401973A (en) Method for performing extraction treatment on corner gas on work faces of adjacent roadways
CN111396051A (en) Unmanned intelligent continuous mining continuous filling water-retaining coal mining method
CN103147759B (en) Prospecting and short-hole shrinkage mining method of small inclined ore body
CN105275487A (en) Long-arm mining N00 construction method ventilation system
CN103362514B (en) Speedy tunneling method for gas drainage roadway
WO2019109535A1 (en) Clean and efficient coal mining method
CN111997614B (en) Method for winding thin coal belt on forward fully-mechanized coal mining face
CN108843319B (en) The forming method of deep Development system
CN102979532B (en) A kind of assistance with hill road coordinates the development method of belt inclined shaft haulage
CN104832130B (en) Help residual coal gasification recovery method in opencut end
CN101338675A (en) Open-cast side shrouded beneficial mineral open well combined mining method
CN102787845B (en) Segmented construction method of extra-long tunnels by adopting development machines to construct inclined shafts and headings first
CN107237635B (en) A kind of thick solid potassium salt mine recovery method of spy for once adopting full thickness

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150415

Termination date: 20160731

CF01 Termination of patent right due to non-payment of annual fee